A05_SOW.pdf

PDF 1 MB Posted

Attached to
Blue Ridge REPLACE ROOFING & GUTTER SYSTEM Federal contract opportunity
Solicitation number
140P5324R0008
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This statement of work outlines requirements for a roof replacement and gutter system project on multiple buildings at the Rocky Knob Maintenance Yard of the Blue Ridge Parkway. The scope of work includes removing and replacing approximately 14,194 square feet of asphalt shingle roofing and underlayment on seven buildings, repairing or replacing damaged sheathing and rafters, installing new flashing and ridge vents, and removing and replacing approximately 984 linear feet of gutters and downspouts on five buildings. The contractor must furnish all necessary labor, equipment, materials, insurance, and permits to complete the project between November 1, 2024 and March 31, 2025. Final payment will be processed upon satisfactory resolution of any noted performance deficiencies.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge REPLACE ROOFING & GUTTER SYSTEM, newest first.
File Type Posted
Sol_140P5324R0008_Amd_0003.pdf PDF
Sol_140P5324R0008_Amd_0002.pdf PDF
B09_Vendor_question_0002.pdf PDF
Sol_140P5324R0008_Amd_0001.pdf PDF
B965_photo_0001.png PNG image
Revised_Areil_Photo_1_23_24_0001.png PNG image
B005_photo_0001.png PNG image
B878_Photo_0001.png PNG image
B03_Davis_Bacon_DOL.pdf PDF
B08_SF_1442_attchment_1.pdf PDF
Sol_140P5324R0008.pdf PDF
9_Bid_B08_Sheet_Replace_Roofing_and_Gutter_Systems_Rocky_Knob_Maintenance_Buildings_20240117.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REMOVE/REPLACE ASPHALT SHINGLE ROOF AND GUTTERS ON ROCKY KNOB MAINTENANCE

YARD BUILDINGS (B002, B003, B004, B005, B086, B878, B965)

1670 Blue Ridge Parkway, Floyd, VA 24091

BLUE RIDGE PARKWAY

Virginia

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. This contract provides for the removal and replacement of approximately 14,194 -SF (B002, B003, B004, B005, B086, B878, B965) of asphalt architectural 30 year shingles and #30 underlayment, repair/replace damaged plywood sheeting, replace flashing around chimney(s), replace drip edge, install roof underlayment, installation of a ridge vent(s) along the length of the buildings, the removal and replacement of approximately 984-LF of gutter with downspouts and installation of approximately 984-LF of gutter guards on buildings B002, B003, B004, B005, B086 at Rocky Knob Maintenance Area.

1. The buildings are a single-story office/storage except for B086 which is two story with an asphalt shingle roofs. The buildings (except for B878 & B965) have gutters along the front and the back. The roofs are currently vented via ridge vent.

2. The buildings may be occupied during this contract.

B. The contract work includes:

1. Remove and dispose of the existing asphalt shingle roof(s) and roofing underlayment off site

2. Protect the building structures and contents from weather and other potentially damaging elements

3. Inspect the existing roof supports (rafters) and fascia boards, replace damaged facia boards

4. Repair or replace in kind as necessary damaged roof supports (rafters), decking, sheathing revealed by inspection

5. Replace in kind all existing flashing

6. Install new 30 pound asphalt saturated roofing underlayment;

7. Install new dark gray 30 year architectural shingles with interlocking tabs

8. Install new drip edges around the entire perimeter of the roof

9. Install full length ridge cap(s) roof vent system

10. Flash Chimney(s)

11. Install new waterproof vent collars

12. Replace/Install Snow Guards on B004 and B086

13. Remove and replace approximately 984 linear feet of gutter and associated downspouts on buildings B002, B003, B004, B005, B086

14. Replace any damaged siding behind the gutters on B002 and B003 before new gutters are installed, siding must be in-kind to match with remainder of building siding

15. Install gutter guards on all gutters

16. Disposing properly of all excess materials and debris;

17. Erosion prevention and quality assurance testing;

18. Reconstruction and restoration of disturbed areas.

C. All work will be performed under a single contract.

D. Work and materials shall adhere to the following mitigations:

1. Replacement architectural asphalt shingles should match existing shingles in size, color, and texture. New shingles must be approved by COR before installation.

2. Materials shall be stored on pavement at work location.

3. Must follow OSHA guidelines for work performed on an elevated surface.

1.02 LOCATION AND ACCESS

A. The project site is located near the Blue Ridge Parkway in Floyd County, VA. The building address (located near) is 1670 Blue Ridge Parkway, Floyd, VA 24091.

Photo/Aerial View: Google Maps view of Rocky Knob Maintenance Yard

Description: Building B002, single story attached to B003

Description: Building B003, single story attached to B002

Description: Building B004, single story office/storage

Description: Building B005, single story

Description: Building B086, two story mechanics shop/office

Description: Building B878, single story, skylight will not be replaced

Description: Building B965, single story

1.03 CONTRACTOR-FURNISHED ITEMS

A. The Contractor shall furnish all necessary supervision, personnel, equipment, transportation, materials, and incidentals required to complete the contract requirements.

B. Contractor shall provide proof of liability insurance for all personnel working in completion of this project.

1.04 WORK CONDITIONS AND LIMITATIONS

A. REQUIRED PERFORMANCE PERIOD

1. Work performance period is to be determined; all work shall be performed between 7 AM – 3:30 PM.

2. Work to be performed between November 1,2024- March 31, 2025

B. CONTRACTOR’S USE OF PREMISES

1. Confine on-site material storage, equipment and vehicle parking, and staging to paved parking areas or other areas specifically designated by the Contracting Officer’s Representative (COR).

2. Keep job site clear of trash and debris. Dispose of any trash, debris and other unusable material legally at authorized facilities on non-Federal land.

C. FIELD VERIFICATION

1. The measurements and quantities specified are estimates and provided for information only. The Contractor must verify all locations, dimensions and conditions affecting the work.

1.05 QUALITY ASSURANCE

A. All proposed materials and methods must meet or exceed the current local, state, and federal codes, standards, and regulations applicable to the contract work.

B. All personnel performing work shall be fully qualified and experienced in the type of work they will execute.

1.06 WARRANTIES

A. Building components: Minimum 1-year warranty against defects. Provide a minimum 5-year warranty for workmanship.

B. Prior to beginning work, report to the COR any conflict in warranty requirements, work scheduling or material availability before proceeding with the work.

1.07 MATERIAL HANDLING

A. Deliver materials to the job site as per COR instructions. Comply with all manufacturers’ recommendations for storage, protection and handling.

PART 2 - MATERIAL

2.01 GENERAL

A. Use new materials except as otherwise approved by the Contracting Officer (CO).

2.02 REQUIRED SUBMITTALS AND APPROVALS

A. LIST OF REQUIRED SUBMITTALS

1. Contractor Liability Insurance

2. Warranty Information

B. CHANGES TO MATERIAL REQUIREMENTS

1. Any proposed changes by the Contractor to the construction materials shall be submitted in writing to the

COR

PART 3 - EXECUTION OF WORK

3.01 GENERAL

A. SERVICE INTERRUPTION

1. Indicate by work schedule expected periods of construction to avoid conflict with operations.

B. SITE INVESTIGATION

1. The Contractor is responsible for investigating site conditions in the vicinity of the required work for any hazards or obstacles which may increase time or cost of the work.

C. CHANGES TO CONSTRUCTION METHODS

1. Any proposed change by the Contractor to the specified construction methods and manufacturer’s instructions must be submitted in writing to the CO along with the justification for the proposed change.

Approval from the CO is required for changes in specified construction methods.

D. PROTECTION OF WORK SITE

1. Work site protected by the maintenance fencing which is Open from 7 AM – 3:30 PM.

2. Maintain the work area and approaches clean and free from trash and debris to reduce interference with ongoing maintenance operations.

3. Provide a safe bypass for NPS employees, and contractor’s personnel.

3.02 PROJECT CLOSEOUT

A. CLEANUP

1. Remove all tools, equipment, excess materials, construction debris, and trash from the project site. Leave project site clean and ready for use at the time of final inspection.

2. Legally dispose of all excess and unusable materials at authorized disposal facilities.

B. FINAL INSPECTION AND ACCEPTANCE OF WORK

1. When all work including any site restoration and cleanup has been completed, the Contractor shall contact the COR to arrange the final inspection.

2. The Contractor shall be notified of any deficiencies found during the final inspection. After all deficiencies have been corrected and all required closeout submittals have been forwarded to the COR, the CO will issue a letter of final acceptance and request the release of claims.

C. CLOSEOUT SUBMITTALS

A. Provide to the COR the following closeout submittals and any other closeout submittals required by the CO:

1. Cut-Sheet Binder: Submit one binder with all manufacturer product information and cut-sheets for all materials installed under this contract. Label binder with project title and include one “contents” page.

PART 4 – PAYMENT

1. Final payment shall be processed upon confirming all noted contractor performance deficiencies have been satisfactorily corrected.

File details come from the government source that posted it. Updated .