AG-0109-S-17-0005_HoonahBridges.pdf

PDF 1 MB Posted

Attached to
Bridge Remove/Repair/Replace - Hoonah, AK Federal contract opportunity
Solicitation number
AG-0109-S-17-0005
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Bridge Remove/Repair/Replace - Hoonah, AK, newest first.
File Type Posted
QUESTIONS_AND_ANSWERS-3.pdf PDF
Questions-Answers_AmendedSpec.pdf PDF
Attachment-3_LoadRatingRequirement.pdf PDF
Amendment_01.pdf PDF
Questions-Answers1.pdf PDF
Questions-Answers1.pdf PDF
Attachment-1_2017_Hoonah_Bridges_Signed_170222.pdf PDF
Attachment-2_Hoonah_Bridges_SuppSpecs.pdf PDF
Attachment-4_WageDeterminationAK7.pdf PDF
Attachment-5_Past_Performance_Worksheet.docx DOCX document
DRAFT_HoonahBridges_Drawings.pdf PDF
DRAFT_Hoonah_Bridges_SupplementalSpecs_170201.pdf PDF
DRAFT_StatementOfWork_HoonahBridges_170201.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

837124

ALASKA REGIONAL OFFICE

709 WEST 9TH STREET

JUNEAU AK 99802

Mari Meiners

USFS/Region 10/AQM See Section L for Mailing & Delivery Address

MARI MEINERS 907-586-8746

1x 03/25/2017

AG-0109-S-17-0005

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Project Title: Bridge Remove/Repair/Replace - Hoonah Alaska

Solicitation Number AG-0109-S-17-0005

Solicitation Date: 3/25/2017

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

5 503 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F.1

04/25/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)Page 1

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

ALASKA REGIONAL OFFICE

709 WEST 9TH STREET

JUNEAU AK 99802

MARI MEINERS

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 171

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-0109-S-17-0005

This requirement is for

Removal/Repair/Replacement of Bridges in Hoonah, Alaska.

Offers are due in accordance with Section L, Instructions for Delivery of Proposals not later than NOON on April 25, 2017.

Price range for this requirement is:

between $500,000 and $1,000,000 for the base and between $1,000,000 and $5,000,000 for the base and all options.

Contractor DUNS: _________________ (fill in)

Contractor Contact Name:

_____________________________ (fill in)

Contact Phone/E-Mail:

________________________________ (fill in)

Delivery: 09/30/2018

Delivery Location Code: 0110

USDA FOREST SERVICE

ADMIRALTY NATL MONUMENT JUNEAU RD

8510 MENDENHALL LOOP RD

JUNEAU AK 99801 US

FOB: Destination

001 Bridge Remove/Repair/Replace - Hoonah, Alaska

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110Page 3

Item No. Description Method of Measure

Pay Unit Quantity Unit Price Total

15101 Mobilization Contract Quantity

Lump Sum 1 $ $

15102 Transport three Gov't furnished bridges from Rowan Bay MAF to work sites on Hoonah road system.

Contract Quantity

Lump Sum 1 $ $

20301 - NLS Bridge removal- native log stringer Contract Quantity

Each 3 $ $

20301 - GLM80

Bridge removal and transport - 80 foot

Glulam Contract Quantity

Lump Sum 1 $ $

20301 - Mod30 Bridge removal and transport - 30 foot modular Contract Quantity

Lump Sum 1 $ $

20404 Borrow, Unclassified - Cat finish, Compaction method d, Finish method C - Includes Haul

Contract Quantity

Cubic Yard 745 $ $

25101-2 Rip Rap, Class 2 Contract Quantity

Cubic Yard 70 $ $

25101-3 Rip Rap, Class 3 Contract Quantity

Cubic Yard 30 $ $

25101-5 Rip Rap, Class 5 Contract Quantity

Cubic Yard 380 $ $

30103 Crushed aggregate, Type Base, Grading C, Compaction B Contract Quantity

Cubic Yard 330 $ $

57102 - GL80

Deliver and Install Government

Furnished Bridge - 80 foot Glulam Contract Quantity

Lump Sum 1 $ $

57102 - Mod70 Remove 70 foot Big R bridge, repair installation site, reinstall 70 foot Big R bridge

Contract Quantity

Lump Sum 1 $ $

57102 - Mod40 Install Government Furnished Bridge -

40 foot EZ Bridge Contract Quantity

Each 1 $ $

57102 - Slab Install Government Furnished Bridge -

40 foot Slab Bridge Contract Quantity

Each 2 $ $

57103-90

Furnish, deliver and install prefabricated 90' bridge, sills backwalls, thrie beam guardrails, approach rails and associated hardware

Contract Quantity

Lump Sum 1 $ $

57105 Prefabricated bridge substructure-design, fabricate, deliver and install Contract Quantity

Each 1 $ $

57106 Bridge approach rails including all necessary transitions and hardware, furnish, deliver and install

Contract Quantity

Each 2 $ $

62501 Seeding, dry method (without mulch) Contract Quantity

Acre 3 $ $

TOTAL BASE PRICE $

BASE ITEMS

Schedule of Items

Part 1 - The Schedule

Section B - Supplies or Services and Prices/Costs

2017 HOONAH BRIDGE REPAIR AND REPLACEMENT

HOONAH RANGER DISTRICT, TONGASS NATIONAL FOREST

1 of 3 Page 4

Schedule of Items

Part 1 - The Schedule

Section B - Supplies or Services and Prices/Costs

2017 HOONAH BRIDGE REPAIR AND REPLACEMENT

HOONAH RANGER DISTRICT, TONGASS NATIONAL FOREST

Item No. Description Method of Measure

Pay Unit Quantity Unit Price Total

20301 - GLM90

Bridge removal and transport - 90 foot

Glulam Contract Quantity

Lump Sum 1 $ $

20301 - Mod60 Bridge removal and transport - 60 foot modular Contract Quantity

Lump Sum 1 $ $

20404 Borrow, Unclassified - Cat finish, Compaction method d, Finish method C - Includes Haul

Contract Quantity

Cubic Yard 550 $ $

25101-4 Rip Rap, Class 4 Contract Quantity

Cubic Yard 326 $ $

30103 Crushed aggregate, Type Base, Grading C, Compaction B Contract Quantity

Cubic Yard 220 $ $

57102 - GL90

Deliver and Install Government

Furnished Bridge - 90 foot Glulam Contract Quantity

Lump Sum 1 $ $

57103-102

Furnish, deliver and install prefabricated 102' bridge, sills backwalls, thrie beam guardrails, approach rails and associated hardware

Contract Quantity

Lump Sum 1 $ $

62501 Seeding, dry method (without mulch) Contract Quantity

Acre 1.0 $ $

TOTAL OPTION ONE $

OPTION ONE ITEMS

2 of 3 Page 5

Schedule of Items

Part 1 - The Schedule

Section B - Supplies or Services and Prices/Costs

2017 HOONAH BRIDGE REPAIR AND REPLACEMENT

HOONAH RANGER DISTRICT, TONGASS NATIONAL FOREST

Item No. Description Method of Measure

Pay Unit Quantity Unit Price Total

20301 - NLS Bridge removal- native log stringer Contract Quantity

Each 1 $ $

20404 Borrow, Unclassified - Cat finish, Compaction method d, Finish method C - Includes Haul

Contract Quantity

Cubic Yard 714 $ $

25101-5 Rip Rap, Class 2 Contract Quantity

Cubic Yard 111 $ $

30103 Crushed aggregate, Type Base, Grading C, Compaction B Contract Quantity

Cubic Yard 80 $ $

57103-70

Prefabricated 70' modular bridge including sills, backwalls, all necessary hardware, furnish, deliver and install

Contract Quantity

Lump Sum 1 $ $

62501 Seeding, dry method (without mulch) Contract Quantity

Acre 0.5 $ $

TOTAL OPTION TWO $

BASE $

OPTION ONE $

OPTION TWO $

TOTAL PRICE

OPTION TWO ITEMS

3 of 3 Page 6

Section C - Description and Specifications

C.1 PROJECT SCOPE

A. Description: This requirement is to remove, repair and replace existing bridges, guardrails, approach railings, and perform routine road maintenance located on National Forest System Roads on

Chichagof Island near Hoonah, Alaska. Contractors are encouraged to visit the work sites to review conditions. Pay particular attention to section H.3 Submittals, Material Certifications and Testing

Reports for list of required submittals.

The work required by this contract includes:

Table One - Synopsis of work sites

Road # Milepost Existing

Structure

Replacement

Structure

Gov’t or

Contractor

Furnished

Present

Location of

Replacement

Bridge

Approach

Rails

Required?

8502 5.784 70’ modular

Reinstall same bridge Gov’t

8502 MP

5.784

Yes –

Contractor furnished

8504 0.156 40’ log stringer

40’ Hamilton

EZ bridge

Gov’t (Cont.

furnished substructure)

Rowan Bay No

8504 0.360 40’ log stringer

40’ glulam slab Gov’t Rowan Bay No

8504 0.439 55’ log stringer 80’ glulam Gov’t

Road 85304

MP 2.141

No

8508 6.802 30’ modular

40’ glulam slab Gov’t Rowan Bay

Yes –

Contractor furnished

8509 0.170 60’ modular 90’ glulam Gov’t

Road 8530

MP 11.128

No

8530 11.128 90’ glulam

102’ welded girder Contractor New

Yes –

Contractor furnished

85082 0.436 56’ log stringer 70’ modular Contractor New No

85304 2.141 80’ glulam

90’ welded girder Contractor New

Yes –

Contractor furnished

Table Two – Base and Options Breakout

Base Option One Option Two

Road # Milepost Road # Milepost Road # Milepost

8502 5.784 8509 0.170 85082 0.436

8504 0.156 8530 11.128

8504 0.360

8504 0.439

8508 6.802

85304 2.141

A total of nine bridges are to be installed. This includes three new contractor furnished bridges and six government furnished bridges. Government furnished bridges come from a variety of sources. Two are currently installed on the Hoonah road system and are to be relocated to new locations, three are in Rowan Bay, one is to be removed and re-installed in the same location (see

Table One).

Transporting three government furnished bridges from the Rowan Bay Marine Access Facility on

Kuiu Island to their respective installation sites on the Hoonah road system.

Removing two modular bridges from their current installation sites and transporting for storage to a rock pit on road 8508 at milepost 7.922. Installing replacement bridges at these sites.

Removing four log stringer bridges and installing replacement bridges at these sites. See Table

One for replacement structures.

Removing a 70’ modular (Big R) bridge, reconstructing installation site and reinstalling same bridge.

Removing an 83’ glulam bridge on road #85304 at MP 2.141. Transport to its new installation site on road #8504 at MP 0.439. Furnish, deliver and install new 90’ bridge with transverse beams, all

Thrie beam guardrail, transition rails, approach rails, longitudinal treated timber decking, longitudinal untreated wearing surface, backwalls, concrete abutments, object markers, and reflectors.

Removing a 90’ glulam bridge on road #8530 at MP 11.128. Transport to its new installation site on road #8509 at MP 0.170. Furnish and install new 102’ bridge with transverse beams, all Thrie beam guardrail, transition rails, approach rails, longitudinal treated timber decking, longitudinal untreated wearing surface, backwalls, concrete abutments, object markers, and reflectors.

Perform all work necessary for the placement and installation of each of the bridges at their respective locations. Installation work to include but not limited to the following: Remove and dispose of existing embankment soil material, supply and prepare material including various sized fill rock and rip rap for all necessary embankment construction and approach roadway grading, properly install all substructure elements including standard spread footing, pre cast concrete abutments and bridge backwalls, place and connect bridge elements in their proper fashion and location, and grade approach roads to match new bridge elevations. Furnish and install four (4) object markers and posts at bridge ends.

Bridges that are dismantled by the contractor and reused in this contract shall have all bridge pieces and hardware inventoried. Any damaged or missing items shall be replaced by the contractor, no additional payment will be made.

Supply and install all components necessary to construct approach rail system in accordance with all relevant specification standards listed in section C.2 of this document. Approach rail system to include, but not limited to: steel approach rail, timber rail posts, transition rail connection to bridge rail, and all connection and standard safety materials. See design documents for all specific construction details. See Table One for list of bridges requiring approach rails. Approach rail systems are incidental to contractor furnished bridges.

Install four (4) object markers and posts at bridge ends. All signage to be installed per design documents and relevant specification standards listed in section C.2 of this document.

Bridge sites may only be closed to public during times in which the contractor is physically on site performing work and shall remain open at all times when contractor IS NOT on site.

Contractor MUST notify COR a minimum of 7 days before anticipation of road closures, and public notifications will be posted as stated in C.3. Contractor is limited to a two week maximum road closure at any one site.

The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies to perform all work listed on the schedule of items, specifications and drawings.

Refer to drawings for complete and detailed description of work.

Payment will be made only for those items listed on Bid Schedule. All other work is incidental to those pay items.

B. Project Location: Hoonah, Alaska is located on Chichagof Island, approximately 40 air miles west of

Juneau. All sites for this project are located on the main Hoonah road system. Hoonah is a full service community, with daily commercial air service and air taxi services and regularly scheduled ferry and commercial barge services. See vicinity map for road and bridge site locations (attachment 1, sheet 2).

C. Rock source locations can be found at:

ROAD NUMBER MILEPOST

8508 0.23

8508 5.01

8508 7.20

8508 7.92

8508 10.45

8530 11.79

8533 0.37

85026 0.73

85026 0.00

85304 0.81

8508_12.86R 0.09

8508_9.23L 0.05

8531_0.61R 0.06

D. Waste to be disposed at designated waste sites, determined by CO/COR.

E. Price range for this project is as follows:

Between $500,000 and $1,000,000 for the Base

Between $1,000,000 and $5,000,000 for the Base and All Options

C.2 SPECIFICATIONS

The following specifications are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

D.O.T. FHA STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-03 U.S. Customary Units

BEST MANAGEMENT PRACTICES BMP’S Soil and Water Conservation Handbook FSH

2509.22 and NATIONAL BEST MANAGEMENT PRACTICES for WATER QUALITY

MANAGEMENT ON NATIONAL FOREST SYTEM LANDS FS-990

Manual on Uniform Traffic Control Devices (MUTCD)

USDA FOREST SERVICE – Sign Installation Guide 0371-2812 MTDC

FLH Standard Specifications (FP-03) can be obtained from the Federal Highway Administration Home Page on the Internet. It is in Word or Adobe Acrobat page description format at:

http://flh.fhwa.dot.gov/resources/specs/fp-03.htm; or online at: http://bookstore.gpo.gov/

The BMP Soil and Water Conservation Handbook, FSH 2509.22 can be found at:

http://www.fs.usda.gov/detail/r10/landmanagement/?cid=fsbdev2_038796

And the National BMP Handbook can be found at:

http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf http://flh.fhwa.dot.gov/resources/specs/fp-03.htm http://bookstore.gpo.gov/ http://www.fs.usda.gov/detail/r10/landmanagement/?cid=fsbdev2_038796 http://www.fs.fed.us/biology/resources/pubs/watershed/FS_National_Core_BMPs_April2012.pdf

The MUTCD can be obtained from the Federal Highway Administration Home Page on the Internet. It is in

HTML or PDF page description format at: http://mutcd.fhwa.dot.gov/

Or hard copies are available for purchase online at: http://bookstore.gpo.gov/

The USDA Forest Service – Sign Installation Guide is included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. The Forest Service

Sign Installation guide can be obtained upon request.

C.3 SAFETY AND PUBLIC NOTIFICATION

Warning signs will be placed at the proper locations to warn the public of road work. All signs shall meet the minimum requirements as established by the Manual of Uniform Traffic Control Devices (MUTCD), 2003 edition. The contractor shall post a notice of where and when the public might expect delays due to project work at several publicly located bulletin boards in Hoonah.

C.4 DAMAGE TO STRUCTURES

The Contractor shall be held liable for any damage caused by his/her personnel or equipment to any existing bridges, ditches, culverts, signs, or riprap at culvert inverts. Repair of structures damaged by the Contractor's operations, shall be the Contractor's responsibility at no cost to the Government.

C.5 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.6 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB

1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.7 SPECIAL PROJECT SPECIFICATIONS AND FOREST SERVICE SUPPLEMENTATIONS

The following specifications and supplementations to FP-03 are hereby made part of this solicitation and any resultant contract:

101 - Terms, Format, and Definitions

102 - Bid, Award, and Execution of Contract

103 - Scope of Work

104 - Control of Work

105 - Control of Material

106 - Acceptance of Work

107 - Legal Relations and Responsibility to the Public

108 - Prosecution and Progress

109 - Measurement and Payment

152 - Construction Survey and Staking

153 - Contractor Quality Control

155 - Schedules for Construction Contracts http://mutcd.fhwa.dot.gov/ http://bookstore.gpo.gov/

157 - Soil Erosion Control

171 - Weed and Disease Prevention

201 - Clearing and Grubbing

202 - Additional Clearing and Grubbing

203 - Removal of Structures and Obstructions

204 - Excavation and Embankment

205 - Rock Blasting

209 - Structure Excavation and Backfill

251 - Riprap

301 - Untreated Aggregate Courses

30311(01) - Blading

552 - Structural Concrete

553 – Pre-stressed Concrete

555 - Steel Structures

556 - Bridge Railing

557 - Timber Structures

563 - Painting

571 - Prefabricated Bridges

625 - Turf Establishment

651 - Development of Pits & Quarries

703 - Aggregate

718 - Traffic Signing and Marking Material

861 – Maintenance of Bridge Surface

SPECIAL NOTE: The above is a list of major specifications applicable to this contract. Other specifications referred to within these specifications (even though not specifically listed) are also fully applicable to the solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

NOTE: The solicitation number will have an “S” for the solicitation indicator in the number. Contracts will have a similar number format but will have a “C” in place of the “S” and may have a different last 4 numbers.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause Number Title Date 52.246-12 Inspection of Construction AUG 1996

E.2 Inspection and Acceptance (AGAR 452.246-70) (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at the project site.

E.3 Inspection and Testing Performed by Government

The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the

Special Project Specifications.

E.4 Conformity with Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

E.5 Contractor’s Quality Control Plan

At the request of the Contracting Officer, the Contractor shall provide a quality control plan, which is mutually agreed upon with the Contracting Officer. This plan shall describe the Contractor’s method for ensuring all work meets the contract requirements. At a minimum, the Quality Control Plan shall outline how the quality of work will be monitored, how the crew will be supervised, and who will perform the quality control functions. Contractor shall provide the Contracting Officer with documentation of quality control inspections.

http://www.arnet.gov/far/

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.211-10 Commencement, Prosecution, And Completion Of Work (Apr 1984) Alternate I

(Apr1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than:

All base items: 30 September 2018

The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful bidder will receive the notice to proceed by 15 May 2017. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

F.2 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

Clause Number Title Date 52.242-14 Suspension of Work APR 1984

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 Post Award Conference (NOV 1996)

A post award or pre-work conference with the successful offeror is required. It will be scheduled within a reasonable time after award and prior to the issuing of a Notice to Proceed.

G.2 Measurement And Payment

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

Payment will be made only for those items listed on Bid Schedules. All other work is incidental to these pay items.

G.3 Electronic Invoicing And Payment Requirements – Invoice Processing Platform (IPP)

(a)Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice

Processing Platform (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor.

To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov http://www.arnet.gov/far/ https://www.ipp.gov/

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment.

Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email

IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.

(b) Final Payment. The final invoice must be accompanied by a release of claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically accepted from the operation of the release. Final payment will not be approved without a properly executed

Contract Release, Form 6300-16.

(c) In addition, when submitting the invoice, the Contractor shall submit payrolls, subcontractor payment information and a spreadsheet detailing the payment breakdown in accordance with the Pay Items in the

Schedule of Items, Section B.1 (either electronically in IPP, hard copy, or via fax) to the Contracting Officer

(see FAR 52.232-5 Payments Under Fixed Price Construction Contracts).

G.4 Designation Of Contracting Officer’s Representative

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award. The COR is responsible for administering the performance of work under this contract.

In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the

Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting

Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G.6 Contractor’s Designated Representative

It is required that the Contractor have a designated representative available on the project during the entire project and that the representative be able to speak and understand English. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the Contracting Officer.

Such designation shall clearly indicate the name and limitations (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting, the representative is strongly encouraged to attend that meeting.

G.7 FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the

Contractor.

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Visual Condition and Route Surveys.

Weather conditions: http://www.weather.gov

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 Archaeological or Historic Sites (see Section I AGAR 452.236-73)

If a previously unidentified archaeological or historic site(s) are encountered, the contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

H.2 Product Substitution

Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the

Contractor's responsibility for such modification. Any and all substitutions will be requested by the

Contractor after award of the contract has been made. No approvals will be made prior to award.

Product Substitution Request

A. When submitted within 30 days after contract award, the Contracting Officer will consider formal requests for substitution of products, equipment and methods, in place of those specified. Requests submitted after 30 days will be considered only in case of product unavailability or other conditions beyond the control of Contractor. Requests shall provide the information and be in the format as specified in paragraph B below.

B. Submit separate request for each substitution. Support each request with:

1. Complete data substantiating compliance of proposed substitution with requirements stated in contract documents:

a. Product identification, including manufacturer's name and address.

b. Manufacturer's literature; identify:

1) Product description

2) Reference standards

3) Performance and test data

c. Samples, as applicable

d. Name and address of similar projects on which product has been used, and date of each installation.

http://www.weather.gov/

e. Comparative data of item to be deleted by proposed substitution. Include drawings to same (or larger) scale as pertinent portion of contract documents and marked to show how differences will be accommodated.

f. Show complete system/assembly as revised to accommodate proposed alternate for difference in performance, size, configuration, connections, service, accessibility, or any other significant characteristics.

g. Show complete layout of system except that which is identical to contract documents unless unchanged portion must be shown to indicate clearances, etc.

h. Include complete detail drawings of supports for all substitute equipment and complete load calculations for adequacy of support prepared and signed by a registered structural engineer.

