Addendum _1 (1).pdf
PDF 1 MB Posted
- Solicitation number
- 7002.2056
- Issued by
- Dallas County, Texas
About this file
This is Addendum No. 1 to a preselection package for the Trinity River Authority of Texas, issued on August 14, 2026, pertaining to Contract No. 25-030 for the Fourth Ozone Generator and Transfer Pump Station Upgrades at the Tarrant County Water Supply Project (Project No. 7002.2056). The addendum modifies the specifications and drawings for the ozone generation equipment and related control systems. The addendum consists of three pages and includes two revised drawings: Drawing N00-101 (Ozone Generator PCS System Architecture Modified) and Drawing N10-101 (PID - Ozone Generator #4). These drawings detail the instrumentation, control architecture, and process integration requirements for the ozone generator system, including fiber optic communications infrastructure connecting multiple remote terminal units (RTUs), programmable logic controllers (PLCs), and SCADA components across various facility buildings and structures.
The addendum adds a specification requirement to Section 00 21 16 (Instruction to Proposers) stating that all submitted proposals are subject to public inspection under the Texas Public Information Act, with proposers waiving claims for information protection by submission. The revised specifications and drawings establish that the contractor shall provide all required network connections, communication cabling, configuration, and PCS/SCADA integration for complete system operation. The ozone generator is identified as a vendor-supplied package, with the vendor responsible for providing, programming, installing, and commissioning the PLC system per Division 40 specifications. The project indicates a phased implementation approach, with PLC-MOCP (Modular Ozone Control Panel) initially connecting only to Generator 4, with subsequent connection of Generators 1-3 as they are replaced, and eventual demolition of the existing LCP-OSCP enclosure once all generators are upgraded.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Preselection Package Request for Proposals Ozone Generators.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRINITY RIVER AUTHORITY OF TEXAS Fourth Ozone Generator and Transfer Pump Station Upgrades December 8, 2025 TEMPLATE TRA Contract No. 25-030 Addendum No. 1 8/14/2026
TRINITY RIVER AUTHORITY OF TEXAS
TARRANT COUNTY WATER SUPPLY PROJECT
OZONE GENERATOR - PRESELECTION PACKAGE REQUESTS
PROJECT NO. 7002.2056
CONTRACT NO. 25-030
ADDENDUM NO. 1
August 14, 2026
TO: All plan holders of record
This Addendum forms part of the Preselection Package Documents and modifies the Specifications and Drawings as noted below. In order to submit a Proposal on the electronic form on CIVCAST, each Proposer must download all Addenda and by doing so has acknowledged all Addenda and will be allowed to submit an online Proposal.
This Addendum consists of 3 pages, including attachments.
DRAWINGS
A. Drawing No. N00-101 OZONE GENERATOR PCS SYSTEM ARCHITECTURE
MODIFIED
1. ADD this drawing in its entirety with the attached document.
B. Drawing No. N10-101 PID – OZONE GENERATOR #4
1. ADD this drawing in its entirety with the attached document.
SPECIFICATIONS
A. Section 00 21 16 Instruction to Proposers
1. ADD Paragraph 1.01.I. as follows:
“I. All responses that have been submitted shall be open to public inspection. By submission of its Proposal, each Proposer conclusively waives any claim that may protect information contained in the Proposal from disclosure under the Texas Public Information Act.”
