A06_Nevada_Energy_Planning_Document.pdf

PDF 510 KB Posted

Attached to
Electrical Improvements, Lake Mead, NV Federal contract opportunity
Solicitation number
140P8122Q0054
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document contains a planning memo from a utility distribution department and information on a related federal contract opportunity. The planning memo provides guidance for serving a new communication building near Consolidation Point in Lake Mead National Recreation Area, including connecting to an existing feeder, minimum capacity requirements, and no special directives at this time. The related federal contract opportunity is solicitation number 140P8122Q0054 for electrical improvements at Lake Mead National Recreation Area, issued by the Department of the Interior National Park Service Pacific West Region. The work involves consolidation point security improvements. The document provides relevant details on the utility project and associated federal contract opportunity in a concise and logically structured summary.

View the file

Other files for this federal contract opportunity

Other files attached to Electrical Improvements, Lake Mead, NV, newest first.
File Type Posted
B08_Transmittal.pdf PDF
B03_General_Decision_NV20220024.pdf PDF
B08_Contract_Price_Schedule.pdf PDF
Sol_140P8122Q0054.pdf PDF
B08_Release_of_Claims.pdf PDF
B08_Invoice_Payment_Request.docx DOCX document
A06_Nevada_Energy_Power_Availability.pdf PDF
A06_Nevada_Energy_Cost_Estimate.pdf PDF
A04_Statement_of_Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Confidential Confidential

1/19/22 IO3008671779-CONSOLIDATION POINT COMMUNICATION BUILDING AVAILABILITY.docx Page 1 of 1

DISTRIBUTION PLANNING DEPARTMENT

PLANNING MEMO

Note

No capacity will be reserved for this project and the requirements to serve will be reevaluated and may be different following receipt of request for Binding Design/Formal Planning.

Minimum Requirements

1. Install any intercept DF-9’s as required. If a feeder extension and new fuse cabinet are needed, please contact Distribution Planning for a revision to this planning memo.

2. Serve from the source feeder near location (1).

3. Distribution Planning has no special directives for this project at this time.

Date: January 19, 2022 ISD: 5/21/22

Project ID: 3008671779 Source Fdr: PBC1208

EPD: 3 kVA Reviewed by:

Planner: Chris Hicks Cc:

Subject: CONSOLIDATION POINT COMMUNICATION BUILDING AVAILABILITY

File details come from the government source that posted it. Updated .