Amendment_0003.pdf

PDF 102 KB Posted

Attached to
Oregon Region Dockside Repairs Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
AB-133M-17-RQ-0783
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

SF 30 Amendment 003

View the file

Other files for this federal contract opportunity

Other files attached to Oregon Region Dockside Repairs Multiple Award Task Order Contract, newest first.
File Type Posted
Document_1,_Clauses_and_Provisions_Amendment_06.pdf PDF
Combined_Synopsis_Solicitation_Amendment_06.pdf PDF
Amendment_0006a.pdf PDF
Document__3_-_Statement_of_Work_for_Task_Order_0001_Amendment_006.pdf PDF
Amendment_0005.pdf PDF
Combined_Synopsis_Solicitation_Amendment_05.pdf PDF
FA-S0201-1.pdf PDF
Document__3_-_Statement_of_Work_for_Task_Order_0001_Amendment_005.pdf PDF
Amendment_0004.pdf PDF
Document_1,_Clauses_and_Provisions_Amendment_04.pdf PDF
AB133M17RQ0783_REFERENCES_FOR_AMENDMENT_02.zip ZIP file
Amendment_0002.pdf PDF
Document__3_-_Statement_of_Work_for_Task_Order_0001_Amendment_02.pdf PDF
Document_1,_Clauses_and_Provisions_Amendment_02.pdf PDF
Combined_Synopsis_Solicitation_Amendment_02.pdf PDF
Document_2,_SOW_Dockside_for_Base_IDIQ_Amendment_03.pdf PDF
Document_4,_Specific_Info_for_T0001_Amend_01.pdf PDF
Amendment_0001.pdf PDF
Document_1,_Clauses_and_Provisions.pdf PDF
Attachment_3,_Subcontracting_Plan_Outline.pdf PDF
Attachment_2,_Subcontractor_Consent_Form_for_Release_of_Past_Performance_Info.pdf PDF
Document_4,_Specific_Info_for_T0001.pdf PDF
Attachment_1,_Past_Performance_Questionnaire.pdf PDF
Document_3,_Statement_of_Work_for_Task_Order_0001.pdf PDF
Combined_Synopsis_Solicitation.pdf PDF
Document_2,_SOW_Dockside_for_Base_IDIQ.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

AMENDMENT 0003 18 Sept. 2017 NMAN7200-17-00659

6. Issued By Code AJ630031 7. Administered By (If other than Item 6) Code

WESTERN ACQUISITION DIVISION SEE BLOCK 6

CONTRACTS BRANCH

7600 SAND POINT WAY NE SOU6

SEATTLE, WA 98115-6349

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

AB-133M-17-RQ-0728

9B. Dated (See Item 11)

4 August 2017 10A. Modification of Contract/Order No.

10B. Dated (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended x is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or © By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

( ) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to update Document #2 – General Specifications (pages 3 and 30) to clarify that the

Government will be responsible for the contracting, cost, and payment of all ABS services under this MATOC.

SEE SUMMARY OF CHANGES

(Page 2)

SUMMARY OF CHANGES

A. Make the following revisions to Document #2 – SOW Dockside for Base IDIQ:

1) DELETE the sentence of paragraph PART A--DOCKSIDE REPAIRS, 1.0 INTENT which reads "The

Contractor shall also be expected to schedule and coordinate inspections through the American Bureau of

Shipping (ABS) when required. This requirement will be clarified on a ‘per task order’ basis.”

2) DELETE the paragraph within PART A--DOCKSIDE REPAIRS, 2.0 SCOPE OF WORK which reads

“The contractor shall be responsible for all American Bureau of Shipping (ABS) arrangements to include contracting for, proper scheduling of and paying for all required ABS services. The contractor shall determine what ABS services will be required for each work item under each task order and include the cost of the ABS services in each task order proposal. The cost of any ABS required services associated with any subsequent Additional Item Requirements (AIR) will be included in the AIR proposal.”

AND REPLACE with the following verbiage:

"The contractor shall schedule and coordinate inspections through the American Bureau of Shipping

(ABS) when required. The contractor, in coordination with the COR, shall determine what ABS services will be required for each work item under each task order. The contracting for, cost, and payment of the

ABS services including those associated with any subsequent Additional Item Requirements (AIR) are the responsibility of the Government and will not be a part of task orders issued under this contract. This requirement will be clarified on a ‘per task order’ basis."

3) DELETE the sentence of paragraph PART B--DOCKSIDE AND SEA TRIALS, 1.0 INTENT which reads "The Contractor shall also be expected to schedule and coordinate inspections through the

American Bureau of Shipping (ABS) when required. This requirement will be clarified on a ‘per task order’ basis. ”

AND REPLACE with the following verbiage:

"The contractor shall schedule and coordinate inspections through the American Bureau of Shipping

(ABS) when required. The contractor, in coordination with the COR, shall determine what ABS services will be required for each work item under each task order. The contracting for, cost, and payment of the

ABS services including those associated with any subsequent Additional Item Requirements (AIR) are the responsibility of the Government and will not be a part of task orders issued under this contract. This requirement will be clarified on a ‘per task order’ basis."

File details come from the government source that posted it. Updated .