8/14/2026
12-STRAND
OM1 FIBER
RTU 42 RTU 41
(TRANSFER PS #1)
RTU 27 RTU 45
(LCP-WEST)
RTU 29
(COAG)
RTU 39
(BULK STORAGE)
FIU-1600
MASTER
RADIO
(MDS 9790)
RTU 32
(RTU 2)
RTU 30
(HI SERVICE)
RTU 33
(RTU 3)
RTU 34
(RTU 4)
RTU 35
(RTU 5)
RTU 36
(RTU 6)
RTU 26
(FILTER PLANT EAST)
RTU 40 (LCP-SED)
(TRANSFER PS #2) (CAUSTIC)
ETHERNET SWITCH
FIBER OPTIC PATCH
PANEL
PROGRAM TAG
(FIELD TAG)
LEGEND
RTU 38 (RTU-0009)
FO FO FO FO
MULTINET
MAIN SWITCHGEAR
NETWORK SWITCH
FO FO
TO REMOTE SITES
BACKBONE
SWITCH A
NETWORK
ENCLOSURE
FIU/ FILTER PLANT WEST
RTU 1 ENCLOSURE
ELECTRICAL BUILDINGCAUSTIC BUILDING
TRANSFER PUMP STATION NO.1
CONTROL
FOPPTPS NO.1 RTU ENCLOSURE
FO
FO
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO FO
TRANSFER PUMP STATION NO.2
CONTROL
FOPPTPS NO.2 RTU ENCLOSURE
OZONE GENERATOR BUILDING
CONTROL FOPP
ELECTRICAL ROOM
CHEMICAL BULK STORAGE
FACILITIES CHEMICAL BUILDING
LCP-COAG ENCLOSURE
(BOTTOM FLOOR)
RTU-38 ENCLOSURE
(TOP FLOOR)
RTU 28
(LCP-H202)
LPC-H202
ENCLOSURE
EAST FILTERSWEST FILTERS
RTU 31 (RTU 2)
FO FO FO FO FO FO FO FO FO FO FO FOFO FO
FO
FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO
LCP-OSCP
ENCLOSURE
OZONE GEN 1
ENCLOSURE
PLC-GEN1
FO FO
LCP-BLO
ENCLOSURE
BLOWER BUILDING
FO FO FO FO
LCP-BASIN
ENCLOSURE
OZONE CONTACTORS
LCP-DEST 1
ENCLOSURE
LCP-DEST 2
ENCLOSURE
FO
FOPP DEST
ENCLOSURE
ADMIN
BUILDING
FO FO FO
BASEMENT
TOP FLOOR
MOTOROLA ACE RTU
MODICON RTU
ALLEN BRADLEY SLC
PLC
FO FO FO FO
FO
FO
FO
FO
FO
24-STRAND
OM1 FIBER
FO
FO FO FO FO FO FO FO FO
FO
FO
FO
24-STRAND
OM1 FIBER
12-STRAND
OM1 FIBER
6-STRAND
OM1 FIBER
FO
FO
FO
FO
12-STRAND OM1
FIBER
12-STRAND
OM1 FIBER
24-STRAND
OM1 FIBER24-STRAND
OM1 FIBER
FO
FO FO FO
FO
FO
24-STRAND
OM1 FIBER
HIGH SERVICE
ENCLOSURE
FILTER PLANT EAST
ENCLOSURE
FILTERS 5-8
ENCLOSURE
FILTERS 9-12
ENCLOSURE
FILTERS 13-16
ENCLOSURE
FILTERS 17-20
ENCLOSURE
FILTERS 21-24
ENCLOSURE
FILTERS 1-4
ENCLOSURE
RIO 38 (RTU-0012)
RTU-0012 ENCLOSURE
(TOP FLOOR)
RTU XX=
(RTU X)=
FO
FO
FO
FO
FO
FO
FO
FO
FO
24-STRAND
OM1 FIBER
FO
FO
FO
FO
FO
FO
FO
FO
12-STRAND
OM1 FIBER
RTU-39 ENCLOSURE
CONTROL
FOPP
FO FO FO FO
24-STRAND
OM1 FIBER
FO FO FO FO FO
12-STRAND
OM1 FIBER FO
FO
FO
FO
FO
FO
FO FO
FO
FO
FO
FO
6-STRAND
OM1 FIBER
6-STRAND
OM1 FIBER
FO FO FO FO FO FO
RDP REMOTEiFIX USERS CONTROL ROOM DMZ FIREWALL
ENTERPRISE
FIREWALL
TCCLT2 LASER
PRINTER
(TCWEB1)
DMZ REPORT
DATABASE SERVER
(TCHIS1)
HISTORIAN
SERVER
(TCTS1)
TERMINAL
SERVER
(TCSVR2)
IFIX REDUNDANT
PCS SERVER
(TCSVR1)
IFIX REDUNDANT
PCS SERVER
(TCHIS1)
DMZ HISTORIAN
SERVER
OPERATIONS BUILDING
SERVER ROOMLAB
TCXXX
LCP-RAW 1
ENCLOSURE
RAW WATER OZONE BUILDING
LCP-DEST 3
ENCLOSURE
LCP-DEST 4
ENCLOSURE
TCCLT1TCDEV1 LASER
PRINTER
TCCLT3VARIOUS WS
FO
FO
FO
FO
C
FOC1
FOC1FOC1FOC1FOC1FOC1FOC1FOC1FOC1FOC1 FOC1FOC1FOC1FOC1FOC1
FO
C
FOC1
FO
PC
2A
FO
PC
1- 1A
FO
PC
4A
FO
C 2B
FOC2FOC2
FO
C
FOC2FOC2FOC2 FOC2FOC2FOC2FOC2FOC2
FO
C
FOC2
FOC2
FOC2
FOC2 FOC2
FOC2
FOC2
FOC2
FOC2
FO
C
FOPC2A
FOPC2B
FOPC2-1A
FOPC2-1B
FO
C
2-
FO
C
2-
FOC2-1FOC2-1-1 FOC2-1
FOPC1BFOPC1A FOPC1BFOPC1A
12-STRAND
OM1 FIBER
FOPC1A
FOPC1-1B
FOPC1B
FOC1-1
FOC1-1
FOPC1-1A
FOPC1C
FOPC1D
FOC3 FOC3
FOPC3BFOPC3A
FO
PC
4B
FOPC2A
FO
PC
1A
FOPC2B
FOPC4A
FOPC4B
FOC4
FOC4
FOPC1C
FOPC1D
FOPC1-1A
FOPC1-1B
FOPC2C
FOPC2D
FOPC1BFOC1
FO
PC
1- 1A
FO
PC
1D
FO
PC
1- 1A
FO
PC
1- 1B
FO
PC
2C
FO
PC
2C
FO
PC
2C
FO
PC
2D
FOPC3A
FOPC3B
FO
PC
3A
FO
PC
3B
FO
PC
3A
FO
PC
3A
FOPC1B
FOPC2B
FOPC1C
FOPC1D FOPC4B
FOPC1-1B
FOPC2D FOPC3B
BACKBONE
SWITCH B
12-STRAND
OM1 FIBER
FOPC4BFOPC4A
FOPC2B
FOPC2A
FOPC2BFOPC2A
UPS
ENCLOSURE
MULTINET
24-STRAND
OM1 FIBER
FOPC2BFOPC2A
UPS
FOPC2A
FOPC2B
UPSFOPC2A
FOPC2B
24-STRAND
OM1 FIBER
UPS
FOPC2-1-1BFOPC2-1-1A
UPS
ENCLOSURE
FOPC21B
FOPC21A
UPS
UPS
FOPC2A
FOPC2B
OIT-F1
OIT-F2
OIT-F3
OIT-F4
UPS-31
OIT-31
FOPC1BFOPC1A
UPS
FOPC1BFOPC1A
OIT-F9
OIT-F10
OIT-F11
OIT-F12
OIT-33
FOPC1BFOPC1A
OIT-F17
OIT-F18
OIT-F19
OIT-F20
OIT-35
FOC1
12-STRAND
OM1 FIBER
12-STRAND
OM1 FIBER
12-STRAND
OM1 FIBER
12-STRAND
OM1 FIBER
12-STRAND
OM1 FIBER
UPS-33 UPS-35
FOPC1BFOPC1A
OIT-F5
OIT-F6
OIT-F7
OIT-F8
OIT-32
FOPC1BFOPC1A
OIT-F13
OIT-F14
OIT-F15
OIT-F16
OIT-34
OIT-F22
OIT-F21 OIT-F23
OIT-F24
OIT-36
FO
FOFOC1
FOPC2B
FOPC2-2A FOPC2-2A
FOPC2-2B
FOC22FOC22
OIT-27
OIT-26
UPS
UPS
FOPC2A
FOPC2-2B
FO FO FO FO
FO
FO FO FO FO OM1 FIBER
FOMFOPPFO
HIPSWITCH
FOC = FIBER OPTIC CABLE (BULK CABLE)
FOPC = FIBER OPTIC PATCH CABLE
FO
FO
FO FO FO FO FO FO FO
FO
FO
24-STRAND
OM1 FIBER
FOC2-1
FOC2-1-3
FOC2-3 FOC2-2
UPS-36UPS-34UPS-32UPS-26
24-STRAND
OM1 FIBER
FOC2
TPS ELECTRICAL ROOM
FOPC1-2A
FO
FO
FO
OZONE GEN 2
ENCLOSURE
PLC-GEN2
OZONE GEN 3
ENCLOSURE
PLC-GEN3
OZONE GEN 4
ENCLOSURE
PLC-GEN4
FO FO FO FO FO FO FO FO FO
FO
FO
FO
FO
FO
FO
GENERAL NOTES:
1. CONTRACTOR SHALL PROVIDE ALL REQUIRED NETWORK CONNECTIONS, COMMUNICATION CABLING, CONFIGURATION, AND PCS/SCADA INTEGRATION REQUIRED FOR COMPLETE OPERATION OF THE SYSTEMS SHOWN.
KEYED NOTES:
1. VENDOR-SUPPLIED PLC SYSTEM. PLC SYSTEM SHALL BE PROVIDED, PROGRAMMED, INSTALLED, AND COMMISSIONED BY EQUIPMENT VENDOR.
PROVIDE PLC SYSTEM PER DIVISION 40 SPECIFICATIONS.
2. PLC ENCLOSURE FOR GENERATORS 1, 2 AND 3 TO BE UPGRADED AS DESCRIBED IN SPECIFICATION SECTION 00 42 13 PROPOSAL.
3. PLC-MOCP TO CONNECT ONLY TO GENERATOR 4 PLC INITIALLY.
4. AS GENERATORS 1-3 ARE REPLACED THE NEW GENERATORS WILL BE CONNECTED TO PLC-MOCP. ONCE ALL GENERATORS ARE REPLACED, LCP-OSCP ENCLOSURE TO BE DEMOLISHED.
MOCP
ENCLOSURE
(ELECTRICAL
ROOM)
PLC-MOCP
FOC2
PLC-OSCP
NITROGEN BOOST SYSTEM
(VENDOR PLC)
PLC-BLO
PLC-DEST1 PLC-DEST2
PLC-BASIN
PLC-RAW1 PLC-DEST3 PLC-DEST4
CAT-6
CAT-6
BIDDING, OR PERMIT PURPOSES
NOT INTENDED FOR CONSTRUCTION,
DOCUMENT IS FOR INTERIM REVIEW AND
, P.E.
TEXAS LICENSE NO.
DATE
128681
SURENDRA BAROT
AUGUST 14, 2026
N00-101.dwg
INSTRUMENTATION AND CONTROL
OZONE GENERATOR
PCS SYSTEM ARCHITECTURE MODIFIED
SB
AHS
AP
JJ
N00-101
DESIGN
GRAPHICS
CHECK
QM
REGION
SYSTEM
CONTRACT NO.
PROJECT ID NO.
CADD FILE NAME
DATE
TARRANT COUNTY WATER SUPPLY
PROJECT
FOURTH OZONE GENERATOR
AND TPS UPGRADES BID PACKAGE 1
WWW.AECOM.COM
TBPELS REG. NO. F-3580
AECOM TECHNICAL SERVICES, INC.
13355 NOEL ROAD, SUITE 400
DALLAS TEXAS 75240
Fi le
: C :\U se rs
\a ha sa n\
D C
\A C
C D oc s\
AE
C
O M
\C I-A
M
ER
(U S)
-6
5-
TR
A_
TC
W
SP
_F O
G _T
PS
\P ro je ct F ile s\
0_
C
AD
_G
IS
_B
IM
\9
_C
AD
\2 0-
SH
EE
TS
\1
0\ N
\N
-1
Pr e-se le ct io n.
dw g
Pl ot
T im e:
A ug
3, :2 7p m A
H as an
SHEET NO.
PAGE NO.
NORTHERN
TCWSP
AUGUST 2026
25-030
60759505
GASEOUS OXYGEN
FROM VAPORIZER
DISTRIBUTION
FROM NON-POTABLE
WATER SUPPLY
MANIFOLD
NON-POTABLE
WATER FROM OZONE
GENERATORS
TO NON-POTABLE
WATER RETURN TO
IMMEDIATE OZONE
CONTACTOR
INFLUENT CHANNEL
FROM OZONE
GENERATOR NO. 3
FROM OZONE
GENERATOR NO. 1
OZONATED FEED GAS
TO RAW WATER
OZONATED FEED GAS
TO CONTACTORS
OZONE GENERATOR 4 CONTROL PANEL (PLC-GEN 4)
OZONE
GENERATOR
POWER SUPPLY
UNIT 604
PSH
FI
FSL
ZSL
ZSH
ZT
PCV
PIT
TE
TE
FE
FIT
PSL
PIT
TE
TIT
OUTSIDE
DRAIN
DRAIN
HS
6402A
LR
HS
6402B
OO HS
6402C
POWER ADJ
I
PI
PI
PIT
TE
TIT
6403 TSH
AE
AIT
O3
D
ES
TR
U
C T
OZONE ANALYZER
VENT TO
ATMOSPHERE
TE
TIT
TSH
TE
TSH
FI
FSL
ZSL
ZSH
ZSL
ZSH
FI
S
S
S
EN
ET
LCP-GEN4 (VENDOR SUPPLIED)
SU
PE
R
VI
SO
R
Y C
O M
PU
TE
R
SU
PE
R
VI
SO
R
Y C
O M
PU
TE
R
REFRIGERANT LOOP
TIT
FROM OZONE
GENERATOR NO. 2
O
ZO
N E
C O
N C
EN
TR
AT
IO
N
O
ZO
N E
G
EN
D
IS
C H
TE
M
PE
R
AT
U
R E
O
ZO
N E
G
EN
D
IS
C H
PR
ES
SU
R
E
O
ZO
N E
SE
TP
O
IN
T
G
EN
ER
AT
O R
O N
/O
FF
G
EN
ER
AT
O R
IN
R
EM
O
TE
O
XY
G
EN
T O
G
EN
TE
M
PE
R
AT
U
R E
O
XY
G
EN
T O
G
EN
PR
ES
SU
R
E
O
XY
G
EN
T O
G
EN
FL
O
W C
O N
TR
O
LL
ER
O
XY
G
EN
T O
G
EN
VA
LV
E
PO
SI
TI
O N
O
XY
G
EN
T O
G
EN
VA
LV
E C
O N
TR
O
LL
ER
N
EW
S U
PP
LY
TE
M
PE
R
AT
U
R E
N
EW
S U
PP
LY
PR
ES
SU
R
E
N
EW
S U
PP
LY
V
AL
VE
O
PE
N
/C
LO
SE
D
N
EW
S U
PP
LY
VA
LV
E O
PE
N
N
EW
S U
PP
LY
VA
LV
E C
LO
SE
D
O
G
EN
C O
O
LI
N G
W
AT
ER
D
IS
C
H T
EM
P
O
ZO
N E
FE
ED
VA
LV
E C
LO
SE
D
O
ZO
N E
FE
ED
VA
LV
E O
PE
N
O
ZO
N E
FE
ED
V
AL
VE
O
PE
N
/C
LO
SE
D
O
ZO
N E
PU
R
G E
VA
LV
E C
LO
SE
D
O
ZO
N E
PU
R
G E
VA
LV
E O
PE
N
O
ZO
N E
PU
R
G E
VA
LV
E O
PE
N
/C
LO
SE
D
I
R
EF
R
IG
IR
AT
O R
D
IS
C H
T
EM
P
O
D
IS
C H
L O
W F
LO
W
O
D
IS
C H
H
IG
H
TE
M
PE
R
AT
U R
E
R
EF
R
IG
ER
AT
O R
IN
LE
T
LO
W F
LO
W
O
ZO
N E
G
EN
D
IS
C H
H
IG
H T
EM
PE
R
AT
U R
E
C
LO
SE
D
O
PE
N
ED
VA
LV
E O
PE
N
/C
LO
SE
C
M D
PR
ES
SU
R
E
TE
M
PE
R
AT
U
R E
VA
LV
E
PO
SI
TI
O N
SE
TP
O
IN
T
VA
LV
E
PO
SI
TI
O N
FL
O
W H
IG
H
PR
ES
SU
R E
LO
W
PR
ES
SU
R
E
O
PR
ES
SU
R
E
O
TE
M
PE
R
AT
U
R E
R
EM
O
TE
G
EN
ER
AT
O R
ST
AR
T/
ST
O P
O
ZO
N E
SE
TP
O
IN
T
O
ZO
N E
G
EN
D
IS
C H
PR
ES
SU
R
E
O
ZO
N E
G
EN
D
IS
C H
H
IG
H
TE
M
PE
R
AT
U R
E
R
EF
R
IG
ER
AT
O R
O
LO
W
F
LO
W
O
ZO
N E
G
EN
D
IS
H W
AT
ER
TE
M
P
O
ZO
N E
G
EN
D
IS
C H
TE
M
PE
R
AT
U
R E
O
ZO
N E
C O
N C
EN
TR
AT
IO
N
H
IG
H T
EM
P
O
D
IS
C H
LO
W
F
LO
W
R
EF
R
IG
ER
AN
T D
IS
C
H H
IG
H
TE
M
P
C
LO
SE
D
O
PE
N
ED
VA
LV
E O
PE
N
/C
LO
SE
C
M D
C
LO
SE
D
O
PE
N
ED
VA
LV
E O
PE
N
/C
LO
SE
C
M D
NON-POTABLE WATER SUPPLY INLET O2 SUPPLY INLET TO GEN OZONE GENERATOR
OZONE GEN COOLING DISCH WATER
OZONE FEED VALVE OZONE PURGE VALVE
1. THE OZONE GENERATOR IS A VENDOR-SUPPLIED PACKAGE, AND INTERNAL INSTRUMENTATION, DIAGNOSTICS, AND PROTECTIVE DEVICES NOT SHOWN SHALL BE PROVIDED BY THE
MANUFACTURER IN ACCORDANCE WITH CURRENT INDUSTRY STANDARDS.
2. ONLY INSTRUMENTATION AND SIGNALS EXPLICITLY SHOWN ON THIS DRAWING ARE REQUIRED TO BE INTEGRATED WITH THE OWNER’S PLC/SCADA SYSTEM. ADDITIONAL INTERNAL VENDOR DIAGNOSTICS AND STATUS SIGNALS MAY REMAIN LOCAL TO THE OZONE GENERATOR CONTROL PANEL UNLESS OTHERWISE DIRECTED BY THE OWNER.
3. EQUIPMENT PROTECTION FUNCTIONS MAY BE IMPLEMENTED VIA HARDWIRED DEVICES, VENDOR PACKAGE LOGIC, OR PLC LOGIC, AS APPROPRIATE. FINAL PROTECTION PHILOSOPHY SHALL
BE COORDINATED WITH THE OZONE GENERATOR MANUFACTURER AND APPROVED BY THE OWNER.
4. COMMUNICATION BETWEEN THE OZONE GENERATOR CONTROL PANEL AND THE PLANT PLC/SCADA SYSTEM SHALL BE VIA ETHERNET TCP/IP OR APPROVED INDUSTRIAL PROTOCOL. FINAL PROTOCOL SELECTION AND NETWORK ARCHITECTURE SHALL BE COORDINATED WITH THE OWNER AND OZONE GENERATOR MANUFACTURER.
5. INSTRUMENT RANGES, MATERIALS, ACCURACY, AND FINAL SELECTION SHALL BE CONFIRMED DURING SHOP DRAWING REVIEW BASED ON VENDOR RECOMMENDATIONS AND PROCESS
REQUIREMENTS.
6. INFORMATION SHOWN IS TYPICAL OF GENERATORS 1 THROUGH 4.
GENERAL NOTES
O
XY
G
EN
T O
G
EN
PR
ES
SU
R
E H
IG
H
O
XY
G
EN
T O
G
EN
PR
ES
SU
R
E
LO
W
AE
AIT
O3
AMBIENT AIR
OZONE ANALYZER
AM
BI
EN
T
AI
R
O
C O
N C
EN
TR
AT
IO
N
AM
BI
EN
T
AI
R O
ZO
N
E C
O N
C
EN
TR
AT
IO
N
AM
BI
EN
T
AI
R
O
ZO
N E
C O
N C
A
LA
R M
AM
BI
EN
T
AI
R
O
ZO
N E
AL
AR
M
NITROGEN
INJECTION FROM
NITROGEN BOOST
SYSTEM
N10-101
INSTRUMENTATION AND CONTROL
PID - OZONE GENERATOR #4
SB
AHS
AP
JJ
N10-101
DESIGN
GRAPHICS
CHECK
QM
REGION
SYSTEM
CONTRACT NO.
PROJECT ID NO.
CADD FILE NAME
DATE
TARRANT COUNTY WATER SUPPLY
PROJECT
FOURTH OZONE GENERATOR
AND TPS UPGRADES BID PACKAGE 1
WWW.AECOM.COM
TBPELS REG. NO. F-3580
AECOM TECHNICAL SERVICES, INC.
13355 NOEL ROAD, SUITE 400
DALLAS TEXAS 75240
Fi le
: C :\U se rs
\a ha sa n\
D C
\A C
C D oc s\
AE
C
O M
\C I-A
M
ER
(U S)
-6
5-
TR
A_
TC
W
SP
_F O
G _T
PS
\P ro je ct F ile s\
0_
C
AD
_G
IS
_B
IM
\9
_C
AD
\2 0-
SH
EE
TS
\1
0\ N
\N
-1
Pr e-se le ct io n.
dw g
Pl ot
T im e:
A ug
3, :2 7p m A
H as an
SHEET NO.
PAGE NO.
NORTHERN
TCWSP
AUGUST 2026
25-030
60759505
BIDDING, OR PERMIT PURPOSES
NOT INTENDED FOR CONSTRUCTION,
DOCUMENT IS FOR INTERIM REVIEW AND
, P.E.
TEXAS LICENSE NO.
DATE
128681
SURENDRA BAROT
AUGUST 14, 2026
| Pre-selection PIDs |
| N00-101 - Pre-selection-LAYOUT |
| N10-101 - Pre-selection-LAYOUT |
File details come from the government source that posted it. Updated .