1. Itemized comparison of the proposed substitution with product specified; list significant variations.

2. Data relating to changes in construction schedule.

3. Any effect of substitution on separate contracts.

4. List of changes required in other work or products.

5. Accurate cost data comparing proposed substitution with product specified.

6. Proposed amount of change to the contract.

7. Designation of required license fees or royalties.

8. Designation of availability of maintenance services, sources of replacement materials.

C. Substitutions will NOT be considered for acceptance when:

1. They are merely indicated or implied on shop drawings or product data submittals without a formal request from Contractor.

2. They are requested directly by a subcontractor or supplier.

3. Acceptance will require substantial revision of contract documents.

4. Substitution has not been requested in accordance with this and related clauses.

D. Substitute products shall not be ordered or installed without written acceptance of the Contracting Officer.

E. Contracting Officer will determine acceptability of proposed substitutions.

F. Number of Substitution Submittals: Only one proposed alternative will be considered for each item. Provide specified item if substitution proposal is rejected.

Contractor’s Representation & Responsibility

A. In making formal request for substitution the Contractor represents he/she:

1. Have investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.

2. Will provide same warranties and bond for substitute as for originally specified product.

3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.

4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.

5. Cost data is complete and includes related costs under the contract, but not:

a. Costs under separate contracts.

b. Contracting Officer costs for redesign or revision of contract documents.

B. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.

C. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.

H.3 Submittals, Material Certifications and Testing Reports

In addition to the items listed below reference FP-03 and the FSSS for all the required submittals, material certifications and/or testing reports that shall be submitted for this project.

Submittal

Number

Submittal Title Referenced By

Specification

No.

Submittal Date

S-01 Schedule of Work Section I Prior to Work Starting

S-02 Job Specific Safety Plan Section I Prior to Work Starting

S-03 Notification of Subcontracting Section I Prior to Subcontractor Starting

Work

S-04 Quality Control Plan FP-03 153.02 Prior to Work Starting

S-05 Erosion Control Plan FSSS 157 14 days prior to Construction

S-06 AISC Certification for IBR

(internediate steel bridges)

FP-03 555.03 Prior to bridge order

S-07 Welding ANSI/AWS Code D1.5 FP-03 555.03 Prior to bridge order

S-08 Steel fabrication/erection drawings

FP-03 555.06,

104.03 (b)

30 days prior to construction

S-09 Shipping plans FP-03 555.06 Prior to shipment from fabrication plant

S-10 Galvanizing plant certification FP-03 555.05, 106.03, 717.07

Prior to galvanizing

S-11 Material Certifications and

Testing Reports

FSSS 553, 554,

555, 556, 557, 571, 573, 601 &

703.05. FP-03

555.05

30 days prior to construction

S-12 Wood grade/treatment FP-03 555.06, 106.03, 557.19, 557.04, 716.04

30 days prior to construction

S-13 Hardware material certifications FP-03 717.01, 106.03

30 days prior to construction

S-14 Shop drawings bridge & guardrail FP-03 555.06, 556.10

30 days prior to construction

S-15 Shop drawings bearing pad assemblies

FP-03 564.03,

717.10

30 days prior to construction

S-16 As built drawings/manufacturer’s data sheets

NA 30 days after construction

S-17 Load and Resistance Factor

Rating for Each Bridge

See Attachment

#3

Prior to Contract Completion and Final Payment

H.4 Landscape Preservation

(a) Confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits.

Unless otherwise agreed to by the CO, retrieve material which falls outside of these limits and either incorporate the material in the work or dispose of the material as directed by the CO.

(b) Schedule and conduct operations to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.). Install silt fencing around areas immediately next to streams and ponds to mitigate suspended sediments when designated on the drawings.

Do not discharge pollutants such as raw sewage, and other harmful materials into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Do not allow wash water or waste water from concrete or aggregate operations to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Collect and return waste motor oils, fuels, lubricants, bitumens and similar hydrocarbons to the supplier. Comply with the requirements of 40 CFR 279, Standards for the Management of Used Oil.

Do not discharge hydrocarbon products on the ground, use them for road oiling, or bury them in a landfill.

Do not operate mechanized equipment in live streams without written approval of the Contracting

Officer.

(c) CREEK CROSSINGS: Schedule and conduct bridge and instream work to minimize disturbance to streams.

Road Number Milepost

Instream Work Timing

8502 5.784 June 15-July 15

8504 0.156 June 01-July 15

8504 0.360 June 01-July 15

8504 0.439 June 01-July 15

8508 6.802 June 01-Sept 01

8509 0.170 June 01-Sept 01

8530 11.128 June 01-July 15

85082 0.436 June 15-Sept 01

85304 2.141 June 15-July 15

1. Do not cross streams without Contracting Officer approval.

2. Submit a written equipment crossing plan to the Contracting Officer for approval 14 calendar days before creek crossing is planned. Two machine crossings will be permitted for all streams designated on the drawings as fish streams or listed in the above table. Outside of this time period, no machine crossings will be permitted if fish eggs are present in the gravel or adult fish are present in the stream;

otherwise two machine crossings will be permitted.

