SF30 - Amendment 002
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 3
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
AMENDMENT 0002 18 September 2017 NMAN7200-17-01661
6. Issued By Code AJ630031 7. Administered By (If other than Item 6) Code
WESTERN ACQUISITION DIVISION SEE BLOCK 6
CONTRACTS BRANCH
7600 SAND POINT WAY NE SOU6
SEATTLE, WA 98115-6349
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
X
AB-133M-17-RQ-0783
9B. Dated (See Item 11)
29 August 2017 10A. Modification of Contract/Order No.
10B. Dated (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers x is extended is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
( ) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to incorporate additional mandatory clauses, remove the requirement for bonding rates in the price schedules, remove item 15900 from the task order specifications, and provide answers and references to vendor questions. See revised Combined Synopsis/Solicitation, Document #1 – Clauses and Provisions, Document
#3 – SOW for Task Order 0001.
As a result of this amendment, the quote due date has been extended to September 28, 2017, 4:00 PM Pacific.
(Page 2)
QUESTIONS AND ANSWERS
) Item 15122 Fan Rooms #1,2 & 3 Louver Replace: We were not provided or we are unable to view Ref. 2.1 pages 67 & 68. Please provide full description of louvers being replaced. For instance are they fire damper type louvers?
See attached Louver/Damper Details. They are not fire dampeners, they are primarily directional control.
2) Item 15730 Crane Inspection: Please provide make & models of cranes & winches to be inspected & tested.
What is criteria of the brake tests?
1) 1 each, DWS Winch is a Mode 5050 S/N 1103 Electro- hydraulic Winch,
2) 1 each, Markey electric-research winch out of Seattle model number unknown
3) 1 each, Aft Crane Skagit KEK2D converted to 440 AC
4) 2 each Bridge cranes model unknown, Original construction, no know drawings.
3) Item 15170 Boiler Controls Upgrade Please provide contact information and point of contact for Vapor
Boiler.
Vapor Power, Phil Krajewski, Sales Application Engineer, 630-694-5500.
4) Item 16440 Replace MSD Tanks: Is it NOAA’s intent to have the tanks replaced with original manufacturer
Omnipure fabricated tanks or is the shipyard to use old tanks as a template?
To replace the tanks Omnipure designed with ones manufactured out of 316L stainless steel.
5) Item 15050 Misc. Piping Repair & Replacement (para 4.2.6.): What size of piping for the 70LF of insulation? What type of insulation
Most of the Insulation will be on the steam system, but not limited to and installed in accordance with AMC-
635-1. In general 1-1/2” to 2” piping and be Fiber glass MIL-I-22344.
6) Item 15120 Ventilation System Cleaning: Please provide quantities & sizes of fans, pre-heaters and cooling coils to be cleaned with solvents (Para. 4.4). Please verify this cleaning is to be accomplished in-place without removal. Please clarify para. 4.1 - - Only clean ventilation forward of the galley of decks C thru F. Para 6.1, please provide biddable quantity of fiberglass insulation to be removed or will this be a Change Order?
There are a total of 18 fans See FA-S3801-4-5, there are 9 hot water, See FA-S3801-4-9 and 3 AC see FA-
S3801-4-16.
4.4) All fan room components are expected to be cleaned in place unless this increases cost.
4.1) Clean decks C thru F forward of the galley and the Galley ( Ie Zones 1 and 2).FA-S3801-1
6.1) The quantity and locations are not documented. Open the ventilation system and develop a list of location with and submit an estimate for removal. Removal will be considered growth.
7) Item 25130 Engine Room Vent Louvers: a) para 4.2 - Will zinc chromate & asbestos abatement be subject to change order after sampling? b) para 4.4 - please provide vendor drawings of demister & electrical actuation
(Page 3) systems. c) para 4.9 - Please clarify this paragraph, there appears to be typographical errors. Are the louvers not
GFM?
4.2) The contractor is to sample and submit an estimate for the abatement if any is required. Abatement will be considered growth.
4.4) See attached.
4.9) Strike Paragraph.
8) Item 15050 – Misc Piping Repair & Replacements
a) Para 4.2.1. The List of Material following this para. – Is this list for the cost of the material only or is it for the removal (ripout) & renewal in the listed quantities?
In general yes but this is in place to accomplish small repairs as they are discovered and is designed to keep work moving and reduce churn.
b) Para 4.2.2 The List of Material following this para. – Please clarify the intent of this para. - are these weld repairs only? What does the Est. Quantity column represent? For instance - 15 each weld repairs of 1” stainless piping?
Most of the repairs will be welding but not limited too just welding Ie the term Miscellaneous this is in place to accomplish small repairs as they are discovered and accomplish small requests by the ship and is designed to keep work moving and reduce churn. The material is a guess at the needs not fixed.