Advantor Upgrade for Open Storage Area

Access Control Refresh Upgrade SF/Xi to SF/Xi6.2 with Badging, including new report printer, badging printer, network switch and 100 direct print proximity cards.

Install enrollment reader at SF/Xi6.2 location.

Upgrade Panels 5004, 5005, 5006 and Exp Panel 1 with IG2.

Remove Zone 5 North Entry from 5004 and cap with plate.

Remove Zone 6 Exit West from 5005 and cap with plate.

Remove Zone 7 Entry from 5006 and Cap with Plate. (That is the only reader on this panel.)

Replace all existing card readers (Prox Pro) with HID RPK40 readers.

Add ACS hardware for 9 doors:

Rm 114 Conference Room Rm 108 Mech Room.

Rm 109 Boiler Room Rm 110 Comm Room Rm 173 Mech Room Rm 117 from 116 Server Room Rm 117 from 120 Server Room Rm 128 NATO Rm 129 NATO

Each door to include:

Electronic Lock or Mag Lock

REX PIR

RPK40 Card Reader Door position switch

IDS Refresh Upgrade IDS processor in Open Storage area with IG2 FIPS processor.

Provide and install 1 ITK keypad for arm/disarm as one zone.

Replace all motion sensors with AP669 sensors.

Replace perimeter BMS with HSS Perform turnkey installation of all components, including all necessary conduit and wiring.

Wire above ceilings will be installed on J-hooks or in cable trays.

Wire below ceilings will be in EMT Conduit.

Conduct Contractor Verification Testing and commission system into service.

Provide software instruction on SF/Xi6 system, including enrollment, schedule set up and system administration.

Provide as-built drawings of final configuration, including device placement and wire paths.

This SOW anticipates that the Government will provide the following collateral support:

Provide storage and staging space for project materials.

Provide access to work areas in conformance with pre-arranged installation schedule.

Provide AutoCAD floor plans as necessary for creation of as-built drawing.

Provide access to 120VAC power for all components requiring AC Power (Advantor to perform power connections.)

*All electrical work to be performed by a licensed electrician.