Administration Document (2).docx
DOCX document 42 KB Posted
- Attached to
- Hydronic loop testing
- Solicitation number
- 138
- Issued by
- Canyon County, Idaho
About this file
This document is a Request for Quotes (RFQ) from the State of Idaho Military Division (IMD) for ongoing monthly hydronic loop testing services for boiler, chiller, and cooling tower loops. The IMD is seeking qualified vendors to provide testing and reporting for these hydronic loops, with further details outlined in the Scope of Work. Quotes are due by the deadline stated in the IPRO header, and the successful contractor will start hydronic loop testing services upon award. The initial contract term is one year, with four optional one-year renewals for a total potential term of five years.
The RFQ requires vendors to provide total cost quotes on the provided Price Sheet, Exhibit B, which must include the cost of testing, administrative costs, and travel expenses. The award will be made to the responsive, responsible vendor with the lowest fully burdened total cost per region for testing. Vendors may also provide a percentage discount for chemicals to be purchased based on their recommendations from the testing. The RFQ also outlines various insurance, access, and reporting requirements for the successful contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Signature Page RFQ August 2020.pdf | ||
| Exhibit B Price Sheet.xlsx | XLSX spreadsheet | |
| Exhibit C.pdf | ||
| 1_Arrivos-OnBase Integration.pdf | ||
| 4_PERSI_OnBase-Statistics_September-2024.pdf | ||
| PERSI OnBase report.pdf | ||
| Insurance Requirements 2023.docx | DOCX document | |
| solicitation_instructions Jan 2017.pdf | ||
| IDOL's OnBase Screenshots for RFP.docx | DOCX document | |
| Standard Terms and Conditions_May 2021.pdf | ||
| 2_Arrivos WorkFlow Table .xlsx | XLSX spreadsheet | |
| 3_PERSI-DocTypes-with-Annual-Volume.xlsx | XLSX spreadsheet | |
| Labor OnBase Licenses.pdf | ||
| RFP Event 204 Administrative Document.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of Idaho Military Division (IMD) Event 138 Hydronic Loop Testing
Purpose The State of Idaho Military Division (IMD) is requesting quotes for ongoing monthly hydronic loop testing for boiler, chiller, and cooling tower loops as further detailed below.
The contact for this RFQ is:
Joseph Nelson Division of Purchasing 208-332-1602 Joseph.nelson@adm.idaho.gov
Background The IMD is seeking qualified vendors to respond to this RFQ to provide testing and reports for hydronic loops. Further details of the various loops in need of testing are outlined in the Scope of Work-Exhibit A.
Timelines Quotes Due: Please see IPRO Header .
Contractor will start Hydro Loop Testing Services, as coordinated with the IMD contact upon Award. IMD contact for services is:
Cliff Burdine IMD Maintenance Operations Manager Phone: 208-272-3738 Email: clifford.c.burdine.nfg@army.mil
Scope of Work See Exhibit A
Award Basis and Contract Terms Award will be made to the responsive responsible vendor with the lowest fully burden total cost per region for testing. Contractors are also able to provide a percentage discount for chemicals to be purchased based off vendors recommendations from the test completed, as provided on Exhibit B, Price Sheet. The fully burden Total Cost must include the cost of testing, all administrative costs, and travel cost associated with the testing.
The initial term includes one (1) year with the option of four (4) one (1) year renewals. Upon mutual, written agreement, the Contract may be renewed, extended, or amended. The anticipated total Contract term is Five (5) years.
Response
| Enter your Total Cost on Exhibit B, Price Sheet, and submit your quote via Luma so that it is | received at Division of Purchasing location specified on the Signature Page prior to the deadline | established above. |
| Quotes must include all Required Submittal Items (See below). | ||
| When submitting via IPRO enter your Total Cost on Exhibit B AND in IPRO and UPLOAD all Required | Submittal Items. |
| List of Attachments |
| Required Submittal Items |
Exhibit A – Scope of Work Exhibit B – Price Sheet Exhibit C – Sample Report Exhibit D – Insurance Requirements State of Idaho Signature Page
Exhibit B – Price Sheet State of Idaho Signature Page Public Works license is required specifically with code 15700 Required proven history of ten (10) or more years of work in this specialty field including advisor for loop treatment maintenance shown in a provided resume
Billing The Contractor must provide a signed invoice after completion of services. The invoice must be submitted no later thirty (30) calendar days after services are completed.
The Contractor must provide the following information with each invoice:
1. IPRO contract number and Agency PO number
2. Identification of billing period
3. Total amounts billed for the billing period
4. Detailed descriptions of items shipped, and quantity shipped, if applicable
5. Ship to address and service address
6. Name of authorized individual and contact information for Contractor
Provide the billing information for this purchase, including billing frequency, invoice/report requirements, agency contact information:
| All invoices are to be emailed to sroinvoices@imd.idaho.gov or mailed to the address below; |
| Idaho State Military Division |
| 4040 West Guard Street Building 600 |
| Boise, ID 83705 |
Price Adjustment Clause Prices must be firm for the initial term. A price adjustment may be considered for each renewal period thereafter. IMD must be notified by increases in price at least thirty (30) calendar days prior to expiration of the current Contract term and provide supporting documentation of industry wide increases. Increases are limited to 1.5% of the current Contract term. If there is an industry wide price decrease, Contractor must notify the State immediately of the decrease; and make the decrease effective for the State the same day. If the State is not notified of price decreases, the pricing at the time of the order will be used for payment and refunds will be issued as necessary.
Special Terms and Conditions
9.1 The Idaho Military Division reserves the right to request additional loop testing beyond the loops identified in the Price Sheet, at the same cost as other loops in the same region, terms, and conditions, not to exceed twenty percent (20%) above the quantities provided, for a period of twelve (12) months beyond the Contract Purchase Order start date.
9.2 The Contractor, subcontractor, and sub-subcontractor, must purchase and maintain in full force and effect from a company or companies lawfully authorized to do business in the State of Idaho such insurance as will protect the Contractor, subcontractor, and sub-subcontractor from claims set forth below which may arise out of or result from the Contractor's or subcontractor’s operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or by a subcontractor or by anyone directly or indirectly employed by Contractor or by subcontractor for whose acts any of them may be liable. See below, Exhibit D – Insurance Requirements, for required Insurance Limits. Prior to final award contractor will need to provide proof of insurance.
| Requirements | ||
| 10.1 | Any damage caused by obtaining test results to carry out the service must be repaired at the | Contractor’s expense within 30 calendar days. |
| 10.2 | Working practices must be adopted that safeguard the environment from pollution, noise, or | other injurious hazards. |
| 10.3 | Unless otherwise required by the Project Manager whom will be identified on the purchase order, work associated with this Contract will be carried out between the hours of 0730 to 1630 from Monday to Friday. No weekend, Federal Holiday or night work is to be carried out without the prior written approval from the project manager. |
0. The Contractor must contact the Project Manager two (2) business days prior to service.
| 10.5 | The Contractor will immediately contact the Project Manager if access proves difficult. Should the Contractor not be able to obtain access to the site, no claims will be paid unless the Contractor can prove that contact was made with the Project Manager two (2) business prior to on-site arrival. | |||
| 10.6 | A walkthrough of each area to be tested will be provided to the contractor that is awarded this | contract. | ||
| 10.7 | Maintenance personnel and point of contacts will be available for guidance and access to areas | specified and will be identified on the scope of work and purchase order. | ||
| 10.8 | Contractor must be specialized in the primary business of testing, analysis and reporting of | hydronic heating and cooling loops (boiler, chiller, and water towers). | ||
| 10.9 | Contractor must provide resume upon bid submission to demonstrate ten (10) years of experience. | |||
| 10.10 | In the event of a base closure for any reason (heightened security posture, weather, Commander’s | discretion), the Contractor will be notified in advance if possible. If Contractor personnel are on | base upon the order of a base closure, all Contractor personnel will leave base property until | normal operations resume. |
| 10.11 | Contractor to provide required monthly testing and treatment recommendations based off test results to Project Manager via emailed PDF test reports within two (2) business days of conducting on-site tests. Project Manager information will be given out when a PO is created for the awarded vendor. |
Exhibit A Event 138 Scope of Work
1. General Information Contractor must provide monthly ongoing hydronic loop testing for boiler, chiller, and cooling tower loops, accurate reporting of existing conditions and technical recommendations for proper chemical treatment to properly maintain piping and prolong the life of the equipment operating on the loops.
| 1.2 | Contractor must provide all testing and materials needed to complete monthly hydronic loop testing for boiler, chiller and cooling tower loops. | |
| 1.3 | Contractor will provide testing results and recommended treatment reports within two (2) business days of on-site testing. | |
| 1.4 | All hydronic loops as specified in this RFQ must be serviced. | |
| 1.5 | The Contractor must comply with access policy when testing the areas located on Gowen Field. | Please see Section 10 Requirements. |
2. Quality Control and Performance monitoring Sites will be selected at random for inspection from time to time by the Project Manager as identified on the scope of work and purchase order.
| 3. Loop Types | |
| 3.1 | Chilled Water Loop (C) or (CWL) |
| 3.2 | Heating Water Loop (H) or (HWL) |
| 3.3 | Cooling Tower Loop (CT) |
| 3.4 | Condensing Cooling Loop (CCL) |
4. Test Types (and units of measure)
| 4.1 | Depending on the type of loop, identified in section 3, contractor must conduct monthly tests for each of the following measures (see attached sample report (Exhibit C) for measures for each loop) | |
| 4.1.1 | Conductivity (uMhos) | |
| 4.1.2 | Copper (ppm) | |
| 4.1.3 | Freeze Point (Degrees Fahrenheit) [calculated from Glycol %] | |
| 4.1.4 | Glycol % | |
| 4.1.5 | Iron (ppm) | |
| 4.1.6 | Nitrite (ppm) | |
| 4.1.7 | pH (numerical) | |
| 4.1.8 | Organo Phosphonate (ppm) – only on Cooling Tower Loops | |
| 4.1.9 | Silica (ppm) – only on Cooling Tower Loops |
| 4.2. | The contractor will provide test kits that must be equivalent in quality or better than the kits listed below. The specifications and brand names in this RFQ, are intended to be descriptive, but not restrictive; indicative of the quality and characteristics of items that meet the minimum requirements. | ||
| 4.2.1 | DR 900 Colorimeter for testing iron, and copper. | ||
| 4.2.2 | Myron L Ultrameter for testing conductivity, PH, and ORP. |
5. Report Requirements Contractor must provide the following Report Requirements:
| 5.1 | Loop Balance Maintenance Recommendations (see Exhibit C sample report attached) | 5.1.1 | Recommend treatment measures for test results which fall outside of the | normal result low and high limits for each measure. |
| 5.2 | PDF electronic format sent to email distribution group within two (2) business days of | performing on-site customer testing. | ||
| 5.3 | Date & Time of testing performed | |||
| 5.4 | POC information with name, phone number and email should customer require | contacting tester. | ||
| 5.5 | Organized format similar to the one found on the sample report. |
File details come from the government source that posted it. Updated .