A.1.9 - RTA DWG_W912HV20B0005_FY16MUNS.pdf
PDF 14 MB Posted
- Attached to
- FY16 PAYZ16000B Munitions Storage Igloo
- Solicitation number
- W912HV20B0005
About this file
This is an invitation for bid (IFB) solicitation for munitions storage igloo construction at Kadena Air Base in Okinawa, Japan. The solicitation requires site visit coordination and specifies that specifications and drawings will only be provided to local sources registered with the Government of Japan to perform construction work. Interested vendors must submit a contractor application and documentation showing registration and licenses to perform requisite construction work. The IFB is for FY16 PAYZ16000B Munitions Storage Igloo project and notes that due to COVID-19, vendors should monitor the beta.SAM website for any updates. The specified agency is the Department of the Army Corps of Engineers Engineering District Japan.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KADENA AIR BASE
IE SHIMA
ISHIKAWA S.
E A S T C H I N A S E A
P A C I F I C O C E A NNAHA C.
NAGO C.
SHEET ID
D R
A W
N B
Y
E
K O
N D
O
D E
S
IG
N E
D B
Y
E
K O
N D
O
S U
B M
IT
T
E D
B Y
L
R O
B B
E R
T S
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
P A
N D
IS
T
R
IC
T O
K
IN
A W
A J A
P A
N
C H
E C
K E
D B
Y
P
Z
IN
N I
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
PLOT SCALE:PLOT DATE: RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
FILE PATH:
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C
H
IC
A G
O
IL
T
-6
-7 w w w .e x p F e d e ra l.
c o m
F Y
P A
Y Z
B
M
U N
IT
IO
N S
S T
O R
A G
E I
G L
O O
S K
A D
E N
A A
IR
B
A S
E
O K
IN
A
W A
J A
P A
N
1 : 203/17/2020 4:22:13 PM
R:\dms02036\ARCH-FY16.rvt
M A
R C
H
G E
N -E
C M
K
A B
.R
V T
G-001
G E
N E
R A
L
C O
V E
R S
H E
E T
US Army Corps of Engineers ®
JAPAN DISTRICT
RENDERING VICINITY MAP
ARCHITECTURAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
FIRE PROTECTION
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
COMMUNICATIONS
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
DESIGNER OF RECORD
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
MECHANICAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
CIVIL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
STRUCTURAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
ELECTRICAL
THIS WORK WAS PREPARED BY ME
OR UNDER MY SUPERVISION
(NAME AND LICENSE)
AREA MAP
KADENA AIR BASE, OKINAWA, JAPAN
PAYZ16000B MUNITIONS STORAGE IGLOOS
RTA
MUNITIONS ENTRY GATE
M A
R K
D
E S
C R
IP
T
IO
N
D A
T
GENERAL NOTES GENERAL SYMBOLS
A-100
DESIGN DISCIPLINE: A -
ARCHITECTURE
SHEET NUMBER WITHIN SERIES
ANNOTATION CALLOUTS
1 Ref
A101
SIM
A101
SIM
DIRECTION OF VIEW
LETTER INDICATES BUILDING SECTION
NUMBER INDICATES ELEV OR DETAIL
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
NUMBER INDICATES DETAIL NO.
PLATE NUMBER WHERE DETAIL IS
DRAWN
DIRECTION OF VIEW
PLATE NUMBER WHERE ELEVATION IS
DRAWN
ELEVATION DRAWING NUMBER
INTERIOR ELEVATION DRAWING NUMBER
PLATE NUMBER WHERE ELEVATION IS
DRAWN
DIRECTION OF VIEW
1 Ref
1Ref
4A-101
SHEET NUMBERING SYSTEM
1 Ref
A101
SIM
NORTH
DIRECTION INDICATOR
GRAPHIC SCALE
GRAPHIC SCALE
1. ALL INSTALLATION AND NEW WORK FOR THIS PROJECT SHALL BE IN
ACCORDANCE WITH THE CONTRACT DRAWINGS AND
SPECIFICATIONS.
2. VISIT THE PROJECT SITE INDICATED IN THE CONTRACT DRAWINGS
AND VERIFY EXISTING SITE CONDITIONS. ALL DIMENSIONS AND
QUANTITIES RELATED TO THE PROJECT SHALL BE VERIFIED PRIOR
TO COMMENCEMENT OF WORK.
3. DAMAGE CAUSED BY REMOVAL OPERATIONS OR CONSTRUCTION
ACTIVITY IN ALL AREAS OF THE PROJECT SITE SHALL BE
REPAIRED/RESTORED TO THE APPROXIMATE ORIGINAL CONDITIONS
OR BETTER AND SATISFACTORY TO THE CONTRACTING OFFICER AT
NO COST TO THE GOVERNMENT.
4. ANY DEVIATIONS FROM THE CONTRACT DRAWINGS WHICH ARE
REQUIRED BY FIELD CONDITIONS DIFFERING FROM THOSE
INDICATED ON THE DRAWINGS SHALL BE CALLED TO THE
ATTENTION OF THE CONTRACTING OFFICER FOR APPROVAL PRIOR
TO COMMENCING WITH THE WORK.
5. ALL MATERIALS REQUIRED TO BE REMOVED IN THIS PROJECT SHALL
LEAVE THE AREA CLEAN AND COMPLETE TO THE SATISFACTION OF
THE CONTRACTING OFFICER.
6. UPON COMPLETION OF ALL WORK IN THIS PROJECT, LEAVE THE
AREA CLEAN AND COMPLETE TO THE SATISFACTION OF THE
CONTRACTING OFFICER. ALL WORK AREAS SHALL BE MAINTAINED
IN A NEAT AND ORDERLY MANNER AND SHALL BE CLEANED ON A
DAILY BASIS. CONSTRUCTION DEBRIS AND MATERIALS SHALL NOT
BE ALLOWED TO BE TRACKED OR CARRIED OUTSIDE THE
CONSTRUCTION BOUNDARIES AND SHALL BE CLEANED
IMMEDIATELY WHEN INCIDENTAL ISSUES OCCUR.
7. ALL INDICATED SIZE AND DIMENSIONS ARE IN MILLIMETERS UNLESS
NOTED OTHERWISE.
8. COORDINATE ACCESS TO VISITOR PASS OFFICE DURING
CONSTRUCTION WITH CONTRACTING OFFICER REPRESENTATIVE.
9. REMOVE AND REINSTALL ANY SIGN, FIXTURES, RECEPTACLES, ETC.
AS NEEDED TO ACCOMMODATE NEW CONSTRUCTIONS.
10. SECURE AND WEATHER PROTECT ANY ROUGH OPENINGS DURING
NON-WORKING HOURS.
INDEX
N
PLAN NORTH
SHEET ID
D R
A W
N B
Y
E
K O
N D
O
D E
S
IG
N E
D B
Y
E
K O
N D
O
S U
B M
IT
T
E D
B Y
L
R O
B B
E R
T S
S
IZ
E
F
IL
E N
A M
E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S J A
P A
N D
IS
T
R
IC
T O
K
IN
A W
A J A
P A
N
C H
E C
K E
D B
Y
P
Z
IN
N I
US Army Corps of Engineers ®
IS
O
A
A
D R
A W
IN
G
C O
D E
PLOT SCALE:PLOT DATE: RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
FILE PATH:
N
M
IC
H
IG
A
N A
V E
S U
IT
E
C
H
IC
A G
O
IL
T
-6
-7 w w w .e x p F e d e ra l.
