This addendum to the City of Minneapolis Farmer's Market Reconstruction project (Event #4278) provides updates and clarifications to the original bidding documents for a comprehensive reconstruction project at 312 East Lyndale Avenue North, Minneapolis, Minnesota. The addendum includes results from the September 29, 2026 pre-bid meeting, responses to contractor questions submitted by October 2, 2026, and revised specifications and drawings effective October 6, 2026. Key project components include general construction with two optional alternates: Alternate #1 for converting storage room 311 into a family restroom matching room 321, and Alternate #2 for prepping, priming, and painting the steel structure, electrical infrastructure, and metal roof panel undersides for the 200 and 300 canopies. The project encompasses site demolition, utility work, plumbing fixture installation (Section 22 4000), interior finishes, door and window installations, reflected ceiling plans, and right-of-way signage modifications. Bids are due October 15, 2026 at 2:00 PM CST, with substantial project completion targeted for November 12, 2027 and an anticipated project start in the first quarter of 2027. The contractor must coordinate all work with ongoing farmer's market operations and obtain City of Minneapolis permits, with all WAC and SAC fees being the contractor's responsibility.
The project is funded through a Federal HUD FY24 CPF Grant, requiring compliance with Section 3 employment and economic opportunity provisions for low- and very low-income persons and communities. Subcontractor participation goals are set at 0% MBE and 0% WBE; however, contractors are encouraged to provide minority-owned and women-owned business enterprises with full and fair opportunities. The project specifies aspiring employment goals of 20% female and 32% minority workforce participation, with prevailing wage rates and Davis-Bacon labor standards applying due to federal funding. Performance and payment bonds equal to 100% of the contract amount are required, along with a 5% bid deposit for bids exceeding $50,000. Contractors must comply with Minneapolis Code of Ordinances Title 7 civil rights requirements, living wage standards for contracts exceeding $100,000, and Amara's Law regarding PFAS-containing products. The addendum clarifies plumbing fixture manufacturers (with BOD as the only approved manufacturer for fixtures Section 22 4000), revises painting scope to include all conduits, junction boxes, and roof panel undersides, and provides detailed site plans, utility information, and construction staging requirements accommodating the market's operational needs throughout the project timeline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Minneapolis, Procurement Division
AN AFFIRMATIVE ACTION EMPLOYER
Event No. 4278 Date: 10/07/2026
Procurement Division Buyer Information
505 Fourth Avenue South, Room 310 Name: Duane Hansen
Minneapolis, MN 55415 Email: duane.hansen@minneapolismn.gov
ADDENDUM NO. 1
Minneapolis Farmers Market Project
Please consider any changes and\or corrections as part of the original bid specifications and submit your bid accordingly.
Changes for Event 4278:
1. A copy of the pre-bid sign in sheet has been included below.
2. A copy of the agenda from the Pre-bid meeting has been included below.
3. A copy of Questions and Answers for Event 4278 has been included below.
4. This project includes Federal HUD FY24 CPF Grant funding and Section 3 applies. A copy of the “Section 3 Clause” has been included below.
5. Changes to Project Manual and Drawings have been included below.
Receipt of this addendum must be acknowledged when submitting your bid.
Bids due 2:00 PM CST, October 15th, 2026
City of Minneapolis Finance and Property Services Department
Event 4278 Pre-Bid Meeting
September 29, 2026 at 9:30 AM
Topics of Discussion:
The purpose of this meeting is to establish goals and procedures for the construction of the above referenced project. The following topics will be discussed:
Introductions
1. Project Team Members
Procurement
1. Overview
2. Schedule
Pre-bid meeting 09/29 @ 9:30AM
Questions Due 10/02
Addendum 10/07
Event Close Date 10/15 @ 2:00PM
3. Contractor Questions due by October 02, 2026
• Questions need to be submitted to Duane Hansen
• duane.hansen@minneapolismn.gov
4. Addendums:
• Addendum No. 1 o Pre-bid Meeting Items/Questions, Other Items o Addendum will be posted by October 07, 2026
5. Bids due by October 15, 2026 @ 2:00 PM CT
City of Minneapolis, Department of Civil Rights
1. SUBP Goals:
• 0% Minority Business Enterprise (MBE) &
0% Women Business Enterprise (WBE)
2. Federal HUD FY24 CPF Grant Funding for this project
Project Overview
3. Scope
4. Project Alternates (Specification Section 01 2300)
• Alternate 01: Family Restroom
• Alternate 02: 200 & 300 Canopy Steel Structure Painting
5. Substitution Requests (Specification Sections 01 2500 & 01 2500A)
6. Timeline
• Anticipated Project Start: 1st Quarter, 2027
• Substantial Project Completion by: November 12, 2027
Other Items
1. Permit from City of Minneapolis
• Contractor shall obtain all necessary permits and pay all charges and fees
• WAC & SAC Fees
2. Farmers Market Use of Site & Contractor’s Schedule/Staging:
• See Architectural Sheet a0.2 CONSTRUCTION STAGING PLAN
i. Farmers Market Operations must be accounted for in Contractor’s schedule and staging
• See Specifications Section 00 73 00, 1-24 PROSECUTION OF WORK
i. Pre-Construction Meeting to review and revise Contractor’s proposed schedules and staging
ii. City Project Manager’s final approval of schedule and staging is required prior to Construction Kickoff Meeting
3. Deliveries
• To be coordinated as part of the construction staging plan
4. Security
• Contractor responsible for Site Security
• To be coordinated as part of the construction staging plan
5. Site Walk
• After Meeting
Other Comments or Questions?
Q&A
Event # 0000004278
Questions & Answers:
Q: Can contractors start before Q1 2027?
A: No. Due to Christmas tree sales and December winter market, January 1st, 2027 would be the earliest available start "me.
Q: Are there specific working hours/"me constraints for construc"on?
A: Reference Specifica"on Sec"on 00 73 00 1-4 for normal hours of work as defined by City
Ordinance and for A.er-Hours Work Permit requirements.
Q: Alternate #2 and RCP Keynote 3 state that only the steel structure is to be painted. Is it acceptable to paint overhead conduits and the underside of roof panels to save on overall prep "me?
A: Yes, it is acceptable to paint all conduits and the underside of roof panels. Alternate #2 and Keynote language have been revised in Addendum No. 1 to include pain"ng all of the steel structure, electrical infrastructure (conduits, junc"on boxes, etc.), and the underside of roof panels to be the same color.
Q: Has the project site had any hazardous materials analysis completed?
A: Yes, please refer to Spec Sec"on 00 3132 for Available Project Informa"on. Published reports are available for download in the City’s bid pos"ng.
SECTION 3 CLAUSE
All Section 3 covered contracts shall included the following clause (referred to as the
Section 3 Clause):
A. The work to be performed under this contract is subject to the requirements of section
3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701 u
(Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD assisted projects covered by Section
3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing.
B. The parties to this contract agree to comply with HUD’s regulations in 24 CFR part
135, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the part 135 regulations.
C. The contractor agrees to send to each labor organization or representative or workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers representative of the contractor’s commitments under this Section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin.
D. The contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR part 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding that the subcontractor is in violation of the regulations in 24 CFR part 135. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24
CFR part 135.
E. The contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR part
135 require employment opportunities to be directed, were not filled to circumvent the contractor’s obligations under 24 CFR part 135.
F. Noncompliance with HUD’s regulations in 24 CFR part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.
G. With respect to work performed in connection with Section 3 covered Indian housing assistance, section 7(b) of the Indian Self-Determination and Education Assistance Act
(25 U.S.C. 450e) also applies to the work to be performed under this contract. Section
7(b) requires that to the greatest extent feasible (i) preference and opportunities for training and employment shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned
Economic Enterprises. Parties to this contract that are subject to the provisions of
Section 3 to the maximum extent feasible, but not in derogation of compliance with section 7(b) 24
P a g e 1
4 2 0 1 C e d a r A v e n u e S o u t h , M i n n e a p o l i s , M N 5 5 4 0 7 | 6 1 2 . 9 0 4 . 1 3 3 2 | h c m a r c h i t e c t s . c o m
ADDENDUM #01
Date: 10/06/2026
Project: City of Minneapolis – Farmers Market Sustainable Modernization
Project Number: 2547
Project Location: 312 East Lyndale Ave N, Minneapolis, MN 55405
Owner: City of Minneapolis
Bids Due: October 15, 2026 at 2:00 PM
Issued By: Josh Tindall, HCM Architects
The additions, revisions, corrections, and clarifications contained herein shall be made to the Bidding Documents, Conditions of the Contract, Contract Drawings, and Specifications for the Project and shall be included in the Scope of Work and Bid Proposals to be submitted. References made below to Specifications and Contract Drawings shall be used as a general guide only. Bidders shall determine for themselves the full scope of work affected by Addendum items.
QUESTIONS
1. Please refer to City documentation for submitted questions & answers.
REQUEST FOR SUBSTITUTIONS
1. No substitution requests were submitted to be reviewed – Please refer to Specification Section 01 2500.
SPECIFICATION REVISIONS
Note: All text revisions have been made in red text.
• 22 4000 – Plumbing Fixtures o Clarified approved manufacturers - Only BOD is the approved manufacturer/model.
DRAWING SHEETS
Note: All sheet revisions have been clouded and tagged with Revision Delta #1, Addendum #1, dated 10/06/2026..
• a0.0 – Cover Sheet o Clarified Alternate #02 Scope to include entire steel structure, all exterior electrical infrastructure, and underside of metal roof panels – Refer to RCP Keynote #3.
o Updated Sheet Index to reflect Addendum #1 reissued sheets
• a2.1i – Interior Finishes Plan o Added PT.4 to Finish Schedule for exterior steel
• a8.0 – Door and Window Types & Details o Revised notes under Door Type D1, D2 and Frame Type F1, that exterior locations to be galvannealed finish ready to receive paint
P a g e 2
4 2 0 1 C e d a r A v e n u e S o u t h , M i n n e a p o l i s , M N 5 5 4 0 7 | 6 1 2 . 9 0 4 . 1 3 3 2 | h c m a r c h i t e c t s . c o m
• a9.0 – Reflected Ceiling Plan - Overall o Revised RCP Keynote #3 and clarified Alternate #2 scope
• a9.1 – Reflected Ceiling Plan – 300 Pavilion o Revised RCP Keynote #3 and clarified Alternate #2 scope
• C010 – Demolition Plan o No parking sign previously called out to be protected will be salvaged and reinstalled.
• C101 – Site Plan o No parking sign previously called out to be protected will be salvaged and reinstalled. Also, City property sign at 3rd/Border intersection will be reinstalled, but internal stop sign does not need to be as the drive is now one-way. This is also clarified on C102.
• C102 – Right-of-Way Signage Plan o Entire plan revised per multiple rounds of city comments.
• C301 – Utility Plan o View 3 – “Utility Plan – Northwest” added to show installation of CB D1 over existing 12” RCP.
ATTACHMENTS
List the attached documents or drawings that are included in the Addendum
Specifications:
o 22 4000 – Plumbing Fixtures
Drawing Sheets:
o a0.0 – Cover Sheet o a2.1i – Interior Finishes Plan o a8.0 – Door and Window Types & Details o a9.0 – Reflected Ceiling Plan - Overall o a9.1 – Reflected Ceiling Plan – 300 Pavilion o C010 – Demolition Plan o C101 – Site Plan o C102 – Right-of-Way Signage Plan o C301 – Utility Plan o
END OF ADDENDUM
MPLS Farmers Market
Plumbing Fixtures 22 4000-1
SECTION 22 4000 - PLUMBING FIXTURES
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Water closets.
2. Toilet seats.
3. Urinals
4. Lavatories.
5. Faucets.
6. Showers.
7. Mop Basins.
8. Drinking fountains
9. Wall hydrants
10. Hose bibbs
11. Supply fittings.
12. Waste fittings.
13. Protective shielding guards.
14. Fixture supports.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include diagrams for power, signal, and control wiring.
C. Contractor shall include Manufacturer's Certification for BABAA requirements with all applicable submittals. Contractor shall comply with BABAA requirements, including coordination with manufacturers, distributors, and suppliers to correct deficiencies in any BABAA documentation.
D. Failure to provide manufacturer's BABAA documentation or certification during shop drawing review will result in rejection of the submittal.
E. Contractor shall certify upon completion that all work and materials have complied with BABAA requirements.
1.3 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1. Product data
2. Product certificates
3. Wiring Diagrams
4. Warranty: Sample of warranty.
1.4 QUALITY ASSURANCE
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.
B. Regulatory Requirements: Comply with requirements in ICC A117.1, "Accessible and Usable
Buildings and Facilities" for plumbing fixtures for people with disabilities.
C. Comply with NSF 14, "Plastics Piping Components and Related Materials," for plastic domestic water piping components.
Plumbing Fixtures 22 4000-2
D. Regulatory Requirements: Comply with requirements in Public Law 102-486, "Energy Policy
Act," about water flow and consumption rates for plumbing fixtures.
E. Regulatory Requirements: Comply with requirements in ICC A117.1, "Accessible and Usable
Buildings and Facilities" for fixtures for people with disabilities.
F. NSF Standard: Comply with NSF 61, "Drinking Water System Components--Health Effects," for fixture materials that will be in contact with potable water.
G. ARI Standard: Comply with ARI’s "Directory of Certified Drinking Water Coolers" for style classifications.
H. ARI Standard: Comply with ARI 1010, "Self-Contained, Mechanically Refrigerated Drinking-
Water Coolers," for water coolers and with ARI’s "Directory of Certified Drinking Water Coolers" for type and style classifications.
I. ASHRAE Standard: Comply with ASHRAE 34, "Designation and Safety Classification of
Refrigerants" for water coolers. Provide HFC 134a (tetrafluoroethane) refrigerant unless otherwise indicated.
J. Select combinations of fixtures and trim, faucets, fittings, and other components that are compatible.
K. Comply with the following applicable standards and other requirements specified for plumbing fixtures:
1. Enameled, Cast-Iron Fixtures: ASME A112.19.1M.
2. Plastic Shower Enclosures: ANSI Z124.2.
3. Plastic Sinks: ANSI Z124.6.
4. Porcelain-Enameled, Formed-Steel Fixtures: ASME A112.19.4M.
5. Slip-Resistant Bathing Surfaces: ASTM F 462.
6. Solid-Surface-Material Lavatories and Sinks: ANSI/ICPA SS-1.
7. Vitreous-China Fixtures: ASME A112.19.2M.
L. Comply with the following applicable standards and other requirements specified for lavatory and sink faucets:
1. Backflow Protection Devices for Faucets with Side Spray: ASME A112.18.3M.
2. Backflow Protection Devices for Faucets with Hose-Thread Outlet: ASME A112.18.3M.
3. Diverter Valves for Faucets with Hose Spray: ASSE 1025.
4. Faucets: ASME A112.18.1.
5. Hose-Connection Vacuum Breakers: ASSE 1011.
6. Hose-Coupling Threads: ASME B1.20.7.
7. Integral, Atmospheric Vacuum Breakers: ASSE 1001.
8. NSF Potable-Water Materials: NSF 61.
9. Pipe Threads: ASME B1.20.1.
10. Sensor-Actuated Faucets and Electrical Devices: UL 1951.
11. Supply Fittings: ASME A112.18.1.
12. Brass Waste Fittings: ASME A112.18.2.
M. Comply with the following applicable standards and other requirements specified for bathtub bathtub/shower and shower faucets:
1. Backflow Protection Devices for Hand-Held Showers: ASME A112.18.3M.
2. Combination, Pressure-Equalizing and Thermostatic-Control Antiscald Faucets:
ASSE 1016.
3. Faucets: ASME A112.18.1.
4. Hand-Held Showers: ASSE 1014.
5. High-Temperature-Limit Controls for Thermal-Shock-Preventing Devices: ASTM F 445.
6. Hose-Coupling Threads: ASME B1.20.7.
Plumbing Fixtures 22 4000-3
7. Manual-Control Antiscald Faucets: ASTM F 444.
8. Pipe Threads: ASME B1.20.1.
9. Pressure-Equalizing-Control Antiscald Faucets: ASTM F 444 and ASSE 1016.
10. Sensor-Actuated Faucets and Electrical Devices: UL 1951.
11. Thermostatic-Control Antiscald Faucets: ASTM F 444 and ASSE 1016.
N. Comply with the following applicable standards and other requirements specified for miscellaneous fittings:
1. Atmospheric Vacuum Breakers: ASSE 1001.
2. Brass and Copper Supplies: ASME A112.18.1.
3. Dishwasher Air-Gap Fittings: ASSE 1021.
4. Manual-Operation Flushometers: ASSE 1037.
5. Plastic Tubular Fittings: ASTM F 409.
6. Brass Waste Fittings: ASME A112.18.2.
7. Sensor-Operation Flushometers: ASSE 1037 and UL 1951.
O. Comply with the following applicable standards and other requirements specified for miscellaneous components:
1. Dishwasher Air-Gap Fittings: ASSE 1021.
2. Flexible Water Connectors: ASME A112.18.6.
3. Grab Bars: ASTM F 446.
4. Hose-Coupling Threads: ASME B1.20.7.
5. Hot-Water Dispensers: ASSE 1023 and UL 499.
6. Off-Floor Fixture Supports: ASME A112.6.1M.
7. Pipe Threads: ASME B1.20.1.
8. Plastic Toilet Seats: ANSI Z124.5.
9. Supply and Drain Protective Shielding Guards: ICC A117.1.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following (Substitutions: Refer to Section 01 6000 – Product Requirements):
1. Flush Valves: Listed as Specified Product Below.
2. Fixture Supports: Listed as specified product below.
2.2 WATER CLOSETS
A. WC2, Wall Hung, Flush Valve, Elongated Bowl, 1.28 gpf, ADA.
1. Fixture: Vitreous china, wall mount, back outlet, elongated toilet bowl. 1-1/2” top spud with
2-1/8” glazed siphon trapway, 1000-gram MAP flush test capacity, static weight load of
1,000 lbs.
a. Manufacturer: Water Closets: American Standard 3351.101
2. Flushometer: 1.28 gpf, ADA compliant, 1” IPS screwdriver Bak-Chek® angle stop, vandal resistant stop cap, mechanical override button, vacuum breaker, spud coupling 1-1/2”, adjustable tail piece, self-adaptive infrared sensor with indicator light, walk by delay to prevent unintentional flushing, synthetic rubber diaphragm with dual filtered by-pass, lithium battery operated.
a. Valve manufacturer: Sloan 8116 flush valve.
3. Seat: Open front less cover, heavy duty solid plastic for elongated bowl, self-sustaining check hinges, stainless steel posts, white.
Plumbing Fixtures 22 4000-4
a. Manufacturer: Bemis 1655SSCT.
4. Fixture Mounting Height: 17” to top of seat.
B. WC1, Wall Hung, Flush Valve, Elongated Bowl, 1.28 gpf.
1. Fixture: Vitreous china, wall mount, back outlet, elongated toilet bowl. 1-1/2” top spud with
2-1/8” glazed siphon trapway, 1000-gram MAP flush test capacity, static weight load of
1,000 lbs.
a. Manufacturer: Water Closets: American Standard 3351.101
2. Flushometer: 1.28 gpf, American Standard Afwall Millennium 3351.101., 1” IPS screwdriver Bak-Chek® angle stop, vandal resistant stop cap, mechanical override button, vacuum breaker, spud coupling 1-1/2”, adjustable tail piece, self-adaptive infrared sensor with indicator light, walk by delay to prevent unintentional flushing, synthetic rubber diaphragm with dual filtered by-pass, lithium battery operated.
a. Valve manufacturer: Sloan 8116 flush valve.
3. Seat: Open front less cover, heavy duty solid plastic for elongated bowl, self-sustaining check hinges, stainless steel posts, white.
a. Manufacturer: Bemis 1655SSCT.
4. Fixture Mounting Height: 16” to top of seat.
2.3 URINALS
A. UR1, Wall Hung, ADA, Flush Valve.
1. Fixture: Wall-mount, wash-down, vitreous china urinal with extended sides, 0.5 gpf, integral trap, 3/4” top spud, 2” outlet spud, two concealed wall hangers and bolts.
a. Valve manufacturer: American Standard 6590.001
2. Flushometer: 0.5 gpf, ADA compliant, chrome, 1” IPS screwdriver Bak-Chek® angle stop, vandal resistant stop cap, mechanical override button, vacuum breaker, spud coupling
3/4”, adjustable tail piece, self-adaptive infrared sensor with indicator light, walk by delay to prevent unintentional flushing, synthetic rubber diaphragm with dual filtered by-pass, lithium battery operated.
a. Valve manufacturer: 0.5 GPF with Sloan 8186 flush valve.
3. Fixture Mounting Height: 17” to rim.
2.4 LAVATORIES
A. LAV-1, Lavatory, Wall hung, ADA.
1. Fixture: White vitreous china, 20” x 18” nominal dimensions, concealed arm installation faucet ledge, self-draining deck, front overflow, 4” centers, front overflow.
a. Manufacturer:American Standard 9141.011
2. Faucet: Battery operated, sensor-operated cartridge, aerator, 0.5 GPM maximum flow, chrome finish, circuit controller mounted under sink in water proof box, in-line filter, slow closing solenoid valve, ADA compliant.
a. Manufacturer: 0.5 GPM with Sloan EAF-275 faucet
3. Mixing Valve: Provide each lavatory with thermostatic mixing valve with adjustable control cartridge, ASSE 1070, all brass unit, vandal resistant cap, hot and cold check valves.
Mount unit under lavatory adjacent to faucet mixing valve. Provide faucet manufacturers reccomended mixing valve.
a. Example Manufacturer: Delta R3070-MIXLF.
2.5 MOP BASINS
A. MS-1, Mop Basin.
Plumbing Fixtures 22 4000-5
1. Fixture: 24” x 24” x 10” keep, crushed stone, stainless steel bumper guard, stainless steel wall guard, and polyester resin construction.
a. Manufacturers: Fiat MSB 2424.
2. Trim: 30” long heavy-duty rubber hose 5/8” (with hose bracket 302 stainless steel and rubber grip, mop hanger 24” long with (3) rubber grips.
3. Fittings: Wall mount faucet with inline vacuum breaker, 4” lever handles, 3/4” hose threaded spout, adjustable wall brace, pail hook, flanged arms with integral stops, rough chrome finish.
a. Manufacturers: Delta 28C9LH.
4. Drain: 3” stainless steel drain body, type 302 stainless steel dome type strainer and lint basket.
2.6 DRINKING FOUNTAINS
A. DF-1, Drinking Fountain, Bottle Filler, ADA
1. Description: Dual Height all stainless-steel unit, accessible, ARI 1010, Type PB, pressure with bubbler, push button actuation mechanism, wall-mounting unit, vandal resistant kit, freeze-resistant valve kit, ADA compliant, 5-year warranty, vandal resistant.
a. Cabinet: Cabinet: vinyl-covered steel with stainless-steel top.
b. Bubbler: One, with adjustable stream regulator, located on cabinet deck. Anti-microbial pliable polyester safety bubbler.
c. Control: Push button. Front, right and left controls on each unit.
d. Supply: NPS 3/8with ball, gate, or globe valve.
e. Bottle Filling Station:
1) Sensor activated with user interface graphics.
2) Automatic 20 second shut off timer.
3) Visual interface displays bottles saved and LED visual filter monitor shows filter replacement.
4) - 1.5 gpm flow rate with laminar flow
f. Filter: One or more water bottle filters complying with NSF 42 and NSF 53 for cyst and lead reduction to below EPA standards; with capacity sized for unit peak flow rate.
g. Drain(s): Grid with NPS 1-1/4minimum horizontal waste and trap complying with
ASME A112.18.1.
h. Support: Galvanized structural steel chassis shall support unit and fasten to existing wall and provides all structural integrity and rigidity to unit.
i. Architect to choose color based on custom color chart.
j. Material: 300 Stainless Steel
2. Manufacturer: Elkay LK4408BF
2.7 WALL HYDRANTS
A. WH-1, Wall Hydrant.
1. Fixture: Flush freezeless wall mounted unit: 3/4” garden hose outlet connection, 3/4” NPS inlet connection, with anodized aluminum recessed box and lockable door, ASSE 1052 vacuum backflow preventer two independent check valves, automatic drain when hose is removed, furnish with operating tee key.
a. Exterior freeze-proof wall hydrants shall be provided for maintenance cleaning and served with cold potable water. Wall hydrants shall be recessed freezeless type with keyed valve.
Plumbing Fixtures 22 4000-6
b. Manufacturer: Woodford 67.
2.8 HOSE BIBBS
A. HB-1, Interior Hose Bibb.
1. Fixture: Wall mounted freezeless unit, 3/4” garden hose outlet connection, 3/4” NPS inlet connection, ASSE 1052 vacuum backflow preventer two independent check valves, automatic drain when hose is removed, metal handle, ASME A112.18.1 for sediment faucets. Fasten unit securely to wall.
a. Manufacturer: Chicago 387-LEFE27
2.9 SUPPLY FITTINGS
A. NSF Standard: Comply with NSF/ANSI 61, "Drinking Water System Components - Health
Effects," for faucet materials that will be in contact with potable water.
B. Standard: ASME A112.18.1/CSA B125.1.
C. Supply Fittings:
1. Supply Piping: Chrome-plated-brass pipe or chrome-plated-copper tube matching water-supply piping size. Include chrome-plated wall flange.
2. Stops: Chrome-plated-brass, one-quarter-turn, ball-type or compression stop with inlet connection matching water-supply piping type and size.
a. Operation: Loose key or Wheel handle
3. Risers:
a. Size: NPS 3/8 for lavatories, electric water coolers and drinking fountains.
b. Size: NPS 1/2 for water closets, dishwashers, service sinks, kitchen sinks and laundry trays.
c. Material: ASME A112.18.6, braided- or corrugated-stainless-steel flexible hose riser.
2.10 WASTE FITTINGS
A. Standard: ASME A112.18.2/CSA B125.2.
B. Drain: Grid type with NPS 1-1/4 offset tailpiece for standard and accessible lavatories in public locations
C. Drain: Pop-up type with NPS 1-1/4 straight tailpiece as part of faucet for standard lavatories in private locations.
D. Drain: Grid type with NPS 1-1/2 offset tailpiece for accessible kitchen sinks.
E. Drain: Grid type with NPS 1-1/2 straight tailpiece for standard kitchen sinks and laundry trays.
F. Trap:
1. Size: NPS 1-1/4 for lavatories.
2. Size: NPS 1-1/2 for kitchen sinks and laundry trays.
3. Material: Chrome-plated, two-piece, cast-brass trap and swivel elbow with 0.032-inch-thick brass tube to wall; and chrome-plated-brass or -steel wall flange.
4. Material: Stainless-steel, two-piece trap and swivel elbow with 0.012-inch-thick stainless-steel tube to wall; and stainless-steel wall flange.
2.11 PROTECTIVE SHIELDING GUARDS
A. Protective Shielding Pipe Covers
1. Construction: 1/8-inch soft, non-laminated flexible PVC with antimicrobial, antifungal, and
UV resistant properties. Fusion molded one-piece universal design for mutable P-trap
Plumbing Fixtures 22 4000-7 configurations. Adhesives, sewing threads and two-ply laminated materials shall not be allowed. Exterior surfaces shall be smooth nonabsorbent with no finger recessed indentations for easy cleaning. Supply riser shall be flexible & min.15” in length.
2. Insulation Material:
a. ASTM C1822-15 Type I for Class A material.
b. Flame & Smoke: IBC (International Building Code) Testing Standard ASTM E 84-07/
UL 723 Class A Material.
c. Thermal Resistance R value of 0.504 or lower when tested by ASTM C177.
d. Thermal Conductivity K value of 0.358, Density-21.61pcf per ASTM C518.
e. Microbial, and Fungal resistance for interior and exterior: ASTM G21- “0” growth.
3. Sanitary: Weep hole for condensation drainage and ventilation
4. Fasteners: Reusable, fusion bonded Velcro and tamper resistant snap-locking fasteners with no sharp or abrasive external surfaces. No cable tie fasteners allowed.
5. Compliance: Installed shall comply with ADA 2010 Accessible Design 4.19.4, & IBC, ADAAG 606.5, GSA & DOD’s ABA 606.5, ICC/ANSI A117.1 606.6 and UPC/IAPMO PS
94-2008.
6. Color: High Gloss color to match fixture. Color selected by Architect.
2.12 FIXTURE SUPPORTS
A. Water-Closet Supports:
1. Description: Combination carrier designed for accessible or standard mounting height of wall-mounting, water-closet-type fixture. Include single or double, vertical or horizontal, hub-and-spigot or hubless waste fitting as required for piping arrangement; faceplates;
couplings with gaskets; feet; and fixture bolts and hardware matching fixture. Include additional extension coupling, faceplate, and feet for installation in wide pipe space.
B. Urinal Supports:
1. Description: Type I, urinal carrier with fixture support plates and coupling with seal and fixture bolts and hardware matching fixture for wall-mounting, urinal-type fixture. Include steel uprights with feet.
2. Accessible-Fixture Support: Include rectangular steel uprights.
C. Lavatory Supports:
1. Description: Type II, lavatory carrier with concealed arms and tie rod for wall-mounting, lavatory-type fixture. Include steel uprights with feet.
2. Accessible-Fixture Support: Include rectangular steel uprights.
2.13 GROUT
A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.
B. Characteristics: Nonshrink; recommended for interior and exterior applications.
C. Design Mix: 5000-psi, 28-day compressive strength.
D. Packaging: Premixed and factory packaged.
PART 3 EXECUTION
3.1 INSTALLATION
A. Install plumbing fixtures level and plumb according to roughing-in drawings.
Plumbing Fixtures 22 4000-8
B. Assemble and install plumbing fixtures, trim, fittings, and other components according to manufacturers’ written instructions.
C. Install counter-mounting fixtures in and attached to casework.
D. Install off-floor supports, affixed to building substrate, for wall-mounting fixtures.
1. Use carrier supports with waste fitting and seal for back-outlet fixtures.
2. Use carrier supports without waste fitting for fixtures with tubular waste piping.
3. Use chair-type carrier supports with rectangular steel uprights for accessible fixtures.
E. Install water-supply piping with stop on each supply to each fixture to be connected to water distribution piping. Attach supplies to supports or substrate within pipe spaces behind fixtures.
Install stops in locations where they can be easily reached for operation.
1. Exception: Use ball, gate, or globe valves if supply stops are not specified with fixture.
Comply with valve requirements specified in Section 22 0523 "General-Duty Valves for
Plumbing Piping."
F. Install flushometer valves for accessible water closets and urinals with handle mounted on the approach side of compartment. Install other actuators in locations that are easy for people with disabilities to reach.
G. Install toilet seats on water closets.
H. Install faucet flow-control fittings with specified flow rates and patterns in faucet spouts if faucets are not available with required rates and patterns. Include adapters if required.
I. Install and secure shower heads and control valves to structural blocking located in wall.
J. Install water-supply flow-control fittings with specified flow rates in fixture supplies at stop valves.
K. Install shower flow-control fittings with specified maximum flow rates in shower arms.
L. Install trap and tubular waste piping on drain outlet of each fixture to be directly connected to sanitary drainage system.
M. Install traps on fixture outlets.
1. Exception: Omit trap on fixtures with integral traps.
2. Exception: Omit trap on indirect wastes unless otherwise indicated.
N. Install protective shielding pipe covers and enclosures on exposed supplies and waste piping of accessible lavatories and sinks. Comply with requirements in Section 22 0719 "Plumbing Piping
Insulation."
O. Install wall flanges or escutcheons at piping wall penetrations in exposed, finished locations.
Use deep-pattern escutcheons if required to conceal protruding fittings. Comply with escutcheon requirements specified in Section 22 0500 "Common Work Results for Plumbing."
P. Seal joints between plumbing fixtures, counters, floors, and walls using sanitary-type, one-part, mildew-resistant silicone sealant. Match sealant color to fixture color. Comply with sealant requirements specified in Section 07 9200 "Joint Sealants."
Q. Installation of materials or products that are not compliant with BABAA requirements shall be considered defective work. Contractor shall correct any deficiencies at no cost to the Owner.
R. Contractor shall certify upon completion that all work and materials have complied with BABAA requirements.
3.2 CONNECTIONS
A. Connect fixtures with water supplies, stops, and risers, and with traps, soil, waste, and vent piping. Use size fittings required to match fixtures.
Plumbing Fixtures 22 4000-9
B. Piping installation requirements are specified in other Division 22 Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
C. Connect wiring according to Division 26 Section "Low-Voltage Electrical Power Conductors and
Cables."
D. Comply with water piping requirements specified in Section 22 1116 "Domestic Water Piping."
E. Comply with soil and waste piping requirements specified in Section 22 1316 "Sanitary Waste and Vent Piping."
F. Ground equipment according to Division 26 Section "Grounding and Bonding for Electrical
Systems."
G. Install protective shielding pipe covers and enclosures on exposed supplies and waste piping of accessible lavatories and sinks. Comply with requirements in Section 22 0719 "Plumbing Piping
Insulation."
3.3 ADJUSTING
A. Operate and adjust plumbing fixtures and controls. Replace damaged and malfunctioning fixtures, fittings, and controls.
B. Adjust water pressure at faucets to produce proper flow.
3.4 FIELD QUALITY CONTROL
A. Verify that installed plumbing fixtures are categories and types specified for locations where installed.
B. Check that plumbing fixtures are complete with trim, faucets, fittings, and other specified components.
C. Inspect installed plumbing fixtures for damage. Replace damaged fixtures and components.
D. Test installed fixtures after water systems are pressurized for proper operation. Replace malfunctioning fixtures and components, then retest. Repeat procedure until units operate properly.
E. Install fresh batteries in sensor-operated mechanisms.
F. Water Cooler Testing: After electrical circuitry has been energized, test for compliance with requirements. Test and adjust controls and safeties.
1. Remove and replace malfunctioning units and retest as specified above.
2. Report test results in writing.
3.5 CLEANING AND PROTECTION
A. After completing installation of plumbing fixtures, inspect and repair damaged finishes.
B. Clean plumbing fixtures, faucets, and other fittings with manufacturers’ recommended cleaning methods and materials.
C. Provide protective covering for installed plumbing fixtures and fittings.
D. Do not allow use of plumbing fixtures for temporary facilities unless approved in writing by
Owner.
END OF SECTION 22 4000
PROJECT SITE:
CITY OF MINNEAPOLIS FARMERS MARKET
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
CONTRACTOR SHALL REVIEW CONSTRUCTION DOCUMENTS & SPECIFICATIONS TOGETHER FOR
ENTIRE COMPREHENSIVE PROJECT UNDERSTANDING & DESIGN REQUIREMENTS. WHEN A BASIS OF DESIGN PRODUCT IS LISTED IN CONSTRUCTION DOCUMENTS, BUT NOT A SPECIFICATION SECTION
OR VICE VERSA, THE BASIS OF DESIGN LISTED SHALL GOVERN.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS, CONDITIONS ETC. AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT.
CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR CONSTRUCTION AND PAY ALL
INSPECTION FEES FOR ALL PORTIONS OF THE WORK.
CONTRACTOR SHALL VISIT THE SITE (INCLUDING MECHANICAL & ELECTRICAL SUB-CONTRACTORS)
TO VERIFY ALL EXISTING CONDITIONS AND TO DETERMINE THE FULL EXTENT OF THE WORK
REQUIRED TO COMPLETE THE DESIGN SHOWN ON THE PLANS.
ALL CONTRACTORS SHALL MEET OR EXCEED ALL STATE OF MINNESOTA AND CITY OF MINNEAPOLIS
CODES AND STANDARDS. EXISTING CODE REQUIREMENTS SHALL TAKE PRECEDENCE OVER WHAT
IS SHOWN ON PLANS.
CONTRACTOR SHALL PROVIDE ADEQUATE VENTILATION FOR WORKERS & ALL EMPLOYEES WHEN
PAINTING OR USING ADHESIVES OR TOXIC CHEMICALS. PAINTING MAY HAVE TO BE DONE ON
WEEKENDS IN OCCUPIED AREAS.
CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL SURFACES DAMAGED DUE TO CONSTRUCTION.
CONTRACTOR REQUIREMENTS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
THIS WORK FOR THIS PROJECT INCLUDES ALL WORK NECESSARY TO COMPLETE THE GENERAL
CONSTRUCTION.
UNDER THIS CONTRACT THE CONTRACTOR SHALL:
COORDINATE USE OF PREMISES WITH THE OWNER, REVIEW SHEET a0.2 CONSTRUCTION PHASING
CONTRACTOR'S WORK SHALL CONFORM TO THE OWNER'S WORK RULES AND SPECIFICATIONS.
REPAIR OR REPLACE SITE DAMAGE TO CONDITIONS WHICH EXISTED PREVIOUS TO STARTING WORK.
PLAN WORK SEQUENCE WITH OWNER AND ARCHITECT AND OBTAIN THEIR APPROVAL BEFORE
STARTING WORK.
NOTIFY OWNER AND ARCHITECT OF EXISTING SITE CONDITIONS THAT ARE IN CONFLICT WITH THE
INTENT OF THESE DOCUMENTS.
COORDINATE ALL WORK ON THE PROJECT. GENERAL CONTRACTOR SHALL PROVIDE A PROJECT
SUPERINTENDENT TO MANAGE AND SUPERVISE THE WORK.
EACH CONTRACTOR AND SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED TO COMPLETE THEIR WORK.
CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF
PRODUCTS UNDER THIS CONTRACT.
IT IS THE RESPONSIBILITY OF SUPPLIERS TO PROVIDE MANUFACTURER'S SPECS AND SHOP
DRAWINGS FOR FIXTURES AND EQUIPMENT TO THE ARCHITECT FOR APPROVAL. IT IS THE
RESPONSIBILITY OF THE RELATED SUB-CONTRACTORS FOR FIELD VERIFICATION AND REVIEW OF
SHOP DRAWINGS PRIOR TO FABRICATION APPROVAL OR FIELD CONSTRUCTION OF ANY RELATED
WORK.
PROVIDE A WASTE CONTAINER AND PAY FOR REMOVAL SERVICE OF ALL REFUSE AND WASTE
MATERIALS GENERATED BY ALL PRIME CONTRACTORS AND SUB-CONTRACTORS. EACH SUB-
CONTRACTOR WILL BE RESPONSIBLE FOR CLEAN-UP AND REMOVAL OF THEIR OWN WASTE
MATERIALS FROM THE SITE. LEAVE THE SPACE VACUUM AND BROOM CLEAN. CLEAN ALL GLASS AND
MIRRORS.
RECEIVE AND VERIFY ALL OWNER SUPPLIED MATERIALS AND EQUIPMENT. ALL SHORTAGES AND
DAMAGES SHALL BE DOCUMENTED ON RECEIVING TICKETS AND REPORTED TO OWNER AND
ARCHITECT IMMEDIATELY UPON RECEIPT.
FINAL CLEANING SHALL BE DONE BY A PROFESSIONAL CLEANING SERVICE OR EQUAL.
PROVIDE OWNER WITH LABOR AND MATERIAL WARRANTIES AND SERVICE CONTRACTS FROM ALL
SUB-CONTRACTORS AND EQUIPMENT AND MATERIAL MANUFACTURER'S. THESE WARRANTIES SHALL
BE IN EFFECT FOR A PERIOD OF ONE (1) YEAR FROM INSTALLATION DATE.
EARTH
GRAVEL/COMPACTED FILL
CONCRETE
STEEL
ALUMINUM
CMU
MASONRY
TILE
MARBLE / SOLID SURFACE
GLASS
FINISH MILLWORK
WOOD BLOCKING
BATT/LOOSE INSULATION
RIGID INSULATION
GYPSUM WALL BOARD
MATERIALS LEGEND
PLYWOOD
PARTICLE BOARDSPRAY FOAM INSULATION
Room name
Room name
150 SF
EXTERIOR WALL TAG ELEVATION MARKER
DOOR TAG
INTERIOR FINISHES TAG
EXTERIOR ELEVATION KEYNOTE FLOOR PLAN KEYNOTE
CEILING PLAN KEYNOTE
INTERIOR ELEVATION KEYNOTE
BUILDING SECTION WALL SECTION
DETAIL SECTION CALLOUT
INTERIOR ELEVATION MARKER
EXTERIOR ELEVATION MARKER A101
1A101
FURNITURE & EQUIPMENT KEYNOTE
STONEMORTAR/GROUT
INTERIOR PARTITION TAG
ANNOTATION LEGEND
BUILDING SECTION KEYNOTE RESTROOM PLAN & ELEVATION
KEYNOTE
ROOF PLAN KEYNOTE REVISION TAG
1i
PT.1
NORTH
A101
A101
A101
A101
BS06
SUBMIT COST TO FULLY BUILD-OUT STORAGE ROOM
311 AS A FAMILY RESTROOM TO MATCH FAMILY
RESTROOM 321 WHICH INCLUDES ADDITIONAL
PLUMBING FIXTURES, ADA GRAB BARS & RESTROOM
ACCESSORIES, INTERIOR FINISHES, AND REPLACING
THE DUTCH-DOOR WITH STANDARD INSULATED FLUSH
DOOR & ASSOCIATED HARDWARE. PLEASE NOTE THE
BASE PROJECT BID ALREADY INCLUDES PLUMBING
FIXTURE ROUGH-INS.
ALTERNATE #01
SUBMIT COST TO PREP, PRIME, AND PAINT THE
ENTIRETY OF THE STEEL STRUCTURE, ALL
ELECTRICAL INFRASTRUCTURE, AND UNDERSIDE OF
METAL ROOF PANELS, PER RCP KEYNOTE 3, FOR THE
200 & 300 CANOPIES TO MATCH THE 400 CANOPY.
ALTERNATE #02
a0.0
1 SITE LOCATION
ABBREVIATIONS INDEX
ABBREVIATION COMPONENT
A
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AHJ AUTHORITY HAVING JURISDICTION
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATELY
ARCH ARCHITECT / ARCHITECTURAL
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BRG BEARING
C
C/C CENTER TO CENTER
CAB CABINET
CFMF COLD FORMED METAL FRAMING
CG CORNER GUARD
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPET
CT CERAMIC TILE
CTR CENTER
CUH CABINET UNIT HEATER
D
DBL DOUBLE
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DN DOWN
DR DOOR
DS DOWNSPOUT
DWG DRAWING
E
EIFS EXTERIOR INSULATION & FINISH
SYSTEM
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
F
F/T FIRE TREATED
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIX FIXTURE
FLR FLOOR
FT FEET
G
GALV GALVANIZED
GYP GYPSUM
H
HB HOSE BIBB
HD HAND DRYER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
I
INSUL INSULATION
INT INTERIOR
ABBREVIATIONS INDEX
ABBREVIATION COMPONENT
J
JAN JANITOR
L
LAV LAVATORY
LF LINEAR FEET
LVL LEVEL
M
M.O. MASONRY OPENING
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MTL METAL
N
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OC ON CENTER
OPNG OPENING
P
PART PARTITION
PERP PERPENDICULAR
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PREFIN PREFINISHED
PROJ PROJECTION / PROJECTOR
Q
QT QUARRY TILE
R
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECOMMENDATION / RECORD
REF REFERENCE
REINF REINFORCED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S
SCH SCHEDULE
SIM SIMILAR
SPEC SPECIFICATIONS
ST STL STAINLESS STEEL
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
T
TOPO TOPOGRAPHY
TOS TOP OF STEEL
TOW TOP OF WALL
TWF THRU WALL FLASHING
TYP TYPICAL
U
UG UNDERGROUND
UH UNIT HEATER
V
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFY VERIFY
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WDW WINDOW
Y
YD YARD
NORTH
KEY PLAN:
SHEET NUMBER:
SHEET TITLE:
PROJECT:
CIVIL ENGINEERING
LANDSCAPE ARCHITECT
STRUCTURAL ENGINEERING
M/E/P ENGINEERING
ISSUE RECORD:
PROJECT NUMBER:
4201 CEDAR AVE. SOUTH
MINNEAPOLIS, MN 55407
612.904.1332 hcmarchitects.com
PROJECT ADRESS:
LICENSE:
333 WASHINGTON AVE N, SUITE 404
MINNEAPOLIS, MN 55401
763 218-6999 mendcollaborative.com
10/6/2026 3:15:02 PM
a0.0
312 East Lyndale Ave N, Minneapolis, MN 55405
CITY OF MINNEAPOLIS
FARMERS MARKET
COVER SHEET
SEPTEMBER 11, 2026
CITY OF MINNEAPOLIS FARMERS MARKET
312 East Lyndale Ave N, Minneapolis, MN 55405
CONSTRUCTION DOCUMENTS
SHEET INDEX - STRUCTURAL
S001 LEGEND SHEET
S002 GENERAL STRUCTURAL NOTES
S201 FOUNDATION PLAN
S202 ROOF FRAMING PLAN
S401 FOUNDATION SCHEDULES AND TYPICAL DETAILS
S402 MASONRY SCHEDULES AND TYPICAL DETAILS
S501 FOUNDATION DETAILS
S701 FRAMING DETAILS
SHEET INDEX - SHEET ISSUES
SHEET
NUMBER SHEET NAME 09
/1 1/
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
/0
6/
AD
D
EN
D
U M
SHEET INDEX - ARCHITECTURAL
a0.0 COVER SHEET • • a0.1 CODE REVIEW • a0.2 CONSTRUCTION STAGING PLAN • a1.0 OVERALL SITE DEMOLITION PLAN • a1.1 DEMOLITION PLAN - 300 PAVILION • a2.0 OVERALL SITE PLAN • a2.1 CONSTRUCTION FLOOR PLAN - 300 PAVILION • a2.1fe FURNITURE & EQUIPMENT PLAN • a2.1i INTERIOR FINISHES PLAN • • a2.2 ROOF PLAN • a3.0 EXTERIOR ELEVATIONS • a4.0 BUILDING SECTIONS • a4.1 WALL SECTIONS • a4.2 WALL SECTIONS • a5.0 WALL ASSEMBLIES • a5.1 EXTERIOR DETAILS • a5.2 SITE DETAILS • a7.0 ACCESSIBILITY DIAGRAMS • a7.1 INTERIOR ENLARGED PLANS & ELEVATIONS - RESTROOMS • a7.2 INTERIOR ENLARGED PLANS & ELEVATIONS - EBT / VENDING • a8.0 DOOR AND WINDOW TYPES & DETAILS • • a9.0 REFLECTED CEILING PLAN - OVERALL • • a9.1 REFLECTED CEILING PLAN - 300 PAVILION • •
NORTH
SHEET INDEX - MECHANICAL
m0.0 MECHANICAL TITLE SHEET m0.1 ENERGY COMPLAINCE FORMS m2.0d MECHANICAL DEMOLITION PLAN m2.1 MECHANICAL PLAN m5.1 MECHANICAL DETAILS AND SCHEDULES
SHEET INDEX - PLUMBING
p2.0d PLUMBING DEMOLITION PLAN p2.1 PLUMBING PLAN p5.1 PLUMBING DETAILS AND SCHEDULES p5.2 PLUMBING CALCULATIONS p6.1 PLUMBING RISERS
SHEET INDEX - ELECTRICAL
e0.0 ELECTRICAL TITLE SHEET e1.0 ELECTRICAL OVERALL/SITE PLAN e2.0d ELECTRICAL OVERALL/SITE DEMOLITION PLAN e2.1 ELECTRICAL PLANS - 200 SERIES PAVILION e2.2 ELECTRICAL PLANS - 300 SERIES PAVILION e2.3 ELECTRICAL PLANS - 400 SERIES PAVILION e4.1 ENLARGED ELECTRICAL PLANS e5.1 ELECTRICAL DETAILS e6.1 ELECTRICAL RISER DIAGRAM e7.1 ELECTRICAL SCHEDULES e8.1 PANEL SCHEDULES e8.2 PANEL SCHEDULES
SHEET INDEX - CIVIL
C000 COVER SHEET •
C010 DEMOLITION PLAN • •
C101 SITE PLAN • •
C102 RIGHT-OF-WAY SIGNAGE PLAN • •
C201 GRADING AND STORMWATER MANAGEMENT PLAN •
C202 ENLARGED GRADING PLAN •
C203 EROSION & SEDIMENT CONTROL PLAN •
C301 UTILITY PLAN • •
C501 DETAILS •
C502 DETAILS •
SHEET INDEX - LANDSCAPE
L1.00 SITE FURNISHINGS AND SIGNAGE PLAN •
L1.01 SITE FURNISHINGS AND SIGNAGE DETAILS •
L1.02 SITE SIGNAGE AND FURNISHING ENLARGEMENT •
L1.03 SITE SIGNAGE AND FURNISHING DETAILS •
REVISION: DATE: DESCRIPTION:
09/11/2026 CONSTRUCTION DOCUMENTS
1 10/06/2026 ADDENDUM #1
C
D
3.3 3.43.23.1
VENDING
OFFICE
SECURE
STORAGE
JAN.
STORAGE
WOMENS
FAMILY
MENS
STORAGE
ATM
ATM
FRP.1
W P.
W P.
W P.
W P.
W P.
W P.
RFT.1 VB.1
SC.1
SC.1
SC.1
SC.1
EXISTSC.1 VB.1RFT.1 VB.1
W P.
RFT.1 VB.1
W P.
PT.2
PT.2
PT.2
PT.2
1 1
1 1
FINISH LEGEND
FLOORS
SC.1 SEALED CONCRETE
RFT.1 RESILIENT FLOOR TILE
MFR: GERFLOOR
PRODUCT: TECHNICAL TILE
STYLE: ATTRACTION
COLOR: TBD
SIZE: 25"x25"
THICKNESS: 0.188"
INSTALL: MONOLITHIC
WALL BASES
VB.1 VINYL BASE #1
MFR: JOHNSONITE
PRODUCT: COVED BASE
COLOR:
SIZE: 4" HIGH
WALLS
PT.1 PAINT #1
MFR: SHERWIN WILLIAMS
PRODUCT: PRO-INDUSTRIAL WATERBASED CATALYZED EPOXY
FINISH: EG-SHELL
COLOR: DRIFT OF MIST | SW9166
LOCATION: OFFICE
PT.2 PAINT #2
MFR: SHERWIN WILLIAMS
PRODUCT: PRO INDUSTRIAL HIGH PERFORMANCE EPOXY
FINISH: EG-SHELL
COLOR: DRIFT OF MIST | SW9166
LOCATION: RESTROOM
PT.3 PAINT #3
MFR: SHERWIN WILLIAMS
PRODUCT: PRO INDUSTRIAL HIGH PERFORMANCE EPOXY
FINISH: SEMI-GLOSS
COLOR: DRIFT OF MIST | SW9166
LOCATION: HOLLOW METAL DOOR & FRAMES
PT.4 PAINT #4
MFR: SHERWIN WILLIAMS
PRODUCT: PRO INDUSTRIAL DTM ACRYLIC
FINISH: SEMI-GLOSS
COLOR: STUCCO GREIGO | SW2003
LOCATION: EXTERIOR STEEL CANOPY STRUCTURE
WP.1 WET WALL PANEL
MFR: WILSONART
PRODUCT: WETWALL
COLOR: STACCATO (W7004)
PANEL SIZE: 48" W x 96" H
SEALANT: WHITE STONE
NOTES: PROVIDE BULLNOSE OUTSIDE CORNERS
FRP.1 FIBERGLASS REINFORCED PANEL
MFR: MARLITE
PRODUCT: STANDARD FRP
SURFACE: PEBBLED
COLOR: P151 LIGHT GREY
MISCELLANEOUS
TP.1 TOILET PARTITIONS
MFR: ASI GLOBAL PARTITIONS
PRODUCT: COLOR - THRU PHENOLIC
COLOR: C HARCOAL 3077
STYLE: FLOOR ANCHORED, OVERHEAD BRACED
CEILINGS
PTC.1 PAINTED CEILING #1
MFR: SHERWIN WILLIAMS
PRODUCT: PRO-INDUSTRIAL WATERBASED CATALYZED EPOXY
FINISH: EG-SHELL
COLOR: EXTRA WHITE | SW7006
LOCATION: CEILINGS @ OFFICE
PTC.2 PAINTED CEILING #2
MFR: SHERWIN WILLIAMS
PRODUCT: PRO INDUSTRIAL PERFORMANCE EPOXY
FINISH: EG-SHELL
COLOR: EXTRA WHITE | SW7006
LOCATION: CEILINGS @ RESTROOMS
1.
2.
3.
4.
5.
6.
CONTRACTOR TO VERIFY ALL CONDITIONS AND REPORT DISCREPANCIES TO THE
ARCHITECT OR OWNER, PRIOR TO BEGINNING CONSTRUCTION.
REFER TO SHEET a9.0 FOR CEILING SCOPE OF WORK.
REFER TO SHEET a7.1 FOR ENLARGED TOILET PLANS.
ALL ELECTRICAL OUTLETS, SWITCHES, THERMOSTATS, PRESSURE MONITORS, ETC. TO
BE VERIFIED WITH OWNER ON-SITE BEFORE WALLS ARE CLOSED UP.
PROVIDE TRANSITION STRIPS AT ALL FLOORING FINISH CHANGES WITH A DELTA
GREATER THAN 1/4" AND WHERE INDICATED ON FINISH PLANS.
ALL FLOORING TO CONTINUE UNDER MILLWORK, EQUIPMENT & SEATING, TYP.
FINISHES PLAN GENERAL NOTES:
NORTH
KEY PLAN:
SHEET NUMBER:
SHEET TITLE:
PROJECT:
CIVIL ENGINEERING
LANDSCAPE ARCHITECT
STRUCTURAL ENGINEERING
M/E/P ENGINEERING
ISSUE RECORD:
PROJECT NUMBER:
4201 CEDAR AVE. SOUTH
MINNEAPOLIS, MN 55407
612.904.1332 hcmarchitects.com
PROJECT ADRESS:
LICENSE:
333 WASHINGTON AVE N, SUITE 404
MINNEAPOLIS, MN 55401
763 218-6999 mendcollaborative.com
10/6/2026 3:15:04 PM
a2.1i
312 East Lyndale Ave N, Minneapolis, MN 55405
CITY OF MINNEAPOLIS
FARMERS MARKET
INTERIOR FINISHES
PLAN
1/4" = 1'-0"a2.1i
1 ENLARGED INTERIOR FINISHES PLAN
ROOM FINISH SCHEDULE
Number Name Area Floor Finish Base Finish Ceiling Finish North Finish East Finish South Finish West Finish Comments
301 VENDING 149 SF RFT.1 VB.1 PTC.1 PT.1 PT.1 PT.1 PT.1 SPOT PAINT AS REQUIRED PER NEW
CONSTRUCTION SCOPE, MATCH EXISTING
302 OFFICE 162 SF RFT.1 VB.1 PTC.1 PT.1 PT.1 PT.1 PT.1
303 SECURE
STORAGE
34 SF RFT.1 VB.1 PTC.1 PT.1 PT.1 PT.1 PT.1
304 JAN. 33 SF SC.1 VB.1 PTC.1 FRP.1 FRP.1 FRP.1 FRP.1
305 STORAGE 22 SF EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING
310 MENS 198 SF SC.1 PT.2 PTC.2 PT.2 WP.1 PT.2 PT.2
311 STORAGE 109 SF SC.1 PT.2 PT.2 PT.2 PT.2 PT.2 WP.1
312 ATM 4 SF SC.1 PT.2 PTC.2 PT.2 PT.2 PT.2 PT.2
320 WOMENS 198 SF SC.1 PT.2 PTC.2 PT.2 WP.1 PT.2 PT.2
321 FAMILY 109 SF SC.1 PT.2 PTC.2 PT.2 PT.2 PT.2 WP.1
322 ATM 5 SF SC.1 PT.2 PTC.2 PT.2 PT.2 PT.2 PT.2
NORTH
KEYNOTES - INTERIOR FINISHES
NUMBER DESCRIPTION
1 WALL MOUNTED EXTERIOR GRADE ACCESSIBLE SIGNAGE, BASIS OF DESIGN:
MFR: INPRO
PRODUCT: ARCHITECTURAL SIGNAGE
STYLE: ASPEN
SIZE: MIN. 8" H x 6" W
BACKPLATE COLOR: 0351 RIVER ROCK
TEXT COLOR: WHITE
TEXT FONT: ARIAL
PICTOGRAMS: STANDARD TO MATCH ROOM FUNCTION
REVISION: DATE: DESCRIPTION:
09/11/2026 CONSTRUCTION DOCUMENTS
D1 FLUSH DOOR
SEE SCHED.
SE
E
SC
H
ED
U
LE
FRAME LEGEND DOOR LEGEND
D2 DUTCH DOOR
SEE SCHED.
SE
E
SC
H
ED
U
LE
3'
6" 3'
6"
F1 SINGLE W/ MASONRY HEADER
SEE SCHED
SE
E
SC
HE
DU
LE TYP
2"
2A
TY
P4"
NOTES:
BASIS OF DESIGN: TRUDOOR WITH
POLYSTYRENE CORE
INCLUDE FULL SHELF, INTERNAL TO
ROOM 311
EXTERIOR DOOR LOCATIONS TO BE
GALVANNEALED FINISH READY TO
RECEIVE PAINT, REFER TO SCHEDULE
NOTES:
EXTERIOR DOOR LOCATIONS
TO BE GALVANNEALED FINISH
READY TO RECEIVE PAINT,
REFER TO SCHEDULE
D3 LOUVERED DOOR
SEE SCHED.
SE
E
SC
H
ED
U
LE
NOTES:
BASIS OF DESIGN: TRUDOOR WITH
RIGID HONEYCOMB CORE
LOUVER SIZE: VARIES, SEE SCHEDULE
FINISH: PAINT, REFER TO SCHEDULE
1'
- 0
F2 SINGLE W/ STANDARD HEADER
SEE SCHED
SE
E
SC
HE
DU
LE TYP
2"
1A
TY
P2"
NOTES:
EXTERIOR LOCATIONS TO HAVE SOLID-
GROUT FILLED FRAMES
EXTERIOR DOOR LOCATIONS TO BE
GALVANNEALED FINISH READY TO
RECEIVE PAINT, REFER TO SCHEDULE
NOTES:
FINISH: PAINT, REFER TO SCHEDULE
WINDOW LEGEND
3'
- 0
3'
- 0
6' - 8"
W1 FLUSH BI-FOLD SERVICE WINDOW
NOTES:
BASIS OF DESIGN: READY ACCESS, 650 WALK-UP SERVING
WINDOW
CUSTOM SIZE: 80"W x 35.75"H x 4.5"D with (2x) 17"W x 27.25"H
SERVICE OPENINGS
GLAZING: 3/4" SMASH AND GRAB GLAZING
FRAME FINISH: CLEAR ANODIZED ALUMINUM
OPERATION: MANUAL OPEN/SELF CLOSE
NOTE: COORDINATE EXTERIOR SECURITY SHUTTER (SS1) TO
MATCH WINDOW OPENING SIZE - EXTENTS SHOWN WITH
DASHED LINE FOR REPRESENTATION ONLY
6' - 8"
3'
0" 3'
0"
SS1 EXTERIOR SECURITY SHUTTER
NOTES:
BASIS OF DESIGN: ALUMATEC PACIFIC PRODUCTS,
ROLL-UP SHUTTER - LIGO
CUSTOM SIZE TO MATCH SERVICE WINDOW OPENING
OPERATION: MANUAL PUSH-UP / PULL-DOWN
MOUNTING: H-GUIDE, WALL MOUNTED
LOCKING: ACCESSIBLE FROM THE INTERIOR
HOUSING: COFFERED PROFILE
FINISH: CUSTOM COLOR TO MATCH WALL PANEL
FRAME DETAILS - INTERIOR
THROAT SIZE
VARIES
IN
TE
RI
OR
EX
TE
RI
OR
1A - HM WRAPPED FRAME
2"
NOTES:
STANDARD JAMB DEPTHS TO BE CENTERED
IN WALL: 5 3/4" FOR 'S4' WALL TYPES
USE LOCK-IN ANCHORS FOR NEW
CONSTRUCTION
VARIES
VARIES
IN
TE
RI
OR
EX
TE
RI
OR
2A - HM WRAPPED FRAME
NOTES:
STANDARD JAMB DEPTHS TO BE CENTERED IN WALL:
- 7-1/8" FOR NOM. 8" DEPTH CMU
- 8-3/4" FOR NOM. 12" DEPTH CMU
USE T-ANCHORS FOR NEW CONSTRUCTION
DOOR SCHEDULE
Mark DOOR / OPENING FRAME Hardware
Set CommentsDoor Type Width Height Door Material Door Finish Frame Type Frame Material Frame Finish
301 D1 3' - 0" 7' - 0" HM PT.3 F1 HM PT.3 01A EXTERIOR INSULATED DOOR PANEL, SOLID-GROUT FILLED FRAME 302 D3 3' - 0" 7' - 0" HM PT.3 F1 HM PT.3 03 LOUVER SIZE: 24" W x 12" H 303 D3 3' - 0" 7' - 0" HM PT.3 F2 HM PT.3 02…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .