Obed Wild and Scenic River

Wartburg, TN

Statement of Work

Obed Boundary Summary

April 5, 2022

NATIONAL PARK SERVICE

INTERIOR REGION 2, SOUTH ATLANTIC GULF

NORTH MAJOR ACQUISITION BUYING OFFICE

SOW Format

1. BACKGROUND ............................................................................................ ERROR! BOOKMARK NOT DEFINED.

2. PROJECT IDENTIFIERS

3. PLACE OF PERFORMANCE

4. PERIOD OF PERFORMANCE

5. SCOPE

6. TASK

7. GENERAL WORK REQUIREMENTS

8. MANAGEMENT

9. SAFETY AND ENVIRONMENTAL COMPLIANCE

10. CONTRACTOR USE OF SITE

11. MOTOR VEHICLE AND TRAFFIC REGULATIONS

12. EMPLOYEES BADGES/PARKING

13. NON-PAYMENT FOR ADDITIONAL WORK

14. CONFLICT OF INTEREST:

15. INSPECTION

16. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION

17. SECURITY:

18. TRAVEL:

19. FOOD STORAGE GUIDELINES:

20. PROJECT PERSONNEL

1. BACKGROUND:

Obed Wild and Scenic River (hereinafter referred to as “OBRI”) is near the town of Wartburg, Tennessee and consists of approximately 5,000 acres protecting 45 miles of free-flowing stream. The Park was established by Congress on October 12, 1976. The parks mission is to preserve the free- flowing condition and the water quality of the Obed River System, while protecting its cultural and natural resources for the benefit and use of present and future generations. The Park serves as a remote,rugged park for climbing, hiking, whitewater activities, and fishing opportunities.

The purpose of this survey is to identify the severance line for the park in up to nine tract sections.

2. PROJECT IDENTIFIERS:

PMIS NUMBER: 208602A

PROJECT TITLE: Survey and Mark OBRI Boundary

3. PLACE OF PERFORMANCE: Various locations throughout OBRI near the town of

(THIS SPACE LEFT INTENTIONALLY BLANK)

EXHIBIT 1

4. PERIOD OF PERFORMANCE:

The contractor shall have no more than 120 calendar days to complete survey and marking of

OBRI boundary tracts as detailed below, once the offeror receives the notice to proceed, with the only exceptions being unforeseen events beyond the contractor's control and/or delays that are caused by the National Park Service.

5. SCOPE:

Survey and mark approximately 27,000 linear feet of NPS holdings within the boundary of the

Obed Wild and Scenic River.

Contractor shall provide a cost for each of the identified tract sections (1 – 9) to determine project funding based on the order or priority.

Contractor shall provide all labor, tools, equipment, materials and supervision required to survey up to nine sections of boundary within the park. The general location of these sections is provided on Exhibit 1. The sections will be completed in the following order of priority based on available funds.

1. Tract 102-01 (approximately 3000 feet)

a. As depicted in red on Exhibit 2, survey the north line of Tract 102-01.

2. Tract 102-05 (approximately 3000 feet)

a. As depicted in blue on Exhibit 2, survey the exterior (generally north) line of

Tract 102-05.

3. Tract 101-52 (approximately 2000 feet)

a. As depicted in red on Exhibit 3, survey the approximately 1000-foot line running generally southeast to northwest at the western end of Tract 101-52 and the approximately 1000-foot line terminating at the Obed River running generally southwest to northeast also at the western end of Tract 101-52.

4. Tract 101-25 (approximately 500 feet)

a. As depicted in red on Exhibit 4, survey the approximately 500-foot line running generally north/south at the eastern end of Tract 101-25.

5. Tract 103-16 (approximately 4500 feet)

a. As depicted in red on Exhibit 5, survey the exterior (generally north) line of tract 103-16.

6. Tract 103-08 (approximately 2500 feet)

a. As depicted in blue on Exhibit 5, survey the north line of Tract 103-08.

7. Tract 104-48 (approximately 2500 feet)

a. As depicted in red on Exhibit 6, survey the south line of Tract 104-48.

8. Tract 104-18 (approximately 4500 feet)

a. As depicted in red on Exhibit 7, survey the north line of Tract 104-18.

9. Tract 104-41 (approximately 4500 feet)

a. As depicted in blue on Exhibit 7, survey the south line of Tract 104-41.

6. TASK:

• All work shall be performed under the direct supervision of a land surveyor(s) licensed in the State of Tennessee. On-site inspections shall be performed by this surveyor.

• Surveyor shall sign and seal the final hard copies of the survey plats. The plats must be recordable and must meet the requirements of the State of Tennessee.

• All survey work shall meet the requirements of the State of Tennessee. Control shall be established using Global Positioning System (GPS) procedures which will provide coordinates and referenced to existing federal and state geodetic survey control. Both grid coordinates and a basis of bearings for the survey will be generated from such monuments.

• Clearing shall be kept to the minimum necessary for the survey. No trees over four inches DBH shall be felled except with permission of the COR.

• The contractor shall install monuments at all angle points. The monuments shall be 5/8” rebar at least 24” long and have a brightly colored cap and be marked with orange flagging tape. On rock outcrops a chiseled cross (painted orange) or a brass tablet securely glued to the rock will be acceptable. All items required for corner establishment shall be provided by the Contractor. Corner positions established shall meet the requirements of the State of Tennessee.

• When the boundary crosses a river or cliff a monument shall be set at a safe distance from the edge. Monuments shall be placed on both rights-of-way of all roads that the boundary crosses.

• Found monuments along the exterior boundary, permanent in nature, i.e. large corner stones, trees, concrete monuments, railroad rails shall not be replaced. In situations where iron pipes, pins or rods are found at corners to be monumented, the pipe/pin/rod shall remain and be referenced on the plat.

• The Contractor shall use orange flagging tape to mark all trees (over eight inches in diameter) within sixteen inches of the property line. The Contractor shall provide all flagging tape to be used under this agreement. Flagged trees shall be intervisible.

• The contractor shall be sensitive to the adjacent property owners’ property and rights and will not infringe upon that property or those rights. Except where the adjacent property is an open public right of way, the Contractor shall approach the boundary segment from the park property, if practical. If not, the contractor shall contact adjoining property owners for permission to place traverses and temporary monumentation on private land.

• The contractor shall make a diligent effort to locate all physical evidence which could affect the location of the boundary line. Internal and external tie lines that are necessary to determine the location and placement of the exterior boundary are to be performed by the contractor as this work is necessary in establishing the exterior boundary.

• Random traverses identified with flagging or other markings that might be mistaken for the true boundary shall be removed.

• Mapping shall be done as an AutoCAD .DWG file. In addition to the hard copies, the

Contractor shall provide these plats as:

a) AutoCAD DWG file(s) (Release 2011 or later, or compatible),

b) GIS (.shp) files Geographic Coordinates, NAD 83

c) Adobe PDF file (11” x 17”) size

• The plats prepared for this project shall be complete for each Phase. If several Phases are in close proximity, they shall be on one sheet. The scale for the drawings shall vary by site. The information shown on any frozen and unfrozen layers shall be free of conflicts when displayed in a composite form. Care shall be taken in placing and labeling points and other data.

• The final plats shall illustrate the following:

a) All physical evidence of property lines and corners found such as iron pipes, stone pipes, fence lines, stone walls, witnessed trees, etc.

b) Highway route numbers, names of adjoining owners with Deed

Book and Page Number, stream names, local names of landmarks and any and all political boundaries.

c) Details of all encroachments or areas of boundary dispute.

d) Bearing and distances between all monuments and the total distance between corners. Bearings will be on the same meridian as traverse and control lines, either True North or local State Plane

Coordinate System. When the measured is different than the record, this shall be noted.

e) Bearing and distances on tie lines to any corner not on the exterior boundary but used to establish it.

f) Remainders of parent tracts to the extent that the plat size allows.

These remainder boundaries will be dashed to differentiate from the exterior boundary symbology.

g) The monuments placed and shown with the appropriate symbology and legend information for proper identification.

h) All encroachments from adjoining property or streets, such as but not limited to trails, ATV tracks, roads, gardens, lawns, structures, and the extent of such encroachments shall be shown. Area, monuments, type of encroachment and deed references will be shown on plats.

i) Property lines in conflict with the NPS boundary line, with deed calls, and acreage of abutting parcels are to be shown on the plats.

j) All buildings or other structures within 25 feet of the line.

• The contractor shall be responsible for all research necessary for completion of the survey.

• Upon request, the Government will furnish all records that they have in-regard-to ownership and boundary location.

• Completion shall be within 120 days of the signing of the contract.

7. GENERAL WORK REQUIREMENTS:

Work Hours: 8:00 am to 4:30 pm (Eastern Time)

Monday through Friday, excluding federal holidays.

Contractor shall coordinate the on-site work schedule with the Contracting Officer and the COR five days prior to the performance start date. The COR may be reached by office or mobile phone during normal business hours. Work outside of normal business hours shall be pre-approved by the Contracting Officer and the COR. All site visits and correspondence shall take place during this time period

8. MANAGEMENT:

The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure on time completion of this contract.

9. SAFETY AND ENVIRONMENTAL COMPIANCE:

• The contractor shall comply with pertinent provisions of the Occupational Safety and

Health Act (OSHA), state, local, safety, laws, and all pertinent provisions of the contract.

• The contractor shall comply with pertinent Environmental Protection Agency laws.

• All tools, equipment and other related materials will be removed at the end of each workday and the area will be left neat and clean.

• The contractor shall comply with all provisions of NHPA and NEPA compliance documents that will be provided by Big South Fork staff.

• The BISO Safety Officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten government and contractor employees or damage to government property.

• The contractor shall immediately report to the Contracting Officer, COR and BISO safety officer all accidents resulting in employee injury, death, or damage to property while performing this contract.

10. CONTRACTOR USE OF SITE:

Contractor shall have limited use of the construction site for construction-related operations only.

Limited use of premises to areas within the Contract indicated in the specifications. Do not disturb portions of the project site beyond areas in which the work is indicated. Contractor will prevent damage to natural surroundings. Damage to natural surroundings will be restored through NPS-approved methods for repairing or replanting, at no additional cost to the government.

11. MOTOR VEHICLE AND TRAFFIC REGULATIONS:

Contractor, sub-contractor and material supplier employees (altogether referred to as “contractor employees” in paragraphs 12, 13, 21 and 23) operating motor vehicles shall possess a valid driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in all contractor employee vehicles at all times and made available upon request.

Contractor employees shall always comply with federal vehicle motor law requiring seat belts be worn. Contractor employees shall adhere to the posted speed limits. Contractor employees are expected to comply with all BISO regulations.

12. EMPLOYEES BADGES/PARKING:

All contractor employees shall comply with parking procedures published for BISO. Contractor employees shall return any BISO issued personal or vehicle identification badges immediately upon termination of employment or completion of this contract.

13. NON-PAYMENT FOR ADDITIONAL WORK:

Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than the appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the Contractor.

Only the appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

14. CONFLICT OF INTEREST:

The contractor shall not employ off-duty COR’s or other government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

15. INSPECTION:

The Government will conduct inspection upon completion of required services. Final payment will be processed upon the Government confirming that all contract performance and administrative requirements have been satisfactorily completed and any deficiencies or non-compliant work have been satisfactorily corrected.

16. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR

INFORMATION:

NONE

17. SECURITY:

Replacement of Contractor Employee for Security Reasons: The Government retains the right to remove contractor employees from park property for security reasons, regardless of prior clearances.

18. TRAVEL:

Contractor is encouraged to make a site visit prior to bidding on the project.

19. FOOD STORAGE GUIDELINES:

All Contractor employees shall comply with BISO food storage guidelines. All food items must be stored in a hard-sided vehicle or in a food storage locker and must never be left unattended.

"Food" includes any item with a scent, regardless of packaging. This may include items that you do not consider food, such as canned goods, bottles, drinks, soaps, cosmetics, toiletries, trash, ice chests (even when empty), and unwashed items used for preparing or eating meals. Food shall be disposed of in a designated bear proof refuse container provided by the National Park Service.