3. Limit machine crossings to two times for all live streams not designated on the drawings as fish streams with pipes 48” and larger to be installed.

4. Do not leave temporary bridges in place between September 15 and March 15, unless approved in advance in writing by the Contracting Officer.

In stream work will only be allowed only at low flows.

Obtain necessary permits for floating camps, floats, shore ramps, and other appurtenances associated with project operations from the following State of Alaska and Federal Agencies:

1. ADNR – Alaska Department of Natural Resources.

2. ADEC – Alaska Department of Environmental Conservation.

3. ADGC – Alaska Department of Governmental Coordination.

4. EPA – US Environmental Protection Agency.

5. DA, COE – US Army Corps of Engineers.

6. USCG – US Coast Guard.

H.5 Use Of Premises (Also see Section I, AGAR 452.236-72 Use of Premises)

(a) Obtain written approval from the Contracting Officer before opening or operating on National Forest land or lands administered by the Forest Service any camp, quarry, borrow pit, storage area, detour, or bypass site, other than SHOWN ON THE DRAWINGS. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor. Such approval, if granted, will be without charge to the Contractor.

(b) Sanitation Facilities: Provide and maintain the following facilities for the work force at the camp, unless provided otherwise.

1. Meet State of Alaska drinking water regulations 18 AAC 80 regarding potable water supplies for drinking, washing and cooking.

2. Comply with State of Alaska wastewater disposal regulations 18 AAC 72 for domestic sewage.

3. Ensure that the design, operation, and maintenance of all solid waste systems under Forest Service jurisdiction meet all Federal, State, and local requirements. Meet State of Alaska solid waste management regulations (18 AAC 60) and Federal regulations contained in 40 CFR 243, 40 CFR

245, 40 CFR 257, and 40 CFR 258. Remove solid wastes and/or residues and dispose of in approved commercial landfills.

4. Meet the requirements of 40 CFR 112 (Oil Pollution Prevention) for fuel storage. Meet the requirements of 33 CFR 150 and 33 CFR 154 for facilities transferrring oil or hazardous materials in bulk.

(c) Do not begin any camp development, either land based or floating, until a plan for development, occupation, and cleanup is submitted and approved by the Contracting Officer. Include the following information in this plan:

1. Location and size of the proposed camp development, including a map.

2. Wastewater system.

3. Number of people who will use the site and proposed dates of occupancy.

4. Power supply system.

5. Water supply system.

6. Building layout, shop area, living quarters.

7. Road and trail layout.

8. Clearing limits and slash disposal locations.

9. Borrow areas.

10. Dock and access location.

11. Equipment and fuel storage area and Spill Prevention Control and Countermeasure (SPCC) plan.

12. Incinerator location and ash disposal plan.

Forest Service will review plan as submitted for completeness and applicability. Proposed modifications of

Contractor's plans will be discussed with the Contractor prior to approval. Any modifications agreed upon will be incorporated in a revised set of plans.

H.6 Contractor's Use And Maintenance Of Existing Roads

The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. Such roads are those which are necessary for direct access to designated borrow sites, quarries, stockpile sites, waste areas, campsites, equipment unloading ramps, and other approved work areas.

The roads authorized for use will be subject to the following general conditions:

(a) Federal Regulations contained in 36 CFR 261.12; except vehicle weight will not exceed that of

AASHTO HS20-44 and/or U80 Loading. Submit written requests to the CO for approval to use L90 and

U102 overload Loadings on roads authorized for use. Regulations prohibit damaging a road or blocking a road open to use by others, except as otherwise provided in Special Project Specification 104.

(b) The Government will not snowplow roads for the Contractor's use. The Contractor may snowplow any road designated for his use. A permit defining snowplowing requirements is required and will be issued by the District Ranger, upon request by the Contractor. Repair any damage to the road structure caused by snow removal operations. Vehicles, other than conventional over-the-snow vehicles (snowmobiles), will not be permitted to use roads when there is an average of more than 4 inches of snow unless the road has been snowplowed.

The Contractor is responsible for and will perform road maintenance on Forest Service roads in the construction area commensurate with his use. Perform road maintenance at such intervals that prevent deterioration of the roadway, or as directed by the Contracting Officer.

H.7 Road Maintenance Requirements

Perform road maintenance work on the required roads in accordance with the following:

(a) Maintain existing roadbed by blading and shaping the traveled way and shoulders. Do not undercut banks. Maintain established drainage structures and/or berms, and place additional drainage structures/berms where necessary to protect embankments.

(b) Perform all seasonal weather cleanup, including removal of bank sloughs, minor slides and fallen timber, which can be accomplished by a motor patrol grader equipped with a front end blade, or comparable equipment, and by the use of hand tools. Replace material eroded from fill slopes and clean out drainage ditches and culverts subject to the above equipment limitations.

Deposit the material removed from slides or other sources in locations approved by the Contracting Officer.

H.8 Emergency Control

(a) Immediately extinguish without expense to the Government all fires on or in the vicinity of the project which are caused by the Contractor's employees, whether set directly or indirectly as a result of construction operations, with or without direction by the Forest Service. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation deemed necessary by the Government resulting from fires set or caused by Contractor's employees or resulting from construction operations.

(b) Contractor's Responsibility for Controlling Other Emergencies - When requested by the Contracting

Officer, allow the Forest Service to temporarily use employees and equipment for emergency control work. Payment will be made at not less than the current area rate established by the Forest Service.

(c) Fire fighting equipment will be required during the fire season from May 10 to August 31, and during any other period of fire danger designated by the Contracting Officer.

Furnish rust-free fire tools to equip all workers employed in Contractor's operations at each separate work site. Maintain tools in serviceable condition and keep tools in one or more weather-tight fire tools boxes.

Paint fire tools boxes red, mark "tools for Fire Only" with letters at least 3” high, and keep sealed. Post a list of the contents inside each fire tool box so as to be visible when opened.

Kind of Tool No. of People Working in Area

1-4 5-9 10-15 16-20

Axe, d.b chopping, 32-inch min. handle 1 1 2 3

Shovels, L.H. R.P., No. 0 or larger 1 3 6 7

Pulaski, 32-inch min. handle 2 3 7 10

File, 10-inch mill bastard 1 1 1 2

Pumps, backpack cans, 5-gal filled with water

1 2 2 3

Equip each internal combustion engine with a spark arrester qualified and rated USDA-Forest Service, Standard 5100-1, unless it is:

(a) Equipped with a turbine-driven exhaust supercharger such as the turbocharger. There shall be no exhaust bypass.

(b) A multi-position engine, such as on a chain saw, which is equipped with screen arrester, as described in the Forest Service Spark Arrester guide.

A spark arrester, which does not meet the requirements in this guide may be approved upon submission of acceptable proof that the arrester is at least 80 percent efficient in retention, attrition, or destruction of carbon particles. Such arrester may be required to meet higher standards as improvements in design and efficiency are discovered.

(c) A passenger-carrying vehicle or light truck intended primarily for use on roads, and equipped with a factory designed muffler and exhaust system.

(d) A heavy duty truck, such as a dump or log truck, or other vehicle used for commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab.

Properly install and constantly maintain in serviceable condition all exhaust equipment described in this

Subsection, including spark arresters and mufflers.

Equip each unit of mobile or stationary power equipment, including trucks, with one shovel, and at least one fire extinguisher meeting one of the following specifications:

1. 2-1/2 pound size or larger dry chemical type.

2. 4 pound size or larger carbon dioxide type.

Test or check each extinguisher for proper functioning prior to the beginning of fire precautionary period.

Provide each gasoline power saw with one chemical-pressurized fire extinguisher of not less than 8 ounce capacity by weight. Maintain the extinguisher in good working order at all times.

Do not burn camp refuse, brush, slash, or debris such as that resulting from clearing around camps or on rights-of-way, without the written approval of the Contracting Officer. Submit written requests for burning to the Contracting Officer at least 48 hours in advance of intended burning. The Contracting Officer will approve routine camp refuse disposal incineration in the camp development proposal.

H.9 Construction Stakes, Lines, And Grades

Contractor will perform all construction staking necessary for completion of contract. The Government will provide location staking for all proposed work.

H.10 Prosecution Of Work

Areas of weak ground are crossed on this project. The initial embankment depth shall be as SHOWN ON

THE DRAWINGS or determined by the Contracting Officer. Reestablish design centerline grade and alignment in accordance with Section 152 as construction progresses, and prior to the placement of borrow excavation. Reestablished design grades may be re-staked by the Contracting Officer to meet local conditions. Final grades may be at elevations other than those SHOWN ON THE DRAWINGS, but in no instance will they be lower than that of the surrounding ground elevations.