c o m
F Y
P A
Y Z
N
IT
IO
N S
S T
O R
A G
E I
G L
O O
S K
A D
E N
A A
IR
B
A S
E
O K
IN
A
W A
J A
P A
N
1 : 643/17/2020 4:22:13 PM
R:\dms02036\ARCH-FY16.rvt
M A
R C
H
G E
N -E
C M
K
A B
.R
V T
G-002
G E
N E
R A
L
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
A
N D
I N
D E
X
M A
S
C R
IP
T
IO
N
D A
T E
KondoE Image
39807
70521
23522
21450
21449
80113
70089
70733
70330
21463
25432
82708
79953
25443
80403
46014
46120
70700
70756
82331
22765
10336
10201
47009
46025
46122
78151
80224
82415
83300
80846
83566
80902
46027
73553
53186
83534
71497
73555
23628
78172
78151
80100
83508
83379
80731
83618
70758
70128
83439
71496
83382
80745
10202
82651
54150
38132
70734
70302
30077
39808
39810
80766
55058
80830
82374
85519
20141
71449
53108
55059
55057
70839
73306
70157
Text
55085
55086
73523
38134
55087
0 3
70027
73112
55066
80876
83515
83383
80139
70088
70149
83436
50124
50126
21462
55036
83535
55044
82917
55020
55054
55032
55024
55040
55028
89905
55048
25439
54151
73416
25442
25441
80831
80429
89471
80446
21456
24082
73566
10319
20149
71463
71450
71498
73589
53101
25440
20334
20335
55053
73335
10375
80614
82943
83559
82714
82702
82915
82104
82905
82722
46015
53185
73056
73490
73531
50130
80227
73396
24081
82310
82309
81701
20139
87017
80435
70176
70087
70138
39809
70028
70324
80155
70323
71456
71495
N-7
P-11
P-3
P-15
B a r r i e r
P-7
L-8
L o c a l i z
C i t i c a l
A e a
N-12 f t
X
L-12
L-4
SA-2C-W
P
A
S
N-9
SA-1A
S
A
D f t
T r i m
P d
P-10
R
U
N
W
Y
N d m s
X f t f t
Service Apron 1
X
Taxiway F f t
P-1 f t
W
T
C
N-10
F
F
O
G
B
H
L
Par
V
C
P
Runway 05R/23L
HP-10
W
T
C
P
A
S
W
T
C
Taxiway L
W T
C
S
A
A
B a r r i
V
C
P
M-2
Taxiway P
Tax iw ay K
F
G
OS-1
N-1
W T
C f t
N-3
P-2 f t
W i n d
S o c k
P
A
S
B
R
L-3
P
A
S
P-13
W i c k
P
A
S
Serv ice
Apron 4
P
A
S
L-6
V
C
P
P A
S
P-5
Taxiway L
8 Figh ter
A pro n
N-5
P i t i c e a f t
B
R
L f t
H
Y
P
A
S
R
P
A
S
W
T
C
P i t i c e a
Figh ter
A pro n
Runway 05L/23R
S
A
B
L-1
N-14
P
A
S
B a r r i
W
T
C
Taxiway A
P
A
S
N-13
B
R
N-6
L
P-9
B
L
H t
N-2
SA-2B-E
SA-1C
f t
X f t
H
A
Z
P i t i c e a
L-5
L
P
A
S f t
Vortac
B a r r i f t
SA-2B-W
W i c k
W
T
C
Runway 05L/23R
Figh ter
A pro n T ax ila ne f t
R
Service Apron 3
Tax iw ay K
L-2
P-6 f t
Tax iw ay W
E
L f t
Tran sie nt am p
Taxiway K
H
Y
Tax iw ay G
H
A
Z
L
Taxiway H
OS-2
F
G
S
T
A
N
D
B
Y f t
Taxiway N
Ta xi w ay
N x
M-1
Taxiway E
H
A
Z
Runway 05R/23L
L-7
Tax iw ay G f t
Runway 05R/23L f t
Serv ice
Apron 5
P
N-11
B
L
Tax iw ay G
OS-3
E
L f t
C m p
Taxiway L
P-8
S
A
A
C r i t i c e a
Taxiway M
A
P
R
O
N
W
T
C
M-3
P
SA-1B
W
T
C
R p o p e
X
OPS Spots
Figh ter
A pro n T ax ila ne
(U pp er Flig ht Ram p) f t
F
G
Taxiway D
P
A
S
B i r d b a t h
N-15
Taxiw ay D
W e i g h
F
G
S
A
C
E
Taxiway B
W
T
C
W
T
C
Taxiway C f t
Serv ice A pro n 2
Taxiw ay E
P
A
S
R i n s c i l i t y
Runway 05L/23R
P i t i c e a
T r d
V
C
P
P
A
S
R
L p o p e
G l i o p e
B a r r i
Taxiway C
L-13
Taxiway D
S
A
C
P-4
Taxiway K
Taxiway F
EOR
B a r r i
L
Tax iw ay J
P
A
T
T
E
R
S
E
A
D
A
E
D
O
O
L
I
T
T
E
F
I
S
H
E
C
O
L
L
I
S
S
E
B
I
L
E
L
E
M
JIM
M
Y `S
W A
Y
W
I
L
L
I
A
E
BUSICK DR
C
L
C
H
R
I
S
T
E
W
A
L
M
S
L
Y
A
R
N
O
R
R
A
C
E
M
C
C
O
N
N
O
P
K
I
N
D
R
H A
M P
S H
I R
E
S
T
K
I
N
C
H
E
L
R
O
H
I
G
H
L
A
R
K
B
E
E
S
D A
V I
E
M
C
K
E
N
N
E
B
O
G
SCHREIBER AVE
S
P
A
R
W
A
D
Y
R
O
B
E
R
E
D
R
O
L
L
I
I
G
H
T
S
C
R
A
G
L
I
T
T
A
S
P
F
A
I
R
C
H
I
E
C
H
E N
N
A U
O
P
V
I N
C
E
E
W
A
R
F
I E
W
E
S
T
M
O
C
O
L
L
I
S
M
C
C
O
N
N
O
P
D O
U G
L A
S
B
L V
D
V
I
N
C
E
E
D
E
W
A
L
K
OMAHA AVE
P
E
A
W
A
L
M
S
L
Y
M
O
O
E
W
A
R
F
I E
W
A
L
K
S
E
E
C
A
R
S
W
E
E
I
V
I
N
C
E
E
I
K
U
T
V
D
S
C
H
R
E
I B
E
P
R
E
D
O
P
S
I
M
L
B
U
L
L
R
I
C
K
E
N
B
A
K
R
O
Y
A
R
N
O
E
M
C
K
E
N
N
E
P
E
A
M
C
A
L
L
I
S
T
D E
IC
H
L M
A N
N D
R
H
I G
H
L
A
R
K
P E
A S
E R
D
R
O
Y
C
H
R
I S
T
E
H
A
R
R
K
I
N
D
R
O M
A H
A
A
V E
G
A
B
R
E
S
M
O
O
E
L
E
V
I
T
E
D
O
U
G
L
V
D
B
A
N
Y
E
Z E
A M
E R
S T
K
E
A
R
O
P
H A
L Y
B U
R T
O N
S T
STETHEM S
T
S
H
O
P
R
E
D
O
P
STALHECKER ST
C
R
S
C
H
L
E
G
P
O
F
I
S
I
M
L
C
H
E
L I
S
T
M
A
H
U
B
R
O
R
L O
R
W
E N
G E
R D
R
W
I L
K
I
M
C
C
O
M
O
P
P H
O E
N
IX
A V
E
W
H
I
S
N
R
M
O
O
E
C
A
R
S
W
E
E
E
A
G
L
E
S
T
O
R
B
R
A
N
C
H
A
C
O
L
F
M
E
L
V
I L
E
L A
R O
C Q
U E
D R
E
M
M
E
B
E
E
R
B
O
W
A
R
N
O
E
V
I
N
C
E
E
P E
A S
E
R
D
B
E
E
S
W
A
R
F
I E
S
C
H
R
E
I
B
E
K
U
T
V
D
M
C
K
E
N
N
E
W
I L L I A
E
M O
LLA
N
D S
T
V
I
N
C
E
E
M
O
O
E
M
E
L
V
I L
E
V
I
N
C
E
E
W
A
L
K
V
I
N
C
E
E
P A
T T
E R
S O
N
A
V E
S E
A V
R
W
E
S
T
B
R
O
F
A
I
R
C
H
I
E
C
H
E
N
N
A
U
O
P
S
C
H
L
E
G
M
O
L
L
A
M
O
L
L
A
P
E
A
P
E
A
B
O
M
C
K
E
N
N
E
M
O
O
E
M
C
K
E
N
N
E
M
O
L
L
A
K
U
T
V
D
A
D
A
E
A I R
F I E
C
E S
S
J
A
C
K
S
F
L
E
M
I
E
S
I
J
B
O
W
I
L
B
A
N
S
E
B
I L
E
J
A
C
K
S
D
A
V
E
BONG DR
A
D
A
E
B
A
N
Y
E
F
O
S
T
R
F
I
G
H
T
R
O
N
G
A
I N
E
S
V
A
C
K
W
O
R
S
R
N
A
N
S
T
S
A
C
R
A
M
E
N
A
R
N
O
E
V
I N
C
E
E
C
A
M
B
R
I
D
P
O
W
E
E
K
E
A
R
O
P
D
I
L
L
W
W E
S T
B R
O O
K A
V E
L
O
R
L
I
E
A
L
B
A
E
F
IS
H
E R
A V
E
P
E
A
M
C
C
O
N
N
O
P
S
T
E
T
H
W
A
D
Y
P A
T T
E R
S O
N
A
V E
Y
O
U
M
C
G
U
I
N
A
V
A
J
Outdoor Rec. Center
HAWC WICO
Marek Park
Kenney Park
Falcon Gym
4-Diamonds
Youth Center
Scuba Rental/Repair/Boat House
O'Conner Youth Gym
Marek Park
Risner Gym
Rodriguez Park
Millenium Teen Center
73111
73114
73107
73109
73151
73128
71207
71209
73552
73551
73508
73513
73512
73509
73106
73553
Taxiway W
D
O
U
G
L
V
D
P
A
L
M
B
E
A
W
ALKER
R D
D
O
U
G
L
V
D
W
A
L
K
D
O
U
G
L
V
D
D
O
U
G
L
V
D
F
A
I
R
C
H
I
E
C
O
L
L
I
S
R O
U T
E
R O
U T
E
GC101
C I V
I L
A C
C E
U
L
R
O U
T E
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
G
C D
W G
2001000
M 1:10000
[m]
900 1000800700600500300 400
N
GENERAL NOTES:
1. THE CONTRACTOR SHALL PROVIDE UNRESTRICTED ACCESS TO THE SITE BY
AUTHORIZED PERSONNEL FOR INSPECTION PURPOSES DURING THE ENTIRE
CONSTRUCTION PERIOD.
2. CONTRACTOR ACCESS TO THE WORK SITE SHALL BE AS SHOWN ON THIS SHEET
UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER. THE CONTRACTOR
SHALL AT ALL TIMES ENSURE AGAINST UNAUTHORIZED ENTRY OR ACCESS TO THE
SECURED AREAS OF THE CONSTRUCTION.
3. ALL CONTRACTOR AND SUBCONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT AND
OTHER MATERIALS SHALL REMAIN WITHIN THE LIMITS OF CONSTRUCTION AND
WITHIN THE SITE ACCESS AND HAUL ROUTES DESIGNATED ON THE PLANS.
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF BASE HAUL
ROUTES WITH THE APPROPRIATE AUTHORITIES. HAULING ON BASE SHALL NOT
INTERFERE WITH BASE OPERATIONS.
5. ALL WORK, MOVEMENT AND PARKING OF EQUIPMENT SHALL, IN ADDITION TO THE
REQUIREMENTS OF THESE SPECIFICATIONS AND ORDERS OF THE CONTRACTING
OFFICER, BE IN ACCORDANCE WITH KADENA AIR BASE REQUIREMENTS.
SAFETY NOTES:
1. EACH PERSON ENTERING ALL BASES AND INSTALLATIONS IS REQUIRED TO CARRY A
BASE PASS AND IDENTIFICATION, OR TO BE ESCORTED AT ALL TIMES BY A PERSON
CARRYING AN AUTHORITY-ISSUED ESCORT BADGE.
2. EACH VEHICLE ENTERING ALL BASES AND INSTALLATIONS IS REQUIRED TO HAVE
VEHICLE PASSES REQUIRED BY SECURITY FORCES.
