Attachment_11_-_FCDAS_Buildings_IFIP_Survey_2011.pdf

PDF 1 MB Posted

Attached to
Contract Award
Solicitation number
AB-133E-16-RP-0058
Issued by

About this file

Attachment 11 - FCDAS Buildings IFIP Survey 2011

View the file

Other files

File Type Posted
AB133E-16-RP-0058_FCDAS_Amendment_004_SF30-signed.pdf PDF
Attachment_7_-_General_Teamsters_Local_959_Collective_Bargaining_Agreement_-_Revised_per_Amendment_A003.pdf PDF
AB133E-16-RP-0058_FCDAS_Amendment_003_SF30-signed.pdf PDF
FJCC_Seniority_List_Redacted.xlsx XLSX spreadsheet
Amendment_A002_SF30_FCDAS-signed.pdf PDF
Teamster_Seniority_List_Redacted.xlsx XLSX spreadsheet
Amendment_A001_SF30_FCDAS.pdf PDF
Attachment_2_-_Overtime_Worksheet _revised_per_Amendment_A001.docx DOCX document
Attachment_12_-_Questions_and_Answers_per_Amendment_A001.xlsx XLSX spreadsheet
FINAL_SF1449_and_Solicitation_for_AB-133E-16-RP-0058 _REVISED_PER_AMENDMENT_A001.pdf PDF
Attachment_10_-_FCDAS_Vehicle_Maintenance_March_2016.pdf PDF
Attachment_7_-_General_Teamsters_Local_959_Collective_Bargaining_Agreement_-_Revised_per_Amendment_A001.pdf PDF
Attachment_6_-_FJCC_Collective_Bargaining_Agreement_Revised_per_Amendment_A001_.pdf PDF
Attachment_9_-_FCDAS_fuel-waste-hazmat_storage_in_tanks_and_drums_2016_0112.pdf PDF
Attachment_1_-_FCDAS_Performance_Work_Statement _revised_per_Amendment_A001.pdf PDF
FINAL_SF1449_and_Solicitation_for_AB-133E-16-RP-0058.pdf PDF
Attachment_8_-_Service_Contract_Act_Wage_Determination_05-2017_Rev_21.pdf PDF
Attachment_3_-_Past_Performance_Questionnaire.pdf PDF
Attachment_5_-_DD254.pdf PDF
Attachment_4_-_Managed_Personal_Property_and_Capital_Equipment_List_.pdf PDF
Attachment_7_-_General_Teamsters_Local_959_Collective_Bargaining_Agreement.pdf PDF
Attachment_6_-_FJCC_Collective_Bargaining_Agreement.pdf PDF
Attachment_1_FCDAS_Performance_Work_Statement__Rev_P.pdf PDF
Attachment_2_-_Overtime_Worksheet.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

Summary

NOAA Limited Survey 2011

Instructions

Dear Colleague:

Thank you in advance for your time in participating in this Integrated Facility Inspection Program (IFIP) survey process. As you may know, National Oceanic and Atmospheric Administration (NOAA) has invested in a survey software package to assess the condition of buildings in its portfolio as required under Executive Order 13327. While the software we use has been enhanced to meet NOAA's needs, please appreciate that it is a commercial off-the-shelf (COTS) system, and as such, it may not ask questions which fully address the deficiencies at your property. If you feel that there is critical information associated with the facility you are surveying which is not being addressed in the survey questions, please provide that information in the comments block at the end of the question page.

In order to facilitate the completion of the questionnaire, you will be able to access and print a copy of the last completed survey questionnaire for a property, as long as that property was previously surveyed. The availability of that data from a previous survey should be useful in expediting the completion of this year's questionnaire, as long as the property's condition remains unchanged.

There are links on the IFIP survey Homepage to a recorded training session video, a user manual and a PowerPoint tutorial in the event you need assistance in completing your questionnaire.

Questions have been raised as to how survey respondents should address situations where work to upgrade the building was in progress, or where funding had been secured to address deficiencies, but work has yet to commence. If this situation exists, please complete the questionnaire based on the condition of the asset at the time of the survey. If work is in progress, but has not been completed, you should continue to report the building system as deficient.

In previous years, there have also been instances where respondents were assigned to complete a survey for a building that had been damaged by a hurricane or by fire; thereby, rendering completion of the survey somewhat meaningless. If this situation should exist for a property in this survey cycle, please contact your Line Office approver for further guidance.

Finally, in answering a survey question, you should consider the magnitude of any deficiency you identify, and whether it is large enough to warrant full replacement of the building system. For example, if 3,000 SF of asphalt on a roof requires repair, and the roof has a total square footage of 5,000 square feet, you may care to indicate that the full 5,000 square feet require replacement because in all practicality were we to contract to fix the roof, NOAA would probably elect to complete a full roof replacement given its magnitude.

Please be aware that the Department is looking closely at properties designated as under-utilized or not utilized as a means of identifying those properties that could be vacated, excessed or disposed of in order to decrease the federal government?s footprint and save taxpayer dollars. Therefore, should you determine that a property being surveyed by you is under- or not-utilized, please provide a detailed explanation for this designation in the comments box of the survey questionnaire, which will then serve as the basis to inform the Department of our rationale for this designation, and our intentions for its future use.

We recognize that the majority of individuals who have been tasked with completing this survey questionnaire do not have a facilities background, but will be asked to respond to somewhat technical questions. You will find the links in the questionnaire to definitions and embedded pictures of various building systems helpful in enhancing your understanding of the questions. Additionally, there is an online help button at the top of each page, where you can find additional instructions, or you can seek further clarification or answers to any questions you may have via email from our support contractor, VFA, at help@vfa.com or by phone at 888-506-8500.

If you find, however, that you are being asked to respond to a question where you lack understanding and require additional information beyond the definitions provided, please feel free to contact Mr. Gene Rodgers at 301-713-0937, ext 105.

Thank you again for taking your time to respond to the questionnaire. Through your efforts, NOAA will be able to gain a greater understanding of the condition of its real property portfolio, and better plan the budgeting of our limited resources to address NOAA?s infrastructure needs.

Survey Name: Limited 2011

Asset Name: Facilities Building

Asset Number: AKW15409

City: FAIRBANKS (GILMORE CREE, AK

Status: Approved

Submission Deadline: none selected

Approval Deadline: none selected

Responder: LARRY.LEDLOW

Approver: JOHN.GIRONDA

Total Sections: 30

Completed Sections: 30

Please fill out or verify the information below the green section and click "Save" when you are done.

NOAA has the following information on file for this asset:

Section: Basic Building Information Approved

Total Cost: 1,039,473 FCI: 0.44

Location

Page 1 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

10/4/2011https://facility.vfafacility.com/auditor/PrintPreview.jsp?IDS=27796

Please update or complete the following information:

Address 1300 Eisele Road Type Building Total Occupiable SF 11532 DOC Security Level

Complex/Site Gilmore Creek Classification General Office - Laboratories Size(Gross) 13607.76

City FAIRBANKS (GILMORE CREE Predominant Use Warehouses Plant Replacement Value 2357793.44 Mission Dependency Mission Dependent, Not Critical

State AK Historic Category Evaluated, Not Historic Ownership DOC Owned

Zip 99712 Total Personnel 10 Primary Occupant NESDIS

FCI 0.44

Year Constructed 1966 Floors Above Grade 1 Utilization Utilized Means CCI FAIRBANKSAK

Year Renovated 1966 Floors Below Grade 0 Construction Type IBC - Type V

*Year Constructed 19661966 +Floors Above Grade

*Utilization Utilized

Year Renovated 19661966 +Floors Below Grade

*Construction Type IBC - Type V

The footings and foundation refer to the entire substructure of a building. The substructure is that part of a building below the first floor and/or framing, upon which the entire building rests.

The following questions are meant to assist in the assessment of the condition of the facility's footings and foundation:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square footage of visible area of concrete footings and foundation requiring crack repair and or spalling (where the concrete has chipped off) work is:

2. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

Severity Index 3: Necessary, but not yet critical; threat is forecasted beyond three years

3. Comments:

Can not be assessed at this time

Section: 1 Substructure - Footings and Foundation Approved

Cost: $0 FCI: 0.44

Floor and Roof Deck Construction represents the horizontal division between two stories of a building.

Note: Surfaces are often covered by materials such that the deck may not be easily observed. Please make an effort to look in closets, mechanical rooms, electrical rooms, etc. to observe conditions as best you can.

The following questions are meant to assist in the assessment of the condition of floor and roof construction in your facility:

No response is appropriate for this section of the survey.

1. The square foot area of visible concrete floor or roof deck requiring crack repair and spalling (where the concrete has chipped off) work is:

2. The square foot area of wood floor or roof deck construction requiring replacement is:

3. The work associated with the above should be performed:

Section: 2 Floor and Roof Deck Approved

Cost: $44,654 FCI: 0.44

Page 2 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

Severity Index 2: Short term threat within thirteen to thirty five months

4. Comments:

High bay door ramps should be repaired.

High value room requires some flooring to be replaced.

Exterior walls refer to an outer wall or vertical enclosure of a structure.

The following questions are meant to assist in the assessment of the condition of the facility's exterior walls:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of the following exterior wall types requiring re-pointing is:

2. The square foot area of brick veneer, brick, concrete block, stone, stone veneer or poured in place concrete exterior walls requiring crack and or spalling (where the concrete has chipped off) repair work is:

3. The square foot area of wood siding requiring repair work such as crack repair and or minor board replacement is:

4. The square foot area of exterior wall types requiring replacement (not addressed in Question # 2 or #3 above) is:

5. The square foot area of brick veneer, brick, concrete block, poured in place concrete, wood, vinyl or aluminum exterior walls requiring cleaning i.e. dirt, graffiti, mold, etc. (not addressed in Question # 2, #3 or #4 above) is:

6. The square foot area of brick veneer, brick, concrete block, poured in place concrete or wood exterior walls requiring painting and or waterproof sealing (not addressed in Question # 2, #3, #4 or #5 above) is:

7. The lineal feet of wood exterior trim requiring painting and or waterproof sealing (not addressed in Question # 2, #3, #4, #5 or #6 above) is:

8. Sealants are flexible, natural or synthetic electrometric materials that are used to join components or fill gaps between seams or on surfaces and prevent infiltration of unwanted material

Section: 3 Exterior Walls Approved

Cost: $184,636 FCI: 0.44

Not Applicable

Brick Veneer Or Brick

Concrete Block

Stone

Stone Veneer

Precast Concrete Panels

Not Applicable / No Cost to Repair

Wood Siding

Vinyl Or Aluminum Siding

EIFS (Exterior Insulation and Finish System)

Metal Clad Siding

Page 3 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011 or moisture on the exterior of buildings. A common name for sealants is "caulk" or "caulking".

If your building utilizes sealants on exterior surfaces or components, does any sealant show signs of cracking, shrinking, or dislodging from the spaces they are intended to protect?

How many lineal feet of sealant should be repaired or replaced?

9. The work associated with the above should be performed:

Severity Index 2: Short term threat within thirteen to thirty five months

10.Comments:

The facility is in need of total exterior painting.

100100

Exterior windows refer to a glazed (glass) opening in an external wall to admit light and air.

Note: You may not be able to view the exterior condition of each window. If this is the case please extrapolate from the conditions of the windows that you are able to observe.

The following questions are meant to assist in the assessment of the condition of the facility's exterior windows:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of the following exterior window types requiring repair, refinish, or replacement:

Note: The following are the definitions of what is included for each service:

Aluminum Window Repair

Aluminum Window Replacement

Steel Window Refinish

Steel Window Repair

Steel Window Replacement

Vinyl Window Replacement

Wood Window Refinish

Wood Window Repair

Wood Window Replacement

2. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

Several windows cracked due to climate, all need refinished and painted.

Section: 4 Exterior Windows Approved

Cost: $42,354 FCI: 0.44

Repair Remove and replace gaskets and any misc. hardware replacement

Refinish Prepare window for painting then paint window, primer & 1 coat finish

Replacement

Remove and replace sealant and remove the install new window w/ frame & glazing. The evaluation for replacement would be determined by one or more of the following criteria:

Movable windows that cannot be operated Movable windows that are difficult to open and /or do not remain open Rotted wood Weather-stripping has failed (air leaks past) Heavily corroded Warped frame

10001000

500500

Page 4 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

Exterior doors are movable elements, in an outer wall or vertical enclosure that allow easy conversion between an opening and a closed wall. For the purposes of this questionnaire, it is assumed that the approximate size of a single passage door in your facility is approximately 3 feet x 7 feet. Therefore, if your facility has double doors, you must count a quantity of "2" for each set of double doors.

The following questions are meant to assist in the assessment of the condition of the facility's exterior doors:

No response is appropriate for this section of the survey.

1. The quantity of exterior doors requiring repair work such as painting (refinishing), caulking, alignment, hinge replacement and/or lock repair is:

2. The quantity of the following door types requiring replacement due to lack of operability, security:

Not Applicable

Wood passage

Aluminum passage

Steel passage

2a. The square foot area of the following door types requiring replacement due to the lack of operability, security:

Overhead Steel Roll-Up, without motor

Steel Door, Powered Overhead Roll-Up

Wooden Door Powered Overhead Roll-Up

3. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

North facing exit door damaged due to snow and ice fall. Door and jam show signs of rotting.

Section: 5 Exterior Doors Approved

Cost: $7,323 FCI: 0.44

A roof is comprised of a material used to cover the roof framing, or roof deck of a building, that prevents the ingress of weather into the building interior.

The following questions are meant to assist in the assessment of the condition of the facility's roof:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of the following Sloped/pitched roof types requiring replacement is:

Asphalt Shingles

Standing Metal Seam

Slate or Synthetic Slate

Clay Tile

Section: 6 Roofing Approved

Cost: $0 FCI: 0.44

Page 5 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

2. The square foot area of the following Flat roof types requiring replacement is:

Adhered Membrane

Ballasted Membrane

Pavers

Built-up Tar

Concrete Roof Panel

3. The lineal feet of roof requiring flashing (flashing is metal used to reinforce and weatherproof the joints and angles of a roof) is:

4. The work associated with the above should be performed:

Severity Index 2: Short term threat within thirteen to thirty five months

5. Comments:

Like new condition, should be re-evaluated in three to five years.

Interior doors are movable members, or segments, in an interior wall or vertical enclosure allowing access between spaces within a building. For the purposes of this questionnaire, it is assumed that the approximate size of the doors in your facility is 3 feet by 7 feet. Therefore, if your facility has double doors, you must enter a quantity of "2" for those doors.

The following questions are meant to assist in the assessment of the condition of the facility's interior doors:

No response is appropriate for this section of the survey.

1. The quantity of interior doors requiring repair work such as painting, caulking, alignment, hinge replacement and or lock repair is:

2. The quantity of the following door types requiring replacement due to damage or inoperability is:

Aluminum

Steel

Galvanized

Wood

Glass

3. The total square foot area of roll-up style doors requiring replacement due to damage or inoperability is:

Severity Index 2: Short term threat within thirteen to thirty five months

Section: 7 Interior Doors Approved

Cost: $35,063 FCI: 0.44

Page 6 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

Products or materials applied to interior wall surfaces to provide a desired appearance are known as wall finishes.

The following questions are meant to assist in the assessment of the condition of the facilities wall finishes:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of the following wall surfaces requiring replacement/refinishing is:

Paint (Oil or Latex)

Vinyl Wall Covering

Wood

Fabric Covering

Epoxy Coating

Urethane Clear Coat

Ceramic Tile

Severity Index 2: Short term threat within thirteen to thirty five months

Interior requires major painting including shop spaces.

Section: 8 Interior Wall Finishes Approved

Cost: $22,432 FCI: 0.44

15000

Products or materials applied to floor surfaces to provide a desired appearance are known as floor finishes.

The following questions are meant to assist in the assessment of the condition of the facility's floor finishes:

1. The square foot area of the following floor finishes requiring replacement/refinishing is:

a. Sqft. -- Carpet Tile replacement

b. Sqft. -- Carpet replacement

c. Sqft. -- Vinyl Composition Tile

d. Sqft. -- Sealed or Painted Concrete

e. Sqft. -- Terrazzo

f. Sqft. -- Marble or Stone

g. Sqft. -- Ceramic or Quarry Tile

h. Sqft. -- Sheet Goods

i. Sqft. -- Rubber Flooring

j. Sqft. -- Raised (Computer Room) Flooring

2. Are carpets and rugs free of tears and trip hazards?

Section: 9 Interior Floor Finishes Approved

Cost: $56,560 FCI: 0.44

Page 7 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

Severity Index 2: Short term threat within thirteen to thirty five months

Cracking in all shop areas, ceramic tile in womens bathroom, tile in all administration type areas should be replaced, this is the original tile in most areas.

Yes

No - Lineal feet of tears or trip hazards.

Products or materials applied to interior ceiling surfaces to provide a desired appearance are known as ceiling finishes.

The following questions are meant to assist in the assessment of the condition of the facility's ceiling finish(s):

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of the following ceiling to be repaired/replaced:

2. The square foot area of ceiling that requires painting is:

Severity Index 2: Short term threat within thirteen to thirty five months

Ceiling tile has become brittle, been painted and some water damage. All shop ceilings require replacement.

Section: 10 Ceiling Finishes Approved

Cost: $66,774 FCI: 0.44

Not Applicable

Suspended Acoustical 7935

Sheetrock

Plaster

Metal

Concealed Spline Acoustical Tiles

Decorative Plaster

Wood

A receptacle in a plumbing system in which water or wastes are collected and ultimately discharged into a sanitary sewage system is known as a plumbing fixture.

Section: 11 Plumbing Fixtures Approved

Cost: $10,545 FCI: 0.44

Page 8 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

The following questions are meant to assist in the assessment of the condition of the plumbing fixtures at your facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The quantity of plumbing fixtures requiring replacement because they are worn, damaged or non functioning for each of the following types is:

2. The quantity of drinking fountains requiring replacement for each of the following types is:

3. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

All bathrooms have been remodeled with new fixtures, lighting, ceilings, 2 with flooring.

Toilets 1

Urinals 0

Restroom Sinks 1

Utility Sinks 2

Bathtubs 0

Interceptors (grease trap) 0

Showers (Built In) 0

Showers (Prefabricated) 0

Wash Stations (Gang Wash Centers) 0

Emergency Eye Washes 0

Emergency Eye/Shower Stations 0

Not Applicable

Porcelain (Non Refrigerated)

Porcelain (Refrigerated)Porcelain (Refrigerated)

Self Contained (Refrigerated)

Accessibility compliance refers to those plumbing fixtures which are accessible as defined by the Americans with Disabilities Act (ADA) or the Uniform Federal Accessibility Standard (UFAS) or Local Regulations.

Note: Not every fixture or every restroom is required to be made accessible.

The following questions are meant to assist in the assessment of plumbing fixture accessibility compliance at your facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The quantity of plumbing fixtures requiring replacement due to non-accessibility for each of the following types is:

Specify Quantity Below:

Section: 12 Accessibility Compliance - Plumbing Fixtures Approved

Cost: $4,831 FCI: 0.44

Toilets 1

Urinals 1

Restroom Sinks 0

Page 9 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

Severity Index 2: Short term threat within thirteen to thirty five months

Showers (Built In) 0

Showers (Prefabricated) 0

Drinking Fountains 0

The system for providing water in a building at needed locations, by means of a network of pipes, is known as a domestic water distribution system. Often times the type of piping used in the Domestic Water Piping System is easiest to see where it connects to the water meter.

The following questions are meant to assist in the assessment of the condition of the domestic water distribution system at your facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The majority of the domestic water piping is:

2. Are there any active leaks associated with the domestic water system?

3. Are there adequate isolation/cutoff valves installed throughout the building? This is usually determined when there is a leak and the water can only be shut off at the Main Valve.

4. Do the existing building isolation/cutoff valves operate properly and shut off the supply of water when needed? (These valves are usually located near each plumbing fixture to shut off the water supply to that fixture). When they do not work properly it may be necessary to operate the main building valve to isolate the water to a plumbing fixture.

5. Has the domestic water system been tested in the last 5 years for such items as bacteria, lead, or E. Coli?

6. The type of domestic hot water heaters/converters requiring replacement because they are inoperable, provide insufficient hot water, are leaking or rusted is:

Section: 13 Domestic Water Distribution Approved

Cost: $0 FCI: 0.44

Copper

Galvanized

Fine thread brass

Lead lined

Yes - How many leaks are there?

No

Yes

No - How many valves are needed?

Yes

No - How many valves need repair?

Yes

Were the test results acceptable?

Yes

No

No

Page 10 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

7. The work associated with the above should be performed:

Severity Index 2: Short term threat within thirteen to thirty five months

8. Comments:

New filtering required, non exist now.

Not Applicable / No Cost to Repair

Electric

Natural Gas

Fuel Oil

Steam

Sanitary waste refers to the network of pipes within a building dedicated to the discharge of human excrement and/ or household wastes. This waste is discharged into a sanitary sewage (domestic sewage) system.

The following questions are meant to assist in the assessment of the condition of the sanitary waste system at your facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The majority of the building's sanitary piping system is:

2. Are there any active leaks associated with the sanitary system?

3. The quantity of sanitary ejector (Sump pump)sets requiring replacement in the building is:

4. The linear feet of sanitary piping requiring replacement is:

5. Where does the sanitary waste discharge?

Section: 14 Sanitary Waste Approved

Cost: $0 FCI: 0.44

Hub type (cast iron)

No hub (cast iron)

Galvanized steel

Plastic/PVC

Yes How many leaks are there?

No

Public sewer system

Does it back up?

Yes

No

Septic tank

Does it back up?

Yes

No

Page 11 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

6. The work associated with the above should be performed:

Severity Index 2: Short term threat within thirteen to thirty five months

7. Comments:

Cesspool

Does it back up?

Yes

No

Storm system refers to a system of horizontal and vertical pipes on the interior or exterior of a building used to carry rainwater from the roof to either the ground or a site drainage system (i.e. roof gutters, roof drains and downspouts).

Note: Buildings with a flat roof generally have drains in the center of the roofs where storm water drainage piping is connected.

The following questions are meant to assist in the assessment of the condition of the storm system at your facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The majority of the building's storm system piping is:

2. Are there any active leaks associated with the storm system piping?

3. The quantity of storm ejector (sump pump) sets requiring replacement because they are unreliable, inoperable or are old in the building is:

4. The quantity of roof drains requiring replacement because the strainer over the pipeis missing, damaged or plugged up is:

5. The linear feet of storm piping requiring replacement because it is leaking, damaged or showing signs of corrosion is:

6. The linear feet or the following types of gutters and downspouts requiring installation or replacement because they are non-existent, leaking, damaged or showing signs of corrosion is:

Section: 15 Storm Water System Approved

Cost: $0 FCI: 0.44

Hub type (cast iron)

No hub (cast iron)

Galvanized steel

Plastic/PVC

Yes Number of leaks

No

Not Applicable / No Cost

Aluminum

Copper

Lead coated copper

Page 12 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

7. The work associated with the above should be performed:

Severity Index 2: Short term threat within thirteen to thirty five months

Sprinklers and standpipe(s) refer to a pre-engineered system of piping, valves, heads, and sometimes pumps, which are designed to deliver a predetermined quantity of water to aid in the extinguishing of a fire.

The following questions are meant to assist in the assessment of the sprinklers and standpipe(s) your facility.

1. Is the building presently equipped with a sprinkler system?

2. Is the building presently equipped with a standpipe system?

3. Fire extinguishers are required to be inspected when initially placed in service and thereafter at approximately 30-day intervals. You can determine if the fire extinguishers are being inspected regularly by looking at the inspection tag attached to the Fire Extinguisher. Are they being inspected monthly?

4. Are portable fire extinguishers maintained annually (this can be determined by looking at inspection tag attached to the Fire Extinguisher)?

5. Have fire extinguishers been removed and not replaced?

6. Do you have an ADP (Automated Data Processing) Center?

Does it have a dedicated Fire Suppression system?

7. The work associated with the above should be performed:

Section: 16 Sprinklers and Standpipes Approved

Cost: $108,109 FCI: 0.44

Yes - The building is completely covered with a sprinkler system.

No - How many square feet (area) are not covered by a sprinkler system? 7000

Yes - There is a standpipe connection on each floor above the second floor (a place where the fire department can connect their hoses). Or the building is less than 3 floors.

No - How many floors above the second floor do not have a standpipe?

Yes

No - How many fire extinguishers need to be inspected?

Yes

No - How many fire extinguishers need maintenance?

Yes - How many fire extinguishers have been removed and not replaced?

No

Yes

No

Yes

No - What is the Square foot area of the room?

Page 13 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

Severity Index 2: Short term threat within thirteen to thirty five months sprinkler system was originally installed in 1970, pipes have been found to be blocked, have replaced some. Riser pipe also needs new differential valving,old valve is corroded internally from water condition and vibration.

The term electrical service refers to electrical power provided to the building from the utility company, or other service provider.

Note: Your electrical service company may need to be contacted to assist in the completion of the following questions.

The following questions are meant to assist in the assessment of the condition of the electrical service at your facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The electrical service:

2. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

Section: 17 Electrical Service Approved

Cost: $37,862 FCI: 0.44

Provides sufficient capacity (you are unaware of limitations on the use of electricity), and has no particular issues.

Lacks capacity, and you have been requested to reduce electrical use due to lack of capacity from the electric service provider.

Lacks capacity, and you have been told no additional electrically powered equipment can be added to the facility.

Is old, has exceeded its useful life, and needs to be replaced. Usually if electrical equipment that has exceeded 30 years of service, is generally considered to exceed its useful service life as defined by BOMA, (Building Owners & Managers Association). Often equipment in this condition have circuit breakers that "trip" on occasion. In addition, if there has been a need for significant amounts of maintenance or equipment failures have occurred, then replacement would be warranted.

The method of providing electrical power within a facility or building, where required, by means of a system of electrical equipment including, but not limited to, distribution switchboard, motor control center(s), panel board(s), feeder wiring and conduit supplying power to equipment.

The following questions are meant to assist in the assessment of the condition of the electrical distribution at your facility.

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The distribution switchboard is:

Section: 18 Electrical Distribution Approved

Cost: $63,998 FCI: 0.44

Not Applicable (proceed to the next question)

The distribution switchboard has extra spaces for circuit breakers and you are unaware of any restrictions of adding more equipment in the building.

The distribution switchboard has few if any spaces for more circuit breakers and you are unaware of any restrictions on the current use of electrical equipment in the facility.

Page 14 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

2. Has the switchboard been serviced within the last 3 years?

3. The motor control center(s) is/are:

4. Has/have the motor control center(s) been serviced within the last 3 years?

5. The panel board(s) is/are:

6. Has the panel board(s) been serviced within the last 3 years?

Note: The term serviced refers to having a qualified electrician perform tests and inspection, which may include an infrared survey of the electrical equipment.

7. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

All electrical is original and requires upgrading

The distribution switchboard has no additional circuit breaker spaces and at times circuit breakers would trip.

Has exceeded its useful service life and needs to be replaced. Usually if electrical equipment has exceeded 30 years of service, it is generally considered to exceed its useful service life as defined by BOMA, (Building Owners & Managers Association). Often equipment in this condition have circuit breakers that "trip" on occasion. In addition, if there has been a need for significant amount of maintenance or equipment failure which has occurred then replacement would be warranted.

Yes

No

The motor control center(s) has extra spaces in the motor control center for more starters/breaker positions and you are unaware of any restrictions of adding more equipment in the building.

The motor control center(s) has few if any spaces in the motor control panels for more starters/breaker positions and you are unaware of any restrictions on the current use of electrical equipment in the facility.

The motor control center(s) has no additional spaces so no additional equipment can be added and potentially circuits breakers/ overloads and on occasion the equipment would trip.

Has exceeded its useful service life and needs to be replaced. Usually if electrical equipment has exceeded 30 years of service, it is generally considered to exceed its useful service life as defined by BOMA, (Building Owners & Managers Association). In addition, if there has been a need for significant amount of maintenance or equipment failure which has occurred then replacement would be warranted.

Yes

The panel board(s) has extra spaces for circuit breakers and you are unaware of any restrictions of adding more equipment in the building.

The panel board(s) has few if any spaces in the electrical panels for more circuit breakers and you are unaware of any restrictions on the current use of electrical equipment in the facility.

The panel board(s) are full and no additional equipment can be added in the facility and potentially circuit breakers would on occasion trip.

Has exceeded its useful service life and needs to be replaced. Usually if electrical equipment has exceeded 30 years of service, it is generally considered to exceed its useful service life as defined by BOMA, (Building Owners & Managers Association). In addition, if there has been a need for significant amount of maintenance or equipment failure which has occurred then replacement would be warranted.

Yes

No - Quantity of panelboards to be inspected.

Lighting and branch wiring refers to the system of light fixtures, outlet devices including light fixture outlets, power receptacles (electrical wall outlets), lighting controls (switches), and the wiring for this equipment.

Section: 19 Lighting and Power Approved

Cost: $138,658 FCI: 0.44

Page 15 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

The following questions are meant to assist in the assessment of the condition of the lighting and power at your facility:

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The majority of the building's lighting is:

2. The majority of the building's branch circuit power system is: (Pick one that best describes your facility)

3. Are electrical cords and cable connections secure and intact?

4. Are electrical power strips limited to one per outlet?

5. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

6. Comments:

Adequate and contains T8 lamps

Adequate but should be upgraded from T12 lamps to T8 lamps for energy conservation

Adequate but light fixture lenses/reflectors are aged

Inadequate and additional lighting is required in the building

Up to 25% of the building's square foot area

Between 25-50% of the building's square foot area

Between 50-75% of the building's square foot area

75 + % of the building's square foot area

Completely inadequate and should be replaced

Has exceeded its useful service life and needs to be replaced. This is usually indicative of fixtures that are routinely being repaired due to failure of components in the fixture.

The work areas have little or no need for extension cords. There are sufficient outlets in the work areas.

The electrical panel boards do not have any additional circuit breaker positions. The work area outlets are completely utilized.

The work areas use extension cords to meet the tasking requirements of the users:

Up to 25% of the building's square foot area

Between 25-50% of the building's square foot area

Between 50-75% of the building's square foot area

Between 75 + % of the building's square foot area

There are many extension cords and circuit breakers trip frequently.

Has exceeded its useful service life and needs to be replaced. Usually if electrical wiring has exceeded 40 years of service, it is generally considered to exceed its useful service life as defined by BOMA, (Building Owners & Managers Association). In addition, if there has been a need for significant amounts of maintenance or equipment failure which has occurred then replacement would be warranted

Yes

No

Yes

No

The system of control panel, manual pull stations, horns (strobe), speakers, and wiring make up the fire alarm system.

Section: 20 Fire Alarm System Approved

Cost: $0 FCI: 0.44

Page 16 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

The following questions are meant to assist in the assessment of the condition of the fire alarm system at your facility.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The majority of the building's fire alarm system is:

2. Is the fire alarm system tested annually?

3. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

New Alarm system installed in late 2010.

In fine working order. Infrequent failures/miss operations occur.

The fire alarm system is not in proper working order. System is erratic and cannot be relied upon and should be repaired.

Indicate the percentage of building square footage that is affected.

Up to 25% of the building's square footage

Between 25-50% of thebuilding's square footage

Between 50-75% of the building's square footage

75 + % of the building's square footage

Inadequate and should be replaced. The system fails routinely.

Has exceeded its useful service life and needs to be replaced. Usually if fire alarm equipment has exceeded 10 years of service, it is generally considered to exceed its useful service life as defined by BOMA, (Building Owners & Managers Association). In addition, if there has been a need for significant amounts of maintenance or equipment failure which has occurred then replacement would be warranted.

No

Yes

Emergency lights refer to those lighting fixtures, which are designed to provide emergency (backup) illumination in the event of power failure.

The following questions are meant to assist in the assessment of the emergency lighting at your facility.

1. Are all exits properly marked with illuminated signage?

2. The quantity of the following types of emergency light fixtures installed is:

Not Applicable / No Cost to Repair

Light fixtures served via an emergency generator

Self contained single head battery units

Self contained dual head battery units

Gel packs connected to existing light fixtures

3. Have the emergency light(s) been inspected and or certified within the past 12 months?

Section: 21 Emergency Light and Power Approved

Cost: $0 FCI: 0.44

Yes

No - How many additional signs are required?

Not Applicable

Yes

No

Page 17 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

4. The quantity of the following types of emergency light fixtures requiring replacement and or addition is:

Light fixtures served via an emergency generator

Self contained single head battery units

Self contained dual head battery units

Gel packs connected to existing light fixtures

5. Are exits at your facility kept free of obstructions?

6. Could exits which have locks on them impede exiting during an emergency?

7. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

Yes

No

Please note: If you need assistance with any of the Safety and Environmental questions below please contact Mr. Will Freeman: Will.Freeman@NOAA.gov 301-713-2870 ext.111.

1. Has this facility been cited by any regulatory agency (EPA, OSHA, state agency, fire department, etc.) in the past 12 months for environmental or safety issues e.g., Notice of Violation (NOV), or other adverse finding?

2. Are there any unsafe conditions currently associated with this building (e.g. overloaded electrical system, structural failure, fire hazards, mold, Indoor Air Quality (IAQ) issues, evidence of water damage, etc.)?

3. Is there a permit, license or registration associated with any system in this building (e.g. drinking water, storm water, sewage, tanks, air emissions, emergency power generator, hazardous waste, radiation (NRC) etc.)?

4. Have personnel been assigned in writing for responsibility for environment & safety compliance in this building?

5. Have any storage tanks been installed either aboveground (AST) or underground (UST) at this building?

Section: 22 Safety and Environmental Compliance Related Questions Approved

Please briefly describe (160 chars max.)

Yes No

Have they been trained?

Yes No

Please provide the following information:

Yes

Total number of ASTs Total storage (gallons) ASTs

Page 18 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

ENERGY QUESTIONS

Please answer the following questions related to energy if your site/NOAA pays for utilities directly to the utility company. (Examples: electric, water, natural gas, propoane, heating fuel, etc.)

6. Has this facility implemented any energy reduction projects over the last year?

7. Does this building operate a water irrigation system that waters shrubbery, plantings or grass on the site?

8. Does your building have "low flow" (reduced water flow) faucets, shower heads, toilets or urinals? Helpful info: low flow toilets use a maximum of 1.6 gallons per flush (gpf) - this amount would be indicated on the toilet; 1.0 gpf for low flow urinals; low flow shower heads and low flow faucets use about 21/2 gallons of water per minute.

9. Do you have any single-pass cooling on equipment (using potable city water to cool equipment, and then wasting the water to drain)? Examples: ice machines, air conditioners, refrigerators and coolers.

If yes, list equipment which uses single-pass cooling.

10.Do you have any unique water (potable/drinking, sea water) using processes? If so, briefly explain processes.

Answer: (text) briefly explain unique water usage

11.Are you resuing any water? Reuse / "gray water" uses include: collecting rain water for irrigation & toilets, groundwater recharging, reusing wastewater, reusing water from fish aquariums, etc.

Answer: (text) briefly explain water reuse process

12.Have you implemented any water conservation projects within the last 12 months? If so, briefly explain (include estimated annual gallons and dollars savings).

Answer: (text) briefly explain water conservation

13.Do you purchase any renewable energy and/or any renewable energy credits for your site? If so, indicate annual amount (kWh/yr).

Answer: (number) kWh/yr of renewable energy & renewable energy credits

14.Do you generate any renewable power on site (photovoltaic, solar hot water systems, wind, geothermal heat pumps, other)? If so, briefly explain the system and size.

Answer: (text) briefly explain renewable system and size

15.Does this building have dedicated meters for measuring utility consumption?

Total number of USTs 11 Total storage (gallons) USTs 50005000

List Types of fuels or chemicals stored in the ASTs/USTs (160 chars max.):

FS-2 Heating oil

No

Yes No (bills paid by lessor or another government agency, etc.) - Skip to the last question

Please explain energy savings project, also include estimated annual savings (dollars, kWh, gals, ccf, etc.) (160 chars max.)

Yes

No

Unknown

Yes

No

Unknown

Yes

No

Unknown one ice machine List equipment which uses single-pass cooling. (160 chars max.)

Briefly explain processes. (160 chars max.)

Briefly explain water reuse process. (160 chars max.)

Briefly explain water conservation project (include estimated savings $ and gallons/year). (160 chars max.)

Indicate annual amount (kWh/yr) of renewable energy & renewable energy credits. (160 chars max.)

Briefly explain the type and size of the renewable system(s). (160 chars max.)

Electric meter Yes No

Natural gas meter Yes No

Water meter Yes No

Page 19 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

16.If you would like to underscore any energy or safety and environmental issues at this site, please describe below (160 chars max.):

Steam meter Yes No

Other Yes No

Please describe

"Other" (above) (160 chars max.):

The term vehicular pavement refers to the surface material covering adjacent parking and driveway areas located on your facility's site.

The following questions are meant to assist in the assessment of the condition of the adjacent vehicular surfaces to the facility:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of the following vehicular pavement types requiring crack and/or spalling (where the surface has chipped/broken creating holes) repair work is:

Concrete

Asphalt

2. The square foot area of the following vehicular pavement types requiring replacement because it is heavily cracked and/or potholed is:

Gravel Or Loose Stone Covering

3. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

Cracks require repair to maintain pavement integrity

Section: 23 Vehicular Pavement Approved

Cost: $25 FCI: 0.44

The term sidewalks, walkways and ramps refers to paths adjacent to the building used for pedestrian traffic.

The following questions are meant to assist in the assessment of the condition of the pedestrian traffic path surfaces:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The square foot area of sidewalks, walkways, and ramps requiring crack repair and/or spalling (where the concrete has chipped off) work is:

Section: 24 Sidewalks, Walkways and Ramps Approved

Cost: $0 FCI: 0.44

Page 20 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

2. The square foot area of paver or other stone sidewalks, walkways and ramps requiring re-setting due to settlement, heaving, or other similar conditions is:

3. Replacement required of sidewalks, walkways, or ramps:

Concrete (lineal feet)

Asphalt (lineal feet)

Paver or Other Stone (square feet)

4. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

The term fencing refers to area enclosures that encompass the facility or open areas directly adjacent to the facility.

The following questions are meant to assist in the assessment of the condition of the site fencing at your facility:

No response is appropriate for this section of the survey.

1. The linear feet of wood fencing requiring repair work such as sealing/painting, repositioning, and or slat replacement is:

2. The square feet of brick fencing requiring repair work such as re-pointing, resetting of bricks and or sealing is:

3. The square feet of concrete fencing requiring repair work such as crack repair, spalling (where the concrete has chipped off) and or sealing is:

4. Replacement is needed for the following fencing types:

Wood, Lineal Feet

Brick, Square Feet

Concrete (Poured in Place), Lineal Feet

Concrete Masonry Unit (CMU), Square Feet

Metal / Chain Link, Lineal Feet

5. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

Section: 25 Site Fencing Approved

Cost: $0 FCI: 0.44

Page 21 of 25NESDIS>NESDIS/FCDAS>Facilities Building>Limited 2011

No fencing around this facility.

Unit Heaters are devices commonly used for heating the interior of equipment, warehouse and storage buildings. Typically, they are either ceiling or wall mounted and utilize electricity or gas (natural gas or propane) as fuel. They are equipped with fans that direct the heated air stream down, towards the occupied space.

Additionally, buildings of this type often utilize electric baseboard heat in limited areas such as mezzanine areas or entries. Electric baseboard heat is composed of electric resistance heating elements housed in a metal enclosure mounted on walls at or near the floor level. Electric baseboard heat is also used for heating individual rooms or spaces and is not used for heating large warehouse areas as unit heaters are.

The following questions are meant to assist in the assessment of the condition of the facility's unit heaters and electric baseboard heat:

No response is appropriate for this section of the survey.

(Does not apply, cannot be assessed, like "new" condition, etc.)

1. The quantity of unit heaters requiring repair or replacement is:

Gas unit heaters require repair or replacement.

Electric unit heaters require repair or replacement.

2. The building's unit heaters are:

3. The lineal feet of baseboard heat requiring repair or replacement is:

Lineal feet of electric baseboard heat require repair or replacement.

4. The building's electric baseboard heat is:

5. The work associated with the above should be performed:

Severity Index 1: Threat is immediate to next twelve months

Severity Index 2: Short term threat within thirteen to thirty five months

The buildings heating system is boiler heat, all underfloor piping was abandoned 20+ years ago and shop areas rely on unit heaters for winter support.

Section: 26 Unit Heaters and Electric Baseboard Heating Approved

Cost: $57,957 FCI: 0.44

Always capable of heating the space even on the coldest of days.

Usually capable of heating the space; although on…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .