Amendment_0005.pdf

PDF 105 KB Posted

Attached to
Oregon Region Dockside Repairs Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
AB-133M-17-RQ-0783
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

SF30 Amendment 05

View the file

Other files for this federal contract opportunity

Other files attached to Oregon Region Dockside Repairs Multiple Award Task Order Contract, newest first.
File Type Posted
Combined_Synopsis_Solicitation_Amendment_06.pdf PDF
Amendment_0006a.pdf PDF
Document_1,_Clauses_and_Provisions_Amendment_06.pdf PDF
Document__3_-_Statement_of_Work_for_Task_Order_0001_Amendment_006.pdf PDF
Combined_Synopsis_Solicitation_Amendment_05.pdf PDF
FA-S0201-1.pdf PDF
Document__3_-_Statement_of_Work_for_Task_Order_0001_Amendment_005.pdf PDF
Amendment_0004.pdf PDF
Document_1,_Clauses_and_Provisions_Amendment_04.pdf PDF
Amendment_0002.pdf PDF
Document__3_-_Statement_of_Work_for_Task_Order_0001_Amendment_02.pdf PDF
AB133M17RQ0783_REFERENCES_FOR_AMENDMENT_02.zip ZIP file
Document_1,_Clauses_and_Provisions_Amendment_02.pdf PDF
Combined_Synopsis_Solicitation_Amendment_02.pdf PDF
Amendment_0003.pdf PDF
Document_2,_SOW_Dockside_for_Base_IDIQ_Amendment_03.pdf PDF
Document_4,_Specific_Info_for_T0001_Amend_01.pdf PDF
Amendment_0001.pdf PDF
Document_4,_Specific_Info_for_T0001.pdf PDF
Attachment_1,_Past_Performance_Questionnaire.pdf PDF
Document_3,_Statement_of_Work_for_Task_Order_0001.pdf PDF
Document_1,_Clauses_and_Provisions.pdf PDF
Attachment_3,_Subcontracting_Plan_Outline.pdf PDF
Attachment_2,_Subcontractor_Consent_Form_for_Release_of_Past_Performance_Info.pdf PDF
Combined_Synopsis_Solicitation.pdf PDF
Document_2,_SOW_Dockside_for_Base_IDIQ.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

AMENDMENT 0005 26 Sept. 2017 NMAN7200-17-00659

6. Issued By Code AJ630031 7. Administered By (If other than Item 6) Code

WESTERN ACQUISITION DIVISION SEE BLOCK 6

CONTRACTS BRANCH

7600 SAND POINT WAY NE SOU6

SEATTLE, WA 98115-6349

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

AB-133M-17-RQ-0728

9B. Dated (See Item 11)

4 August 2017 10A. Modification of Contract/Order No.

10B. Dated (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers x is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or © By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

( ) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to vendor questions, revise the statement of work for the Task

Order to add Item 1S3300, and provide a set of drawings.

The quote due date is not extended.

(Page 2)

QUESTIONS AND ANSWERS

1) General – Is there a modern General Arrangement for Fairweather? If so, please provide.

Response: See Attached Drawing FA-S0201-1.

2) Item 15121 - Fan Room #5 Heat Exchanger Replacement; we assume this heat exchanger to be a

Coiling Coil for the Air Conditioning system, please confirm. What is the space designation for Fan

Room #5 and A.C. system No. designation? Where is the 2nd Heat Exchanger located?

Response: The heat exchangers are both preheaters and are in a back to back configuration in the fan room. Location is F deck noted as PH F-53-1(2) of DWG FA-S3801-2-1.

3) Item 15830 – Small Boat Tank Replacement;

a) Is there drawings of the tanks?

b) What is the thickness of the SS plate & angles to be used for construction?

c) Are there drawings for the piping arrangement?

d) Can the deck pads be reused to avoid welding on the deck?

e) What is the structure on top of the Hydraulic tank, is it part of the new tank – is it to be reused or renewed?

f) Is there TLI in the tanks?

g) We assume the term “cofferdam” is being used for deck area inside the spill containment area around the tanks – please confirm.

h) Will the tanks be empty? If not, what should the contractor expect for quantities?

Response:

a) The tank drawings cannot be located.

b)1/4”

c) There are no known drawings for this.

d) Yes.

e) It’s a hose reel and will be relocated to the side no reverb required.

f)No.

g) The spill containment is “the coffer dam”.

h) There should be only residual oil remaining in the tanks.

4) During the availability of Fairweather will there be crew members living aboard? If yes, how many?

IAW with Item 10700 para. 4.8 and Document 2 SOW for Base IDIQ (General Requirements), para. 3.3

Habitability, if the ship will was declared uninhabitable due to Items of Task Order 0001 Items being accomplished would the Contractor be responsible for crew housing and meal costs? If yes, what level or grade of lodging & meals is deemed acceptable?

Response: See Attached Revised SOW, Item 1S3300.

File details come from the government source that posted it. Updated .