B09_Vendor_question_0002.pdf

PDF 194 KB Posted

Attached to
Blue Ridge REPLACE ROOFING & GUTTER SYSTEM Federal contract opportunity
Solicitation number
140P5324R0008
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This document contains vendor questions and responses regarding a National Park Service solicitation to replace roofing and gutter systems on five buildings at Blue Ridge Parkway. The work includes removing and replacing approximately 984 linear feet of 5-inch gutters and associated downspouts on the buildings, as well as installing gutter guards and replacing snow guards on two buildings with metal cleats to match the existing style. The total estimated square footage of the roofs to be worked on is 14,194 square feet. The vendor inquired about the possibility of remeasuring the buildings and scheduling a site visit, to which the only available time provided was Monday, February 5th from 7:30 to 9:30 AM.

The related federal contract opportunity was solicitation number 140P5324R0008 to replace the roofing and gutter system for Blue Ridge Parkway buildings under the Department of the Interior National Park Service Southeast Region.

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge REPLACE ROOFING & GUTTER SYSTEM, newest first.
File Type Posted
Sol_140P5324R0008_Amd_0003.pdf PDF
Sol_140P5324R0008_Amd_0002.pdf PDF
Sol_140P5324R0008_Amd_0001.pdf PDF
B878_Photo_0001.png PNG image
B965_photo_0001.png PNG image
Revised_Areil_Photo_1_23_24_0001.png PNG image
B005_photo_0001.png PNG image
A05_SOW.pdf PDF
Sol_140P5324R0008.pdf PDF
9_Bid_B08_Sheet_Replace_Roofing_and_Gutter_Systems_Rocky_Knob_Maintenance_Buildings_20240117.pdf PDF
B03_Davis_Bacon_DOL.pdf PDF
B08_SF_1442_attchment_1.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor question:

1. In the Scope of Work document, part 1 General, 101 Description of work, B 13. States:

Remove and replace approximately 984 linear feet of gutter and associated downspouts on buildings B002, B003, B004, B005, B086.

As state in the SOW, All gutters and downspouts on Buildings B002, 003, 004, 005, and 086 must be replaced and gutter guards installed

2.Will you require the replacement gutters to be 5 or 6 inches?

Park Response: They are 5 inches, needs to be replaced with 5 inches.

Replaced gutters and downspouts in-kind with 5 inch gutters.

2. Do you have the square footage of the buildings? No, only the approximate roof area>

• what color will the NPS prefer? Brown

• Can you provide the approximate sq.ft for the roofs. Estimated measurements are a total sq ft of roofs is 14,194 sf

3. For snow guards, does the NPS prefer cleats or ice bar style?

Replace/Install Snow Guards on B004 and B086. Current style is metal cleats. Should be replaced inkind.

4. T 1-11 siding on Bldg. B004 looks bad on the corners where downspouts are to be attached. Is this something we should figure into the quote?

As stated in SOW, “Replace any damaged siding behind the guters on B002 and B003 before new guters are installed, siding must be in-kind to match with remainder of building siding”. B004 was not included, and siding can be le� as is.

5. Is it possible to come back and remeasure? Also, f possible a site visit sometime next week.

Monday, 2/5/24 730-930AM would be the only time available next week.

File details come from the government source that posted it. Updated .