The document is a BIM (Building Information Modeling) Execution Plan for the Delta College K Wing Addition & Renovations project, developed by Delta College located in University Center, Michigan. The BIM Execution Plan outlines the strategic approach for implementing Building Information Modeling throughout the project lifecycle, with a focus on creating a comprehensive digital model that will be used for design coordination, clash detection, estimating, energy performance modeling, and future facility maintenance. The plan specifies that a Level of Development (LOD) 300 BIM model will be required at the end of the Construction Documents (CD) phase, which will be used by the Construction Manager (CM) for populating bid components and final trade coordination.

The project's BIM goals include general clash detection of structural, architectural, mechanical, and electrical components, creating an owner's as-built BIM model, and developing a fully functional model for Delta College's facility maintenance staff. The model will incorporate data from MEP (Mechanical, Electrical, Plumbing) trades, potentially including hyperlinks to submittal files. The BIM Execution Plan is considered a living document that can be refined throughout the project's life cycle, with the intent to ensure the project remains on schedule and meets all requirements. The plan emphasizes the importance of information exchanges, defining supporting infrastructure for BIM implementation, and clearly outlining the responsibilities and opportunities associated with the BIM process.

View the file

Other files for this state and local contract opportunity

Other files attached to Delta College K Wing Addition & Renovations: CMc Proposals, newest first.
File Type Posted
2022004-DeltaCollegeKWing-drawing set-010224.pdf PDF
Addendum-Q_A (1).docx DOCX document
Certifications.docx DOCX document
9 - RFP CMc K Wing Addition _ Renovations Scoring Sheets.pdf PDF
1 - RFP CMc - K Wing Addition and Renovations.pdf PDF
3 - Delta College Campus Map 2014.pdf PDF
10-11-2019 CMc Advertisement.pdf PDF
Introduction Page.docx DOCX document
Pricing Sheet.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIM EXECUTION PLAN

Delta College – K Wing Addition & Renovations

Per the A/E RFP:

BIM model LOD 300 will be required at the end of the CD phase and be available for use by the CM for populating bid components for final coordination of all trades. The

BIM model shall be returned to the Architect by the CM for verification and completion of an Owners as-built BIM model. It is the intent to use this model during the design phase for general clash detection of Structural, Architectural, Mechanical and Electrical coordination of all trade components, estimating and energy performance modelling.

BIM Model Intent:

CM should either hire BIM coordinator directly or sub it to contractors. It is Delta College’s intent to have a fully functional BIM model upon project completion to be used by the Delta College facility maintenance staff. The specific points of data for MEP trades to incorporate into the model are still being determined (including hyperlinks to submittal files), however, it is data that is readily available in submittal information.

The Project BIM Execution Plan (BEP) is a detailed plan that defines how the project will be executed, monitored and organized with regard to BIM.

The intent of the BIM Execution Plan is to provide an outline that will ensure all parties involved are clearly aware of the opportunities and responsibilities associated with projects that implement

BIM.

The plan defines why we are using BIM on the project. It sets goals, objectives and people’s responsibilities and outlines how the process will be executed through the project’s life cycle.

The BIM Execution Plan should be considered a living document and can be developed and refined throughout the project’s life cycle to ensure the project remains on schedule and meets briefed requirements.

Identify BIM goals

Design BIM project execution process

Develop information exchanges

Define supporting infrastructure for BIM implementation

CONTENTS

CONTENTS

PROJECT INFORMATION

PROJECT SCHEDULE

PROJECT GOALS

INFORMATION MANAGEMENT & EXCHANGE

MODEL ELEMENT RESPONSIBILITIES TABLE

MODEL ELEMENTS TABLE

PREPARED BY: COMPANY: DATE:

Name Name 1/16/2024

REVISION RECORD

REVISION DATE BY WHOM COMMENTS

1 8/15/2018 NCB

2 10/10/2019 AEK Updated for K Wing Addition & Renovation Project

PROJECT INFORMATION

Project name: Delta College – K Wing Addition & Renovations

Project owner: Delta College

Project address/location 1961 Delta Rd, University Center, MI

Brief project description: Renovation of all existing spaces located within the K wing, building addition and associated site work.

Contract type/delivery method: A/E and CMc

Contractor engagement - indicative date: A/E – 12/2021, CMc –2/2024

Has a Project BIM Brief been completed? No

PROJECT SCHEDULE

Fill in the table below with any major project milestones which occur during the project’s life cycle.

Project phase/milestone Estimated start date Estimated completion date

Pre-design Per schedule in RFP Per schedule in RFP

Concept design Per schedule in RFP Per schedule in RFP

Preliminary design Per schedule in RFP Per schedule in RFP

Developed design Per schedule in RFP Per schedule in RFP

Detailed design Per schedule in RFP Per schedule in RFP

Construction Per schedule in RFP Per schedule in RFP

Handover Per schedule in RFP Per schedule in RFP

Operation Per schedule in RFP Per schedule in RFP

PROJECT GOALS

List client goals and expectations for the project. This table will help define the BIM Uses required for the project, in alignment with the project goals.

Refer to Appendix D for BIM Uses.

This information could be extracted from the Project BIM Brief and any associated documents, if one has been completed.

Priority (high/med/low)

Goal description - value added objectives BIM Uses

H Design phase general clash detection of structural, architectural, mechanical and electrical coordination of all trade components, estimating and energy performance modelling

H LOD 300 required at end of CD phase and be available for use by the CM for populating bid components for final coordination of all trades. BIM model returned to architect by CM for verification and completion of an Owners as-built BIM Model

H Use of BIM model for Delta College Facility Maintenance Staff

H Implementation of BIM model data into Delta College TMA computerized maintenance management software.

INFORMATION MANAGEMENT & EXCHANGE

Measurement and coordinate systems:

Identify project spatial location (real world co-ordinate and level system).

Project datum TBD

Height datum TBD

Project location Easting Northing

Model positioning Degrees

Model standards As a minimum, each discipline in the project team should model industry proven, best practice methodology, as well as comply with their in-house standards and protocols. However, the client may have specific modelling and documentation requirements and standards which need to be adhered to as part of the BIM deliverables.

These should be specified below.

Model standards to be used

N/A

Model structure Describe and produce a simple diagram to show how the model is separated, e.g., by building, by floors, by zone, by model size, by areas, and/or discipline.

Model description document (MDD) Each modelling team should include a model description document (MDD) or similar agreed document that includes crucial information for each model it publishes.

The document should describe the contents of the model, any major revisions/changes and explain its purpose and limitations.

Permission and access The following document management issues should be considered/resolved and a procedure defined for each: permissions/access, file locations, FTP site location(s), file transfer protocol, file/folder maintenance, etc.

MODEL ELEMENT RESPONSIBILITIES TABLE

This table assigns responsibilities to Model Elements via an Author (MEA) and defines Level of Development (LOD) for those model elements across project stages.

Commissioning

Design

Development

Post

Construction

2D Design

Programming

Performance

Specs

Massing Advanced

SD

DD 50% CD 100% CD

COBie

Design

Data

ARCH LOD 50 LOD 100 LOD 150 LOD 200 LOD 250 LOD 300 LOD 300 LOD 300

MEP-FP LOD 50 LOD 100 LOD 150 LOD 200 LOD 250 LOD 300 LOD 300 LOD 300

STRUCT LOD 50 LOD 100 LOD 150 LOD 200 LOD 250 LOD 300 LOD 300 LOD 300

CIVIL LOD 50 LOD 100 LOD 150 LOD 200 LOD 250 LOD 300 LOD 300 LOD 300

GC LOD 300 LOD 350 LOD 350 LOD 400 LOD 450 LOD 500

Cx LOD 500

OWNER LOD 550 LOD 600

* This table depicts the intent of BIM project lifecycle: utilizing one set of models thru mapping LOD by phase and discipline.

Facility Management

O&M ConstructionDesign

Schematic Design Construction Documents

Discipline

Model-Based

Estimating &

Procurement

Detailing

Shop Dwgs

Fabrication

AS-Built

Record

Modeling

LOD by PHASE & DISCIPLINE

Owner OccupiedPre-Construction Construction

COBie

Field

Data

Systems

Testing

Commissiong

& Handover

Spatial

Planning

Asset

Tracking &

Maintenance

3D Coordination

3D

Coordination

3D

Virtual

Mockups

3D Design

MODEL ELEMENTS TABLE

Notes

SPATIAL

Site boundaries, setbacks

Grids

Levels

Zones

Spaces, rooms

STRUCTURE

Floor structures

Beams

Shaft openings

Stair & ramp structures

Walls – load bearing

Columns

ENCLOSURE

Cladding

Column claddings

Curtain walls

Windows

External doors, openings

INTERIOR

Partitions

Internal doors, openings

Ceilings

Flooring

Balustrading

F, F & E

Casework, joinery

Fixtures

Fittings

Equipment (non-service)

Furniture

Signage

MECHANICAL

Plant external & equipment

Plant internal & equipment

Services in risers

Louvers

Ductwork

Registers

Pipework (above and below floor)

Controls

HYDRAULIC

Plant & equipment

Sanitary fixtures

Pipework (above and below floor)

FIRE PROTECTION

Sprinklers

Pipework (main)

Pipework (branch)

Detection

EWIS / alarm systems

Hydrants

Extinguishers

Services in risers

ELECTRICAL

Electrical fixtures

Power outlets

Switch & distribution boards

Cable trays

Conduit larger than 1.25”

All underground conduit

Lighting

Light switches / controls

Communications

Audio/Visual

Security