This is a set of engineering drawings and specifications for replacing a pump station and drainfield at Big Hole National Battlefield in Montana. The drawings detail the installation of a new 2,000-gallon fiberglass pump station with duplex effluent pump system to replace the existing pump station #1, along with associated force main piping and a pressure-dosed gravelless drainfield system.
The plans include site layouts, demolition plans, force main profiles, and detailed specifications for the drainfield system which requires 440 chamber units across multiple trenches. Key components include 3" PVC force main piping, manholes, a 6,000-gallon septic tank to remain in place, and detailed utility trenching requirements. The drainfield is designed for peak flow conditions of 2,741 gallons per day with a loading rate of 0.4 gal/day/sqft, requiring a total area of 6,853 sqft. The drawings provide comprehensive construction details including pipe connections, valves, monitoring ports, and drainfield chamber configurations stamped by a licensed professional engineer in Montana.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8325Q0012_Amd_0003.pdf | ||
| B11_140P8325Q0012_Vendor_questions_0003.docx | DOCX document | |
| Sol_140P8325Q0012_Amd_0002.pdf | ||
| B11_140P8325Q0012_Vendor_questions_0001.docx | DOCX document | |
| Sol_140P8325Q0012_Amd_0001.pdf | ||
| A04_BIHO_-_CRM_Survey_Scope_of_Work.docx | DOCX document | |
| A07_BIHO_-_CRM_Survey_Location_Map.pdf | ||
| B03_Service_Contract_Act_WD___2015-5399_SAM.pdf | ||
| Sol_140P8325Q0012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/7/2020 file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG file:///P:/Clients-NPS/Projects/Big%20Hole%20National%20Battlefield/BIHO%20Project%202%20&%203%20Combined/DWG/DRAWING/COVER%20SHEET.DWG
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
R
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
PROPANE
W
EW EW
UGT UGT
ES
UGP
WV
H
Y
D
X X X X
GP
GM
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
0+00
0+50
1+00
1+50
2+00
2+50
3+00
3+50
4+00
4+50
5+00
5+50
6+00
6+50
7+00
7+50
8+00
8+50
9+00
9+50
10+00
10+50
11+00
11+50
12+00
12+50
13+00
13+50
14+00
14+50
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
21+00 21+5022
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
0+
0+
1+
1+
2+
2+
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
2+50
3+
3+
4+
4+
5+
5+
6+
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
6+
6+
7+
7+
8+
8+
9+
9+
+0
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
+0
+5
+0
+5
+0
+5
+0
+5
+0
+5
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
14+50
+0
+5
+0
+5
+0
+0
+5
+0
+5
+0
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
19+00
+5
0 20 +0
0 20 +5
+0
+5
+0
+5
+0
+5
+0
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
+0
+5
+0
+5
+0
+5
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
K bi
MATTHEW C.
SCHMITTER
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
08/10/2020
MONT ANA
No. 28848 PE L I
CE N
SED
P R
O
F ES S IO N A L ENGIN
E E
| Sheets and Views |
| COVER COVER SHEET |
| G01 SURVEY CONTROL & EXISTING SITE PLAN |
| G02 DEMOLITION PLAN |
| G03 GENERAL NOTES, LEGEND, & ABBREVIATIONS |
| C01 SITE PLAN & KEY MAP |
| C02 FORCE MAIN PLAN & PROFILE |
| C03 FORCE MAIN PLAN & PROFILE |
| C04 FORCE MAIN PLAN & PROFILE |
| C05 FORCE MAIN PLAN & PROFILE |
| C06 FORCE MAIN PLAN & PROFILE |
| C07 FORCE MAIN PLAN & PROFILE |
| C08 FORCE MAIN PLAN & PROFILE |
| C09 DETAILS |
| C10 DETAILS |
| C11 DETAILS |