9_Bid_B08_Sheet_Replace_Roofing_and_Gutter_Systems_Rocky_Knob_Maintenance_Buildings_20240117.pdf
PDF 105 KB Posted
- Attached to
- Blue Ridge REPLACE ROOFING & GUTTER SYSTEM Federal contract opportunity
- Solicitation number
- 140P5324R0008
About this file
This bid schedule outlines work required to replace asphalt shingle roofs and gutters on seven maintenance buildings located at the Rocky Knob Maintenance Yard for the Blue Ridge Parkway. Option 1 specifies removing and disposing of existing roofing materials before installing new 30-year architectural shingles, underlayment, flashing, drip edges, ridge caps, roof vents, vent collars, and snow guards. Option 2 involves removing and replacing approximately 984 linear feet of gutters and downspouts on five buildings, replacing any damaged siding, and installing gutter guards. Pricing is to be provided separately for each option. The related federal contract opportunity on the Blue Ridge Parkway seeks bids to perform the roofing and gutter replacement work described in the bid schedule. The soliciting agency is the National Park Service Southeast Region within the Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5324R0008_Amd_0003.pdf | ||
| Sol_140P5324R0008_Amd_0002.pdf | ||
| B09_Vendor_question_0002.pdf | ||
| Sol_140P5324R0008_Amd_0001.pdf | ||
| B878_Photo_0001.png | PNG image | |
| B965_photo_0001.png | PNG image | |
| Revised_Areil_Photo_1_23_24_0001.png | PNG image | |
| B005_photo_0001.png | PNG image | |
| A05_SOW.pdf | ||
| Sol_140P5324R0008.pdf | ||
| B03_Davis_Bacon_DOL.pdf | ||
| B08_SF_1442_attchment_1.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
REMOVE/REPLACE ASPHALT SHINGLE ROOF AND GUTTERS ON ROCKY KNOB
MAINTENANCE YARD BUILDINGS (B002, B003, B004, B005, B086, B878, B965)
Option 1: REMOVE/REPLACE ASPHALT SHINGLE ROOF BUILDINGS (B002, B003, B004, B005, B086, B878, B965)
Option 1 Work
1. Remove and dispose of the existing asphalt shingle roof(s) and roofing underlayment off site
2. Protect the building structures and contents from weather and other potentially damaging elements
3. Inspect the existing roof supports (rafters) and fascia boards, replace damaged facia boards
4. Repair or replace in kind as necessary damaged roof supports (rafters), decking, sheathing revealed by inspection
5. Replace in kind all existing flashing
6. Install new 30 pound asphalt saturated roofing underlayment;
7. Install new dark gray 30 year architectural shingles with interlocking tabs
8. Install new drip edges around the entire perimeter of the roof
9. Install full length ridge cap(s) roof vent system
10. Flash Chimney(s)
11. Install new waterproof vent collars
12. Replace/Install Snow Guards on B004 and B086
Total: $
Option 2: REMOVE/REPLACE GUTTERS ON ROCKY KNOB MAINTENANCE YARD
BUILDINGS AND INSTALL GUTTER GUARDS (B002, B003, B004, B005, B086)
Option 2 Work
1. Remove and replace approximately 984 linear feet of gutter and associated downspouts on buildings B002, B003, B004, B005, B086
2. Replace any damaged siding behind the gutters on B002 and B003 before new gutters are installed, siding must be in-kind to match with remainder of building siding
3. Install gutter guards on all gutters
Total: $
File details come from the government source that posted it. Updated .