Addendum 1.pdf

PDF 291 KB Posted

Attached to
Snake River Correctional Institution Complex One Water Heater Replacement Rebid
Solicitation number
S-29100-00017820
Issued by
Oregon

About this file

This is an Addendum 1 document issued by the State of Oregon for the Snake River Correctional Institution (SRCI) Complex One Water Heater Replacement Rebid project. The addendum provides clarifications and modifications to the original solicitation for the replacement of water heating and temperature control systems at the correctional facility's housing units A, B, and C. The project scope includes replacing six existing 250-gallon, 400,000 BTU gas-fired water heaters with six new 250-gallon, 800,000 BTU units; replacing eighteen thermostatic mixing valves with new digital mixing valves; installing horizontal-mounted NEMA-rated control enclosures; integrating all equipment with BACnet capabilities into SRCI's Carrier I-Vue building automation system; installing dedicated circuits and new heat trace on rooftop cold and hot water lines; and replacing the service panels servicing the water heaters.

The addendum serves to address specific questions, clarifications, or modifications raised during the bidding process for this rebid opportunity. This document would typically contain revised specifications, answers to bidder inquiries, updated technical requirements, or corrections to the original solicitation documents to ensure all prospective contractors have consistent and accurate information prior to submission of their bids. The addendum ensures compliance with the detailed technical specifications referenced in the original scope of work, including compliance with details SB-92747-1 and SB-91833-1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oregon Department of Corrections Purchasing Section

3723 Fairview Industrial Dr SE Salem, OR 97302

(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov

8/20/26

ADDENDUM 1

For

S-29100-00017820 SRCI Complex One Water Heater

Replacement Rebid

Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications.

This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.

This addendum shall be added to and become part of the original Invitation to Bid.

1. BIDDERS OR THEIR REPRESENTATIVE ARE REQUIRED TO ATTEND THE

MANDATORY PRE-BID CONFERENCE FOR THIS SOLICITATION. However, attendance at the mandatory pre-bid conference held for Solicitation S-29100-00016926 satisfies this requirement, and such Bidders or their representatives are not required to attend the mandatory pre-bid conference for this rebid.

Only Bidders or their representatives whose names appear on the official Plan Holder List from the original bid walk for Solicitation S-29100-00016926 will be recognized as having met the mandatory attendance requirement. The Plan Holder List for the original bid walk is attached.

BIDDERS CLAIMING PRIOR ATTENDANCE MUST VERIFY THEIR NAME ON THE

ATTACHED PLAN HOLDER LIST. Bidders whose names do not appear on the Plan Holder List must attend the mandatory pre-bid conference for this solicitation, or their Bids will be considered non-responsive.

This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.

Company Name: __________________________________________________________

Authorized Signature: ______________________________________________________

Date:_______________________________________

S A E G O N

AT

HE

N

PO

RA

EC

TI

ON

S

D e p a r t m e n t o f C o r r e c t i o n s

P r e B i d W a l k t h r o u g h

A t t e n d e e li st f o r

I T B

S

S R C I

C o m p l e x O n e

W a t e r H e a t e r R e p l a c e m e n t

D a t e

J u n a t

A M

(P

ST

F i r m

N a m e

A d d r e s s

R e p r e s e n t a t i v e

T e l e p h o n e N o

E m a i l

G e n e r a l

S U B

S u p p l i e r

D S L

B O i L D E R S

P I N E

S T

S A l E M

O R

Ke Vi n

Jo ll y

K E V I N J

D S L B U I L D E R S c o m

A p e x M e c h a n i c a l

S E

E a t o n

B l v d

B a t t l e G r o u n d W A

M a i m e L ip e es ti ma ti ng @a pe xm ec ha ni ca l.

or g

Co pp er

Me ch an ic al

N

4t h St

Ri dg ef ie ld W A

Z a c Si lv er se n es ti ma ti ng @c op pe rm ec ha ni ca l.

co m

A C C O

N

S a w y er ke

Ga rd en

Ci ty ты

J o s h

Ar ag on

J o s a v a g o n e a c c o e s c o m

A c c o

N S a u y e r

A u g

Gy ar de n C i n

I D

J a r e d

S m i l h

J a r s m i t h a c o e s c o m

P a g e o f

File details come from the government source that posted it. Updated .