This document contains a preliminary cost estimate for electrical distribution facilities and a related federal contract opportunity notice. The cost estimate provides a ballpark figure of $17,953 for installing 12kV distribution lines and associated equipment for a new construction project in Nevada, including installation, removals, labor, and contingencies. It notes the estimated connection point may change and does not include costs for trenching or restoring paved surfaces, which are the responsibility of the applicant. The related federal contract opportunity is to perform electrical improvements at Lake Mead National Recreation Area in Nevada. The solicitation number is 140P8122Q0054 and is issued by the National Park Service Pacific West Region within the Department of the Interior for consolidation point security upgrades.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Contract_Price_Schedule.pdf | ||
| Sol_140P8122Q0054.pdf | ||
| B08_Transmittal.pdf | ||
| A06_Nevada_Energy_Planning_Document.pdf | ||
| B03_General_Decision_NV20220024.pdf | ||
| B08_Release_of_Claims.pdf | ||
| B08_Invoice_Payment_Request.docx | DOCX document | |
| A06_Nevada_Energy_Power_Availability.pdf | ||
| A04_Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ballpark Cost Sheet
New Construction (12kV Distribution System)
7/20/2020 Project ID:
Project EPD (kVA):
This is a preliminary estimate for distribution facilities only (unless otherwise noted below). It is based upon the information and the scope of work you have provided and is solely for the purpose of aiding in your decision making process. Preliminary designs and cost estimates are subject to change to match the actual conditions identified at the time of the binding design.
Installation:
Removals (non-taxable):
Office Labor:
Miscellaneous:
Miscellaneous:
Miscellaneous:
Miscellaneous:
Subtotal:
30 % Additional Contingency:
Initial Allowance Credit*
16.00% % Tax:** 16.00% % Substructures Tax:***
** Tax Rate shown is the current rate, but is subject to change at any time.
*** All required trenching and substructures are your responsibility in accordance with Public Utilities Commission of Nevada (PUCN) regulatory tariff, Rule 9 (section A.12). Work must be performed in accordance with NV Energy standards.
After inspection and acceptance, these facilities become the property of NV Energy for maintenance purposes in the form of a non-cash contribution. Cost for this work is not paid directly to NV Energy and is not included in this estimate.
However, a Substructures Tax will be collected as part of your project's cost based on the reasonable value of those facilities and the tax rate in effect at the time. The estimated taxable value of such facilities for this project is shown below, but is mainly comprised of trenching, conduit, boxes, vaults, and pads and may not include a realistic approximation of other costs you may encounter such as paving, restoration, concrete encasement, etc. You are encouraged to request a quote from a trenching contractor to help determine your total cost.
$17,017.46
See PUCN Rule 9 (and all other PUCN Rules) at the link below for full details on cost responsibility:
Cross streets:
Facility number:
Additional Notes/Assumptions:
Total Potential Estimate Allowance: $0,241 Future Allowance: $0,241
3008671779
12,232
Notes:
Total Cost (does not include cost of Applicant trenching/substructures):
17,953
3KVA
46,792
Cost Summary (An itemized view of the costs is included on the following pages)
9,055
4,829 2,723
30,184
Estimated connection point. The point of connection may change at the time of design to accommodate field conditions.
www.nvenergy.com/company/rates/snv/rules/
(estimated taxable value of trenching and substructures, non-cash contribution)
* Potential for up to $0,241 in additional future allowance (during annual review after construction is complete) if meter sets and load peaks are met; up to but not to exceed the refundable amount advanced.
Prices from Maximo's CU Estimating application (prices include Loadings/Indirect Charges). Prices last updated:
This estimate does not account for nighttime work or overtime that might be required due to field conditions.
Approximate distance from edge of property to estimated connection point:
Date Created 1/20/20226:13 AM