A04_SOW.pdf
PDF 48 KB Posted
- Attached to
- WI-IRON RIV NFH-QUARTERS ROOF REPLACEMENT
- Solicitation number
- 140FC225Q0024
About this file
This document is a Scope of Work (SOW) for the Iron River National Fish Hatchery Quarters 23, 24, and 25 Roof Replacement project located at 10325 Fairview Road, Iron River, Wisconsin. The scope involves comprehensive roof replacement for three separate houses, each with an approximate roof area of 2,400 square feet, requiring complete removal of existing roofing materials and installation of new components.
The detailed scope includes removing all existing shingles, underlayment, edging, and flashing; installing new dark brown standing seam metal roofing with a ventilated ridge cap; adding new metal flashing around chimney and roof penetrations (preferred brown color); installing ice and water barriers, underlayment, and rake and drip edging; and placing snow bars along each roof side. The contractor must carefully handle existing gutters and downspouts, dispose of demolition materials according to local regulations, and thoroughly clean the worksite, including using a high-power magnet to collect nails. The project requires field verification of actual dimensions and material quantities, with careful attention to manufacturer installation guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A06_Snow_Guards.pdf | ||
| A06_Thermal_and_Moisture_Protection.pdf | ||
| Sol_140FC225Q0024.pdf | ||
| A06_Drawings.pdf | ||
| B03_WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
Iron River National Fish Hatchery
Quarters 23,24,25 Roof Replacement
All work to done on Iron River National Fish Hatchery Quarters 23,24, and 25. These are three separate houses.
Work Location 10325 Fairview Road, Iron River, WI 54847
Approximate roof area of each building is 2400 square feet. Contractor is responsible for field verifying actual dimensions, roof penetrations, and quantities of materials to be used.
Remove all existing shingles, underlayment, rake and drip edging, flashing, nails, fasteners and debris to expose existing roof sheathing.
All demolition materials will be removed from site and disposed of according to state and local regulations.
Install all new metal flashing around chimney and all roof penetrations including but not limited to plumbing vents, electrical conduit and air venting (preferred color for all flashings brown)
Install new ice and water barrier, underlayment, rake and drip edging (color of rake and drip edging to match new roof color.
Install new standing seam metal roofing, color dark brown with a ventilated ridge cap. Cut slotted opening along the entire plywood ridge if necessary to allow the attic space to vent through the ridge cap.
Install a snow bar along each side of the roof the entire length. Install according to manufactures instructions.
New gutters and downspouts will not be included as part of this scope of work, care must be taken not to damage existing gutters, downspouts, and fascia. If they need to be removed for the roof installation reinstall them after the work is complete.
Caulk or seal all flashing as recommended by manufacturer to ensure a leak free product.
Clean up worksite to remove all debris and nails including using a high-power magnet to pick up nails around entire house and driveway.