This document contains a schedule of items for a federal construction contract solicitation to renovate the Silver Lake Boat Launch in Inyo National Forest. Key requirements include mobilization, bonds and insurance, field engineering, erosion control, selective demolition of existing structures, clearing and grubbing, excavation and embankment work for the boat ramp and utility trench, installation of concrete structures including the boat ramp, sidewalks, and parking areas, asphalt paving, aggregate materials, storm drainage infrastructure, project closeout, and five optional items. Pricing is requested for the base contract and each optional item. The total estimated value is between $500,000 and $1,000,000. Responses are due by June 23, 2021. The soliciting agency is the U.S. Department of Agriculture Forest Service.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B – SCHEDULE OF ITEMS
127EAW21R0041 – SILVER LAKE BOAT LAUNCH PROJECT
INYO NATIONAL FOREST
MAMMOTH LAKES RANGER DISTRICT
B- 1 - SCHEDULE OF ITEMS (BASE CONSTRUCTION)
| ITEM NO. |
| DESCRIPTION |
| UNIT |
| QTY |
| UNIT PRICE |
| TOTAL PRICE |
Base Bid
| Mobilization |
| LS |
| 1 |
| Bonds & Insurance |
| LS |
| 1 |
| Field Engineering |
| LS |
| 1 |
| Barriers & Temporary Service |
| LS |
| 1 |
| Temporary Fencing |
| LF |
| 100 |
| Turbidity Curtain |
| LS |
| 1 |
| Erosion & Water Pollution Control |
| LS |
| 1 |
Selective Demolition
| A. Remove Sidewalk |
| LS |
| 1 |
| B. Remove Curb |
| LS |
| 1 |
| C. Remove Asphalt |
| LS |
| 1 |
| Clearing & Grubbing |
| LS |
| 1 |
Excavation & Embankment
| A. Boat Ramp |
| LS |
| 1 |
| Utility Trench & Backfill |
| LF |
| 250 |
| Boarding Float Relocation & Anchor Assembly |
| LS |
| 1 |
Concrete & Base Rock
| A. Cast-In-Place Boat Ramp |
| SF |
| 240 |
| B. Pre-Cast Boat Ramp Panels |
| SF |
| 1,240 |
C. Sidewalks
| SF |
| 5,084 |
| D. Parking Lot Curb |
| LF |
| 779 |
| E. Parking Lot Curb & Gutter |
| LF |
| 424 |
Asphalt Pavement Repair & Overlay
| Pavement Fabric |
| SY |
| 3,600 |
| Asphalt Pavement Repair & Crack Seal |
| SF |
| 32,452 |
| Asphalt Pavement 2" Overlay |
| TON |
| 400 |
Aggregate
| A. Rock Slope Protection |
| CY |
| 82 |
| B. Aggregate Base |
| CY |
| 91 |
| Pavement Markings |
| LS |
| 1 |
Storm Drain
| A. Stormceptor |
| EA |
| 1 |
| B. 15" RCP Storm Drain |
| LF |
| 25 |
Project Closeout
Base Bid Total
Option 1 - Lighting
| A. Boat Ramp Light |
| EA |
| 1 |
| Electrical |
| LS |
| 1 |
Option 1 Total
Option 2 - Signs
| A. Project Sign Relocation |
| EA |
| 1 |
| B. Direction & Regulatory |
| LS |
| 1 |
Option 2 Total
Option 3 - Water System
| Yard Hydrant |
| LS |
| 1 |
Option 3 Total
Option 4 - Selective Demolition
| A. Demolition of Existing Restroom |
| LS |
| 1 |
| B. Demolition of Existing Sewage Lift Station |
| LS |
| 1 |
Option 4 Total
Option 5 - Restroom
| Restroom |
| LS |
| 1 |
Option 5 Total
All 5 Options Total
Base Offer + All 5 Options (Total Priced Offer)
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.