3. VEHICLES AND PERSONS ENTERING KADENA AIR BASE ARE SUBJECT TO SEARCH
AND INSPECTION PRIOR TO ENTERING. CONTRACTORS ARE EXPECTED TO
FAMILIARIZE THEMSELVES WITH AND COMPLY WITH THESE PROCEDURES.
4. ALL VEHICLE DELIVERIES SHALL BE COORDINATED, IN ADVANCE, WITH THE
CONTRACTING OFFICER, SO THAT THE GATE GUARDS MAY BE NOTIFIED. VEHICLE
OPERATORS MUST HAVE IN THEIR POSSESSION A COMMERCIAL MANIFEST
IDENTIFYING THE CONTENTS OF THE VEHICLE AND/OR TRAILER WHEN ARRIVING AT
THE GATE.
5. REQUESTS FOR EXCEPTIONS TO THE POLICIES AND PROCEDURES OF THIS
DOCUMENT SHALL BE COORDINATED IN ADVANCE THROUGH THE CONTRACTING
OFFICER.
6. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
CONTRACTOR ACCESS, HAUL ROUTE AND STAGING NOTES:
1. THE FINAL CONTRACTOR STAGING AREAS WILL BE DETERMINED AT THE
PRE-CONSTRUCTION MEETING. THE STAGING AREA WILL BE NEAR STRUCTURE
48904.
2. GATE 1 SHALL BE THE ACCESS POINT FOR ALL KADENA AIR BASE CONSTRUCTION
TRAFFIC. ENTRY VIA OTHER KADENA AIR BASE GATES IS PROHIBITED, UNLESS
OTHERWISE APPROVED BY THE CONTRACTING OFFICER. THE CONTRACTOR MAY
EXIT THE BASE VIA ANY OPEN GATE.
3. CONTRACTOR'S EMPLOYEES WILL ONLY PARK IN AREAS DESIGNATED BY THE
CONTRACTING OFFICER.
4. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE EMPLOYEE
TRANSPORTATION BETWEEN THE WORK AND STAGING AREAS IF NECESSARY.
5. ALL CONSTRUCTION TRAFFIC SHALL TRAVEL ON THE ROUTES INDICATED ON THIS
DRAWING, OR AS APPROVED BY THE CONTRACTING OFFICER.
6. BASE EMERGENCY VEHICLES MUST HAVE UNRESTRICTED USE OF THE EXISTING
ON-SITE HAUL ROUTES AT ALL TIMES; THE CONTRACTOR USE OF THE ON-SITE HAUL
ROUTE SHALL BE SUCH THAT THE EMERGENCY RESPONSE VEHICLES CAN OPERATE
ON THESE ROADS WITHOUT DELAYS TO THE EMERGENCY RESPONSE TIME.
7. CONTRACTOR SHALL STAY WITHIN THE CONSTRUCTION WORK AREAS.
8. UNLESS NOTED OTHERWISE, ALL CONTRACTOR EQUIPMENT MUST BE TAKEN BACK
TO THE STAGING AREA UPON THE COMPLETION OF WORK EACH DAY.
9. CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR EQUIPMENT, MATERIALS AND
VEHICLES.
10. ON-SITE HAUL ROUTES SHALL BE MAINTAINED BY THE CONTRACTOR AND SHALL BE
RESTORED TO THE ORIGINAL OR BETTER CONDITION, UPON PROJECT COMPLETION.
A CONDITION REPORT OF THE BEFORE AND AFTER CONDITION OF ON-SITE HAUL
ROUTES SHALL BE PREPARED JOINTLY BY THE CONTRACTOR AND THE
CONTRACTING OFFICER. FENCING, DRAINAGE, GRADING AND TEMPORARY HAUL
ROUTES OR ACCESS POINTS ON THE SITE SHALL BE THE CONTRACTOR'S TOTAL
RESPONSIBILITY AND SHALL BE APPROVED BY THE CONTRACTING OFFICER PRIOR
TO THE WORK. DAMAGE TO THE PAVEMENT DUE TO CONSTRUCTION TRAFFIC SHALL
BE RESTORED TO ORIGINAL OR BETTER CONDITION AT NO EXTRA COST TO THE
GOVERNMENT.
11. STAGING AREA - THE CONTRACTOR SHALL MAKE PROVISIONS FOR ANY REQUIRED
UTILITIES AT HIS OWN EXPENSE.
12. ALL BARRICADE LIGHTING SHALL BE VERIFIED BY THE CONTRACTOR FOR PROPER
OPERATION AT THE END OF EACH DAY BEFORE CONTRACTOR CEASES OPERATION.
13. ALL COSTS ASSOCIATED WITH PREPARING THE STORAGE AND STAGING AREA SITE
SHALL BE BORNE BY THE CONTRACTOR. THIS INCLUDES, BUT IS NOT LIMITED TO
CLEARING AND GRADING OF THE SITE, CONSTRUCTION OF ALL TEMPORARY
UTILITIES, ACCESS ROADS, ALL SECURITY FENCING, RESTORATION OF THE SITE AT
PROJECT COMPLETION.
14. THE CONTRACTOR SHALL RESTORE ALL GRASSED AREAS USED FOR HAUL ROADS
TO THEIR ORIGINAL CONDITION, INCLUDING THE ESTABLISHMENT OF GRASS.
GATE ACCESS
FROM GATE 1
CONSTRUCTION
HAUL ROUTE
MUNITIONS GATE
ACCESS TO PROJECT AREA
RECYCLE ROUTE
SCALE 1:10000
A1
ACCESS AND HAUL ROUTE
LEGEND:
ACCESS AND HAUL ROUTE
LEAD PAINTED METAL RECYCLING
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
US Army Corps of Engineers ®
BB101
I V
I L
B O
R I N
G
L
O G
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
B
B D
W G
SCALE: NTS
A1
BORING LOG 48904
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
C-001
I V
I L
C I V
T
E S
L
R
O B
E R
T S
L
R
O B
E R
T S
K
F
A T
H
L
R
O B
E R
T S
P A
Y Z
B
C
D
W G
1. ALL CONSTRUCTION SHALL BE DONE IN ACCORDANCE WITH APPLICABLE FEDERAL AND LOCAL LAWS, CODES, ORDINANCE AND THE STANDARDS OF KADENA AIR BASE, JAPAN.
2. THE CONTRACTOR SHALL COORDINATE AND OBTAIN CLEARANCES AND PERMITS FROM BASE CIVIL
ENGINEERING PRIOR TO EXCAVATION ACTIVITIES.
3. THE DISRUPTION OF UTILITY SERVICES SHALL BE MINIMIZED. BASE CIVIL ENGINEERING SHALL APPROVE IN
ADVANCE ANY SERVICE INTERRUPTIONS AND THE REMOVAL OF EXISTING UTILITY LINES. TEMPORARY
SERVICE FOR WATER AND SEWER SHALL BE PROVIDED AS PART OF THE WORK.
4. ALL DISTANCES, DIMENSIONS, AND ELEVATIONS ARE IN THE METRIC SYSTEM UNLESS OTHERWISE INDICATED.
5. PROVIDE SHORING FOR TRENCH EXCAVATION WORK THAT EXCEEDS 1.50 M IN DEPTH.
6. CONTRACTOR SHALL PROVIDE FENCING AND/OR BARRICADES FROM THE WORK AREA TO THE NEAREST
STREET OR OTHER PREDETERMINED DEMARCATION LINE AND BE RESPONSIBLE FOR MAINTAINING THE
GROUNDS WITHIN IN ACCORDANCE WITH THE PROJECT CONSTRUCTION DOCUMENTS THROUGHOUT THE
PERIOD OF WORK.
7. ALL EXISTING UTILITY LINES THAT ARE BEING REPLACED SHALL BE REMOVED AND DISPOSED OF OFF SITE
UNLESS OTHERWISE INDICATED.
8. THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS WITH MINIMAL INTERFERENCE TO
ROADS, DRIVEWAYS, PARKING AREAS, AND VEHICULAR FACILITIES. THE CONTRACTOR SHALL USE ITS BEST
EFFORTS TO PROVIDE CONTINUOUS TRAFFIC FLOW IN ALL DIRECTIONS AT ALL TIMES.
9. THE LOCATIONS OF COVERED SLABS, AC PAVEMENTS, PIPES, UNDERGROUND STRUCTURES, OR OTHER
UTILITIES SHOWN ON THESE PLANS ARE BASED ON VISIBLE FEATURES ON THE GROUND OR AVAILABLE
DRAWINGS PROVIDED BY OTHERS, AND ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE TYPE OF
MATERIALS, EXACT LOCATION, SIZE AND DEPTH OF ALL UTILITIES PRIOR TO THE START OF WORK.
10. THE CONTRACTOR SHALL VERIFY THE WATER MAIN LOCATIONS SHOWN ON THE DRAWINGS AND SHALL
PERFORM THE NECESSARY FIELD VERIFICATION TO AVOID DISRUPTION.
11. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, SIZES AND MATERIALS OF PROPOSED CONNECTIONS TO
EXISTING UTILITIES. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING EXCAVATION ACTIVITIES
IN THESE LOCATIONS.
12. EXISTING UTILITIES TO BE RECONNECTED SHALL BE EXPOSED TO DETERMINE ACTUAL TYPE OF MATERIAL
AND SIZE. PROCURE THE APPROPRIATE TRANSITION COUPLINGS BEFORE STARTING TEMPORARY OUTAGES
FOR RECONNECTION.
13. THE CONTRACTOR SHALL REVIEW THE PLANS AND NOTIFY CONTRACTING OFFICER IMMEDIATELY OF ANY
DISCREPANCIES FOUND BEFORE PROCEEDING WITH THE WORK.
14. DUE TO VARIATIONS AND CONSTRAINTS, EACH UTILITY TIE IN LAYOUT WILL BE DETERMINED BY ITS ACTUAL
FIELD CONDITIONS. CHANGES TO THE DESIGN CONFIGURATION REQUIRE APPROVAL OF CONTRACTING
OFFICER AND SHALL BE DOCUMENTED ON THE AS-BUILT DRAWINGS.
15. ALL EXISTING UTILITIES, VALVE BOXES AND MANHOLES WHETHER SHOWN OR NOT SHOWN ON THE PLANS
THAT ARE AFFECTED BY TRENCHING WORK SHALL BE PROTECTED AT ALL TIMES DURING CONSTRUCTION, IF
DISTURBED THEY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION AND ANY DAMAGE SHALL BE
REPAIRED AT NO COST TO THE GOVERNMENT.
16. THE CONTRACTOR SHALL PROVIDE TEMPORARY ACCESS PROTECTION FOR EQUIPMENT, TRUCKS OR OTHER
CONSTRUCTION VEHICLES TO PREVENT ANY DAMAGE TO EXISTING AND/OR NEWLY INSTALLED PAVEMENT.
17. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATING AREAS THAT ARE KNOWN TO HAVE
UNDERGROUND UTILITIES. HAND EXCAVATION IS REQUIRED WITHIN 0.90 M OF ANY EXISTING UTILITIES. IN
CASE WHERE THE DEPTH OR ELEVATION ARE NOT INDICATED ON THE PLANS, THE CONTRACTOR SHALL
PROCEED WITH CAUTION AND SHALL BE RESPONSIBLE FOR ANY DAMAGES INCURRED DURING EXCAVATION
ACTIVITIES.
18. IT IS EXPECTED THAT WORK WILL BE PERFORMED IN AREAS OF PREVIOUSLY DISTURBED SOIL.
NONETHELESS, CULTURAL ASSETS MAY BE PRESENT WITHIN THE WORK AREA, AND CAUTION MUST BE
EXERCISED DURING GROUND DISTURBANCE. CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER ONE
(1) WEEK PRIOR TO EXCAVATIONS FOR WORK TO BE PERFORMED IN PREVIOUSLY UNDISTURBED SOIL OR
WITHIN ENVIRONMENTALLY SENSITIVE AREAS. THE CONTRACTING OFFICER WILL NOTIFY THE BASE CIVIL
ENGINEER (BCE) AND ENVIRONMENTAL OFFICE. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER UPON DISCOVERY OF CULTURAL ASSETS.
19. ALL FENCES SHOWN IN CONTRACT DRAWING WILL NEED TO BE RESTORED IF CONSTRUCTION REQUIRES
TEMPORARY REMOVAL DUE TO TRENCHING.
20. EXISTING ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALKS, CONCRETE
SCREEN WALLS, FENCES, TREES, NATURAL DRAINAGE SWALES, AND OTHER STRUCTURES THAT ARE
DISTURBED OR DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED TO ITS
ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.
21. UNPAVED AREAS DISTURBED DURING CONSTRUCTION SHALL BE FULLY RESTORED USING SEED AND
FERTILIZER IMPREGNATED, NON-WOVEN COTTON FABRIC, PER SEEDING SPECIFICATION 32 92 19, FOR
SLOPES FLATTER THAN 4:1. SLOPES STEEPER THAN 4:1 SHALL BE SODDED, PER SODDING SPECIFICATION
SECTION 32 92 23.
22. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AND AVOID PONDING
CONDITIONS ANYWHERE ON SITE. STORM WATER IS TO BE DIRECTED TO STORM WATER CONVEYANCE
STRUCTURES.
23. TRAFFIC CONTROL SIGNS SHALL BE BILINGUAL (ENGLISH AND JAPANESE).
24. THE PROJECT SITE HAS THE POTENTIAL FOR UNEXPLODED ORDINANCE (UXO). CONTRACTOR TO COMPLY
WITH THE BASE CIVIL ENGINEERING SQUADRON'S UXO POLICY FOR ALL CONSTRUCTION ACTIVITIES.
GENERAL NOTES CIVIL NOTES
GENERAL
1. THE CONTRACTOR SHALL PROVIDE TEMPORARY CONNECTION TO EXISTING LINES AS REQUIRED FOR
TESTING AND/OR TO MINIMIZE WATER AND SEWER SERVICE INTERRUPTION BEFORE THE REMOVAL OF ANY
PORTION OF EXISTING LINES. ALL EXISTING WATERLINES ARE ASSUMED TO BE NON-ASBESTOS CEMENT PIPE
(ACP), UNLESS OTHERWISE NOTED IN THE DRAWINGS.
2. CONSTRUCTION OF NEW WATER LINES SHOULD NOT BE REQUIRED FOR THE CONSTRUCTION SCOPE OF THIS
PROJECT; HOWEVER, IF EXISTING WATER LINES ARE DAMAGED DURING CONSTRUCTION, NEW WATER LINES
MUST BE CONSTRUCTED PER BASE CIVIL ENGINEER SQUADRON STANDARDS INCLUDING TESTING
REQUIREMENTS.
3. CONTRACTOR SHALL PROTECT EXISTING PAVEMENTS UNLESS REMOVAL IS INDICATED ON PLANS. IF
DAMAGED DURING CONSTRUCTION THE PAVEMENT SHALL BE REPLACED IN KIND BY THE CONTRACTOR AT
NO ADDITIONAL COST TO THE CONTRACT.
4. CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE DITCHES DURING CONSTRUCTION UNLESS
OTHERWISE INDICATED ON PLANS. ANY CONCRETE DITCHES DAMAGED DURING CONSTRUCTION
OPERATIONS, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR, TO EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE CONTRACT.
5. LOCATION OF UTILITY LINES IS BASED ON GIS MAPPING. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE.
6. FOR THE INSTALLATION OF THE UNDERGROUND ELECTRICAL CONDUIT, THE CONTRACTOR MAY UTILIZE A
DIRECTIONAL BORING METHOD IN LIEU OF A TRENCH AS INDICATED ON PLANS, OR A COMBINATION OF
THOSE METHODS.
7. EXISTING COMMUNICATIONS LINES ARE SHOWN FOR REFERENCE PER GIS MAPPING. EXISTING LINES WITHIN
THE LIMITS OF CONSTRUCTION CAN BE REMOVED OR ABANDONED IN PLACE. THE CONTRACTOR IS NOT
REQUIRED TO PROTECT, MAINTAIN SERVICE, OR RECONNECT COMMUNICATION INFRASTRUCTURE WITHIN
THE LIMITS OF CONSTRUCTION.
LOCATION OF WATER LINES
1. THE LOCATION OF THE WATER LINES SHOWN ON THE DRAWINGS IS BASED ON GIS INFORMATION, NOT
UTILITY LOCATES AND SURVEYED PAINT MARKS. FIELD VERIFICATION OF THE LOCATION OF EXISTING WATER
LINES IS REQUIRED PRIOR TO DIGGING.
SURVEY NOTES
1. SITE CONTROL WAS ESTABLISHED USING THE TRIMBLE R8M3 GNSS GPS RECEIVER WITH TRIMBLE “SURVEY
CONTROLLER” SOFTWARE.
2. CONTROL SURVEY FOR THE PROJECT WAS CONDUCTED BY DAICHI SOKUYOU SEKKEI, CO. LTD. CERTIFIED BY
THE GOVERNMENT OF JAPAN, OKINAWA PREFECTURE GENERAL BUREAU CONSTRUCTION DEVELOPMENT
DIVISION AS A LICENSED LAND SURVEYING FIRM UNDER REGISTRATION NO. 3-29025.
3. THE HORIZONTAL AND VERTICAL POSITIONS USED FOR THIS PROJECT ARE BASED UPON GPS OBSERVATIONS
IN THE JAPAN GEODETIC DATUM (JDG) 2011 ZONE 15 GRID COORDINATE SYSTEM.
4. XY COORDINATES USED IN DRAWINGS REFER TO HORIZONTAL DATUM JGD 2011 ZONE 15, IN METERS.
5. AERIAL PHOTOGRAPHY FLOWN IN APRIL 2017.
EXCAVATION NOTES
EXCAVATION REQUIREMENTS
1. CONTRACTOR MAY CHOOSE TO CUT EXISTING SOD IN THE DISTURBED AREAS AND REINSTALL; HOWEVER, RESTORATION OF ALL DISTURBED AREAS SHALL BE ACHIEVED.
2. EXCAVATE TO CONTOURS, ELEVATIONS, AND DIMENSIONS INDICATED. REUSE EXCAVATED MATERIALS
THAT MEET THE SPECIFIED REQUIREMENTS.
3. EXCAVATIONS SHALL EXTEND SUFFICIENT DISTANCE FROM WALLS AND FOOTINGS TO ALLOW FOR PLACING
AND REMOVING FORMS.
4. EXCAVATION BELOW INDICATED DEPTHS SHALL NOT BE PERMITTED EXCEPT TO REMOVE UNSATISFACTORY
MATERIAL.
5. UNSATISFACTORY MATERIAL REMOVED BELOW DEPTHS INDICATED SHALL BE REPLACED WITH
SATISFACTORY MATERIAL AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. EXCAVATION SHALL BE PERFORMED SO THAT THE AREA WILL BE CONTINUALLY AND EFFECTIVELY
DEWATERED TO ELIMINATE ANY GROUND WATER IN THE EXCAVATION AS WELL AS GRADED TO DRAIN TO
ELIMINATE ANY PONDING SURFACE WATER. WATER FROM ANY SOURCE SHALL NOT BE PERMITTED TO
ACCUMULATE IN THE EXCAVATION. THE EXCAVATION SHALL BE DRAINED BY PUMPING OR OTHER
SATISFACTORY METHODS TO PREVENT SOFTENING OF THE FOUNDATION BOTTOM, UNDERCUTTING OF
FOOTINGS, OR OTHER ACTIONS DETRIMENTAL TO PROPER CONSTRUCTION.
7. SHORING INCLUDING SHEET PILING SHALL BE FURNISHED AND INSTALLED AS NECESSARY TO PROTECT
WORKMEN, BANKS, ADJACENT PAVING, STRUCTURES, AND UTILITIES.
EXAMPLE FILL REQUIREMENTS
1. TYPE OF MATERIALS PERMITTED IN FILL INCLUDE GW, GM, GC, GP, SW, SP, SM, AND SC OF THE UNIFIED
SOIL CLASSIFICATION SYSTEM. THE PLASTICITY INDEX SHOULD BE LESS THAN 12 AND THE LIQUID LIMIT
LESS THAN 35.
2. WHEN SUBGRADE SURFACES ARE LESS THAN THE SPECIFIED DENSITY, THE SURFACE SHALL BE BROKEN
UP TO A MINIMUM DEPTH OF 150 MM, PULVERIZED AND COMPACTED TO THE SPECIFIED DENSITY. SLOPED
SURFACES STEEPER THAN 1 VERTICAL TO 4 HORIZONTAL SHALL BE PLOWED, STEPPED, BENCHED, OR
BROKEN UP SO THAT THE FILL MATERIAL WILL BOND WITH THE EXISTING MATERIAL.
3. THE EXCAVATED SURFACE SHALL BE SCARIFIED TO A DEPTH OF 150 MM BEFORE FILL PLACEMENT IS
BEGUN.
4. SATISFACTORY MATERIAL SHALL BE PLACED IN HORIZONTAL LAYERS NOT EXCEEDING 200 MM IN LOOSE
DEPTH AND THEN COMPACTED IN GRASSED AREAS AND NOT EXCEEDING 150 MM IN LOOSE DEPTH IN
PAVED AREAS.
5. MATERIALS SHALL NOT BE PLACED ON SURFACES THAT ARE MUDDY.
6. COMPACTION SHALL BE ACCOMPLISHED BY SHEEPSFOOT ROLLERS, PNEUMATIC-TIRED ROLLERS, STEEL-WHEELED ROLLERS, OR OTHER APPROVED EQUIPMENT WELL SUITED TO THE SOIL BEING
PREPARED.
7. MATERIALS SHALL BE MOISTENED OR AERATED AS NECESSARY TO PROVIDE PROPER WATER CONTENT
THAT WILL READILY FACILITATE OBTAINING THE SPECIFIED COMPACTION WITH EQUIPMENT USED.
8. FILL MATERIALS SHALL BE COMPACTED TO DENSITIES AFTER ASTM STANDARD D 1557 OR JIS A 1210 TO 95%
UNDER STRUCTURES & 90% UNDER SIDEWALKS/GRASSED AREAS FOR COHESIONLESS FILLS. COMPACT
TOP 600 MM BELOW FINISHED PAVEMENT OR TOP 300 MM OF SUBGRADE, WHICHEVER IS GREATER TO 100%.
9. SEE STRUCTURAL NOTES FOR SOIL IMPROVEMENTS.
TRAFFIC CONTROL NOTES
EXCAVATION REQUIREMENTS
1. THE CONTRACTOR SHALL COORDINATE ANY TRAFFIC CONTROL MEASURES WITH THE CONTRACTING
OFFICER (CO) 72 HOURS IN ADVANCE OF ANY IMPLEMENTATION.
2. CONTRACTOR SHALL FURNISH, INSTALL AND MAINTAIN BILINGUAL TRAFFIC CONTROL DEVICES REQUIRED
FOR ROAD CLOSURE.
3. CONTRACTOR SHALL PROVIDE ROAD CLOSURE TRAFFIC CONTROL MEASURES SUCH THAT LONG DEAD
ENDS ARE NOT CREATED. TURNING MOVEMENTS OF LARGE VEHICLES MUST BE CONSIDERED.
CONTRACTOR MUST STAGE WORK SUCH THAT ACCESS TO A MUNITIONS STRUCTURE IS NOT BLOCKED. THE
PROPOSED PROJECT SITES ARE ON LOOPED ROADWAYS AND ACCESS SHALL BE MAINTAINED IF A
ROADWAY IS CLOSED BY ANOTHER ROUTE.
4. PRIOR TO COMMENCING TRENCHING CONSTRUCTION OPERATIONS FOR PROPOSED UTILITIES, ROAD
CLOSED SIGNS MAY BE REQUIRED AS DIRECTED BY THE CO.
5. CONSTRUCTION SIGNS MOUNTED ON TEMPORARY SUPPORTS SHALL ME MOUNTED AT A MINIMUM HEIGHT
OF 1.6M.
6. THE CONTRACTOR SHALL RELOCATE OR REMOVE SIGNAGE, AS DETERMINED BY THE CO.
7. THE CONTRACTOR SHALL PLACE AN OPAQUE COVERING OVER ANY SIGNAGE WHICH IS NOT APPLICABLE
FOR ANY PERIOD OF TIME.
8. BARRICADES SHALL BE PLACED AT BOTH ENDS OF CLOSED PORTIONS OF ROAD. THE CONTRACTOR SHALL
PROVIDE ENOUGH BARRICADES TO CROSS THE ENTIRE ROADWAY. BARRICADES MUST BE LIGHTED IF
ROADWAY IS TO REMAIN CLOSED DURING THE HOURS OF DARKNESS.
9. ALL BARRICADES AND VERTICAL PANELS SHALL HAVE MONO-DIRECTIONAL OR BI-DIRECTIONAL STEADY
BURNING LIGHTS.
HAZARDOUS MATERIAL DEMOLITION NOTES
1. ASBESTOS AND LEAD BASED PAINT HAVE BEEN FOUND ON SOME OF THE EXISTING STRUCTURES TO BE
DEMOLISHED. REFER TO REPORT DATED AUGUST 2017, PREPARED BY ENVIROQUEST, INSPECTION REPORT
FOR ASBESTOS & LEAD BASED PAINT FOR LOCATIONS AND DETAILED INFORMATION OF FINDINGS.
2. REFER TO SPECIFICATION SECTION 02 82 13.00 10 FOR ASBESTOS REQUIREMENTS.
3. REFER TO SPECIFICATION SECTION 02 83 13.00 20 FOR LEAD BASED PAINT REQUIREMENTS AS WELL AS
LEAD CONTAINING PAINT REQUIREMENTS FOR WORKER PROTECTION. EXISTING ECM DOORS ARE TO BE
PROVIDED TO THE GOVERNMENT FOR PAINT REMOVAL AND DISPOSAL. REFER TO SHEET GC101 FOR
DISPOSAL LOCATION.
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
CP 1-2B
CP 1-2A
CP 2-7B
CP 2-9A
CP 2-9B
CP 1-1A
CP 1-1B
CP 3-1A
CP 3-1B
CP 2-1B
CP 2-1A
CP 2-2B
CP 2-2A
CP 2-4B
CP 2-4A
CP 2-6B
CP 2-6A
CP 2-8A
CP 2-8B
CP 2-7A
CP 1-1A
CP 1-1B
C
P
C P
C
P
C
P
C
P
C
P
C P
C
P
C
P
48904
C
H
I
U
V
B
O
M
B
E
R
H
M
A V
E R
IC
K
L O
O P
N
U
R
S
E
R
F
A
I R
W
A
Y
H
A
B
U
S
T
A
L
L
I
N
G
S
S
H
E
P
P
A
R
D
S
M
I
C H
I E
F
G
A U
V
H A
B U
S
I
D
E
W
I
N
D
E
R
E
A
G
L
E
MAVERIC
K LOOP
W A
Y N
E
R
E C
K N
Y
H
A
B
U
C A
R O
T H
E R
S
S
I
D
E
W
I
N
D
E
R
S
H
E
P
P
A
R
D
H
A
B
U
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
N=43110
N=43140
N=43050
N=43170
N=43080
N=43200
N=43230
N=43260
N=43290
N=43320
N=43350
N=43380
N=43410
N=43440
N=43470
N=43500
N=43530
N=43560
N=43590
N=43620
N=43650
N=43680
N=43710
N=43740
N=43770
N=43800
N=43830
N=43860
N=43890
N=43920
N=43950
N=43980
N=44010
N=44040
N=44070
N=44100
N=44130
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C-101
C I V
I L
O V
E R
A L
L
M
A P
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
D
W G
40200
M 1:2000
[m]
180 20016014012010060 80
N
LEGEND:
STRUCTURE TO BE DEMOLISHED
AND REBUILT
EXISTING STRUCTURE NUMBER
48904
SCALE 1:2000
A1
OVERALL MAP
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
CP 1-1A
CP 1-1B
CP 1-1A
CP 1-1B
48904
N: 43856.37
E: 27585.40
N: 43848.35
E: 27585.20
N: 43855.79
E: 27609.04
N: 43847.77
E: 27608.84
C
H
I
U
V
C-102
C I V
I L
S I T
E
O
V E
R V
I
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
D
W G
20100
M 1:1000
[m]
90 1008070605030 40
LEGEND:
EXISTING DITCHLINE
EXISTING ELECTRIC
EXISTING WATER
EXISTING CULVERT PIPE
ROAD CENTERLINE
EXISTING CONTOUR
EXISTING STRUCTURE NUMBER
PROPOSED STRUCTURE
PROPOSED ASPHALT PAVEMENT
PROPOSED CONCRETE PAVEMENT
PROPOSED UNDERDRAIN
EXISTING STORM SEWER INLET
EXISTING FIRE HYDRANT
CONTROL POINT
LIMITS OF CONSTRUCTION
BORE LOCATION
N
Ex
Wx
48904
CP
118.00
NOTES
1. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE.
2. CONTRACTOR SHALL PROTECT EXISTING PAVEMENTS UNLESS REMOVAL IS INDICATED ON PLANS. IF
DAMAGED DURING CONSTRUCTION THE PAVEMENT SHALL BE REPLACED IN KIND BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE CONTRACT.
3. CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE DITCHES DURING CONSTRUCTION UNLESS
OTHERWISE INDICATED ON PLANS. ANY CONCRETE DITCHES DAMAGED DURING CONSTRUCTION
OPERATIONS, SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR, TO EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE CONTRACT.
BULDING NUMBER DEMOLITION PLAN SHEET SITE PLAN SHEET GRADING PLAN SHEET
48904 CD101 CS101 CG101
D
SCALE 1:1000
A1
SITE OVERVIEW I
JGD 2011 ZONE 15 WGS84 UTM Z52
CONTROL POINT NORTHING EASTING NORTHING EASTING ELEVATION DESCRIPTION
CP 1-1A 43872.275 27576.571 2920092.814 377952.650 90.128
SURVEY NAIL (BLUE COVER)
CP 1-1B 43863.956 27620.889 2920083.981 377996.862 94.229
SURVEY NAIL (BLUE COVER)
CP 1-1A
TABLE 1: INVESTIGATE BORING DETAILS
BUILDING NO.
DEPTH, M
X-LATITUDE Y-LONGITUDE ELEVATION
48904 10.00 43847.974 27580.384 90.458
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
C P
C P
C P
C P
C P
C P
48904
24.80M
M
CP 1-1A
CP 1-1B
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
SF
SF
SF
SF
SF
SF
SF
2.00M
CD101
C I V
I L
D E
M O
L I T
I O
N
P
L A
N
E C
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
D D
W G
M 1:100
[m]
9 1087653 4
N
NOTES
1. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFICATION OF EXISTING UTILITIES BEFORE GROUND
DISTURBANCE
2. REMOVE EXISTING SLIDING DOORS AND DELIVER TO 525 AMXS
AT BUILDING 925 FOR LEAD BASED PAINT REMEDIATION. THE
DOORS WILL BECOME THE PROPERTY OF THE GOVERNMENT
X
KEYNOTES
REMOVE STRUCTURE 48904, INCLUDING WING WALL AND
FOOTING. CONTRACTOR SHALL BE RESPONSIBLE TO FIELD
VERIFY THE DIMENSIONS SHOWN ON THE PLANS
REMOVE ASPHALT PAVEMENT ADJACENT TO WING WALLS FOR
FOOTING EXCAVATION, APPROX. 10 SQM
REMOVE 2M OF CONCRETE PAVEMENT ADJACENT TO STRUCTURE
DOORS FOR FOOTING EXCAVATION, APPROX. 10 SQM
REMOVE VENTILATION EQUIPMENT
INSTALL SILT FENCE, REF. DETAIL E1/CD501
INSTALL INLET PROTECTION, REF. DETAIL E4/CD501
INSTALL SAND BAG FILTER, REF DETAIL B1/CD501
REMOVE VEGETATION AND DEBRIS FROM EXISTING INLET AND
DOWNSTREAM PIPE
CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE
DITCHES DURING CONSTRUCTION. ANY CONCRETE DITCHES
DAMAGED DURING CONSTRUCTION OPERATIONS, SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR, TO EXISTING
CONDITIONS AT NO ADDITIONAL COST TO THE CONTRACT
REMOVE ASPHALT PAVEMENT FOR NEW ELECTRICAL LINE,
APPROX. 7.5 SQM, REF. DETAIL A1/CS501; SEE CIVIL
NOTES/GENERAL ON C-001
CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING LIGHTNING
PROTECTION POLES AND CABLES
SCALE 1:100
A1
DEMOLITION PLAN ECM 48904
LEGEND:
EXISTING DITCH BOTTOM
EXISTING CULVERT PIPE
STRUCTURE TO BE DEMOLISHED
EXISTING CONCRETE APRON
LIMIT OF CONSTRUCTION
ASPHALT PAVEMENT REMOVAL
CONCRETE PAVEMENT REMOVAL
CLEARING AND GRUBBING
EXISTING ELECTRIC
EXISTING WATER LINE
EXISTING ROAD CENTERLINE
SILT FENCE
SAND BAG FILTER
EXISTING ELECTRICAL MANHOLE
EXISTING POWER POLE
EXISTING LIGHTNING PROTECTION POLE
CP CP CP CP CP
Ex Ex Ex Ex Ex
Wx Wx Wx Wx Wx
SF SF SF
E
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
CD501
I V
I L
D E
M O
L I T
I O
N
D
E T
A I L
S
I
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
D D
W G
1. SAND BAGS SHALL BE STAGGERED BETWEEN EACH LAYER.
2. CATCH ALL FILTERS MAY BE USED AT INLETS WITHIN PAVED
LOCATIONS ONLY.
3. SAND BAGS SHALL REMAIN UNTIL LANDSCAPED AREAS ARE
STABILIZED.
GENERAL NOTES:
OPEN LID
SECTION
PLAN
SAND
BAGS
SAND
BAGS
CATCHBASIN/
INLET
1. SECURE POLYETHYLENE LINING WITH UV-STABILIZED
GEOTEXTILE FABRIC SANDBAGS.
2. POLYETHYLENE LINING SHALL BE 10 MIL AND FREE OF HOLES,
TEARS, OR OTHER DEFECTS. THE SHEET SHALL BE
APPROPRIATELY SIZED TO FIT THE ENTIRE WASHOUT SYSTEM
WITHOUT SEAMS OR OVERLAPS. REPLACE LINER AS
NECESSARY.
3. EXCAVATION SHALL BE A 3M x 3M MIN. AND SIZED TO CONTAIN
ALL LIQUID AND WASTE EXPECTED TO BE GENERATED.
GENERAL NOTES:
SECTION
PLAN
T L
B L
TW
BW
SAND
BAGS
EXCAVATION
D
SAND
BAGS
GENERAL NOTES:
1. STONE SIZE - USE 25mm TO 75mm STONE, OR RECLAIMED OR RECYCLED CONCRETE
EQUIVALENT.
2. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING OF
STONE.
3. SURFACE WATER - SURFACE WATER FLOWING OR DIVERTED TOWARD
CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF PIPING IS
IMPRACTICAL, A MOUNTABLE BERM WITH 5H:1V SLOPE WILL BE PERMITTED.
4. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL
PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY. THIS
MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITION
DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP
SEDIMENT. SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC RIGHT-OF-WAY
MUST BE REMOVED IMMEDIATELY.
5. WASHING - WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE
ONTO PUBLIC RIGHT-OF WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON
AN AREA STABILIZED WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT
TRAPPING DEVICE.
6. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.
PLAN VIEW
ACCESS
ROAD
3 M MIN.
9 M MIN.
PROFILE
EXISTING
GROUND
FILTER CLOTH
MOUNTABLE BERM
(OPTIONAL)
1 M
9 M
200 MM MIN
ACCESS ROAD
BURY BOTTOM OF FABRIC
1. SILT FENCE SHALL BE MAINTAINED UNTIL THE AREA DRAINING TOWARDS TO THE STRUCTURE HAS STABILIZED
GROUND COVER, AS DETERMINED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
GENERAL NOTES:
GROUND SURFACE
1830 MM O.C. MAX.
GEOTEXTILE FABRIC
FLOW
STAPLE SILT FENCE
TO STAKE (TYP.)
M
M
M
M
25MM X 25MM WOOD STAKE
LIMIT OF GRUBBING/GRADING
CONSTRUCTION LIMIT
GEOTEXTILE FABRIC (MIRAFI100X
OR EQUIVALENT)
COMPACTED BACKFILL
REINFORCING CORD
M
M
SCALE NTS
E1
SILT FENCE
SCALE NTS
B1
SAND BAG FILTER DETAIL
PLAN
SIDE VIEW
SAND CONTAINED IN PERVIOUS
BURLAP BAGS OR SYNTHETICS NET
BAGS (3 MESH) APPROXIMATELY
(305) WIDE AND (150) THICK
PLACE SAND BARRIER
BAGS SUCH THAT NO
GAPS ARE EVIDENT
SAND BARRIER BAGS
CAN BE A SINGLE OR
DOUBLE LAYER
IF DOUBLE LAYER OF SAND
BARRIER BAGS ARE USED THE TOP
BAGS MUST BE PLACED SUCH THAT
NO GAPS ARE EVIDENT WITH THE
LOWER LAYER OF BAGS
PLACE SAND BARRIER SUCH
THAT NO GAPS ARE EVIDENT
SCALE NTS
E4
INLET PROTECTION
SCALE NTS
E6
CONCRETE WASHOUT
SCALE NTS
E8
CONSTRUCTION ENTRANCE
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
CP 1-1A
CP 1-1B
N: 43856.37
E: 27585.40
N: 43848.35
E: 27585.20
N: 43855.79
E: 27609.04
N: 43847.77
E: 27608.84
N: 43866.64
E: 27576.51
N: 43839.18
E: 27576.16
N: 43837.55
E: 27619.57
N: 43857.93
E: 27619.13
N: 43866.16
E: 27585.33
N: 43866.64
E: 27576.51
N: 43839.18
E: 27576.16
N: 43837.55
E: 27619.57
N: 43857.93
E: 27619.13
N: 43866.16
E: 27585.33
C P
C P
C P
C P
C P
C P
C P
48904
M
23.64M
CS101
C I V
I L
S I T
E
P
L A
N
E C
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
S D
W G
M 1:100
[m]
9 1087653 4
N
NOTES
1. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION
OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE
X
KEYNOTES
INSTALL ASPHALT PAVEMENT ADJACENT TO THE WING WALL.
MATCH EXISTING ASPHALT PAVEMENT.
INSTALL CONCRETE PAVEMENT ADJACENT TO STRUCTURE DOOR.
MATCH EXISTING CONCRETE APRON
CLEAN STORM SEWER INLET AND ASSOCIATED STORM SEWER PIPE
INSTALL ASPHALT PAVEMENT ALONG ELECTRICAL LINE TRENCH.
