Addendum 2~7.pdf
PDF 867 KB Posted
- Attached to
- RFP For Vended Meals
- Solicitation number
- BD-26-2162-BFCCP-2162-124062
- Issued by
- Franklin County, Massachusetts
About this file
This is Addendum No. 2 to the contract documents for a roof replacement project at 221 Pleasant Street in Brookline, Massachusetts, issued by the Brookline Housing Authority. The project involves replacing the roof on the Egmont Street Development building and is identified as Project No. 046121. A pre-bid meeting was held on January 14, 2026. The bid due date for filed sub-bids is 3:00 p.m. on January 22, 2026, while general bids are due by 4:00 p.m. on February 5, 2026. The addendum, dated January 20, 2026, consists of 28 pages and includes clarifications, modifications, and the updated Davis-Bacon Federal Wage rates. Key clarifications include confirmation that Aetna Fire Alarm is the preferred fire alarm vendor, specifications for temporary electrical disconnects, and revisions to vapor barrier versus air/vapor barrier requirements. Chimney specifications are provided as approximately 5 feet in total height with 37-inch by 37-inch plan dimensions.
The addendum replaces the Davis-Bacon Federal Wages General Decision from December 12, 2025, with the updated General Decision Number MA20260004 effective January 2, 2026. The document provides comprehensive prevailing wage rates for various trades including carpenters, electricians, plumbers, roofers, sheet metal workers, and other construction classifications across multiple Massachusetts counties and regions. Wage rates vary by county and trade classification, with examples including carpenters ranging from $26.55 to $69.84 per hour depending on location and work type, electricians ranging from $48.16 to $66.17 per hour, and roofers at $42.48 to $53.53 per hour. The General Contractor is required to provide full-time, on-site project supervision throughout the contract duration, with a competent Project Superintendent maintaining full-time presence at the jobsite during all workdays. Executive Order provisions for paid sick leave and minimum wage requirements apply to all covered workers on this federally-funded contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 2 - Page 1 of 1
PROJECT:
Roof Replacement 221 Pleasant Street Brookline, MA 02446 Project No. 046121
ADDENDUM NO. 2 01/20/2026
Posted: 01/20/2026 at 1:49PM EST
Awarding Authority/Owner:
Brookline Housing Authority 90 Longwood Avenue Brookline, MA 02446
Reference Contract Documents (drawings and specifications) dated 01/07/2026
The attention of Bidders submitting proposals for the above subject project is called to the following addendum to the specifications and drawings. The items set forth herein, whether of omission, addition, substitution, or clarifications are all to be included in and form a part of the proposal submitted.
THE NUMBER OF THIS ADDENDUM (2) MUST BE ENTERED IN THE APPROPRIATE
SPACE “B” PROVIDED AFTER THE WORD “NUMBERS” OF THE CONTRACT FORM ENTITLED
“FORM FOR GENERAL BID,” AND IN SPACE “B” OF THE “FORM FOR SUB-BID.”
BID DOCUMENT MODIFICATIONS ARE AS FOLLOWS.
Other Modifications / Attachments:
The following attachment includes additional modifications, clarifications and/or provisions not included in the items above in this Addendum.
See document at the end of document.
All other of the portions of the Contract Documents remain unchanged. Please be reminded to acknowledge this Addendum on the bid forms.
Addendum 02 with Merged Documents.pdf --- End of Addendum No. 2 ---
ADDENDUM NO. 2
TO: Prospective Bidders
PROJECT: Roof Replacement Project Brookline Housing Authority Egmont Street Development (200-2) 221 Pleasant Street Brookline, Massachusetts SOCOTEC Project No. AE252029.2 EOHLC No. 046121
FROM: SOCOTEC A.E. Consulting, LLC 75 Hood Park Drive, Suite 300 Boston, MA 02129
DATE: January 20, 2026
This addendum modifies the Project Manual dated January 7, 2026, as noted below. Acknowledge receipt of this addendum in the space provided on the bid form. Failure to do so may subject the Bidder to disqualification.
The Bid Due Date for Filed Sub-Bids remains 3:00 p.m. January 22, 2026.
The Bid Due for General Bids remains 4:00 p.m. on February 5, 2026
This addendum consists of 28 pages (including these 2 pages).
INFORMATIONAL
1. Attached to this Addendum is the PreBid Meeting sign in sheet for the Prebid Meeting held on
Wednesday, January 14, 2026 (1-page)
CLARIFICATIONS
1. The General Contractor shall provide and maintain proper supervision of the labor force for project duration. The General Contractor shall provide, for project duration, a competent full-time, Project Superintendent who shall remain on site, full-time every workday. The Project Superintendent shall be responsible for providing full-time supervision of the labor force, including but not limited to his employees, his subcontractors, his material suppliers, and his equipment suppliers. His responsibilities shall also include general coordination and management of the job and his attendance is required at all project meetings. He shall not work as a foreman, mechanic, laborer, or tradesman, except with the written permission of the Engineer.
RFI/QUESTIONS
RFI 002 – Please confirm the buildings preferred fire alarm vendor
Answer: The preferred Fire Alarm Vendor for Brookline Housing Authority is Aetna Fire Alarm.
RFI 003 – Electrical Specification appears to be incomplete
Roof Replacement Project Brookline Housing Authority Egmont Street Development (200-2) Brookline, Massachusetts Addendum No. 2 January 20, 2025
Answer: The Temporary Electrical Disconnect Specifications are provided for the contractor so that if the vertical height of the exhaust fans have to be raised they have an idea what the required would be. The scope here is to extend the existing electrical feeds and nothing more
RFI 004 – Drawing T2, New Roof Composition indicates a self-adhered vapor barrier. 075100, 2.01 C.
specifies an adhered vapor barrier
Answer: The cold process vapor barriers specified in Section 07 51 00-11, 2.01 C.1-4 is to be deleted.
The contractor shall reference Section 07 22 00-9, 2.04 A. for installation of the air barrier. Any references in the specifications to vapor barrier are to be replaced with "air/vapor barrier".
RFI 006 – Could you please clarify chimney elevations and dimensions to get proper square foot per chimney
Answer: The chimney's are generally 5'-0" in total height up to the underside of the precast concrete parapet cap. The chimney's approximately 37" x 37" in plan dimension. The precast concrete parapet cap is approximately 6-1/2" in thickness
SPECIFICATIONS
1. Section 00 73 43.20 – Davis Bacon Federal Wages General Decision Number MA20250004 12 12
2025, Remove all pages and replace with Davis Bacon Federal Wages General Decision Number MA20260004 01 02 2026 attached to this Addendum (25 pages)
END OF ADDENDUM NO. 2
"General Decision Number: MA20260004 01/02/2026
Superseded General Decision Number: MA20250004
State: Massachusetts
Construction Type: Residential
Counties: Barnstable, Berkshire, Bristol, Essex, Hampden, Hampshire, Middlesex, Norfolk, Plymouth, Suffolk and
Worcester
Counties in Massachusetts.
RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/02/2026
BRMA0001-026 08/01/2023
LOWELL CHAPTER
MIDDLESEX COUNTY (Acton, Asby, Ashland, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstable, Framingham, Ft. Devens, Groton, Holliston, Hopkinton, Hudson, Littleton, Lowell, Maynard, Natick, North Acton, Pepperell, Sherborn, Shirley, South Acton, Stow, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington) NORFOLK
(Medfield, Medway, Mills) WORCESTER (Ashbumham, Athol, Fitchburg, Gardner, Harvard, Hopedale, Hubbardston, Lancaster, Leominster, Luneburg, Milford, Petersham, Phillipston, Princeton, Royalston, Southboro, Sterling, Templeton, Westminster, Winchendon)
Rates Fringes
Bricklayer, Plasterer, Stonemason.......................$ 62.40 34.40
BRMA0001-027 08/01/2023
SPRINGFIELD/PITTSFIELD CHAPTER
BERKSHIRE, HAMPDEN, HAMPSHIRE, WORCESTER (Warren) COUNTIES
Bricklayer, Plasterers, Stonemasons, Tile Layers.........$ 50.81 32.27
BRMA0001-028 08/01/2023
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North
Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton)
NORFOLK
(Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westwood, Wrenhtham)
PLYMOUTH (Lakeville)
BRICKLAYER.......................$ 62.40 34.40
BRMA0001-029 08/01/2023
WORCESTER CHAPTER
(Auburn, Barre, Blackstone, Berlin, Bolton, Boylston, Brookfield, Charlton, Clinton, Douglas, Dudley, Grafton, hardwick, Holden, Leicester, Mendon, Millbury, Millville, New
Braintree, Northboro, Northbridge, Oakham, Oxford, Paxton, Rutland, Shrewbury, Southbridge, Spencer, Sturbridge, Sutton, Upton, Uxbridge, Webster, Westboro, West Boylston, Worcester)
Bricklayer, Plasterer, Stonemason.......................$ 60.26 33.71
BRMA0003-026 08/01/2024
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville) NORFOLK (Brookline, Milton) SUFFOLK
BRICKLAYER.......................$ 64.50 37.54
BRMA0003-027 08/01/2024
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield, Wakefield, Wenham, West Newbury) MIDDLESEX (Reading, North Reading, Wakefield)
Bricklayer, Plasterer............$ 64.50 37.54
BRMA0003-028 08/01/2024
NEWTON CHAPTER
MIDDLESEX (Newton); NORFOLK (Dover, Needham, Wellesley)
BRMA0003-029 08/01/2024
NEW BEDFORD CHAPTER
BARNSTABLE, BRISTOL (Acushnet, Darmouth, Fairhave, Fall
River, Freetown, New Bedford, Somerset, Swansea, Westport)
PLYMOUTH
(Marion, Mattapoisett, Rochester, Wareham)
BRICKLAYER.......................$ 64.50 37.54
BRMA0003-030 08/01/2024
QUINCY CHAPTER
NORFOLK (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Stoughton, Weymouth) PLYMOUTH (Abington, Bridgewater, Brockton, Carver, Duxbury, East Bridgewater, Halifax, hanover, Hanson, Hingham, Hull, Kingston, Marshfield, Middleboro, Norwell, Pembroke, Plymouth, Rockland, Scituate, West Bridgewater, Whitman)
BRMA0003-031 08/01/2024
WALTHAM CHAPTER
MIDDLESEX (Belmont, Burlington, Concord, Lixington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)
BRMA0003-032 08/01/2024
BARNSTABLE, BRISTOL, SUFFOLK AND WORCESTER
Tile Layer.......................$ 64.50 37.54
CARP0327-003 09/01/2025
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville) NORFOLK (Brookline, Dedham, Milton) and SUFFOLK
Carpenters (Including Drywall
Hanging & Acoustical Ceiling
Installation)....................$ 61.19 31.55
CARP0336-008 09/01/2025
WORCESTER COUNTY
(except Gilbertville, Hardwick, Warren, West Brookfield)
Installation)....................$ 50.10 31.45
CARP0336-014 09/01/2025
BERKSHIRE, HAMPDEN, HAMPSHIRE AND WORCESTER (Gilbertville, Hardwick, Warren, West Brookfield)
Installation)....................$ 43.33 27.82
CARP0339-003 09/01/2025
BRISTOL (Attleborough, North Attleborough) ESSEX, MIDDLESEX
(Except Belmont, Cambridge, Everett, Malden, Medford, Somerville) NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Wrentham) and PLYMOUTH (Duxbury, Hanover, Hingham, Hull, Marshfield, Norwell, Pembroke, Rockland and Scituate)
Installation)....................$ 50.10 31.45
CARP0624-008 09/01/2017
BARNSTABLE, BRISTOL (Except Attleboro and North Attleboro)
AND
PLYMOUTH (Bridgewater, Brockton, Kingston, Lakeville, Middleboro, Plymouth, South Hanover, Whitman)
Installation)....................$ 39.28 27.90
CARP0723-001 10/01/2024
ZONE 2: BARNSTABLE, BERKSHIRE, BRISTOL, ESSEX, HAMPDEN,
HAMPSHIRE, PLYMOUTH, WORCESTER COUNTIES AND PART OF
MIDDLESEX,
NORFOLK AND SUFFOLK COUNTIES
(All other cities and towns in Massachusetts + Chelsea &
Winthrop)
CARPENTER (New Wood Frame
Construction not exceeding 4 stories including basement)
Wood framing, siding and exterior trim work..........$ 26.55 13.02
All other carpentry work on wood frame projects......$ 26.55 13.02
CARP0723-002 10/01/2024
ZONE 1: MIDDLESEX, NORFOLK AND SUFFOLK COUNTIES (Consists of
Boston, Islands of Boston Harbor, Brookline, Cambridge, Dedham, Malden, Medford and Somerville)
Carpenters (New Wood Frame
Construction not exceeding 4 stories including basement)
Wood framing, siding and exterior trim work..........$ 31.61 14.02
All other carpentry work on wood frame projects......$ 31.61 14.02
ELEC0007-008 06/29/2025
HAMPDEN (Except Chester and Holyoke); HAMPSHIRE
(Belchertown, Ware)
ELECTRICIAN......................$ 52.16 29.56
ELEC0007-009 06/29/2025
BERKSHIRE; HAMPDEN (Chester, Holyoke); HAMPSHIRE (Except
Belchertown, Ware)
ELECTRICIAN......................$ 52.16 29.56
Teledata System Installer
(Berkshire County)...............$ 52.16 29.56
ELEC0096-004 09/07/2025
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend);
WORCESTER (Except Warren)
ELECTRICIAN......................$ 48.16 36.20
Teledata System Installer........$ 36.12 34.51
ELEC0096-005 09/07/2025
WORCESTER (Warren)
ELECTRICIAN......................$ 48.16 36.20
ELEC0099-005 06/01/2025
BRISTOL (North & South Attleboro, Seekonk)
ELECTRICIAN......................$ 56.11 44.10%
ELEC0103-002 09/01/2025
ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX
(Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)
ELECTRICIAN......................$ 66.17 37.08
ELEC0103-004 09/01/2025
ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)
ELEC0103-010 09/01/2025
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott);
MIDDLESEX
(Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Coahasset, Dedham, Dover, Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull); SUFFOLK
(ESSEX; MIDDLESEX {Excluding
Ashby, Ashland, Ayer, Ft.
Devens, Groton, Hokinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend};
NORFOLK {Excluding Avon, Holbrook, Plainville, Randolph, Stoughton}; SUFFOLK)...$ 52.94 34.74
ELEC0223-011 09/01/2024
BARNSTABLE, BRISTOL (Except Attleboro, North Attleboro, Seekonk); NORFOLK (Avon, Halbrook, Randolph, Sloughton);
PLYMOUTH (Except Hingham and Hull Townships)
ELECTRICIAN......................$ 50.02 31.09%+15.50
(PLYMOUTH COUNTY (except
Townships of Hingham and
Hull))...........................$ 42.52 31.09%+15.25
ELEV0004-003 01/01/2025
BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK AND SUFFOLK
ELEVATOR MECHANIC................$ 74.17 38.435+a+b
FOOTNOTE FOR ELEVATOR MECHANICS
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the
Friday after Thanksgiving Day; and Christmas Day.
ELEV0041-007 01/01/2025
BERKSHIRE, HAMPDEN AND HAMPSHIRE
ELEVATOR MECHANIC................$ 66.41 38.435+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the
Friday after Thanksgiving Day; and Christmas Day.
ENGI0004-017 06/01/2025
BARNSTABLE; BRISTOL; ESSEX; MIDDLESEX, NORFOLK; PLYMOUTH;
SUFFOLK; and WORCESTER (Remainder of County)
Power Equipment Operator:
Excavators & Loaders.............$ 57.18 33.70
a. PAID HOLIDAYS: New Year's Day, Washington's
Birthday, Labor Day, Memorial day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and
Christmas
Day.
ENGI0004-018 06/01/2025
WORCESTER (Athol, Barre, Brookfield, East Brookfield, hardwick, New Braintree, North Brookfield, Oakham, Petersham, Phllipston, Royalston, Struthbridge, Templeton, Warren, West
Brookfield, Winchendon)
Excavators & Loaders.............$ 57.18 33.70
FOOTNOTES:
a. New Year's Day, Washington's Birthday, Memborial Day, Independence Day, Labor Day, Patriots Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day.
ENGI0098-012 06/01/2024
BERKSHIRE; HAMPDEN and HAMPSHIRE COUNTIES
Excavators & Loaders.............$ 41.23 30.58+A
a. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day
LABO0473-003 12/01/2024
BERKSHIRE, HAMPSHIRE (Chesterfield, Cummington, Goshen, Middlefield, Plainfield and Worthington)
Laborers: Mason Tender, Stone/Stucco.....................$ 31.54 25.63
LABO0596-007 12/01/2021
HAMPDEN, HAMPSHIRE (except Chesterfield, Cummington, Goshen, Middlefield, Plainfield and Worthington)
Laborers: Mason Tender, Stone/Stucco.....................$ 32.75 26.02
PAIN0035-016 01/01/2019
BERKSHIRE, HAMPDEN, AND HAMPSHIRE COUNTIES
PAINTER (DRYWALL FINISHING
ONLY)............................$ 32.33 26.35
PAIN0035-017 01/01/2019
BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, PLYMOUTH,
SUFFOLK, AND WORCESTER COUNTIES
PAINTER (DRYWALL FINISHING
ONLY)............................$ 39.86 30.25
PLAS0534-006 07/01/2024
MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES
PLASTERER........................$ 43.97 33.87
PLUM0004-006 09/01/2025
MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and
Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)
WORCESTER (except Hopedale and Southboro)
Plumbers, Pipefitters
(including HVAC work)............$ 55.00 31.57
PLUM0012-008 03/02/2025
ESSEX(Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence,Manchester, Marblehead, Merrimac, Methuem, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfieild, Wenham, West
Newbury)
PLUMBER..........................$ 69.84 36.43
PLUM0012-009 03/02/2025
ESSEX(Lynn, Lynnfield, Nahant, Saugus, and Swampscott);
MIDDLESEX (Acton, Arlington, Ashland, Ayer-except west of
Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlisle, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Waltham, Watertown, Wayland, Westford, Wilmington, Winchester, Wobrun); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK;
WORCESTER (Hopedale and Southboro)
PLUMBER..........................$ 69.84 36.43
PLUM0051-006 08/26/2024
BARNSABLE; BRISTOL; PLYMOUTH (Except Hingham, Hull, Scituate)
(including HVAC work)............$ 52.49 33.60
PLUM0104-005 09/17/2025
BERKSHIRE (Becket, Otis, Sandisfield); HAMPDEN; HAMPSHIRE
(including HVAC work)............$ 52.26 31.05
FOOTNOTE FOR PLUMBERS & STEAMFITTERS:
A. Paid holidays: Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer.
PLUM0104-011 09/17/2025
BERKSHIRE (Except Becket, Otis, Sandisfield)
(including HVAC work)............$ 52.26 31.05
FOOTNOTE FOR PLUMBERS & STEAMFITTERS:
A. Paid holidays: Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer.
PLUM0537-006 03/01/2025
ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury);
MIDDLESEX
(Acton, Arlington, Ashford, Ayer-except west of Greenville
Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);
SUFFOLK; WORCHESTER (Hopedale and Southboro)
Pipefitter including HVAC work...$ 66.58 39.22
ROOF0033-006 08/01/2025
BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, SUFFOLK,
WORCESTER
Roofer, Waterproofers/Caulkers...$ 53.53 35.69
ROOF0248-004 07/16/2025
BERKSHIRE, HAMPDEN, HAMPSHIRE
Roofer, Waterproofers/Caulkers...$ 42.48 30.14
ROOFER: Slate & Tile Roof.......$ 42.48 30.14
SHEE0017-004 04/01/2025
WORCESTER (Harvard, Lancaster)
Sheet metal worker...............$ 60.00 48.78
SHEE0017-010 04/01/2025
BARNSTABLE, BRISTOL (Acushnet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, New Bedford, Rehoboth, Seekonk, Somerset, Swansea, Westport); DUKES, and NANTUCKET
Sheet Metal Worker...............$ 42.80 38.17
SHEE0017-011 04/01/2025
ESSEX; MIDDLESEX; NORFOLK; PLYMOUTH (Except Marion
Mattapoisett, Rochester, Wareham); SUFFOLK
Sheet Metal Worker...............$ 60.00 48.78
SHEE0063-002 07/01/2025
WORCESTER (Except Harvard & Lancaster)
Sheet metal worker...............$ 43.48 36.46
SHEE0063-004 07/01/2025
BERKSHIRE, HAMPDEN AND HAMPSHIRE COUNTIES
Sheet metal worker...............$ 43.48 36.46
SUMA2003-001 01/08/2003
CEMENT MASON/CONCRETE FINISHER...$ 39.38
FLOOR LAYER: Carpet.............$ 31.96
LABORER
Unskilled...................$ 18.73 6.33
PAINTER
Brush & Roller, excluding drywall finishing...........$ 30.86
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick
Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the
EO
is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between
January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive
Order 13658 does not apply to contracts subject only to the
Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be
Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of
Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in
January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted.
ME
refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD
Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage
Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the
Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part
7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of interested party's position and any information (wage payment data, project description, area practice material, etc.)
that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
Washington, DC 20210.
END OF GENERAL DECISION