2. Silver Lake BLF Specifications.pdf
PDF 703 KB Posted
- Attached to
- 127EAW21R0041 - Silver Lake Boat Launch
- Solicitation number
- 127EAW21R0041
- Issued by
-
Department of Agriculture Forest Service
About this file
This document describes a federal solicitation for construction services. The solicitation is for the Silver Lake Boat Launch project located in Inyo National Forest, Mono County, California, with an estimated value between $500,000 and $1,000,000. The solicitation is a total small business set aside issued by the Department of Agriculture Forest Service. Offerors must submit all requests for information by June 23, 2021 and participate in an organized pre-proposal site visit. Proposals are due by the date specified in the solicitation. The scope of work includes demolition of existing structures, construction of a new boat launch ramp and boarding float, sidewalk improvements, replacement of restroom facilities, parking area repairs, signage installation, and other site construction services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAW21R0041.pdf | ||
| 127EAW21R0041.pdf | ||
| 1. Statement of Work.pdf | ||
| 10. Davis-Bacon Act WD # CA20210020.pdf | ||
| 3. DBW Layout - Design - Construction - Handbook.pdf | ||
| 8. Silver Lake Boat Launch - BMPs.pdf | ||
| 7. Fire Plan.pdf | ||
| 6. Silver Lake Boat Launch Drawings.pdf | ||
| 11. RFI Form.docx | DOCX document | |
| 5. Drawings of Boarding Float.pdf | ||
| 4. Project Location Maps.pdf | ||
| 9. Schedule of Items.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Silver Lake Boat Launch
Replacement Project
Technical Specifications
February 2021
SPECIFICATIONS
SPECIFICATIONS LIST
SECTION 00301 - TERMS AND DEFINITIONS
SECTION 01010 - SUMMARY OF WORK
SECTION 01050 - FIELD ENGINEERING
SECTION 01290 - PAYMENT PROCEDURES
SECTION 01310 - CONSTRUCTION SCHEDULE
SECTION 01311 - PROJECT MEETINGS
SECTION 01500 - TEMPORARY FACILITIES
SECTION 01510 - TRAFFIC CONTROL AND PUBLIC SAFETY
SECTION 01700 - PROJECT CLOSEOUT
SECTION 01900 - MOBILIZATION
SECTION 02110 - CLEARING AND GRUBBING
SECTION 02200 – DEMOLITION AND REMOVAL
SECTION 02221 - UTILITY TRENCHING AND BACKFILLING
SECTION 02223 - EXCAVATION AND EMBANKMENT
SECTION 02232 - AGGREGATE BASE
SECTION 02270 - EROSION AND WATER POLLUTION CONTROL
SECTION 02271 - ROCK SLOPE PROTECTION
SECTION 02553 - ASPHALT CONCRETE PAVEMENT
SECTION 02581 - PAVEMENT MARKINGS
SECTION 02600 - WATERLINES AND APPURTENANCES
SECTION 02609 - STORM DRAINAGE SYSTEMS
SECTION 02849 - SIGNS AND SIGNPOSTS
SECTION 03306 - STRUCTURAL CONCRETE
SECTION 05490 - BOARDING FLOATS
SECTION 10155 - PRECAST CONCRETE TOILET BUILDING
SECTION 16400 - ELECTRICAL
SECTION 16510 - LIGHTING FIXTURES
SECTION 00301 – TERMS AND DEFINITIONS
SECTION 00301
TERMS AND DEFINITIONS
PART 1 - GENERAL
1.01 SCOPE
This section refers to the terms and definitions used throughout the contract drawings and specifications, unless specifically noted otherwise.
1.02 TERMS
The specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, “the Contractor,” is implied. Also implied in the language is “shall be,” or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying materials, products, or equipment for use on the project.
Wherever “directed,” “required,” “prescribed,” or similar words are used, the “direction,”
“requirement,” or “order” of the Contracting Officer (CO) is intended. Similarly, wherever
“approved,” “acceptable,” “suitable,” satisfactory,” or similar words are used, they mean
“approved by,” “acceptable to,” or “satisfactory to” the CO.
The word “will” generally pertains to decisions or actions of the CO.
Whenever in these specifications, or in other contract documents, the following terms (or pronouns in place of them) are used, the intent and meaning shall be interpreted as follows:
reference to a specific standard, test, testing method, or specification shall mean the latest published edition or amendment that is in effect at the solicitation issue date for the contract, unless otherwise noted.
1.03 DEFINITIONS
Wherever the following terms, or pronouns in place of them, are used in these specifications or in other contract documents, the intent and meaning are as follows:
Adjustment in Contract Price: “Equitable adjustment,” as used in the Federal Acquisition
Regulations.
Base Course: The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Berm: Curb or dike constructed to control roadway runoff water.
Best Management Practice: A series of water quality protection practices and procedures approved or certified by the State water quality agency under the provisions of section 401/402 of
Clean Water Act, as amended.
Certificate of Compliance: A signed statement by a person with legal authority to bind a company or supplier to its product. The certificated states that the material or assemblies furnished fully comply with the requirements of the contract.
Change: “Change” means “change order” as used in the Federal Acquisition Regulations.
Clearing Limits: The limits of clearing as designated on the ground or on the drawings.
Cofferdam: A cofferdam is an enclosed single or double wall braced structure with walls sheeted with timber, concrete, or steel, and extending well below the bottom of excavation, when practical. Earthen or rockfill dikes, dams, or embankments are not considered cribs or cofferdams for this purpose.
Conduit: A pipe for carrying fluids, wire, rope, gas, etc.
Contracting Officer (CO): The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the
CO. Authorized representatives include the Contracting Officer’s Representative (COR), and
Inspector.
Contractor: The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through agents, employees, or subcontractors, as used in specifications and drawings.
Defect: A failure to meet a requirement with respect to a single quality characteristic.
Drawings: The documents, including plan and profile sheets, plans, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.
Embankment: A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.
Equipment: All machinery and equipment, including necessary supplies or upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of work.
Excess Excavation: Material in excess of that needed for construction of designated improvements.
Falsework: Any temporary construction work used to support the permanent structure until it becomes self-supporting. Falsework includes steel or timber beams, girders, columns, piles, foundations, and any proprietary equipment including modular shoring frames, post shores, and adjustable horizontal shoring.
Forest Service: The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Government Land: National Forest System lands, and other lands controlled or administered by the Forest Service or other Federal agencies.
Inspector: The Government-authorized representative designated in writing by the Contracting
Officer or Contracting Officer’s Representative responsible for detailed inspection.
Invert: The lowest point of the internal cross section of pipe.
Job-Mix Formula: Percentage of each material in a mixture intended for a particular use.
Laboratory: A testing laboratory of the Government, or any other testing laboratory approved by the Contracting Officer.
Lot: An isolated quantity of material from a single source; a measured amount of construction assumed to be produced by the same process.
Materials: Any substances specified for use in the construction of the project and its appurtenances.
Measurement: Determining and expressing the quantities of work or materials.
Neat Line: A line defining the proposed or specified limits of an excavation or structure.
Nominal Dimensions or Weights: The numerical values shown on the drawings or in the specifications as measurements of materials to be used in the construction.
Nominal Maximum Particle Size: The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.
Pass: A pass shall consist of one complete coverage of the surface.
Pavement Structure: Subbase, base, or surface course, or combination thereof, placed on a subgrade to support traffic loads and distribute them to the roadbed.
Profile Grade: The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction
Random Sampling: A sample of material chosen such that each increment of a population of material has an equal probability of being selected.
Reasonably Close Conformity: Compliance with reasonable and customary manufacturing and construction tolerances, performing all work and furnishing all materials in “reasonably close conformity” with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground.
Right-of-Way: A general term denoting (1) privilege to pass over land in some particular line
(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway.
Schedule of Items: A Schedule in the Contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Second Sample: A sample taken when the initial sample indicated that the material is defective.
Shoulder: The portion of the roadway or walkway contiguous to the traveled way or accommodation of stopped vehicles, emergency use, and lateral support of pavement structure.
Sidewalk: The portion of the roadway constructed primarily for pedestrian use.
Specifications: A description of the technical requirements for a material, product, or service that includes criteria for determining whether these requirements are met.
Station: (1) A measure of distance used for highways and railroads equal to 100 feet. (2) A precise location along a survey line.
Subbase: The prepared surface, including widening for curves, turnouts, and other areas upon which a subbase, base, or surface course is constructed.
Surface Course: The top layer of a pavement structure, sometimes called the wearing course, usually designed to resist skidding, traffic abrasion, and disintegrating effects of climate.
Target Value: Values that are established according to the contract, and from which allowable variations are measured.
Traveled Way: The Portion of the roadway for the movement of vehicles, exclusive of shoulders and auxiliary lanes.
Unit of Measurement: The unit and fractions of units designated in the Schedule of Items.
Unsuitable Material: The material excavated during construction that is not usable in embankment and must be disposed of, or that can be used only in certain locations or for limited purposes.
1.04 MEASUREMENT AND PAYMENT
Compensation provided for in the contract is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract.
Work required by the contract will not be paid for directly unless a PAY ITEM for the work is designated in the Schedule of Items.
Work referenced for measurement under another section will not be paid for directly unless a
PAY ITEM for the work designated in the Schedule of Items for the referenced section.
Work not paid for directly is considered to be included under the other contract PAY ITEMS.
Unless otherwise shown, work measured and paid for under one PAY ITEM will not be paid for under any other PAY ITEM.
The quantity to be paid for is the quantity designated in the Schedule of Items. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
When more than one class, size, or thickness is specified in the Schedule of Items for PAY
ITEMS, suffixes will be added to the item number to differentiate between the items.
1.05 DETERMINATION OF QUANTITIES
The following measurement and calculations are used to determine contract quantities.
For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified.
Measurement for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding shall be along slope lines.
Structures shall be measured according to neat lines shown on Project Drawings, or as altered by the CO in writing to fit field conditions.
For items that have linear measurements, such as pipe, measurement shall be made parallel to the base or foundation upon which the structures are placed. Pipe shall be measured along center of invert.
For standard manufactured items (such as fence, wire, plates, rolled shapes, and pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weight or dimensions. Unless controlled by tolerances in cited specifications, manufacturer’s tolerances shall be accepted.
1.06 UNITS OF MEASUREMENT
Payment will be by units defined and determined according to measure. Unless otherwise specified, the meanings of the following terms are as follows:
A. Cubic Yard in Place (CY): Measure solid volumes by multiplying completed length by width by height/depth; or other method involving three-dimensional measurements.
B. Cubic Yard in the Hauling Vehicle (CY): Material measured in the hauling vehicle may be weighed and converted to cubic yards for payment purposes if the conversion factors are mutually agreed to in writing.
C. Each (EA): One entire unit, which may consist of one or more parts. The quantity is the actual number of units completed and accepted.
D. Acre (AC): 43,560 ft2. Make longitudinal and transverse measurements for area computations horizontally. Do not make deductions from the area computation for individual exclusions having an area of 500 ft2.
E. Hour (hr.): Measurement will be for the actual number of hours ordered and performed by the Contractor.
F. Pound (lb.): If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.
G. Gallon (gal): The quantity may be measured by any of the following methods;
1. Measured volume container
2. Metered volume. Use an approved metering system
3. Commercially packaged volumes.
H. Lump Sum (LS): Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item.
I. Linear Foot (LF): Measure form end to end, parallel to the base or foundation being measured, or horizontal.
J. Station (STA): 100 feet measured horizontally.
K. Square Yard (SY): Measure on a plane parallel to the surface being measured or horizontally.
L. Ton (T): 2000 Pounds.
No adjustment in contract unit price will be made for variations in quantity due to the differences in the specific gravity or moisture content.
Use net certified scale weights, or weights based on certified volumes.
1.07 Method of Measurement
One of the following methods of measurement for determining final payment is designated in the
Schedule of Items for each PAY ITEM.
A. Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units designated in the Schedule of Items may be authorized under any of the following conditions:
1. Changes in the work authorized by the CO.
2. A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
3. A written quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.
B. Staked Quantities (SQ): These quantities are determined from staked measurements prior to construction.
C. Actual Quantities (AQ): These quantities are determined from measurement of completed work.
D. Vehicle Quantities (VQ): These quantities are measured or weighed in hauling vehicles.
E. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION
SECTION 01010 – SUMMARY OF WORK
SECTION 01010
SUMMARY OF WORK
1.01 DESCRIPTION:
A. Work under this contract includes, but is not limited to, the following items of work at the
Silver Lake Boat Launching Facility:
1. Demolition of the existing single lane boat launch ramp and the construction of a new boat launch ramp. Includes the construction of a cast-in-place boat ramp (abutment), installation of new boat ramp panels and construction of a rock slope protection for the new boat launch ramp.
2. Relocation of the existing boarding float from its current location to the west side of the newly constructed boat launch ramp.
3. Demolition of the existing sidewalk/curbing and the construction of new ADA compliant sidewalk/curbing.
4. Demolition of the existing two flush toilet buildings and lift station, and the installation of one double stall vault toilet building.
5. Installation of security lighting near the boat launch ramp.
6. Installation of a new yard hydrant near the new vault toilet building.
7. Repairing and resurfacing of the parking area pavement surface. Includes the installation of a storm drainage system to capture runoff from the parking area and restriping the parking area to mark out parking spots and traffic flow directions.
8. Relocation of the existing project credits sign and installation of direction/regulatory signage.
9. Removal of trees, shrubs, boulders, vegetation and other objectionable materials within the limits of excavation or as shown on the project drawings.
1.02 LOCATION:
A. The project site is located at Silver Lake in the June Lake Loop Recreation Area on the Inyo
National Forest, Mono County California. The boat launch facility is located south of Silver lake Campground near the north end of Silver Lake.
B. The Project owner is the USDA Forest Service, Inyo National Forest.
1.03 OWNER RESPONSIBILITY:
A. The Forest Service’s responsibility for project construction includes:
1. Review and approve shop drawings, product data and submittals from the Contractor.
2. Prepare and approve Contractor payment invoices and final payments.
3. Review and authorize contract change orders and/or extra work.
4. Provide project inspection and approval of Contractor’s work.
5. Provide access to the site and staging areas for performance of specified work.
SECTION 01010 – SUMMARY OF WORK
1.04 CONTRACTOR’S USE OF PREMISES:
A. Construction camping within the site will not be allowed.
B. The Contractor shall conduct their operations to minimize inconvenience to the public. The
Contractor may close portions of the site during construction, providing temporary access lanes. The traffic control plan shall be developed by the Contractor and approved by the
COR.
C. Storage of construction materials shall be limited to those areas designated and approved by the Forest Service.
D. The contractor shall take precautions to locate and protect all existing utility lines. Notify utility companies via Underground Services Alert (USA) and the COR prior to excavations in the vicinity of known utilities.
1. If damage occur to an unknown utility, repairs shall be performed as directed by the
COR. Equitable adjustments shall be made under the terms of the changes provisions.
E. The Contractor shall comply with all legal load requirements of the State of California, County and City Jurisdictions when operating on area access roads. Damage to existing roadways from equipment operation or excessive loads shall be repaired by the Contractor at no additional cost to the Forest Service.
1.05 FIELD VERIFICATION
A. The Contractor shall field-verify all new and existing dimensions and field conditions prior to starting work or ordering products.
1.06 CONTRACTOR-FURNISHED ITEMS:
A. The Contractor shall furnish all labor, materials and equipment necessary for the completion of the work, as specified.
SECTION 01290 – FIELD ENGINEERING
SECTION 01050
FIELD ENGINEERING
1.01 SECTION INCLUDES
A. General Conditions: Basic site engineering requirements may also be described in other sections of these Specifications.
B. Contractor’s use of survey control.
C. Contractor’s grade setting.
D. Project record documents.
E. Forest Service’s survey and layout.
1.02 CONTRACTOR’S QUALITY CONTROL
A. The Contractor shall retain the service of California Licensed Surveyor to stake cuts and fills for earthwork and to survey control points.
B. The Contractor shall employ an experienced grade setter to maintain the construction stakes and ensure that the earthwork portion of the project is being constructed to the design grades.
C. Provide copies of all grade sheets to the COR immediately after compiling each phase of project layout or as requested by the COR.
D. Minimum accuracy for required work is as follows:
1. Grade: Vertical Tolerance: +/- 0.05 feet, Horizontal Tolerance: +/- 0.5 feet.
2. Culverts and ditches: Horizontal Tolerance: +/- 0.5 feet, Vertical Tolerance: +/- 0.05 feet.
3. Structures: Horizontal Tolerance: +/- 0.5 feet (location), Vertical Tolerance: +/- 0.05 feet.
1.03 SUBMITTALS
A. Contractor’s staking plan, if requested, including ASCII file of point coordinates, elevation and descriptions.
B. Contractor’s staking notes, if requested.
C. Staking notes shall be submitted within two days of request by the COR.
1.04 PROJECT RECORD DOCUMENTS
A. The Contractor’s grade setter shall maintain a complete and accurate log of control, grid coordinates, and locations of the edges of work. The survey notes shall be made available to the COR upon request.
B. The Contractor shall provide red-line markups of the design drawings showing actual locations of finished site features.
1.05 SUPPLIED SURVEY
A. The Forest Service shall provide the coordinates and elevations of the temporary control used by the Forest Service’s surveyor to perform the topographic surveys used for design as shown on the Drawings. The Forest Service will also provide the digital terrain model or the design for the Contractor’s use after award of Contract.
PART 3 - EXECUTION
3.01 EXAMINATION
A. The Contractor shall verify locations of survey control points prior to starting work.
B. The Contractor shall promptly notify the COR of any survey control discrepancies that are discovered.
3.02 SURVEY REFERENCE POINTS
A. The Contractor shall protect survey control points while completing site work and preserve permanent reference points during construction.
B. The Contractor shall promptly report to the COR the loss, destruction, or relocation of any reference point due to construction improvements or any other reasons.
C. The Contractor shall replace disturbed, damaged, or destroyed survey control points based on original survey control at his or her own cost. The Contractor shall not make any changes without prior written notice to and approval from the COR.
D. The Contractor shall maintain a complete and accurate log of control and survey work for grade checking and construction as it progresses.
E. The Contractor shall be responsible for establishing and maintaining temporary elevation control as required to complete the improvements in the contract documents. Elevation control locations (temporary benchmarks) and elevation updates shall be kept current and be available at the Construction site at all times.
3.03 FOREST SERVICE PROVIDED SURVEY
A. The Forest Service’s surveyors have staked various control points that are tied to the design database. The control coordinates, elevations and point descriptions are provided on the
Contract Documents.
The Forest Service shall provide the AutoCAD file to the Contractor and Contractor’s
Surveyor for their use in construction staking.
3.04 CONTRACTOR PROVIDED SURVEY
A. The Contractor shall provide construction staking, and grade setting. The Contractor shall replace any lost or damaged stakes at his or her own cost.
B. The COR may perform such checks as deemed necessary to verify the accuracy of the
Contractor’s layout work and ensure that the completed work complies with the Drawings and Specifications. The control staking provided by the Contractor shall be preserved and left undisturbed until the COR has completed any checks deemed necessary. Staking that has been destroyed or disturbed prior to completion of the COR’s checks shall be replaced by the
Contractor.
PART 4 - MEASUREMENT AND PAYMENT
4.01 MEASUREMENT AND PAYMENT
A. Payment for “Field Engineering” shall be included in the bid schedule as a lump-sum item.
All surveying and survey associated materials necessary to perform the work shall be included in the cost for “Field Engineering”.
SECTION 01290 – PAYMENT PROCEDURES
SECTION 01290
PAYMENT PROCEDURES
1.01 DESCRIPTION
A. Work Included: Comply with procedures described in this Section when applying for progress payment and final payment under the Contract.
B. Related Documents:
1. Schedule of Items.
2. General provisions of the Contract, and Section 00301.
1.02 QUALITY ASSURANCE
A. During progress of the Work, modify the schedule of items to reflect changes in the Contract sum due to Change Orders or other modifications of the Contract.
A. Informal Submittal: Informal submittal of the Contractor's Application for Payment may be made prior to the schedule for formal submittal described in the Contract, if the Contractor and Contracting Officer agree that such informal and preliminary submittal will facilitate the
Contracting Officer's review of the formal submittal.
B. Invoices will be prepared by the Contractor, and submitted through the invoicing processing platform (IPP)
SECTION 01310 – CONSTRUCTION SCHEDULE
SECTION 01310
CONSTRUCTION SCHEDULE
1.01 DESCRIPTION
A. The purpose of this section is to assure adequate planning and execution of the Work so that the Work is completed within the number of calendar days allowed in the Contract, and to assist the Contracting Officer and Forest Service in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work, prepare and maintain the schedules and reports described in this Section.
1.02 QUALITY ASSURANCE
A. Perform data preparation, analysis, charting, and updating in accordance with standards approved by the COR.
A. Submit construction schedule electronically: Within 5 days after the Contractor has received the Notice to Proceed. Schedule shall be prepared in accordance with Part 3 of this Section.
B. Submit periodic reports electronically: Reports shall include information detailing work to be accomplished in the next four weeks and shall be submitted every four weeks. Periodic report shall be prepared in accordance with Part 3 of this Section.
PART 2 - PRODUCTS
2.01 CONSTRUCTION ANALYSIS
A. Graphically show the order and interdependence of all activities necessary to complete the
Work, as planned by the Contractor and his project field superintendent in coordination with all subcontractors whose work is shown on the diagram.
B. The Schedule shall be coordinated with the Forest Service’s use of the site, the COR's time for submittal reviews, the schedules for work of the various subcontractors and material availability.
C. Include, but do not necessarily limit indicated activities to:
1. Project mobilization.
2. Submittal and approval of Shop Drawings and Samples.
3. Procurement of equipment and critical materials.
4. Fabrication of special material and equipment, and its installation and testing.
5. Final cleanup.
6. Inspections and testing.
SECTION 01310 – CONSTRUCTION SCHEDULE
7. All activities by the Contracting Officer that affect progress, required dates for completion, or both, for all and each part of the Work.
D. Show complete sequence of construction by activity, identifying work of separate stages, and other logically grouped activities. Indicate dates for early and late start, early and late finish, float, and duration.
E. Provide a workable plan for monitoring the progress of all elements of the Work, establish the critical elements of work, and forecast potential problems in maintaining the specified completion dates.
3.01 CONSTRUCTION SCHEDULE
A. As soon as practicable after receipt of Notice to Proceed, complete the construction analysis in preliminary form, meet with the COR, review contents of the proposed construction schedule, and make all revisions agreed upon.
B. Submit in accordance with Paragraph 1.03-A above.
3.02 PERIODIC REPORTS
A. Submit Periodic Reports as follows:
1. Include proposed equipment on site.
2. Include name of Contractor’s rep on site.
3. List labor force onsite, indicate General/Subcontractor.
4. Indicate "actual" progress in percent completion for each activity.
5. Provide written narrative summary of revisions causing delay in the program, and an explanation of corrective actions taken or proposed.
B. Submit in accordance with Paragraph 1.03-B above
SECTION 01311 – PROJECT MEETINGS
SECTION 01311
PROJECT MEETINGS
1.01 SUMMARY
A. Section includes requirements for the pre-work conference, progress meetings, and final inspection.
2.01 PRE-WORK CONFERENCE
A. Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose of the meeting will be to review required work, project drawings and specifications, construction and Schedule of
Items, payroll and payments, and administrative provisions of the Contract.
B. Attendance: The Contractor, subcontractors, and the persons responsible for coordination of the work should be present at the meeting.
C. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project and present the submittals requested in the specifications.
2.02 PROGRESS MEETINGS
A. Location: Meetings shall be held at the project site or as determined by the Contracting
Officer.
B. Notification: Meetings may be called by either the Contracting Officer or the Contractor.
Request shall state who should attend and include an agenda.
2.03 FINAL INSPECTION
A. Location: Meetings shall be held at the project site.
B. Notification: The Contractor shall notify the COR in writing 15 working days before the completion date, so the Government can schedule the final inspection.
C. Attendance: The Contractor shall require the superintendent and major subcontractors to be present during this inspection.
SECTION 01311 – PROJECT MEETINGS
SECTION 01500 – TEMPORARY FACILITIES
SECTION 01500
TEMPORARY FACILITIES
1.01 TEMPORARY UTILITIES AND SANITARY FACILITIES
A. The Contractor shall provide, pay for, install, and maintain for the duration of the Work, all necessary toilet and sanitary facilities for workers. All such facilities shall be kept in a clean and sanitary condition and shall conform to all applicable codes and regulations governing such facilities.
B. The Contractor shall coordinate with the Forest Service for a source for construction water.
SECTION 01510 – TRAFFIC CONTROL AND PUBLIC SAFETY
SECTION 01510
TRAFFIC CONTROL AND PUBLIC SAFETY
1.01 SCOPE
A. The work included under this section shall consist of providing for the public’s convenience, safety, and maintaining traffic control, including flaggers. A Traffic Control Plan shall be submitted to the COR seven days prior to implementation.
1.02 TRAFFIC AND ACCESS
A. The Contractor's operations shall minimize inconvenience to the public while maintaining safe working conditions. The Contractor shall control safe vehicular and pedestrian traffic in and around the project sites.
B. Safe and adequate access shall be provided and maintained to all utility control locations.
Access to these facilities shall be continuous and unobstructed unless otherwise approved by the COR.
1.03 STORAGE OF EQUIPMENT AND MATERIALS IN PUBLIC STREETS
A. Construction materials may not be stored in streets, roads, or highways after unloading except where such street or road is provided with a detour. All such materials or equipment not installed or used in the construction shall be stored elsewhere by the Contractor at
Contractor's expense unless the Contractor is authorized additional storage space. The
Contractor shall coordinate with Caltrans concerning use of right-of-way for storage of materials or equipment.
B. Excavated material, except that which is to be used as backfill in the adjacent trench, may not be stored in public streets, roads, or highways unless otherwise permitted. After placing backfill, all excess material shall be removed immediately from the site.
1.04 STREET CLOSURES, DETOURS, BARRICADES
A. The Contractor shall comply with all applicable State, County, and City requirements for closure of streets. The Contractor shall provide barriers, guards, lights, signs, temporary bridges, flaggers and other persons, advise the public of detours and construction hazards.
The Contractor shall also be responsible for compliance with additional public safety requirements which may arise during construction. The Contractor shall furnish and install, and upon completion of the work, promptly remove all signs and warning devices.
1.05 SIGNS, LIGHTS, AND DEVICES
A. All signs, lights, barricades, and use of flaggers shall conform to the requirements set forth in the “Manual on Uniform Traffic Control Devices” by the Federal Highway Administration.
SECTION 01510 – TRAFFIC CONTROL AND PUBLIC SAFETY
SECTION 01700 – PROJECT CLOSEOUT
SECTION 01700
PROJECT CLOSEOUT
1.01 DESCRIPTION: The work under this section consist of final cleanup, closeout, submittals, and final inspection procedures.
2.01 CLEANING MATERIALS: As recommended by the manufacturer of surface to be cleaned.
2.02 POSTED OPERATING INSTRUCTIONS: Frame instructions under non-glare glass or approved laminated plastic. In areas where operating instructions are subject to sunlight or moisture, provide weather-resisting materials.
3.01 POSTED OPERATING INSTRUCTIONS: As specified in the individual sections, furnish operating instructions attached to or posted adjacent to equipment. Include wiring diagrams, control diagrams, control sequence, startup, adjustment, operation, lubrication, shutdown, safety precautions, procedures in the event of equipment failure, and other items of instruction recommended by the manufacturer.
3.02 CLEANING: Before scheduling the final inspection, remove all tools, equipment, surplus materials and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials and labels from finished surfaces, thoroughly clean building interiors and pick up all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
3.03 PROJECT RECORD DRAWINGS:
A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions and additions using conventional drafting standards to show actual construction conditions. Show additions in red, deletions in green and special instructions in black.
B. Keep record drawings current. Inspection will be made monthly and certification of accuracy and completeness will be required on monthly payment requisitions.
C. On completion of the total project, submit complete record drawings. Include all shop drawings, sketches and additional drawings that are to be included in the final set, with clear instructions showing the location of these drawings.
3.04 CLOSEOUT SUBMITTALS:
Contractor shall submit the following before requesting a final inspection.
SECTION 01700 – PROJECT CLOSEOUT
A. Project Record Drawings: As specified above.
B. Guarantees and Bonds
C. Spare Parts and Materials: As specified in individual sections.
D. Operation and Maintenance Data: As specified in individual sections.
E. Keys and Keying Schedule: Submit all keys including duplicates. Wire all keys for each lock securely together. Tag and plainly mark with lock number, equipment identification, or panel or switch number and indicate location, such as building and room name or number.
F. Operating Tools: As specified in the individual sections.
G. Special Tools: One set of special tools required to operate, adjust, dismantle, or repair equipment. Special tools are those not normally found in possession of mechanics or maintenance personnel.
3.05 SUBSTANTIAL COMPLETION AND FINAL INSPECTION: Submit written certification that project, or designated portion of project, is substantially complete, and request in writing a final inspection. The COR will make an inspection within 10 days of receipt of the request.
A. When work is determined to be substantially complete, the COR will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial
Completion.
B. If work is not determined to be substantially complete, the COR will notify the Contractor in writing. After completing work, the Contractor shall resubmit certification and request a new final inspection.
3.06 ACCEPTANCE OF THE WORK: After all deficiencies have been corrected, a Letter of
Acceptance will be issued.
4.01 CONTRACT CLOSEOUT: Payment will be included in the bid schedule for which this work relates. No separate measurement or payment will be made.
SECTION 01900 – MOBILIZATION
SECTION 01900
MOBILIZATION
1.01 DESCRIPTION:
This work shall include preparatory work and operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and for all other work and operations that must be performed prior to beginning work on various items on the project.
Preparatory work includes the cleaning of all construction equipment delivered to the project.
The cost of bonding is also included within this pay item.
4.01 MEASUREMENT: Shall be lump sum for the job.
4.02 PAYMENT: Progress payments shall be made as follows:
A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
The total of all payments, including bonding, shall not exceed the original contract amount for this item.
SECTION 02110 – CLEARING AND GRUBBING
SECTION 02110
CLEARING AND GRUBBING
1.01 SECTION INCLUDES
A. Removal of trees, shrubs, boulders, vegetative materials and other objectionable material within the limits of excavation.
