A2.3.pdf
PDF 495 KB Posted
- Solicitation number
- AFCEC-26-R-0006
About this file
This is an architectural/construction finish schedule document for a federal building project, specifically for the Ben Dilson Jr. High School Phase 3 Addition/Renovation located in Alaska.
The document provides a comprehensive room-by-room finish schedule that specifies materials, finishes, and colors for all building components including floors, walls, ceilings, and base surfaces across multiple rooms. Key architectural elements detailed include flooring types (carpet, vinyl, tile, concrete), wall treatments (paint colors, tile, drywall), ceiling specifications, and base materials. The schedule includes color identification references with specific paint codes and material selections designated for contractor procurement and installation. Special construction notes address requirements for acoustic ceilings, laminate countertops, plastic laminate applications, ceramic tile work, hollow metal frames, and various wall treatments. Additional finish notes provide guidance on material finishes, surface preparation, installation methods, and quality standards for items such as paint application, tile setting, drywall finishing, and carpet installation. The document incorporates standard Army Corps of Engineers specifications with references to material standards, texture requirements, and finish quality expectations. A color legend provides visual representation of designated finishes, and general notes establish baseline construction standards including requirements for drywall installation, paint selection criteria based on location, and specifications for handling special finish applications in wet areas and high-traffic zones.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S4.1.pdf | ||
| S4.2.pdf | ||
| S3.2.pdf | ||
| S1.2.pdf | ||
| S0.1.pdf | ||
| M5.1.pdf | ||
| M4.1.pdf | ||
| M3.1.pdf | ||
| E4.1.pdf | ||
| E5.1.pdf | ||
| E1.1.pdf | ||
| E2.2.pdf | ||
| C1.0.pdf | ||
| C3.0.pdf | ||
| A8.7.pdf | ||
| A8.3.pdf | ||
| A7.1.pdf | ||
| A5.7.pdf | ||
| A4.4.pdf | ||
| A4.3.pdf | ||
| A5.6.pdf | ||
| A3.1.pdf | ||
| A3.9.pdf | ||
| S4.3.pdf | ||
| T2.pdf | ||
| T3.pdf | ||
| S2.1.pdf | ||
| M7.2.pdf | ||
| M6.1.pdf | ||
| M7.1.pdf | ||
| M2.2.pdf | ||
| M1.1.pdf | ||
| M1.0.pdf | ||
| L2.pdf | ||
| E0.1.pdf | ||
| D2.2.pdf | ||
| C4.0.pdf | ||
| C2.0.pdf | ||
| C5.0.pdf | ||
| AFCEC26R0006 Alaska AI Data Center QA 4 Final.pdf | ||
| AF2.1.pdf | ||
| AB2.pdf | ||
| AB3.pdf | ||
| A8.4.pdf | ||
| A8.1.pdf | ||
| Alaska AI Data Center QA 3 Final.pdf | ||
| Updated Alaska AI Data Center RFLP 04 15 26.pdf | ||
| AFCEC_26-R-0006 Alaska Data Center Questions Answers - Virtual Industry Day 23 April 2026.pdf | ||
| RFLP Revised Alaska AI Data Center 04 15 26.pdf | ||
| Alaska AI Data Center RFLP_04 10 26 - Copy.pdf |
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .