9 - RFP CMc K Wing Addition _ Renovations Scoring Sheets.pdf
PDF 135 KB Posted
- Attached to
- Delta College K Wing Addition & Renovations: CMc Proposals State and local contract opportunity
- Solicitation number
- 2021044
- Issued by
- Bay County, Michigan
About this file
The documents are a comprehensive set of scoring and rating sheets for the Delta College K Wing Addition & Renovations Construction Manager as Constructor (CMc) selection process in University Center, Michigan. The procurement involves selecting a construction management firm to oversee a $5,701,700 project that includes complete renovations of the existing K wing spaces and a new 4,675 square foot building addition. The scoring methodology includes multiple evaluation criteria such as project team experience, firm capabilities, project delivery approach, team capacity, and reference checks, with a maximum possible score of 180 points across interview, technical proposal, and reference ratings.
The project is projected to receive $2,423,200 in state funding, with approximately $4,337,627.33 allocated for direct construction/renovation and $1,364,072.67 designated for ancillary expenses like asbestos abatement, telecommunications, furniture, equipment, and fees. The selection process is detailed and rigorous, using a 5-point scoring system where 5 represents "Highly Qualified" and 1 represents "Not Acceptable". The college reserves the right to negotiate with the most satisfactory firm based on both total scores and cost proposals, with an emphasis on the quality of services offered. The final selection will be made at the sole discretion of the Steering Committee, considering both the perceived value of services and associated costs.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 2022004-DeltaCollegeKWing-drawing set-010224.pdf | ||
| Addendum-Q_A (1).docx | DOCX document | |
| Certifications.docx | DOCX document | |
| 10 - Delta BIM Execution Plan - K Wing.pdf | ||
| 1 - RFP CMc - K Wing Addition and Renovations.pdf | ||
| 3 - Delta College Campus Map 2014.pdf | ||
| 10-11-2019 CMc Advertisement.pdf | ||
| Introduction Page.docx | DOCX document | |
| Pricing Sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page 1 of 1 – Delta College – K Wing Addition & Renovations – Selection Criteria Interview Sheet
DELTA COLLEGE – K WING ADDITION & RENOVATIONS
Selection Criteria Interview Sheet (If interviews are required)
Rating Weight Score
1. Related project experience – firm 1
2. Related project experience – individuals 1
3. Compatibility of team (experience together) 1
4. Knowledge of local construction market 1
5. Project delivery 1
Management approach
Quality control
Schedule control
Innovation and flexibility
Interaction with Delta
6. LEED and commissioning methods and experience 1
7. Cost control methods and experience 1
8. Team capacity and availability to perform services 1
9. Viewer’s opinion of overall quality of Construction 3
Management services offered.
TOTAL SCORE
Potential Maximum Score = 55
The College reserves the right to revise the total score if, in our sole opinion, we believe that the results of one or more areas of review will impact the potential of the team effort beyond the weight given to those particular issues.
Scoring shall range from 1 = Unacceptable to 5 = Highly Qualified or Highly Acceptable
Total scores and references will both be reviewed. It is at the sole discretion of the selection committee to judge the perceived quality of services. All cost proposals will be opened and the College will choose to negotiate with one of the firms. If no agreement can be reached the College will negotiate with the next most satisfactory firm until a firm is selected.
Page 1 of 1 – Delta College – K Wing Addition & Renovations – Technical Proposal Scoring Sheet
Technical Proposal Scoring Sheet
Rating Weight Score
A. Project Team
1. General history of working together successfully 1
2. Viewers overall impression of team capabilities 1
B. Firm Experience as Shown by Direct Experience of Individual Team Members
1. Construction, construction management experience 1 and capabilities
2. Cost estimating experience and capabilities 1
3. LEED and commissioning experience 1
C. Project Delivery
1. Cost control approach 1
2. Preconstruction phase approach 1
3. Continuity of team throughout project and 1 division of work
D. Team capacity 1
E. Litigation history 1
TOTAL SCORE
Potential Maximum Score = 50
The College reserves the right to revise the total score if, in our sole opinion, we believe that the results of one or more areas of review will impact the potential of the team effort beyond the weight given to those particular issues.
Page 1 of 2 – Delta College – K Wing Addition & Renovations – CMc Selection Criteria for Scoring Sheets
CMc Selection Criteria for Scoring Sheets
General Scoring Range (all items scored on a scale of 1 to 5)
5 Highly Qualified
4 Qualified
3 Adequate
2 Minimally Acceptable
1 Not Acceptable
Item Specific Scoring Ranges
A. Project Team
General history:
5 Majority of team worked on many examples
3 Majority of team worked on a few examples
1 Majority of team worked on 0 – 1 examples
B. Firm Experience
Construction, construction management experience:
5 Several successful examples with same team
3 A few successful examples with same team members
1 Limited expertise
Cost estimating:
5 Excellent history, fully dedicated staff
3 History, staff dedicated part-time
1 Limited expertise and/or history with problems
LEED and Commissioning Experience:
5 Several successful examples with same team
3 A few successful examples with same team members
1 Limited expertise
Page 2 of 2 – Delta College – K Wing Addition & Renovations – CMc Selection Criteria for Scoring Sheets
C. Project Delivery
Cost control:
5 Excellent plan, well trained staff, cost control efforts that work
3 Good plan, well trained staff
1 Limited plan and/or new staff or devoted part-time
Preconstruction phase approach and deliverables:
5 Excellent plan, deliverables well defined and of high quality
3 Good plan, weakness perceived in an area
1 Plan and deliverables are lacking in definition
Continuity of team:
5 All team members, expert consultants and individuals retained throughout most of project
3 Key individuals retained throughout the initial phases of the project
1 No assurance of key player retention
D. Team Capacity
5 All team members, expert consultants and individuals available for project assignments.
3 Key individuals available for specific assignments
1 No assurance of key individual’s availability
E. Litigation history:
5 Legal difficulties with clients in last five (5) years either nonexistent or not troubling in nature
3 Minor legal difficulties existed
1 Evidence of any pattern of legal difficulties or an issue of a more serious nature exists.
Page 1 of 2 – Delta College – K Wing Addition & Renovations – Reference Rating Sheets
Reference Rating Sheet
Date
CMc Firm Reviewer’s Initials
Project Name/Description
Project Size/Cost
Project Completion Date
Owner
Contact Position
Telephone Number
5 4 3 2 1
Exc Good Avg Fair Poor
Does reference project have strong similarities to our project or a portion of our project? ___ ___ ___ ___ ___
Is age of project appropriate for reference? (Complete and used is best, but not too old.) ___ ___ ___ ___ ___
Were team members the same as proposed team members? ___ ___ ___ ___ ___
Key players (firms and individuals):
Were you satisfied with the key individuals assigned to your job? ___ ___ ___ ___ ___
Did the contractor do an outstanding job in trying to keep the project on schedule? ___ ___ ___ ___ ___
Page 2 of 2 – Delta College – K Wing Addition & Renovations – Reference Rating Sheets
5 4 3 2 1
Exc Good Avg Fair Poor
Were budget and cost controls well planned and on target? ___ ___ ___ ___ ___
What is your overall impression of the CMc’s work on this project? Did they respond well to your needs and requests? ___ ___ ___ ___ ___
Did the individuals work well with others and communicate openly? ___ ___ ___ ___ ___
Did the CMc, or individuals, cooperate well or were many issues turned into "extras"? ___ ___ ___ ___ ___
What is your overall evaluation of the CMc’s work on this project? ___ ___ ___ ___ ___
AVERAGE SCORE
Page 1 of 1 – Delta College – K Wing Addition & Renovations – Final Rating Sheets
Final Rating Sheet
Score
Interview Rating (If Required – Maximum Score 55)
Technical Proposal Rating (Maximum Score 55)
Reference Rating – Average Score x 14 =
(Maximum Score 70)
(Each reference contact to be rated from 1 to 5, with 1 being acceptable and 5 being highly pleased with applicant’s efforts and proved to be highly relevant)
TOTAL SCORE:
Maximum Score: 180
Both Total Scores and Cost Proposals will be reviewed. It is at the sole discretion of the Steering
Committee to judge the perceived value of services offered versus cost. While quality of services will be most important, both aspects will be considered when choosing a Construction Manager as
Constructor with whom to negotiate a contract.
FINAL RATING
Total
CMc Total Score Score Rank Total Cost
Final Rank