Addendum #2 - dated 05-01-2026.pdf
PDF 45 KB Posted
- Attached to
- Intelligent Transportation Systems (ITS) / Transportation Management Center (TMC) Operations
- Solicitation number
- IN-15838
- Issued by
- Miami-Dade County, Florida
About this file
This Addendum #2, dated May 1, 2026, issued by the Florida Department of Transportation District Six, provides revised requirements for the District Six Intelligent Transportation Systems (ITS) / Transportation Management Center (TMC) Operations Contract (DOT-RFP-26-6202SD-REBID). The addendum establishes the proposal due date as May 7, 2026, at 10:00 AM, with electronic submission required via email to D6.Purch@dot.state.fl.us. The contract encompasses multiple operational service areas including Program and TMC Management Services, Freeway Operations Services, Arterial Operations Services, Express Lanes and Ramp Signaling Operations Services, Incident Management Program Services, Incident Response Vehicle (IRV) Operations Services, Community Outreach and Customer Support Services, TMC Information Technology Services, ITS Utility Locates Services, IT Data Architect Services, and TMC Contract Oversight Services. No pre-bid meeting will be conducted.
The addendum makes substantial revisions to the Price Proposal (Exhibit C) and related scope documents (Exhibit A and B), primarily simplifying pricing structures by removing detailed job classification tables, minimum required annual hours specifications, additional annual hours columns, loaded billing rates per hour, and annual cost breakdowns for most service areas. For the Express Lanes and Ramp Signaling Operations Services, the revised pricing structure retains only a single job classification for "75/826 EL Ramp Signaling Operator(s)" with 4,160 minimum required annual hours. The revised Incident Response Vehicle Operations Services section maintains pricing for three operator classifications: I-75 IRV Operator, I-95 IRV Operator, and SR 826 IRV Operator. Proposers are required to submit the revised Exhibit C Price Proposal document dated May 1, 2026, and must furnish all personnel, vehicles, equipment, materials, licenses, and incidentals necessary to perform services, including staffing positions beyond minimum requirements as deemed necessary to fully satisfy all contract requirements. Digital signatures and dates are acceptable for proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit_A_Scope_of_Servc Addendum#2 5-1-26.pdf | ||
| DOT-RFP-26-2026SD-REBID-Addendum#2 5-1-26.pdf | ||
| Exhibit_C_Price_Proposal Addendum#2 5-1-26.xlsx | XLSX spreadsheet | |
| Exhibit_B_Method_of_Comp Addendum#2 5-1-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Transportation
RON DESANTIS
GOVERNOR
1000 NW 111 Avenue
Miami, FL 33172
JARED W. PERDUE, P.E.
SECRETARY
DOT-RFP-26-6202SD-REBID
ADDENDUM #2 May 1, 2026 Page 1 of 6
ADDENDUM NO. 2
DATE: May 1, 2026
TO: PROPOSERS
FROM: Suzanne Diaz Procurement Agent District Six
RE: Project & Proposal No.: DOT-RFP-26-6202SD-REBID
FIN No.: Various
Counties: Miami-Dade
Proposals Due Date: May 7, 2026, at 10:00 AM
Via email to D6.Purch@dot.state.fl.us
WORK DESCRIPTION: District Six Intelligent Transportation Systems (ITS) / Transportation Management Center (TMC) Operations Contract.
I. REVISION #1
The Request for Proposal, Section 2) Timeline, has been revised. The Letting Date is now on Thursday, May 7, 2026, at 10:00am. All remaining scheduled dates did not change and remain the same.
Below please find updated RFP Schedule of Timeline:
Section 2) TIMELINE
ACTION / LOCATION DATE LOCAL TIME
PROPOSALS DUE, ON OR BEFORE --------------------------------------------- 5/7/2026 10:00 AM Technical and Price Proposal) Receipt of Technical and Price Proposal Follow instructions in Section 27, Electronic submission of proposals Must be emailed to D6.Purch@dot.state.fl.us
II. REVISION #1
Exhibit A Scope of Services is revised as follows:
1. The language in the following sections has been revised to provide updated guidance regarding pricing and payment in accordance with the changes made to Exhibit C – Price Proposal as shown in Revision # 3 below:
4.1.8 Program and TMC Management Services – Pricing
4.1.9 Program and TMC Management Services – Payment
4.2.5 Freeway Operations Services – Pricing
4.3.6 Arterial Operations Services – Pricing
4.4.6 Express Lanes and Ramp Signaling Operations Services – Pricing
4.4.7 Express Lanes and Ramp Signaling Operation Services – Payment
4.5.6 Incident Management Program Services – Pricing
4.6.5 IRV Operations Services – Pricing
4.7.6 Community Outreach and Customer Support Services – Pricing
May 1, 2026
DOT-RFP-26-6202SD – REBID
ADDENDUM #2
4.8.6 TMC IT Services – Pricing
4.9.6 ITS Utility Locates Services – Pricing
4.10.2 IT Data Architect – Pricing
4.11.8 TMC Contract Oversight Services – Pricing
4.12.2 Miscellaneous TSM&O and Traffic Operations Services – Pricing
III. REVISION #2
Exhibit B – Method of Compensation is revised as follows:
1. Remove the requirement for the Consultant to submit 3 copies of monthly invoices from Section 3.0
PROGRESS PAYMENTS.
IV. REVISION #3
Exhibit C – Price Proposal is revised as follows:
1. Section 1 – Lump Sum – Program and TMC Management Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (1.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 1.1 row has been removed.
c. Year 1 Costs label has been revised.
2. Section 2 – Lump Sum – Freeway Operations Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (2.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 2.1 row has been removed.
c. Year 1 Costs label has been revised.
3. Section 3 – Lump Sum – Arterial Operations Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (3.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 3.1 row has been removed.
c. Year 1 Costs label has been revised.
DOT-RFP-26-6202SD – REBID
ADDENDUM #2
4. Section 4 – Lump Sum – Express Lanes and Ramp Signaling Operations Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (4.1) has been modified as follows:
i. “95” has been removed from the title of the table.
ii. Job Classification entries have been removed, and the column has been reduced to one row containing a new Job Classification for “75/826 EL Ramp Signaling Operator(s).”
iii. Minimum Required Annual Hours entries have been removed, and the column has been reduced to one row. 4,160 hours corresponding to the new “75/826 EL Ramp Signaling Operator(s)” Job Classification have been added.
iv. Additional Annual Hours column has been removed.
v. Total Annual Hours column and entries have been removed.
vi. Loaded Billing Rate (Per Hour) column has been reduced to a single row corresponding to the new “75/826 EL Ramp Signaling Operator(s)” Job Classification.
vii. Annual Cost For Job Classification column has been reduced to a single row corresponding to the new “75/826 EL Ramp Signaling Operator(s)” Job Classification.
viii. Subtotal 4.1 row has been removed.
c. Table (4.2) has been removed.
d. Year 1 Costs label has been revised.
5. Section 5 – Lump Sum – Incident Management Program Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (5.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 5.1 row has been removed.
c. Year 1 Costs label has been revised.
6. Section 6 – Loaded Billing Rate – Incident Response Vehicle Operations Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (6.1) has been modified as follows:
i. Job Classification column only the first three cells corresponding to I-75 IRV Operator, I-95 IRV Operator, and SR 826 IRV Operator have been kept, blank cells have been removed.
ii. Minimum Required Annual Hours column cells with “0” entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column only the first three cells corresponding to I-75 IRV
Operator, I-95 IRV Operator, and SR 826 IRV Operator have been kept, and the rest of the cells have been removed.
vi. Annual Cost For Job Classification column only the first three cells corresponding to I-75 IRV Operator, I-95 IRV Operator, and SR 826 IRV Operator have been kept, and the rest of the cells have been removed.
7. Section 7 – Lump Sum – Community Outreach and Customer Support Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (7.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 7.1 row has been removed.
c. Year 1 Costs label has been revised.
DOT-RFP-26-6202SD – REBID
ADDENDUM #2
8. Section 8 – Lump Sum – TMC Information Technology Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (8.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 8.1 row has been removed.
c. Year 1 Costs label has been revised.
9. Section 9 – Lump Sum – ITS Utility Locates Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (9.1) has been modified as follows:
i. Job Classification column has been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 9.1 row has been removed.
c. Year 1 Costs label has been revised.
10. Section 10 – Lump Sum – IT Data Architect Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (10.1) has been modified as follows:
i. Job Classification column and entries have been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 10.1 row has been removed.
c. Year 1 Costs label has been revised.
11. Section 11 – Lump Sum – TMC Contract Oversight Services has been revised as follows:
a. Pricing instructions have been revised.
b. Table (11.1) has been modified as follows:
i. Job Classification column has been removed.
ii. Minimum Required Annual Hours column and entries have been removed.
iii. Additional Annual Hours column has been removed.
iv. Total Annual Hours column and entries have been removed.
v. Loaded Billing Rate (Per Hour) column has been removed.
vi. Annual Cost For Job Classification column has been removed.
vii. Subtotal 11.1 row has been removed.
c. Table (11.2) has been removed.
d. Table (11.3) has been removed.
e. Table (11.4) has been removed.
f. Year 1 Costs label has been revised.
12. You are required to submit the Revised Exhibit C Price Proposal DOT-RFP-26-6202SD-REBID – Addendum #2 dated 5/1/2026, with the proposal.
Revised documents are posted on VIP. All other documents of the subject project remain unchanged.
DOT-RFP-26-6202SD – REBID
ADDENDUM #2
V. QUESTIONS AND REPONSES
Below please find the answers to questions received from prospective proposers on this project.
Questions Response
1. Will there be a pre-bid meeting? 1. No.
2. Beacon would not be a prime as we have an AI-enabled SOP Assistant that meets, potentially exceeds your needs as you describe in the RFP section 4.5 We have demonstrated the solution to a number of the FDOT districts already with great success.
We have also demonstrated it to AECOM and some of the other AEC firms with equal enthusiasm.
Naturally we would want to send a proposal to each of the bidders (but we do not know yet who they are although could take a good guess.
If we sent you a suggestion of an addendum to the RFP, perhaps a priced option, would you be open to this idea? There would be no risk to you and it would give the bidders an opportunity to include a solution that would be of great value to D6 and FDOT as a whole.
2. No. The Department is not open to the proposed idea of introducing a priced option for an AI-enabled SOP Assistant solution.
The Department requires the Consultant to propose a price for each required service area— either as a single lump sum or a maximum limited amount—that includes all labor, materials, equipment, and any other costs necessary to perform all services within the service area, as described or implied in Exhibit
A – Scope of Services.
3. In any event, would you see a value in Beacon sending you a proposal as a separate line item (even if you would not separately purchase in this way)?
3. No. Only responsive proposals that meet all requirements of this solicitation will be accepted.
Please refer to RFP Section 20) Responsiveness of Proposals.
4. RFP Section 21, item c.iii requires that resumes be ‘signed and dated’. Since the proposal will be submitted electronically, and consistent with the original RFP responses, please confirm whether digital signatures such as scanned handwritten signatures are acceptable to meet the ‘signed and dated’ requirement for these resumes?
4. Digital signatures and dates are acceptable.
5. Section 26 of the RFP states that ‘All proposals and associated forms shall be signed and dated in ink by a duly authorized representative of the Proposer.’ Since the proposal must be submitted electronically, and consistent with the original RFP responses, please confirm whether a digital signature such as a scanned handwritten signature is acceptable to satisfy the ‘signed and dated in ink’ requirement.”?
5. Digital signatures and dates are acceptable.
6. Exhibit A (scope of services) identifies required services and minimum salary rates for some job classifications. Exhibit C (price proposal) identifies Job Classifications and Minimum Required Annual Hours. Consistent with the original RFP responses, can FDOT clarify that the consultant is expected to identify staff, hours, and rates beyond the minimums to satisfy all services and requirements in Exhibit A?
6. The Consultant shall furnish all personnel, vehicles, equipment, materials, licenses, and incidentals necessary to perform all services described, referenced, or otherwise required under Exhibit A – Scope of Services, which shall be performed in accordance with the General Provisions set forth in Exhibit A – Scope of Services, Section 3.
The Consultant shall identify and furnish all staffing positions deemed necessary by the
Consultant to fully satisfy all requirements
DOT-RFP-26-6202SD – REBID
ADDENDUM #2
Questions Response detailed in Exhibit A – Scope of Services and the applicable SOGs; and, at a minimum, it shall furnish the required minimum staffing positions that meet or exceed the minimum qualifications, responsibilities, working hours, working location requirements and minimum salary thresholds specified in Exhibit A – Scope of Services.
Exhibit C – Price Proposal has been revised.
Please refer to Revision # 3 of this Addendum #
2.
Revised documents are posted on VIP. All other documents of the subject project remain unchanged.
Failure to file a Protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.