1.02 REGULATORY REQUIREMENTS
A. Waste material removed from the site shall be disposed of in conformance with Federal, State, and local requirements. Any disposal shall be included in the Contractor’s costs for clearing and grubbing.
B. Coordinate clearing work with other on-site construction.
3.01 SURFACE CONDITIONS
A. It will be the responsibility of the Contractor to estimate the amount of material to be cleared, grubbed, and removed based on a thorough inspection of the site and drawings.
3.02 PROTECTION
A. Locate, identify, and protect utilities to remain.
B. Protect trees, plant growth, and features designated to remain as final landscaping.
C. Protection of persons and property:
1. Protect bench marks, survey control points, and existing structures from damage or displacement.
2. Barricade open depressions and holes occurring as part of this work and post warning lights on property adjacent to or with public access. Operate warning lights from dawn to dusk each day and as otherwise required.
D. Remove only trees designated for removal.
E. Protect critical environmental and cultural areas from damage.
SECTION 02110 – CLEARING AND GRUBBING
3.03 CLEARING AND GRUBBING
A. Clear and grub construction areas of all surface and subsurface material, as required, to remove any and all obstructions within the limits of the improvements.
3.04 STOCKPILING AND DISPOSAL
A. The Contractor shall dispose any material that cannot be used for top dressing off site.
4.01 MEASUREMENT AND PAYMENT
A. Payment for “Clearing & Grubbing” shall be included in the bid schedule as a lump-sum item.
SECTION 02200 – DEMOLITION AND REMOVAL
SECTION 02200
DEMOLITION AND REMOVAL
1.01 DESCRIPTION: Work per this section shall include all demolition, including, but is not necessarily limited to:
A. Demolition
B. Salvaged Items
C. Site Restoration
D. Hauling of Disposed Material
1.02 SECTION REQUIREMENTS
A. DEMOLITION: The Contractor shall remove and dispose of all items as shown on the drawings, which may include but are not limited to, existing utilities, asphalt pavement, concrete rubble, building material and all other existing debris as required to be demolished within project limits. Unless otherwise indicated, demolished and excavated materials become Contractor's property.
B. The Contractor shall remove and salvage and re-install the items as shown on the drawings, which may include but are not limited to, existing utilities, control panels, mechanical equipment, concrete wheel stops and signage. The Contractor shall ensure that all salvageable items are properly stored and replaced. If damage occurs to any salvageable item, the
Contractor shall replace the item with a brand new item at no additional cost to the contract.
C. The Contractor shall protect the general public from demolition activities at all times. The
Contractor shall be responsible for the erection, maintenance and, after use, removal of temporary safeguards such as fencing, barricades, guard rails, signs, lights, flares and all necessary items as required for protection and safety of personnel, and for security of property.
D. Any safeguards protecting existing facilities and controls shall remain in place for the duration of the project.
1.03 JOB CONDITIONS
A. WATER REMOVAL: Provide and operate all necessary equipment for water removal to maintain excavations and construction areas free of subsurface and storm water. It shall be the responsibility of the Contractor to account for any associated costs required for dewatering during the bidding process. No extra cost will be awarded to the Contractor after the contract has been executed for dewatering purposes.
B. UTILITY SERVICES
1. The Contractor shall arrange with the utility provider to shut off utilities when necessary.
2. Cut off pipe or conduit for utilities to be abandoned or discontinued a minimum of 24-inches below grade, unless otherwise noted on the plans. Cap, valve, or plug and seal the remaining portion of pipe or conduit.
3. At no times shall the Contractor interrupt existing utilities that serve occupied or active facilities, except when authorized in writing to do so by the Contracting Officer.
C. The Contractor shall provide all shoring, sheeting and bracing required to retain excavations and to prevent slides and cave-ins. Refer to General Conditions for related paragraphs concerning safety precautions and operations for construction.
D. Perform all operations to avoid breakage, marring, bending or other damage to existing structures or utilities, which are to remain. Brace sides of excavation and shore structures when needed for stability.
E. Explosives: The use of explosives will not be permitted.
F. If damage is done to any adjacent facilities caused by demolition operations, the Contractor shall promptly repair the damage. All costs for repair of damaged facilities shall be at the
Contractor’s expense.
PART 2 - PRODUCTS (NOT APPLICABLE)
3.01 DEMOLITION
A. Demolish and remove the following within the project limits:
1. ABANDONED UTILITIES: Abandoned utility lines may exist within project site which are not shown on the Contract Drawings. The Contractor shall contact the COR upon discovery of any utilities encountered that are not shown on the plans that affect the work. The Contractor shall demolish and remove these items, if required, upon approval by the Contracting Officer.
2. DEBRIS: The Contractor shall remove all existing debris that exists on-site as required to complete the work.
3. BUILDING RUBBLE: The Contractor shall remove all building rubble and debris associated with the demolition of the existing restrooms
4. STRUCTURAL SECTIONS: The Contractor shall remove all structural sections as shown on the plans, consisting of concrete and asphalt paving. Base material shall also be removed if not deemed suitable for reuse by the COR.
B. HAUL ROUTES: Haul routes may be limited to certain areas within the project site. The
Contractor shall provide a hauling route to the COR if so directed. The Contractor shall take all steps required to prevent spillage when transporting waste materials to a disposal site. The
Contractor shall be solely responsible for any costs required for cleanup and damage resulting from the Contractor’s haul spillage.
C. CLEANING
a. Promptly remove from the property and legally dispose of all demolished materials.
Remove all equipment, debris and rubbish from the property.
b. During progress of this work, maintain the site in a presentable condition. Clean up spillage and debris at the site and on haul routes and public roads.
c. Promptly repair any items damaged during the progress of this work, including any damage to pavement, sidewalks, haul routes, public roads or adjacent ground caused by transporting materials or equipment.
d. All debris resulting from work shall become property of Contractor.
D. Bring to the COR’s attention, any obstructions which are not noted or shown on the plans or described herein. Protect such facilities until further direction is received from the
Contracting Officer. Additional work required due to unforeseen conditions shall be performed as directed by the Contracting Officer and will be paid for as extra work in accordance with the General Conditions.
E. The Contractor shall maintain all erosion and pollution controls during demolition operations.
Discharge of water into the existing waterways and/or drainage systems shall be clean and turbidity levels shall meet or exceed guidelines allowed by the California Regional Water
Quality Control Board or as mentioned in any permits associated with the project.
3.02 SITE RESTORATION
A. Completely fill below grade areas and voids resulting from structure demolition operations with onsite soil materials.
B. Uniformly rough grade areas of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent grades and new grades.
3.03 CLEANING AND DISPOSAL OF DEMOLISHED MATERIALS
Remove debris and all other deleterious material resulting from demolition operations and legally dispose of off the project site at an approved disposal site.
PART 4 - PAYMENT
Payment for costs incurred for work under this section shall be at the contract price for:
“DEMOLITION”.
SECTION 02221 – UTILITY TRENCHING AND BACKFILLING
SECTION 02221
UTILITY TRENCHING AND BACKFILLING
1.01 DESCRIPTION: The work of this section consists of trenching, backfilling, concrete patching and asphalt patching for the construction and installation of pipelines, culverts, conduits and cables. All trenching will be open cut except as noted on the drawings.
1.02 QUALITY ASSURANCE:
A. All references to percent of maximum density shall be as determined by ASTM D1557, Method C, at a moisture content determined to be suitable for such density. Moisture-density curves shall be prepared in a certified soils testing laboratory.
B. In-Place Soil Density Testing: Procedures used be in accordance with ASTM D1556-82, Density of Soil in Place by the Sand-Cone Method, or ASTM D2922-81, Density of Soil and
Soil-Aggregate in Place by Nuclear Methods (shallow depth). Testing shall be in accordance with Section 01051.
Test locations will be selected at the discretion of the COR.
1.03 PROJECT CONDITIONS:
A. Arrange construction sequences to provide the shortest practical time that the trenches will be open to avoid hazard to the public and to minimize the possibility of trench collapse.
Trenches in traffic areas shall be plated or otherwise protected from the public.
1.04 EXCAVATION CLASSIFICATION: Regardless of the nature of material excavated, all excavation will be considered unclassified.
2.01 GENERAL: All backfill material shall be approved before use and be free of cinders, ashes, ice, frozen soil, large hard clods, organic debris, or other deleterious items. Trench excavation materials may be used as approved by the COR.
2.02 MATERIALS FOR SELECT BACKFILLING:
A. The class or type of backfill material shown on the plans and designated in these specifications shall meet the following criteria:
1. Class 1 Material: Three types of materials are acceptable; 1) naturally occurring (not crushed) rounded sand, 2) crushed sand, and 3) decomposed granite. All material shall be free from clay, organic, or other deleterious material, shall have a sand equivalent of at least 50, and shall meet the following percent passing by weight gradations:
Natural Crushed Decomposed
Sieve Size Sand Sand Granite
1-1/2” 100 ---
3/4” 75-100 100 100
No. 4 55-100 75-100 75-100
No. 200 0-5 0-15 0-5
2. Class 2 Material: Select excavated earth, free from stones or lumps exceeding 1” in greatest dimension, vegetative matter, or other deleterious material.
3. Class 3 Material: Select excavated earth, free from stones or lumps exceeding 2” in greatest dimension, vegetative matter or other deleterious material.
4. Class 4 Material: Select excavated earth, free from stones or lumps exceeding 4” in greatest dimension, vegetative matter or other deleterious material.
5. Sand-Cement Slurry Backfill Material: Sand-cement slurry shall consist of washed sand, free from clay and organic material of which 100% will pass a ¾” screen, at least 75% will pass a No. 4 sieve and no more than 5% will pass a No. 200 sieve. The sand shall be mixed thoroughly with Type 1 or 2 cement, at a ratio of 1-1/2 sacks per cubic yard of sand and enough water to accommodate mixing and placing, but not more than will allow compaction of replacement asphalt.
3.01 TRENCH CLEARING:
A. The maximum width of clearing for utility trenches shall be 10 feet unless otherwise directed by the COR. Trench spoils shall not be placed over or around uncleared vegetation unless specifically approved by the COR.
3.02 TRENCH EXCAVATION:
A. This work shall consist of pipe trench excavation regardless…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .