About this file

This file is a General Requirements Submittals section (Division 1, Section 01330) from contract specifications for the MN Fergus Falls WMD Handrail Stairs project (Solicitation Number 140FF027Q0027). The document outlines mandatory submittal requirements that the contractor must fulfill within 21 days of contract award, unless otherwise noted on the submittal register. Required submittals include a submittal register containing all items needing review, manufacturer's literature with detailed specifications and performance data, shop drawings, project schedules, price breakdowns for lump sum items, subcontractor lists, progress payment certificates, guarantees and warranties, operating and maintenance instructions, delivery tickets for all materials showing brand name and catalog numbers, and waste manifests documenting construction debris and hazardous waste disposal with landfill and EPA registration information.

The document emphasizes that approval of submittals does not relieve the contractor of compliance obligations with contract drawings and specifications, and the contractor remains responsible for determining correct dimensions, design connections, and satisfactory construction. Specific sections reference FAR requirements for project schedules, price breakdowns, and progress payment certificates, with full FAR clause text to be provided at the pre-construction conference. The submittal register attachment (not included in this excerpt) identifies which items require submission and any deviations from the standard 21-day deadline.

View the file

Other files

File Type Posted
A06_Prefabricated_Steel_Stair_System.docx DOCX document
Sol_140FF027Q0027.pdf PDF
A06_Submittal_Register.docx DOCX document
A05_Statement_of_work.docx DOCX document
A06_Project_Coordination.docx DOCX document
A06_Aluminum_Handrails.docx DOCX document
A06_Drawings.pdf PDF
A06_Definitions_and_Standards.docx DOCX document
B03_Wage_Determination.pdf PDF
A06_Closeout.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIVISION 1 SECTION 01330

GENERAL REQUIREMENTS SUBMITTALS

A. General Refer to submittal register or technical specifications for all submittals required.

When specifically requested by the Government representative, the Contractor shall provide copies of manufacturer's literature containing detailed specifications and performance data or shop drawings fully describing the items and written installation instructions and/or recommendations for review and approval prior to accomplishing equipment installation.

B. Submittal Register:

1. A submittal register, listing all items requiring submittals under this solicitation, is provided as an attachment to this document. The Contractor shall provide all required submittals to the Engineer within 21 days of award except for items noted otherwise on the submittal register.

2. The approval of submittals shall not relieve the contractor to comply with the terms and conditions of the contract drawings and specifications. The contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all work.

C. Project Schedule: Contractor shall provide as required by Federal Acquisition Regulation (FAR) clauses. *

DIVISION 1 SECTION 01330

01310- D. Price Breakdown - Lump Sum Items: Contractor shall provide as required by FAR clauses. *

E. Subcontractor's List

Submit a list of subcontractors who will be working on the project.

F.Submittal of Progress Payment Certificate: Contractor shall provide as required by FAR clauses. *
DIVISION 1SECTION 01330

01330-

DIVISION 1 SECTION 01330

01330-
G.Guarantees, Warranties And Certificates -Refer to Section 01770.

H. Operating And Maintenance Instruction - Refer to Section 01770

I. Delivery Tickets

1. The Contractor shall submit to the Government's on site representative, one legible copy of each delivery ticket for all material delivered to the construction site.

2. The delivery ticket shall show brand name, catalog number, and number of items received.

DIVISION 1 SECTION 01330

01330-

J. Waste Manifests

4. The Contractor shall submit copies of all waste manifests.

5. Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), location of disposal, landfill designation, EPA registration of landfill, and EPA registration for transportation of any hazardous wastes.

DIVISION 1 SECTION 01330

01330-

* The applicable FAR clauses will be provided in full text to the resultant contractor at the pre-construction conference.

(END OF SECTION 01330)

01330-

File details come from the government source that posted it. Updated .