MATCH EXISTING ASPHALT PAVEMENT
SCALE 1:100
A1
SITE PLAN ECM 48904
LEGEND:
EXISTING DITCH BOTTOM
EXISTING CULVERT PIPE
PROPOSED SUBSURFACE DRAIN
PROPOSED MAGAZINE
EXISTING CONCRETE APRON
LIMIT OF CONSTRUCTION
PROPOSED ASPHALT PAVEMENT, REF.:
DETAIL F1/CS501
PROPOSED CONCRETE PAVEMENT,
REF. DETAIL F6/CS501
EXISTING ROAD CENTERLINE
CP CP CP CP
D D D
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
SCARIFY AND RE-COMPACT CUT AREAS,
OR COMPACT FILL MATERIAL:
- 90% COMPACTION - COHESIVE SOILS
- 95% COMPACTION - GRANULAR SOILS
PER ASTM D1557 / JIS A1210 STANDARD
NATIVE SOIL (CUT) OR IMPORTED FILL MATERIAL,
REFER TO SPECIFICATIONS
SCARIFY AND RE-COMPACT CUT AREAS,
OR COMPACT FILL MATERIAL:
- 90% COMPACTION - COHESIVE SOILS
- 95% COMPACTION - GRANULAR SOILS
PER ASTM D1557 / JIS A1210 STANDARD
200mm PCC SURFACE COURSE, NON-REINFORCED
FLEXURAL STRENGTH: 4.5 MPa
100mm AGGREGATE BASE COURSE
- 100% COMPACTION PER ASTM D1557 / JIS A1210 STANDARDS
SCARIFY AND RE-COMPACT CUT AREAS,
OR COMPACT FILL MATERIAL:
- 90% COMPACTION - COHESIVE SOILS
- 95% COMPACTION - GRANULAR SOILS
PER ASTM D1557 / JIS A1210 STANDARD
100mm DENSE-GRADED ASPHALT PAVEMENT
200mm AGGREGATE BASE COURSE
- 100% COMPACTION PER ASTM D1557 / JIS A1210 STANDARDS
250mm AGGREGATE SUBBASE COURSE
- 95% COMPACTION PER ASTM D1557 / JIS A1210 STANDARDS
NATIVE SOIL (CUT) OR IMPORTED FILL MATERIAL,
REFER TO SPECIFICATIONS
TRENCH WALL
EXCAVATION
NEW PIPE LINE OR CONDUIT
PAVEMENT
TURF
EXISTING GROUND
EXISTING
PAVEMENT
SAW CUT &
PROVIDE
TACK COAT
150 MIN
C O
V E
R
V
A R
I E
S
M
UNDISTURBED GROUND
150 MIN
DETECTABLE WARNING
TAPE FOR ELECTRICAL
SOD & TOPSOIL
REPLACEMENT
PAVEMENT SECTION
REPLACEMENT
C O
V E
R
V
A R
I E
S
M
GENERAL NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL
DETAILS ON AGGREGATE MATERIALS.
B
A
LAYER
A - NATIVE SOILS UNDER TURF
- BASE COURSE AGGREGATE TO SUBGRADE UNDER PAVEMENT
B - BASE COURSE AGGREGATE
CS501
C I V
I L
S I T
E
D
E T
A I L
S
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
S D
W G
SCALE NTS
F6
RIGID PAVEMENT
SCALE NTS
F1
FLEXIBLE PAVEMENT ECM
SCALE NTS
C1
UTILITY TRENCH
NOTES:
1. REFER TO STRUCTURAL FOR THE INTERFERENCE BETWEEN THE CONCRETE APRONS AND THE ECM STRUCTURE.
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
C P
C P
C P
C P
C P
C P
48904
C P
C P
C P
C P
C P
C P
C P
48904
93.551
95.750
95.745
90.924
90.489
90.497
90.409
90.414
96.588
96.591
96.593
96.591
93.404
93.070
93.073
93.436
92.250
91.967
91.932
92.164
93.512
93.599
90.497
90.435
90.345
93.910
89.068
89.188
90.226
91.231
91.209
91.126
92.658
92.707
92.606
94.002
94.058
93.959
93.436
93.155
93.147
93.432
92.364
92.053
92.051
92.369
90.878
90.297
90.288
90.507
89.324
89.081
89.347
88.242
87.680
87.684
88.184
91.257
90.929
90.128
94.229
89.990
.0
.5
.0
93.0
92.5
95.0
.5
93.5
94.0
94.5
95.5
.0
CP 1-1A
CP 1-1B
FFE 90.497
95.092
95.092
95.173
95.092
95.092
90.890 ME
93.444 ME
95.173
94.5
94.0
93.5
93.0
92.0
.5
.0
91.5
92.0
93.0
93.5
94.0
94.5
.0
92.5
92.5
95.0
95.0
INV 90.834
INV 90.834
CG101
C I V
I L
G R
A D
I N
G
P
L A
N
E C
M
V
M
A T
E I
V
M
A T
E I
L
R
O B
E R
T S
L
R
O B
E R
T S
P A
Y Z
B
C
G D
W G
X
KEYNOTES
CONTRACTOR SHALL PROTECT THE EXISTING CONCRETE DITCHES
DURING CONSTRUCTION. ANY CONCRETE DITCHES DAMAGED
DURING CONSTRUCTION OPERATIONS, SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR, TO EXISTING CONDITIONS AT NO
ADDITIONAL COST TO THE CONTRACT.
CONTRACTOR SHALL PROTECT EXISTING PAVEMENT APRON. IF
DAMAGED DURING CONSTRUCTION, THE APRON SHALL BE
REPLACED IN KIND BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE CONTRACT.
NOTES
1. LOCATION OF UTILITY LINES ARE AS PER GIS MAPPING.
CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION
OF EXISTING UTILITIES BEFORE GROUND DISTURBANCE
2. ALL DISTURBED AREAS SHALL BE FULLY RESTORED USING SEED
AND FERTILIZER IMPREGNATED, NONWOVEN COTTON FABRIC,
PER SEEDING SPECIFICATION 32 92 19, FOR SLOPES FLATTER
THAN 4:1. SLOPES STEEPER THAN 4:1 SHALL BE SODDED (SEE
SPECIFICATIONS SECTION 32 92 23 SODDING) OVER A MINIMUM
OF 100MM OF TOP SOIL. NON-SEEDED GEOTEXTILE SHEET
SHOULD BE INSTALLED ON ALL AREAS WITH SLOPES STEEPER
THAN 4:1
M 1:100
[m]
9 1087653 4
N
SCALE 1:100
A1
GRADING PLAN ECM 48904
D D D
2.0%
LEGEND:
EXISTING DITCH BOTTOM
EXISTING CULVERT PIPE
PROPOSED SUBSURFACE DRAIN
PROPOSED DRAINAGE STRUCTURE
PROPOSED MAGAZINE
EXISTING CONCRETE APRON
LIMIT OF CONSTRUCTION
PROPOSED ASPHALT PAVEMENT
PROPOSED CONCRETE PAVEMENT
EXISTING ELECTRIC
EXISTING WATER LINE
EXISTING ROAD CENTERLINE
SLOPE
FLOW DIRECTION
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING ELEVATION
PROPOSED ELEVATION
MATCH EXISTING
PAVEMENT
GROUND
FINISHED FLOOR ELEVATION
PIPE INVERT
123.0
123.0
ME
P
G
FFE
123.123
123.123
D
CP CP CP CP CP
Ex Ex Ex Ex Ex
Wx Wx Wx Wx Wx
INV
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
F I L
E
N
A M
E
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
M
Y
C
O R
E
N G
I N
E E
R S
J A
P A
N
D
I S
T R
I C
T
O K
I N
A W
A
J A
P A
N
C H
E C
K E
D
B
Y
I S
O
A
A
D R
A W
I N
G
C
O D
E
RTA
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10
N
M
I C
H I G
E
S U
I T
E
C H
I C
A G
O
I L
T w w w e x p f e d e r a l c
P
A Y
Z
B
M U
N I T
I O
O
R A
L O
O S
K A
D E
S
E
O
K I N
A W
A
J A
P A
N
M A
S
C R
I P
T I O
N D
A T
E
M A
R C
H
DESIGN CRITERIA:
A. BUILDING CODES AND SPECIFICATIONS:
1. AMERICAN CONCRETE INSTITUTE (ACI 318)
2. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC 360, 341)
3. AMERICAN WELDING SOCIETY, AWS
4. UFC 3-301-01, STRUCTURAL ENGINEERING
5. UFC-3-310-04, SEISMIC DESIGN FOR BUILDINGS
B. LIVE LOADS:
ROOF..................4.80 kPa (100 psf) FLOOR................24.0 kPa (500 psf)
FORKLIFT (10,000 LBS CAPACITY)
GROSS VEHICLE WEIGHT = 112 kN (25 kips) FRONT AXLE LOAD (AT RATED CAPACITY) = 145 kN (33 kips)
C. BLAST LOADS
HEAD WALL, DOOR PEAK OVERPRESSURE..........700 kPa (102 psi) ROOF PEAK OVERPRESSURE................................745 kPa (108 psi)
D. WIND LOAD:
RISK CATEGORY = III
BASIC ULTIMATE WIND SPEED: 392 km/h (243 mph) NOMINAL WIND SPEED = 85 m/s (189 mph)
IMPORTANCE FACTOR (I) = 1.00
EXPOSURE CATEGORY = C
ENCLOSURE CLASSIFICATION: PARTIALLY ENCLOSED
E. EARTHQUAKE:
RISK CATEGORY = III
IMPORTANCE FACTOR, Ie = 1.25 Ss = 1.73 g Sds = 1.04 g S1 = 0.93 g Sd1 = 1.49 g
SITE CLASS: E
SHORT PERIOD SITE COEFFICIENT, Fa = 1.0 LONG PERIOD SITE COEFFICIENT, Fv = 2.4
SEISMIC-FORCE RESISTING SYSTEM = A.5 INTERMEDIATE PRECAST SHEAR WALLS
SEISMIC DESIGN CATEGORY, SDC = E
ANALYSIS PROCEDURE = EQUIVALENT LATERAL FORCE PROCEDURE
SEISMIC BASE SHEAR V = Cs x W
W = 5.7 MN (1,280 kips), SEISMIC DEAD LOAD Cs = 0.28, SEISMIC RESPONSE COEFFICIENT
F. SOILS
SOIL DENSITY: 18 kN/m^3 (115 pcf) STATIC ACTIVE PRESSURE: 7.85 kPa/m (50 psf per ft) SEISMIC ACTIVE PRESSURE: 5.20 kPa/m (35 psf per ft) STATIC AT-REST PRESSURE: 11.0 kPa/m (70 psf per ft) SEISMIC AT-REST PRESSURE: 7.25 kPa/m (45 psf per ft)
FOUNDATIONS (CONTINUED)
4. DEEP SOIIL MIXING “DSM” IMPROVEMENTS SHALL EXTEND TO DEPTHS WHERE COMPETENT DENSE TO VERY DENSE GRAVEL (GP-GM OR GP-GC) LAYERS ARE ENCOUNTERED. IF COMPETENT DENSE TO VERY DENSE GRAVEL LAYERS ARE ENCOUNTERED AT THE BOTTOM OF FOUNDATION ELEVATION, FOUNDATIONS MAY BEAR
DIRECTLY ON THE UNIMPROVED SUBGRADE.
5. MINIMUM 28-DAY DESIGN COMPRESSIVE STRENGTH FOR SOIL-CEMENT MIX SHALL BE 600 kN/m². LABORATORY MIX DESIGN SHALL BE BASED ON THE REQUIREMENTS INDICATED IN "GUIDELINES FOR DESIGN AND QUALITY CONTROL OF GROUND IMPROVEMENT FOR BUILDING FOUNDATIONS" OR "RECOMMENDATIONS FOR DESIGN OF GROUND IMPROVEMENT FOR BUILDING FOUNDATIONS" PUBLISHED BY THE BUILDING CENTER OF JAPAN AND THE JAPAN ARCHITECTURAL INSTITUTE, RESPECTIVELY. LABORATORY MIX DESIGNS SHALL HAVE MINIMUM 28-DAY COMPRESSIVE STRENGTH OF AT LEAST 3 TIMES THE DESIGN COMPRESSIVE STRENGTH WITH CEMENT CONTENTS OF 100 TO 300 kg/m3 AND WATER-CEMENT RATIOS OF APPROXIMATELY 70 PERCENT.
TYPE OF CEMENT SHALL COMPLY WITH LOCAL ENVIRONMENTAL REGULATIONS IN ORDER NOT TO EXCEED THE LIMITS FOR HEXAVALENT CHROMIUM LEACHING. REFER TO SECTION 31 32 40 SPECIFICATION FOR
ADDITIONAL REQUIREMENTS.
6. LATERAL LOAD RESISTING SYSTEM IS BASED ON PASSIVE PRESSURES HAVING EQUIVALENT FLUID DENSITY OF 40 kPa/m (250 PSF/FT) AND ULTIMATE FRICTION COEFFICIENT OF 0.30 BETWEEN CONCRETE FOUNDATION BOTTOMS AND SOIL. UPPER 300 mm (1 FT) IS NEGLECTED FOR LATERAL RESISTANCE.
7. IN AREAS REQUIRING FILL PLACEMENT, THE EXPOSED SUBGRADE SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 300 mm AND COMPACTED TO BETWEEN 90% AND 95% COMPACTION PER JIS A 1210. FILL PLACED IN AREAS WITH SLOPE STEEPER THAN 5H : 1V SHALL BE CONTINUALLY BENCHED AS THE FILL IS BROUGHT UP IN LIFTS.
8. IMPORTED FILL SHALL BE PLACED IN LAYERS NOT EXCEEDING 200 mm LOOSE THICKNESS AND COMPACTED TO A MINIMUM OF 90% COMPACTION FOR COHESIVE SOILS AND 95% DENSITY FOR GRANULAR SOILS COMPACTION PER JIS A 1210. THE FILL MATERIAL SHALL HAVE AN EXPANSION POTENTIAL NO GREATER THAN 1.0 PERCENT WHEN TESTED IN ACCORDANCE WITH ASTM D 1883 OR JIS A 1211. MAXIMUM PARTICLE SIZE SHALL BE 75 mm OR HALF OF THE COMPACTED LIFT THICKNESS, WHICHEVER IS GREATER. REFER TO SPECIFICATION 31 23
00.00 20 “EXCAVATION AND FILL.”
9. RELATIVE COMPACTION IN THESE NOTES SHALL REFER TO THE IN-PLACE DRY DENSITY OF SOIL EXPRESSED AS A PERCENTAGE OF THE MAXIMUM DRY DENSITY OF THE SAME SOIL ESTABLISHED IN ACCORDANCE WITH
ASTM D1557 OR JIS A 1210.
10. BEARING LAYER UNDER THE “DSM” IMPROVED SOILS SHALL HAVE A MINIMUM AVERAGE SPT-N VALUE OF 20 WITHIN THE INFLUENCE DEPTH OF THE FOUNDATION. INFLUENCE DEPTH SHALL BE 2 TIMES THE FOOTING WIDTH FOR ISOLATED FOOTINGS AND 4 TIMES THE FOOTING WIDTH FOR CONTINUOUS FOOTINGS.
11. FOR FOOTINGS WITH WIDTHS UP TO 3 m, SOIL IMPROVEMENTS SHALL EXTEND HORIZONTALLY AT LEAST 300 mm FROM THE EDGE OF ISOLATED FOOTINGS AND AT LEAST 150 mm FROM THE EDGE OF CONTINUOUS FOOTINGS. FOR FOOTINGS WIDER THAN 3 m, SOIL IMPROVEMENTS SHALL EXTEND HORIZONTALLY AT LEAST 500 mm FROM THE EDGE OF THE FOOTING.
12. “DSM” TECHNIQUE USES AN EXCAVATOR-MOUNTED MIXING TOOL AND A PNEUMATICALLY DELIVERED WET SLURRY OR DRY BINDER TO CREATE A LARGE STABILIZED MASS. THE EQUIPMENT SHALL BE EQUIPPED WITH MONITORING DEVICES TO ENSURE ACCURATE AND CONTINUOUS MONITORING AND CONTROL OF CEMENT GROUT INJECTION PRESSURES, CEMENT GROUT QUANTITIES AND OTHER OPERATIONS AS REQUIRED TO
INSTALL AND MIX MATERIALS.
13. ESTIMATED TOTAL SETTLEMENT IS 25 mm AND DIFFERENTIAL SETTLEMENT IS 13 mm BASED ON THE SHALLOW FOUNDATIONS BEARING ON SOIL-CEMENT SLURRY IMPROVED SOILS OR ON COMPETENT DENSE
LAYERS.
14. A MINIMUM OF 50 mm OF LEAN CONCRETE SHALL BE PLACED BELOW THE FOOTING ON TOP OF THE IMPROVED SOIL OR BEARING LAYER. LEAN CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGTH (f'c) OF 8 MPa.
15. FOR THE SLAB-ON GRADE AREAS, PLACE GRANULAR BASE COURSE OF M-40 OR C-40 GRADATION PER JIS A 1204 AND COMPACT TO 95% DENSITY PER JIS A 1210. IN ADDITION, AT LEAST ONE (1) ø750 mm PLATE BEARING TESTS PER JIS 1521 SHALL BE PERFORMED TO ENSURE THE EFFECTIVE MODULUS OF SUBGRADE REACTION OF 27 kN/m3 (100 PCI) AT THE TOP OF GRANULAR BASE COURSE.
16. FOOTINGS CONSTRUCTED NEAR TOPS OF SLOPES OR ON SLOPING GROUND CONDITIONS SHALL BE EMBEDDED DEEP ENOUGH TO PROVIDE A MINIMUM HORIZONTAL SETBACK DISTANCE OF 1.5 m MEASURED
FROM THE OUTSIDE EDGE OF THE BOTTOM OF FOOTING TO THE FACE OF THE SLOPE.
17. FOUNDATIONS LOCATED NEXT TO UTILITY TRENCHES OR EASEMENTS SHALL BE EMBEDDED BELOW A 45- DEGREE IMAGINARY PLANE EXTENDING UPWARD FROM THE BOTTOM EDGE OF THE UTILITY TRENCH.
18. CONCRETE SHALL NOT BE PLACED OVER FROZEN SOIL OR FOOTING EXCAVATIONS SUBJECTED TO WATER.
STRUCTURAL PRECAST CONCRETE
1. PRECAST MANUFACTURER SHALL BE RESPONSIBLE FOR COORDINATING ALL DISCIPLINES AFFECTING PRECAST ELEMENTS.
2. THERE SHALL BE NO FIELD CUTTING OF PRECAST ELEMENTS WITHOUT THE APPROVAL OF THE CONTRACTING OFFICER.
3. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT TWENTY-EIGHT DAYS OF 30 MPa.
4. ALL GROUT SHALL BE NON-SHRINK, NON-METALLIC WITH f'c = 42 MPa.
STRUCTURAL STEEL
1. STRUCTURAL STEEL FABRICATION, ERECTION, AND CONNECTION DESIGN SHALL CONFORM TO:
JASS 6 JAPANESE ARCHITECTURAL STANDARD SPECIFICATION, STRUCTURAL STEELWORK SPECIFICATION
FOR BUILDING CONSTRUCTION.
AISC 360 SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS (AMERICAN INSTITUTE OF STEEL CONSTRUCTION)
AWS D1.1 STRUCTURAL WELDING CODE - STEEL (AMERICAN WELDING SOCIETY)
2. STRUCTURAL SHAPES SHALL CONFORM TO THE FOLLOWING JIS DESIGNATIONS WITH YIELD STRENGTH Fy:
H SHAPES.............................................................. JIS G 3136 SN490B .................... Fy = 325 MPa (47 ksi) CHANNELS (WELDABILITY)................................... JIS G 3136 SN400B ................... Fy = 235 MPa (34 ksi) ANGLES, PLATES (WELDABILITY) ....................... JIS G 3136 SN400B .................... Fy = 235 MPa (34 ksi)
☐ TUBING (SQR, RECT) ....................................... JIS G 3466 STKR400 .................. Fy = 245 MPa (35 ksi) Ø PIPE (ROUND) ................................................... JIS G 3444 STK400 .................... Fy = 235 MPa (34 ksi)
3. STRUCTURAL FASTENERS SHALL CONFORM TO THE FOLLOWING JIS DESIGNATIONS WITH TENSILE STRENGTH Fu:
HIGH STRENGTH HEXAGON BOLTS ...........
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .