9-02.2 Mifflin TISIP ESC Plan.PDF
PDF 2 MB Posted
- Solicitation number
- Not on record
- Issued by
- Dauphin County, Harveys Lake Borough, Pennsylvania
About this file
This is an Erosion and Sediment Pollution Control Plan (ESCP) prepared by Herbert, Rowland & Grubic, Inc. for Dauphin County in cooperation with the Dauphin County Conservation District, documenting environmental controls for the 2023 TISIP Program - Bundle #1 project involving culvert replacement and roadway improvements in Mifflin Township. The plan addresses a disturbed acreage of 0.387 acres (16,842 square feet) along Route 478 near Little Wiconisco Creek, a warm water fishery designated stream. The project requires implementation of temporary erosion and sediment control best management practices (BMPs) including compost filter sock installation, sandbag cofferdams, pumped water filter bags, concrete washouts, and temporary seeding with specified PennDOT formulas. Construction must occur during low flow conditions, with work staged in sequential phases including clearing and grubbing, cofferdam installation, culvert excavation and installation, and site stabilization. Weekly inspections and post-rainfall event inspections of all BMPs are mandatory, with maintenance logs and inspection records required to be maintained on-site throughout the construction period. Permanent stabilization requires 70% uniform perennial vegetative cover using either Formula B (lawn areas with 3:1 slopes and flatter) or Formula L (all other areas) seeding at specified application rates with straw mulch at 1,200 pounds per 1,000 square yards.
The plan identifies soil limitations specific to the project area, including Basher Silt Loam with hydrologic soil group B/D classification, accounting for constraints such as seasonal high water table saturation, slow percolation, frost action, and landslide proneness. Mitigation measures for identified soil limitations include utilization of pumped water filter bags for dewatering, selection of wet-tolerant vegetation, erosion control matting on slopes steeper than 3:1, and restriction of construction traffic to stabilized surfaces. The contractor bears responsibility for maintaining all erosion and sediment control facilities during construction and for all off-site pollution control measures, including removal of excess material in compliance with Pennsylvania Department of Environmental Protection (PA DEP) regulations. A pre-construction meeting must be held at least seven days before earth disturbance activities commence, with attendance required from all contractors, landowners, municipal officials, the conservation district representative, and the plan preparer. Pennsylvania One-Call System notification is required a minimum of three days before initiating any earth disturbance activities. The plan was prepared by registered professional engineer Rajesh Kumar Moola (PE089722) with certification valid through July 23, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRICT COUNTY ROUTE SECTION SHEET
OF
REV
NO
REVISIONS DATE BY APPD
-M
A R
-2
:2
P L
O T
T E
D
O P
E R
A T
O R
F
IL
E N
A M
E m p a n e ll a
P
\0
\0
M if f li n \O
R D
\E S
C \T
E S
C D
T .d g n
1 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
LOCATION MAP
PLAN PREPARER
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND, & GRUBIC, INC.
APPROVING AGENCY
(717)921-8100
DAUPHIN, PA 17018
1451 PETERS MOUNTAIN ROAD
DAUPHIN COUNTY CONSERVATION DISTRICT
MEASURES DURING CONSTRUCTION
TEMPORARY EROSION AND SEDIMENT POLLUTION CONTROL
CURRENT EDITION.
DEPARTMENT OF TRANSPORTATION PUBLICATION 408 SPECIFICATIONS,
ALL MATERIALS AND WORKMANSHIP CONFORMS TO THE PENNSYLVANIA
UNLESS OTHERWISE INDICATED, CONTRACTOR SHALL ENSURE THAT 10.
OF DAMAGED TEMPORARY CONTROLS.
AFTER EACH MEASURABLE RAINFALL EVENT, INCLUDING THE REPAIR
INSPECTION OF THE TEMPORARY CONTROLS ON A WEEKLY BASIS AND
CONTRACTOR SHALL MAINTAIN A MAINTENANCE PROGRAM FOR 9.
WHO IS RESPONSIBLE FOR IMPLEMENTING EROSION AND SEDIMENTATION CONTROL.
CONTRACTOR SHALL DESIGNATE AT LEAST ONE INDIVIDUAL, WHO WILL BE PRESENT AT THE PROJECT SITE DAILY, 8.
DISTURBED LAND. CLEAR AND GRUB ONLY IN THE AREAS DESCRIBED FOR EACH STAGE OF CONSTRUCTION.
CONTRACTOR SHALL PERFORM EARTHMOVING ACTIVITIES IN A MANNER THAT MINIMIZES THE AMOUNT OF 7.
A SPILL OCCURS, CONTROL IT IMMEDIATELY TO PREVENT ITS ENTRY INTO NEARBY WATERWAYS.
CONTRACTOR SHALL EMPLOY MEASURES DURING CONSTRUCTION TO PREVENT SPILLS OF FUELS OR LUBRICANTS. IF 6.
VEGETATIVE COVER ON SLOPES IS SUFFICIENTLY ESTABLISHED.
ANY TEMPORARY EROSION CONTROL MEASURES USED BY THE CONTRACTOR SHALL BE CONTINUED UNTIL THE 5.
OR OTHER SUITABLE DUST SUPPRESSOR.
WHERE DUST OR WIND EROSION IS A PROBLEM, CONTRACTOR SHALL SPRINKLE UNSTABLE SURFACE(S) WITH WATER 4.
AT ALL TIMES WITHOUT SERIOUS EROSION.
DURING CONSTRUCTION, THE ROADBED WILL BE MAINTAINED IN SUCH CONDITION THAT IT WILL BE WELL-DRAINED 3.
BECAUSE OF UNFAVORABLE SEEDING TIME.
CONTRACTOR SHALL USE TEMPORARY SEEDING ON EXPOSED SLOPES THAT CANNOT BE PERMANENTLY SEEDED 2.
CONSTRUCTION OF THESE STAGING AREAS.
THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTING THE EROSION CONTROLS NECESSARY FOR THE
CONTRACTOR SHALL NOTIFY THE COUNTY CONSERVATION DISTRICT OF THE LOCATION OF THE STAGING AREAS. 1.
TEMPORARY EROSION AND SEDIMENT POLLUTION CONTROL MEASURES
SEEDING AND MULCHING.
GREATER AND WITHIN 50' OF ALL SURFACE WATER AND MUST BE IN PLACE AND ANCHORED PRIOR TO
A.CONTRACTOR TO PLACE TEMPORARY ROLLED EROSION CONTROL PRODUCTS ON ALL SLOPES 3:1 OR
6. TEMPORARY ROLLED EROSION CONTROL PRODUCTS
UNTIL INDICATED BY THE CONSTRUCTION STAGING.
SANDBAG COFFERDAMS SHALL BE INSTALLED PER PROVIDED DETAILS AND ARE NOT TO BE REMOVED
A.CONTRACTOR SHALL INSTALL SANDBAG COFFERDAMS AT LOCATIONS INDICATED ON THE DRAWINGS.
5. SANDBAG COFFERDAM
EXCAVATION.
POSSIBLE, AND DISCHARGE SHALL BE TO A STABLE EROSION RESISTANT AREA DOWNSTREAM OF
FOR DE-WATERING PURPOSES. FILTER BAG SHALL BE PLACED IN WELL-VEGETATED AREAS, WHERE
A.CONTRACTOR SHALL UTILIZE A PUMPED WATER FILTER BAG WHENEVER EXCAVATIONS MUST BE PUMPED
4. PUMPED WATER FILTER BAG
CIRCUMSTANCES IS WASH WATER FROM THE VEHICLES PERMITTED TO ENTER SURFACE WATERS.
CONTRACTOR SHALL USE CONCRETE WASHOUTS TO CLEAN DELIVERY VEHICLE. UNDER NO
A.CONTRACTOR SHALL INSTALL CONCRETE WASHOUT AT LOCATIONS INDICATED ON THE DRAWINGS.
3. CONCRETE WASHOUT
PROPERTIES AND EXITING THE SITE.
AND/OR AS SHOWN ON THE PLAN IN ORDER TO PREVENT SEDIMENT FROM ENTERING ONTO ADJACENT
A.CONTRACTOR SHALL PLACE COMPOST FILTER SOCK BARRIER DOWN SLOPE OF CRITICAL EROSION AREAS
2.COMPOST FILTER SOCK
A RATE OF 1,200 POUNDS PER 1,000 SQUARE YARDS.
MAY USE MULCH TO HELP STABILIZE THOSE AREAS. MULCH SHALL CONSIST OF HAY OR STRAW APPLIED AT
C.IN PLACES WHERE EROSION IS A PROBLEM DURING THE GROW-IN PHASE OF THE COURSE, CONTRACTOR
METHOD OF SEEDING IN ACCORDANCE WITH PENNDOT PUBLICATION 408.
B.CONTRACTOR SHALL PERFORM ALL SITE PREPARATIONS INCLUDING LIMING, FERTILIZING, TIME AND
MULCHING SHALL BE EMPLOYED.
EXPOSED FOR LONGER THAN 20 CALENDAR DAYS. IF CONDITIONS DO NOT PERMIT TEMPORARY SEEDING, AREAS THAT ARE A POTENTIAL EROSION PROBLEM DURING CONSTRUCTION AND TO THOSE AREAS
PLACE AT THE RATE OF 6 POUNDS PER 1,000 SQUARE YARDS. APPLY TEMPORARY SEEDING TO THOSE
(SPRING) OR CEREAL RYE (FALL), 100 PERCENT BY WEIGHT), OR EQUIVALENT, FOR TEMPORARY SEEDING.
A.CONTRACTOR SHALL USE PENNDOT PUBLICATION 408 FORMULA T TEMPORARY GRASS MIX SEEDING (OATS
1.TEMPORARY SEEDING/MULCHING
INCREASED BACKWATER.
PUMPED WATER FILTER BAGS, AND OTHER E&S BMPS IN THE EVENT OF HIGH WATER TO PREVENT THE
29.CONTRACTOR SHALL REMOVE THE TEMPORARY COFFERDAMS, SOIL STOCKPILES, THE STAGING, THE
28.ALL CONSTRUCTION WORK SHALL TAKE PLACE WHEN THE STREAM IS AT "LOW FLOW" CONDITIONS.
TREES AND SHRUBS IF THE OWNER REFUSES TO ACCEPT THE WOOD.
ABUTTING PROPERTY. DELIVER ACCEPTED WOOD TO A NEARBY LOCATION AS DIRECTED. DISPOSE OF THE
OWNER. SURRENDER ALL MATERIAL FROM THE REMOVAL OF TREES AND SHRUBS TO THE OWNER OF THE
27.TREES AND SHRUB ALONG A HIGHWAY PREVIOUSLY OPENED TO TRAFFIC BELONG TO THE PROPERTY
THEREFORE IT IS NOT ANTICIPATED TO CREATE ANY POTENTIAL THERMAL IMPACTS.
26.THE PROPOSED CULVERT REPLACEMENT WILL NOT INCREASE THE IMPERVIOUS AREA AT THE SITE AND
AREAS.
THE E&S PLAN CONTAINS BMPS TO MINIMIZE THE IMPACTS OF CONSTRUCTION TO THE SURROUNDING
PROJECT. THE SOIL TYPES IN THE AREA OF DISTURBANCE DO NOT POSE THE POTENTIAL FOR POLLUTION.
25.THE NATURALLY OCCURRING GEOLOGIC FEATURES ARE NOT ANTICIPATED TO HAVE ANY IMPACT ON THE
AND/OR WETLANDS.
24.BACKFILL MATERIAL AND/OR CONSTRUCTION MATERIAL SHALL NOT BE STORED IN THE FLOODWAY
FILL."
PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT OF CLEAN
SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING SHOULD BE
SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED
INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED
DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE PROPERTY
TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF
HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL
ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE
AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ASSOCIATED WITH THE PROJECT QUALIFY AS CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED
23.ENVIRONMENTAL DUE DILIGENCE MUST BE PERFORMED TO DETERMINE IF THE FILL MATERIALS
FORM FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING THE FILL.
MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL.
SUBSTANCE, THE CONTRACTOR MUST SUBMIT FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL
22.FOR ANY PLACEMENT OF CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED
USE.)
"USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-
PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM
FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS
BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE
SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND
21.CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, STABILIZATION SPECIFICATIONS.
WITHIN ONE YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE
SPECIFICATIONS. DISTURBED AREAS WHICH ARE AT FINAL GRADE OR WHICH WILL NOT BE RE-DISTURBED
YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY VEGETATIVE STABILIZATION
DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN ONE
AREAS. DURING NON-GERMINATING PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES.
20.IMMEDIATELY AFTER EARTH DISTURBANCE CEASES, THE CONTRACTOR SHALL STABILIZE THE DISTURBED
RUNOFF OF RAINWATER WITHOUT UNDUE RESIDUE.
CONTRACTOR WILL BE REQUIRED TO SHAPE THE TOP OF EARTHWORK IN SUCH A MANNER AS TO ALLOW
19.PRIOR TO SUSPENSION OF CONSTRUCTION OPERATIONS FOR AN APPRECIABLE LENGTH OF TIME, THE
WATER AVOIDED.
ARE KEPT TO A MINIMUM. THE WORK AREA WILL BE KEPT WELL DRAINED AND CONCENTRATION OF
18.GRADING OPERATIONS WILL BE CONDUCTED IN SUCH A WAY THAT THE AREAS OF UNPROTECTED SOIL
PREVENTION, AND CONTINGENCY (PPC) PLAN.
17.CONTRACTOR IS RESPONSIBLE FOR PREPARING AND HAVING AVAILABLE ON-SITE PREPAREDNESS, MEETS THE CONDITIONS OF CHAPTER 102 AND/OR OTHER STATE OR FEDERAL REGULATIONS.
THE SITE(S) RECEIVING THE EXCESS HAS AN APPROVED EROSION AND SEDIMENT CONTROL PLAN THAT
16.THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ANY EXCESS MATERIAL AND MAKE SURE
BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
CODE 260.1 ET SEQ. 271.1., AND 287.1 ET SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED
OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA.
15.ALL BUILDING MATERIALS AND WASTES MUST BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED
ON SITE AND INCORPORATED INTO THE SITE GRADING.
14.ANY SEDIMENT REMOVED FROM BMPS DURING CONSTRUCTION WILL BE RETURNED TO UPLAND AREAS
B.THE DATE, TIME, AND THE NAME OF THE PERSON CONDUCTING THE INSPECTION.
A.A SUMMARY OF THE SITE CONDITIONS, E&S BMPS, AND COMPLIANCE; AND
THE COMMONWEALTH. A WRITTEN REPORT OF EACH INSPECTION SHALL BE KEPT, AND INCLUDE:
CONTROL (E&S) BMPS ARE OPERATIONAL AND EFFECTIVE IN PREVENTING POLLUTION TO THE WATERS OF
EXPERIENCED IN EROSION AND SEDIMENT CONTROL, TO ASCERTAIN THAT THE EROSION AND SEDIMENT
WEEKLY, AND AFTER EACH MEASURABLE PRECIPITATION EVENT BY QUALIFIED PERSONNEL, TRAINED AND
13.THE PERMITTEE AND CO-PERMITTEE MUST ENSURE THAT VISUAL SITE INSPECTIONS ARE CONDUCTED
GENERAL NOTES CONT'D
GENERAL NOTES
BE REQUIRED.
BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS OR MODIFICATIONS OF THOSE INSTALLED WILL
MULCHING AND RE-NETTING SHALL BE PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENT CONTROL
MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RESEEDING, RE-
BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL
BMPS PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT CONTROL
12.UNTIL THE SITE IS STABILIZED, CONTRACTOR SHALL MAINTAIN ALL EROSION AND SEDIMENT CONTROL
MOVEMENTS.
SURFACE EROSION AND SUBSURFACE CHARACTERISTICS SUFFICIENT TO RESIST SLIDING AND OTHER
OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED
11.PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM 70% PERENNIAL VEGETATIVE COVER OR
ORGANIC MATERIAL, LARGE STONES, AND OTHER OBJECTIONABLE MATERIALS.
10.FILL MATERIAL FOR THE EMBANKMENTS SHALL BE FREE OF ROOTS, OR OTHER WOODY VEGETATION, VEGETATED AREAS.
PUMPED WATER FILTER BAG OR EQUIVALENT SEDIMENT REMOVAL FACILITY, OVER UNDISTURBED
9. ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE THROUGH A SEDIMENT CONTROL BMP, SUCH AS A
PROTECTION (DEP).
MEASURES THAT MEET ANY APPLICABLE REGULATIONS OF THE DEPARTMENT OF ENVIRONMENTAL
THAT WERE NOT FORESEEN IN THE DESIGN STAGE, ESTIMATE THE EROSION POTENTIAL AND SELECT
DETERMINES THAT EROSION CONTROL MEASURES INCLUDING COMPOST FILTER SOCK ARE NECESSARY
8. WHEN THE ENGINEER, MUNICIPAL OFFICIAL, OR COUNTY CONSERVATION DISTRICT REPRESENTATIVE
SEDIMENT POLLUTION.
BEST MANAGEMENT PRACTICES (BMPS) TO ELIMINATE THE POTENTIAL FOR ACCELERATED EROSION AND/OR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE CONTRACTOR SHALL IMPLEMENT APPROPRIATE
7. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
BEFORE ANY FOLLOWING STAGE IS INITIATED.
SEQUENCE NOTED ON THESE PLANS. EACH STAGE SHALL BE COMPLETED AND IMMEDIATELY STABILIZED
6. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE CONSTRUCTION
FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
IN THOSE ACTIVITIES SHALL NOTIFY PENNSYLVANIA ONE-CALL SYSTEM INCORPORATED AT 1 (800) 242-1776
5. AT LEAST 3 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS INVOLVED
COUNTY CONSERVATION DISTRICT TO AN ON-SITE PRE-CONSTRUCTION MEETING.
OFFICIALS, THE EROSION AND SEDIMENT CONTROL PLAN PREPARER, AND A REPRESENTATIVE OF THE
INVITE ALL OPERATORS INVOLVED IN THOSE ACTIVITIES, THE LANDOWNER, ALL APPROPRIATE MUNICIPAL
4. AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, THE CONTRACTOR SHALL
SIDE SLOPES MUST BE 3:1 OR FLATTER.
THE REQUIRED IMPROVEMENTS. TOPSOIL STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE
DOWNSLOPE OF THE STOCKPILE LOCATION, AND STRIP AND STOCKPILE TOPSOIL ONLY AS NECESSARY FOR
3. CONTRACTOR SHALL UTILIZE TOPSOIL STOCKPILE LOCATION(S), INSTALL COMPOST FILTER SOCK
SITE AT ALL TIMES.
2. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT
CONTROL PLAN, CONTACT THE DAUPHIN COUNTY CONSERVATION DISTRICT TO RECEIVE APPROVAL.
OTHER PLANS THAT MAY CHANGE THE EFFECTIVENESS OF THE APPROVED EROSION AND SEDIMENT
1. BEFORE INITIATING ANY REVISION TO THE APPROVED EROSION AND SEDIMENT CONTROL PLAN OR TO ANY
LOCATION
PROJECT
CREEK
WICONISCO
LITTLE
US 00
(T -4
W E
R T R
D
(T -5
S A
V
ID
G E R
D
(T -4
R O
A D
C A P R
D
(P H
IL
L
IP
S R
D
S R
(SHIP
PEN D
AM R
D)
SR 4
(T -6
R E
IT
Z R
D
(T -4
W E
A V
E R R
D
TWP
PAXTON
UPPER
TWP
MIFFLIN
STATE ROAD
TOWNSHIP ROAD
WATERWAY
TOWNSHIP LINE
LEGEND
SCALE
4000 FEET2000
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
RAJESH KUMAR MOOLA
PE089722
07/23/2026
REV
NO
REVISIONS DATE BY APPD
-M
A R
-2
:4
P L
O T
T E
D
O P
E R
A T
O R
F
IL
E N
A M
E c h a r tz
P
\0
\0
M if f li n \O
R D
\E S
C \T
E S
C D
T .d g n
2 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
WATERS OF THE COMMONWEALTH
CONSTRUCTION RESTRICTIONS
PER CHAPTER 93, WATER QUALITY STANDARDS, OF THE PA CODE (TITLE 25, ENVIRONMENTAL PROTECTION).
LITTLE WICONISCO CREEK IS DESIGNATED AS A WARM WATER FISHES (WWF) WITH MIGRATORY FISHES (MF)
NONE
ANTICIPATED CONSTRUCTION WASTES
BUILDING RUBBLE
CONCRETE
ROCK
SOIL
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
SOIL LIMITATIONS
DISTURBED ACREAGE
16,842 SF = 0.387 ACRES OF TOTAL LIMIT OF DISTURBANCE
PROJECT SOIL TYPES
NAME SLOPE SYMBOL HYDROLOGIC SOIL GROUPDEPTH TO RESTRICTIVE FEATURE DEPTH TO WATER TABLE
72 TO 99 INCHES TO LITHIC BEDROCK B/D0 TO 3 PERCENTBASHER SILT LOAM Bc ABOUT 18 TO 24 INCHES
PRONE, SLOW PERCOLATION, PIPING, POOR SOURCE OF TOP SOIL, FROST ACTION, AND WETNESS.
SATURATED ZONE/ SEASONAL HIGH WATER TABLE, HYDRIC/ HYDRIC INCLUSIONS, LOW STRENGTH/ LANDSLIDE
BASHER SILT LOAM (Bc) - CUTBANKS CAVE, CORROSIVE TO CONCRETE/STEEL, FLOODING, DEPTH TO
SOIL LIMITATION RESOLUTIONS
LIMITATION RESOLUTION
CUTBANKS CAVE
CONDUCT TRENCHING OPERATIONS IN ACCORDANCE WITH OSHA TECHNICAL
MANUAL FOR TRENCHING. STABILIZE BANKS IMMEDIATELY WITH SEED, MULCH,
EROSION CONTROL MATS, BONDED FIBER MATRIX, OR A COMBINATION OF THESE
AND/OR OTHER METHODS.
CORROSIVE TO
CONCRETE OR
STEEL
PROTECT CONCRETE AND STEEL WITH PROTECTIVE COATINGS, SELECT
ALTERNATIVE MATERIALS IN LIEU OF CONCRETE OR STEEL, OR A COMBINATION
OF THESE AND OR OTHER METHODS.
DROUGHTY
SELECT VEGETATIVE SPECIES TOLERANT TO DRY CONDITIONS, IRRIGATE
VEGETATED AREAS, OR IMPLEMENT COMBINATIONS OF THESE AND/OR OTHER
METHODS.
EASILY ERODIBLE
PROVIDE TEMPORARY OR PERMANENT CHANNEL LINING, DECREASE CHANNEL
GRADE, INCREASE CHANNEL WIDTH, SELECT VEGETATION WITH A GREATER
RETARDANCE, SELECT PERMANENT LININGS OTHER THAN GRASSES, OR
IMPLEMENTING COMBINATIONS OF THESE AND/OR OTHER METHODS.
DEPTH TO
SATURATED ZONE
\ SEASONAL HIGH
WATER TABLE \
WETNESS \
FLOODING \
PONDING \
HYDRIC SOILS
SELECT VEGETATIVE SPECIES TOLERANT TO WET CONDITIONS, TILE VEGETATED
AREAS, OR IMPLEMENT COMBINATIONS OF THESE AND/OR OTHER METHODS.
UTILIZE PUMPED WATER FILTER BAGS TO DEWATER DISTURBED AREAS DURING
CONSTRUCTION.
LOW STRENGTH \
LANDSLIDE PRONE
LOCATE ROADWAYS TO OTHER SOIL TYPES, IMPORT OTHER SOILS FOR ROADWAY
CONSTRUCTION, OR IMPLEMENT A COMBINATION OF THESE AND/OR OTHER
METHODS. FOR CUT/FILL SLOPES, REDUCE SLOPE, INSTALL EROSION CONTROL
MATTING, OR IMPLEMENT A COMBINATION OF THESE AND/OR OTHER METHODS.
SLOW
PERCOLATION
LOCATE INFILTRATION FACILITIES TO ANOTHER SOIL TYPE, RESTRICT
CONSTRUCTION TRAFFIC AT THOSE LOCATIONS, TILL SOIL IN THOSE LOCATIONS,
ADD SOIL AMENDMENTS SUCH AS COMPOST AT THOSE LOCATIONS.
PIPING
IMPORT OTHER SOIL FOR EMBANKMENTS OF SEDIMENT BASINS, SEDIMENT TRAPS,
STORM WATER RETENTION BASINS AND STORM WATER DETENTION BASINS,
LOCATE THOSE FACILITIES ON OTHER SOIL TYPES, LIMIT EMBANKMENT SLOPE
STEEPNESS, OR IMPLEMENT COMBINATIONS OF THESE AND/OR OTHER METHODS.
POOR SOURCE OF
TOPSOIL
IDENTIFY AND RESOLVE CHARACTERISTICS THAT RENDER THE SOIL TYPES POORLY
SUITED AS TOPSOIL. PERFORM SOIL TESTS TO DETERMINE THE REQUIRED SOIL
AMENDMENTS AND APPLICATION RATES. IDENTIFY SOILS ON-SITE THAT ARE
ADEQUATE SOURCES OF TOPSOIL AND STOCKPILE THESE FOR USE DURING
RESTORATION.
FROST ACTION
IMPORT OTHER SOIL FOR EMBANKMENTS OF SEDIMENT BASINS, SEDIMENT TRAPS,
STORM WATER RETENTION BASINS AND STORM WATER DETENTION BASINS,
LOCATE THOSE FACILITIES ON OTHER SOIL TYPES, DO NOT CONSTRUCT
EMBANKMENTS DURING PERIODS PRONE TO FROST, OR IMPLEMENT COMBINATIONS
OF THESE AND/OR OTHER METHODS.
SHRINK-SWELL
LOCATE FACILITIES THAT MAY BE SUSCEPTIBLE TO DAMAGE FROM SHRINK OR
SWELLING TO ANOTHER SOIL TYPE, IMPORT OTHER SOILS FOR THESE FACILITIES,
OR IMPLEMENT COMBINATION OF THESE AND/OR OTHER METHODS.
POTENTIAL
SINKHOLE
LOCATE SEDIMENT BASINS, SEDIMENT TRAPS, STORM WATER RETENTION BASINS
AND STORM WATER DETENTION BASINS ON OTHER TYPES OF SOIL, LINE
RESERVOIR AREAS WITH IMPERMEABLE LININGS, LIMIT STANDING WATER DEPTHS,
LIMIT RETENTION TIMES, AND IMPLEMENT COMBINATIONS OF THESE AND/OR
OTHER METHODS.
CONSTRUCTION STAGING AND DEMOLITION SEQUENCE
CONSTRUCTION
THE APPROPRIATE SEED FORMULA AND MULCHING TO ANY DISTURBED AREA RESULTING FROM THE REMOVAL OF A BMP.
POLLUTION CONTROL BMPS. DISPOSE OF ALL BMPS IN A LANDFILL OR OTHER APPROPRIATE OFF-SITE LOCATION. APPLY
13.UPON APPROVAL FROM THE COUNTY CONSERVATION DISTRICT, REMOVE ALL REMAINING EROSION AND SEDIMENT
DISTRICT TO INITIATE THE FINAL INSPECTION PROCESS.
DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION, CONTACT THE COUNTY CONSERVATION
12.WHEN CONSTRUCTION IS COMPLETE AND PERMANENT VEGETATION HAS ESTABLISHED 70% UNIFORM COVER WITH A
11.REMOVE THE TRAFFIC DETOUR.
10.CONSTRUCT ROADWAY IMPROVEMENTS AS SHOWN ON THE PLAN.
9. REMOVE SANDBAG COFFERDAMS AND BYPASS PUMPING.
OUTSIDE THE CHANNEL AS REQUIRED.
8. BACKFILL THE EXCAVATION. IMMEDIATELY PLACE TOPSOIL, SEED, AND MULCH OR RECP WITHIN DISTURBED AREAS
TRENCH.
THE CULVERT IS INSTALLED WITH A 1' DEPRESSION BELOW THE ADJACENT STREAM GRADES. BACKFILL THE CULVERT
7. INSTALL THE PROPOSED CULVERT, ENDWALLS, AND RIP-RAP APRONS. WHEN INSTALLING, CONTRACTOR SHALL ENSURE
MATERIAL REMOVED FOR LATER USE. STOCKPILES SHALL BE PLACED OUTSIDE THE LIMITS OF THE FLOODWAY.
6. SAWCUT THE PAVEMENT AND EXCAVATE AND REMOVE THE EXISTING BRIDGE. STOCKPILE ANY NATURAL STREAMBED
5. INSTALL THE CONCRETE WASHOUT.
CLEAR AND GRUB THE PROPOSED WORK AREA WITHIN THE MARKED LIMITS OF THE DISTURBANCE.4.
FILTER BAG.
3. INSTALL SANDBAG COFFERDAMS AND BYPASS PUMPING TO DIRECT FLOW AROUND THE SITE, INCLUDING PUMPED WATER
2. IMPLEMENT THE TRAFFIC DETOUR.
1. INSTALL COMPOST FILTER SOCK AT THE LOCATIONS INDICATED.
EVALUATION.
PROTECTIVE FENCING AROUND SENSITIVE AREAS SHOWN ON THE PLAN OR IDENTIFIED DURING THE PRE-PROJECT
THAT ARE DURABLE ENOUGH TO LAST THE ENTIRE DURATION THAT THE DISTURBANCE WILL BE ACTIVE. INSTALL
2. CLEARLY MARK THE LIMITS OF DISTURBANCE AT THE LOCATIONS INDICATED ON THE PLAN. USE STAKES AND FLAGGING
AS PRACTICAL.
VEGETATION TO THE GREATEST EXTENT POSSIBLE. LIMIT CONSTRUCTION EQUIPMENT TO STABILIZED SURFACES AS MUCH
THAT SHOULD NOT BE DISTURBED DURING THE LIFE OF THE PROJECT. PROTECT EXISTING MATURE TREES AND
1. PERFORM A PRE-PROJECT SITE EVALUATION AND DETERMINE IF THERE ARE AREAS WITHIN THE LIMITS OF DISTURBANCE
LOCATION. STRIP AND STOCKPILE TOPSOIL ONLY AS NECESSARY FOR THE REQUIRED IMPROVEMENTS.
ESTABLISH TOPSOIL STOCKPILE LOCATION(S). INSTALL COMPOST FILTER SOCKS DOWNSLOPE OF THE STOCKPILE G.
F. SET UP NECESSARY TRAFFIC CONTROL MEASURES TO IMPLEMENT THE ROADWAY DETOUR DURING CONSTRUCTION.
COMMENCEMENT OF ANY EARTH DISTURBANCE.
REMOVE FROM THE SITE, RECYCLE OR DISPOSE OF ANY EXCESS MATERIAL IN A MANNER APPROVED BY PADEP.
STABILIZE ALL AREAS DISTURBED BY THE REMOVAL OF THE TEMPORARY EROSION/SEDIMENT POLLUTION CONTROLS.
CONTROLS AND SPREAD ON SITE. REMOVE TEMPORARY EROSION/SEDIMENT POLLUTION CONTROLS. PERMANENTLY
OVER THE ENTIRE DISTURBED AREA, REMOVE ANY SEDIMENT FROM THE TEMPORARY EROSION/SEDIMENT POLLUTION
ONCE A 70% UNIFORM EROSION-RESISTANT VEGETATIVE COVER HAS BEEN ESTABLISHED DEVICES AS SHOWN ON PLANS.
FIELD MARK THE LIMIT OF DISTURBANCE PRIOR TO THIS. MAINTAIN EROSION AND SEDIMENT POLLUTION CONTROL E.
SEEDING FORMULAS INDICATED.
PROTECTION ARE ALSO PROVIDED PER THE E&S PLAN. UNLESS OTHERWISE NOTED, STABILIZE ALL AREAS WITH THE
D. ALL REFERENCES TO STABILIZATION BY SEEDING IMPLY THAT THE APPROPRIATE SOIL SUPPLEMENTS AND MULCH
ACCORDING TO NOTE B.
PROPOSED CHANGES TO THE APPROVED PLAN WITH THE ENGINEER. UPON REVIEW AND APPROVAL, PROCEED
C. PROCEED WITH ALL EARTH DISTURBANCE ACTIVITIES IN ACCORDANCE WITH THE SEQUENCE. COORDINATE ANY/ALL
UNDERGROUND UTILITIES.
UNMARKED, NOTIFY THE PENNSYLVANIA ONE CALL SYSTEM INC AT 1-800-242-1776 FOR THE LOCATION OF EXISTING
AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES OR EXPANDING INTO AN AREA PREVIOUSLY B.
OTHER GOVERNING AUTHORITY TO AN ON-SITE MEETING.
INVITE ALL CONTRACTORS, LAND OWNERS, APPROPRIATE MUNICIPAL OFFICIALS, AND REPRESENTATIVES FROM ANY
AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES (INCLUDING CLEARING AND GRUBBING), A.
PRE-CONSTRUCTION
MAINTENANCE OF EROSION AND SEDIMENT POLLUTION CONTROL MEASURES
APPROVED BY PA DEP.
9. CONTRACTOR SHALL REMOVE FROM THE SITE, RECYCLE OR DISPOSE OF ANY EXCESS MATERIAL IN A MANNER
8. THE CONTRACTOR IS RESPONSIBLE FOR ALL OFF-SITE EROSION AND SEDIMENT POLLUTION CONTROL.
CONTROL PLAN.
7. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL FACILITIES SHOWN ON THE EROSION AND SEDIMENT
THE TOPSOIL, RE-SOW THE GRASS, AND APPLY MULCH.
6. ON ANY PERMANENT SEEDING AREAS THAT BECOME ERODED OR DISTURBED, CONTRACTOR SHALL REPLACE
SITE AND INCORPORATED INTO THE SITE GRADING.
5. ANY SEDIMENT REMOVED FROM BMPS DURING CONSTRUCTION SHALL BE RETURNED TO UPLAND AREAS ON
WILL RETURN TO COMPLIANCE.
c. THE TIME FRAME TO CORRECT THE NON COMPLIANCE, INCLUDING THE EXACT DATES WHEN THE ACTIVITY
b. ALL STEPS TAKEN TO REDUCE, ELIMINATE AND PREVENT THE RECURRENCE OF THE NON-COMPLIANCE.
a. RECORD LOCATION AND SEVERITY OF BMPS FAILURE.
POLLUTION:
4. RECORD THE FOLLOWING INFORMATION IF BMPS CONTINUE TO FAIL TO ALLEVIATE EROSION AND SEDIMENT
SEDIMENTATION BMPS FAIL TO PERFORM AS EXPECTED, REPLACE OR MODIFY BMPS AS NEEDED.
REPAIR, REPLACEMENT, RE-GRADING, RESEEDING, RE-MULCHING, AND RE-NETTING. IF EROSION AND
3. PERFORM IMMEDIATELY ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, LOG ON-SITE AT ALL TIMES AND AVAILABLE UPON REQUEST BY THE COUNTY CONSERVATION DISTRICT.
ACTIONS, DATE, TIME, AND THE NAME OF THE PERSON CONDUCTING THE INSPECTION. KEEP THE INSPECTION
2. DOCUMENT ALL SITE INSPECTIONS IN AN INSPECTION LOG KEPT FOR THIS PURPOSE WITH THE COMPLIANCE
REPLACE ALL FACILITIES THAT ARE DAMAGED, CLOGGED, OR CAN NO LONGER FUNCTION AS INTENDED.
1. CHECK ALL SEDIMENT AND EROSION CONTROL FACILITIES FOR DAMAGE WEEKLY AND AFTER EACH STORM.
PERMANENT EROSION AND SEDIMENT POLLUTION CONTROL MEASURES
OTHERWISE NOTED.
WITH THE REQUIREMENTS OF THE PA DEP EROSION AND SEDIMENT CONTROL PROGRAM MANUAL UNLESS
5. IMPLEMENT ALL PERMANENT SOIL EROSION AND SEDIMENTATION CONTROL MEASURES IN ACCORDANCE
CONSTRUCTION.
4. THE CONTRACTOR WILL MAINTAIN ALL PERMANENT EROSION CONTROL MEASURES DURING
(2) MULCHING - STRAW @ 1200 LBS./1000 S.Y.
C. ANNUAL RYEGRASS - 10% BY WEIGHT
B. CREEPING RED FESCUE - 35% BY WEIGHT
A. HARD FESCUE - 55% BY WEIGHT
(1) SEED @ 48.0 LBS./1000 S.Y.
B. FORMULA L SEED MIXTURE (PENNDOT SPECIFICATIONS - ALL OTHER AREAS)
(2) MULCHING - STRAW @ 1200 LBS./1000 S.Y.
C. KENTUCKY BLUEGRASS - 50% BY WEIGHT
B. CREEPING RED FESCUE OR CHEWINGS FESCUE - 30% BY WEIGHT
A. PERENNIAL RYEGRASS MIXTURE - 20% BY WEIGHT
(1) SEED @ 42.0 LBS./1000 S.Y.
A. FORMULA B SEED MIXTURE (PENNDOT SPECIFICATIONS - LAWN AREAS WITH 3:1 SLOPES AND FLATTER)
VEGETATION. THE FOLLOWING TYPES OF TREATMENT HAVE BEEN RECOMMENDED FOR THIS PROJECT:
SHALL BE STABILIZED BY APPLYING A SEED MIXTURE TO ESTABLISH AN EROSION RESISTANT STAND OF
3. ALL AREAS DISTURBED BY CONSTRUCTION, OTHER THAN THOSE RECEIVING LANDSCAPING OR PAVING, AN APPROVED PLANTING SEASON.
2. PERMANENT SEEDING AND MULCHING WILL BE INCORPORATED INTO THE CONSTRUCTION PHASE DURING
1. PERMANENT SOIL PROTECTION WILL BE COMPLETED AS EARLY AS PRACTICAL.
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
RAJESH KUMAR MOOLA
REV
NO
REVISIONS DATE BY APPD
-M
A R
-2
:0
P L
O T
T E
D
O P
E R
A T
O R
F
IL
E N
A M
E m p a n e ll a
P
\0
\0
M if f li n \O
R D
\E S
C \T
E S
C D
T .d g n
3 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
SEEDING SCHEDULE
1. FERTILIZER SHALL BE APPLIED IN ACCORDANCE WITH A SOIL TEST. IN THE ABSENCE OF A SOIL TEST, FERTILIZER SHALL BE APPLIED AS FOLLOWS:
2. SPECIFICATION ITEMS OBTAINED USING PENNDOT PUBLICATION NO. 408
3. ALL AREAS RECEIVING PERMANENT SEEDING SHALL HAVE A MINIMUM OF 4" OF ORGANIC TOPSOIL.
AND
OR
OR
* PERENNIAL RYEGRASS: A COMBINATION OF IMPROVED CERTIFIED VARIETIES WITH NO ONE VARIETY EXCEEDING 50%
** KENTUCKY BLUEGRASS: A COMBINATION OF IMPROVED CERTIFIED VARIETIES WITH NO ONE VARIETY EXCEEDING 50%
4. MULCH CONTROL NETTING MUST BE PLACED ON ALL SLOPES STEEPER THAN 3:1
FORMULA B
PENNDOT
AND FLATTER
WITH SLOPES 3:1
LAWN AREAS
APPLICATION
FORMULA
SEEDING
SPECIES APPLICATION RATE FERTILIZER LIMING RATE SEEDING DATE
SY
800LBS/ 1000
BELOW
SEE NOTE 1
FORMULA L
PENNDOT
AREAS
ALL OTHER
STRAW
MULCH RATEMULCH
8/1 TO 10/15
3/15 TO 6/1 AND
STRAW
FORMULA T
PENNDOT
TEMPORARY
8/1 TO 10/15
3/15 TO 6/1 AND STRAW
BELOW
SEE NOTE 1
SY
800LBS/ 1000
(AVENA SATIVA)
OATS (SPRING)
(SECALE CEREALE)
CEREAL (FALL)
OF THE TOTAL RYEGRASS COMPONENT.
BELOW
SEE NOTE 1
OF THE TOTAL BLUEGRASS COMPONENT.
MULTIFLORUM)
ANNUAL RYEGRASS (LOLIUM
(FESTUCA RUBRA)
CREEPING RED FESCUE
(FESTUCA LONGIFOLIA)
HARD FESCUE***
*** HARD FESCUE: A COMBINATION OF IMPROVED CERTIFIED VARIETIES WITH NO ONE VARIETY EXCEEDING 50% OF THE
TOTAL HARD FESCUE COMPONENT.
**** MULCH TO BE ANCHORED WITH WOOD CELLULOSE FIBER AT 160 LBS/1000 SY OR EQUAL.
(POA PRATENSIS)
KENTUCKY BLUEGRASS MIXTURE**
(FESTUCA RUBRA OR SSP COMMUTATE)
CREEPING RED FESCUE OR CHEWINGS FESCUE
(LOLIUM PERENNE)
PERENNIAL RYEGRASS MIXTURE*
SY****
1200 LBS / 1000
SY****
1200 LBS / 1000
A. 10-20-20 ANALYSIS COMMERCIAL FERTILIZER AT 140 LBS/1000 SY
B. 38-0-0 UREAFORM FERTILIZER AT 50 LBS/1000 SY
32-0-0 TO 38-0-0 SULFUR COATED UREA FERTILIZER AT 59-50 LBS/1000 SY AS DIRECTED
31-0-0 IBDU FERTILIZER AT 61 LBS/1000 SY
SY
800LBS/ 1000
4.8 LBS/1000 SY
16.8 LBS/1000 SY
26.4 LBS/1000 SY
21 LBS/1000 SY
12.5 LBS/1000 SY
8.5 LBS/1000 SY
8/1 TO 10/15
3/15 TO 6/1 AND
SY****
1200 LBS/ 1000
6 LBS/1000 SY
6 LBS/1000 SY
NOT TO SCALE
PUMP DISCHARGE ENERGY DISSIPATER DETAIL
PYRAMIDAL CONFIGURATION FOR ADDED HEIGHT.
SOCKS IN 18" DIAMETER FILTER SOCK MAY BE STACKED ONTO DOUBLE 24" DIAMETER 2.
INSTALL ON FLAT GRADE (0 < 2% SLOPE).1.
:NOTES
SPACED 5' O.C.
2" x 2" x 36" WOOD STAKES
12" MIN.
FILTER SOCK
12" DIAMETER COMPOST
SECTION A-A
PLAN
SPACED 5' O.C.
2" x 2" x 36" WOOD STAKES INTO FILTER RING
PUMP FROM UPSTREAM (CLEAN WATER)
SIDE OF FILTER RING
OVERLAP ON UPSLOPE
FILTER SOCK. 4' MINIMUM
12" DIAMETER COMPOST
AA
EXISTING GROUND
R-4
CLASS 4, TYPE A GEOTEXTILE
1TOPSOIL/DEBRIS
STOCKPILE
NOT TO SCALE
NOTE: STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET.
STOCKPILE SLOPES SHALL BE 3 : 1 OR FLATTER.
* SEE COMPOST FILTER SOCK DETAIL FOR INSTALLATION
* COMPOST FILTER SOCK
* COMPOST FILTER SOCK
GRADE
EXISTING
TYPICAL STOCKPILE DETAIL
STREAM
INTAKE PIPE
PUMP
COFFERDAM
TEMPORARY
CULVERT
DISSIPATER
ENERGY
CULVERT
PIPE
DISCHARGE
ANCHORED PLASTIC)
(R-4 OR SECURELY
ENERGY DISSIPATER
PUMP DISCHARGE
IN-CHANNEL WORK/PUMPED BYPASS DETAIL
NOT TO SCALE
AREAS THAT HAVE NOT YET ACHIEVED STABILIZATION.
PROVIDED FOR THE STREAM CHANNEL FROM ANY DISTURBED
REDIRECTED INTO IT. SUITABLE PROTECTION SHOULD BE
SHOULD BE COMPLETED AND STABILIZED BEFORE FLOW IS
CHANNEL ALL DISTURBED AREAS WITHIN THE EXISTING 6.
1/2 FILLED WITH SEDIMENT.
THE BAG WILL BE ACCESSED AND REMOVED ONCE IT HAS BEEN
SHOULD BE USED. CONSIDERATION SHOULD BE GIVEN TO HOW
AREAS ARE NOT AVAILABLE, A GEOTEXTILE UNDERLAYMENT
BAG AND PROPERLY DISPOSED. WHEREVER WELL VEGETATED
ITS TOTAL CAPACITY, IT SHOULD BE REPLACED WITH A NEW
SECURELY CLAMPED. WHEN THE BAG HAS BEEN FILLED TO 1/2
BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE
DESIGNED TO TRAP PARTICLES LARGER THAN 150 MICRONS.
SLOPE), WELL VEGETATED AREA. THE BAG SHOULD BE
ACCEPTABLE METHOD IF LOCATED ON A RELATIVELY FLAT (<5%
COMMONWEALTH. THE USE OF FILTER BAGS IS ANOTHER
FILTERED PRIOR TO DISCHARGING INTO WATERS OF THE
AREAS MUST BE ANY PUMPED WATER FROM EXCAVATED 5.
PLAN.
AN APPROVED EROSION AND SEDIMENT POLLUTION CONTROL
MUST BE IMMEDIATELY REMOVED TO A DISPOSAL SITE HAVING
BE USED ON SITE ALL EXCAVATED MATERIALS THAT WILL NOT 4.
STORAGE PILE AND THE STREAM CHANNEL.
SEDIMENT BARRIER SHOULD BE INSTALLED BETWEEN THE
TEMPORARY STOCKPILE LOCATED OUTSIDE THE CHANNEL. A
SUBSEQUENTLY USED AS BACKFILL SHOULD BE PLACED IN A
WILL BE ALL EXCAVATED CHANNEL MATERIALS THAT 3.
POSSIBLE, AND STABILIZED.
TO PRE-CONSTRUCTION CONFIGURATIONS, AS MUCH AS
COMPLETION, ALL CHANNEL ENTRANCES SHOULD BE RESTORED
ANY EQUIPMENT WORKING WITHIN THE CHANNEL. UPON
POSSIBLE, A TEMPORARY CROSSING SHOULD BE PROVIDED FOR
TOP OF BANKS WHEREVER POSSIBLE. WHERE THIS IS NOT
DONE FROM THE ANY IN-CHANNEL EXCAVATIONS SHOULD BE 2.
COMPLETED AND STABILIZED PRIOR TO DIVERTING FLOW.
BY MEANS OF A BYPASS PUMP. ALL SUCH BYPASSES SHOULD BE
THE WORK AREA NORMAL FLOW SHOULD BE CONVEYED PAST 1.
NOTES:
PUMP
FILTER BAG
WATER
PUMPED
COFFERDAM
TEMPORARY
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
SANDBAG COFFERDAM FOR PUMP BY-PASS DETAIL
NOT TO SCALE
STREAM
FLOW
PLASTIC OR EPMD RUBBER SHEETING
SANDBAGS, 75 LBS/BAG MIN. WEIGHT
SANDBAGS TO FORM A WATERTIGHT SEAL.
OR EPMD LINER TO THE TOP, BOTTOM AND SIDES OF THE COFFERDAM WITH
SHEETING TOE THE SANDBAGS INTO THE EMBANKMENT. SECURE THE PLASTIC 1.
NOTES:
WORK AREA
NORMAL BASE FLOW
ABOVE THE HEIGHT OF (MIN)
MAINTAIN 2 ROWS OF SANDBAGS
2' MIN.
PLACE SANDBAGS TO HOLD SHEETING IN PLACE
STREAMBED
ORIGINAL
IN PLACE
TO HOLD SHEETING
PLACE SANDBAGS
INVERT
CLEARED CHANNEL
PLACE SHEETING ON
EXCAVATED AREA
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
REV
NO
REVISIONS DATE BY APPD
-M
A R
-2
:2
P L
O T
T E
D
O P
E R
A T
O R
F
IL
E N
A M
E m p a n e ll a
P
\0
\0
M if f li n \O
R D
\E S
C \T
E S
C D
T .d g n
4 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
NOT TO SCALE
WORK AREA
M
IN
SECTION - COMPOST FILTER SOCK
PLAN VIEW - AS SILT BARRIER
COMPOST FILTER SOCK
BLOWN/PLACED
FILTER MEDIA
AREA
UNDISTURBED
STAKE
WOODEN
2"x2"
AREA
UNDISTURBED
AREA
DISTURBED
10' O.C.
STAKE PLACED
2"x2" WOODEN
F L
O W
F L
O W
SIZE VARIES
COMPOST FILTER SOCK
SOIL SUPPLEMENT.
THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A
REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN
STAKES SHALL BE UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, 7.
REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE
MONTHS; BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 6.
PRACTICE MANUAL.
VERSION OF THE PENNSYLVANIA EROSION CONTROL BEST MANAGEMENT
THE LATEST SOCK FABRIC AND COMPOST SHALL MEET THE STANDARDS OF 5.
REPLACED WITHIN 24 HOURS OF INSPECTION.
SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR
EVENT. DAMAGED SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF 4.
PENNSYLVANIA EROSION CONTROL BEST MANAGEMENT PRACTICE MANUAL.
GROUND HEIGHT OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED IN THE
THE ABOVE ½ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 3.
TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCK.2.
MANAGEMENT PRACTICE MANUAL.
EXCEED THAT SHOWN IN THE PENNSYLVANIA EROSION CONTROL BEST
SOCK ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT
GRADE. BOTH ENDS COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL 1.
NOTES:
COMPOST FILTER SOCK
FILTER BAG
RESUME UNTIL THE PROBLEM IS CORRECTED.
IMMEDIATELY AND NOT FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE 7.
WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
MANUFACTURER, THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE 6.
AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
MANUFACTURER THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE 5.
SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING
FILTER NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST 4.
PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE
BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER
AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY
RESISTANT BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION 3.
REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE
FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE
BE PROVIDED. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL 2.
VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH
STRENGTH, LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH 1.
NOTES:
80 SIEVEASTM D-4751AOS % RETAINED
70%ASTM D-4355UV RESISTANCE
350 PSIASTM D-3786MULLEN BURST
110 LBASTM D-4833PUNCTURE
205 LBASTM D-4632GRAB TENSILE
60 LB/INASTM D-4884AVG. WIDE WIDTH STRENGTH
MINIMUM STANDARDTEST METHODPROPERTY
PLAN VIEW
WELL VEGETATED, GRASSY AREA
FILTER BAG
ELEVATION VIEW
WELL VEGETATED, GRASSY AREA
PUMPED WATER FILTER BAG DETAIL
NOT TO SCALE
INTAKE HOSE
PUMP
INTAKE HOSE
PUMP
CLAMPS
HOSE
DISCHARGE
(RECOMMENDED)
HEAVY DUTY LIFTING STRAPS
DISCHARGE HOSE
CLAMPS
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
STAKES PLACED 5' O.C.
2" X 2" X 36" WOODEN
NOT TO SCALE
FILTER SOCK
18" DIAMETER COMPOST
CONCRETE WASHOUT
PUMP CONTAMINATED WATER INTO
CONCRETE WASHOUT
STAKES PLACED 5' O.C.
2" X 2" X 36" WOODEN
HEIGHT
WATER IS 50% OF CONCRETE WASHOUT
MAXIMUM DEPTH OF CONTAMINATED
FILTER SOCK
18" DIAMETER COMPOST
12" MIN
GEOMEMBRANE
IMPERVIOUS
SECTION
PLAN
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
RAJESH KUMAR MOOLA
PE089722
INSTALLING THE SOCKS
PLACED AT THE LOCATION OF THE WASHOUT PRIOR TO
A SUITABLE IMPERVIOUS GEOMEMBRANE SHALL BE
CONFIGURATION FOR ADDED HEIGHT AND STABILITY
CONCRETE WASHOUT MAY BE STACKED IN A PYRAMIDAL
INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE
NOTES
3.
2.
1.
REV
NO
REVISIONS DATE BY APPD
-M
A R
-2
:0
5 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
O P
E R
A T
O R
F
IL
E N
A M
E m p a n e ll a
P
\0
\0
M if f li n \O
R D
\E S
C \T
E S
C D
T .d g n
GROUND LINE
EXISTING
GROUND LINE
EXISTING
EXISTING GROUND LINE
SOIL
WITH SURFACE, SEE NOTE 1
WITH PROPER CONTACT
ROLLED EROSION CONTROL PRODUCTS
SURFACE
ROLLED EROSION CONTROL PRODUCTS AND
TO PROVIDE CONTINUOUS CONTACT BETWEEN
REMOVE OBSTRUCTIONS AND FILL VOIDS
WITH SURFACE, SEE NOTE 1
WITHOUT PROPER CONTACT
ROLLED EROSION CONTROL PRODUCTS
VOID
SOIL
2'-0" - 3'-0"
MATERIAL
EMBANKMENT
12"
4"
4"
SEE ANCHOR DETAILS
ANCHORS (TYP)
MATERIAL
EMBANKMENT
ANCHORS (TYP)
3'-0"
1'-6"
3'-0"
1'-6"
ANCHOR PATTERNS FOR SLOPES
PLACE 2 ANCHORS/SY
1H:1V OR STEEPER
ANCHOR PATTERN FOR
(INCLUDING 3H:1V)
BETWEEN 3H;1V AND 2H:1V
ANCHOR PATTERN FOR SLOPES
PLACE 1½ ANCHORS/SY
PLACE 2½ ANCHORS/SY
PLACE 1 ANCHORS/SY
SLOPES FLATTER THAN 3H:1V
ANCHOR PATTERN FOR
FIGURE 2
CONTINUOUS CONTACT
FIGURE 1
LACK OF CONTINUOUS CONTACT
TYPICAL SLOPE CROSS SECTION
PUBLICATION 408, SECTION 806.2(d).
2. PROVIDE ANCHORING DEVICES IN ACCORDANCE WITH
AND THE SOIL.
BETWEEN THE ROLLED EROSION CONTROL PRODUCTS
1. ESTABLISH AND MAINTAIN CONTINOUS CONTACT
NOTES:
(INCLUDING 2H:1V)
BETWEEN 2H:1V AND 1H:1V
ANCHOR PATTERNS FOR SLOPES
2'-0" - 3'-0"
12"
6"
PRODUCT, AS INDICATED
ROLLED EROSION CONTROL
NOT TO SCALE
ROLLED EROSION CONTROL PRODUCTS (RECP)
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
3'-0" 3'-0"
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
REV
NO
REVISIONS DATE BY APPD
-M
A R
-2
:0
6 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
O P
E R
A T
O R
F
IL
E N
A M
E m p a n e ll a
P
\0
\0
M if f li n \O
R D
\E S
C \T
E S
C D
T .d g n
SEE DETAIL AEMBANKMENT MATERIAL (TYP)
MATERIAL (TYP)
EMBANKMENT
EMBANKMENT MATERIAL (TYP)
GROUND LINE
EXISTING
WIDTH, AS INDICATED
FOR ANCHOR PATTERN
SEE SHEET 5
ANCHOR (TYP),
FOR ANCHOR PATTERN
SEE SHEET 5
ANCHOR (TYP),
FLOW
FLOW
AS REQUIRED
ANCHOR PATTERN,
AS REQUIRED
ANCHOR PATTERN,
EMBANKMENT MATERIAL (TYP)
SEE NOTE 3
SEE NOTE 2
INITIAL ANCHOR TRENCH
SEE NOTE 1
6"
(SEE NOTE 4)
2'-0" TO 3'-0"
END
UPSTREAM
SEE DETAIL A
END
DOWNSTREAM
4"
12"
(SEE NOTE 4)
2'-0" TO 3'-0"
6"
4"
3"
3"
1'-0"
6"
BACKFILL
COMPACTED
OF PUBLICATION 408.
6. PROVIDE ANCHORING DEVICES IN ACCORDANCE WITH SECTION 806.2(d)
5. PLACE 2½ ANCHORS/SY.
THE CREST OF CHANNEL SIDE WHENEVER POSSIBLE.
4. EXTEND ROLLED EROSION CONTROL PRODUCTS 2'-0" TO 3'-0" ABOVE
SEPARATION FROM THE SOIL.
SMOOTHLY ONTO THE ROLLED EROSION CONTROL PRODUCTS WITHOUT
THE WIDTH OF THE CHANNEL TO ENSURE WATER FLOW TRANSITIONS
3. EXCAVATE TERMINAL ANCHOR TRENCH 1'-0" DEEP AND 6" WIDE ACROSS
EROSION CONTROL PRODUCTS.
FROM BEING TRANSPORTED DOWNSTREAM BENEATH THE ROLLED
OF THE ROLLED EROSION CONTROL PRODUCTS TO PREVENT LOOSE SOIL
THE WIDTH OF THE CHANNEL AT 25'-0" TO 30'-0" ALONG THE LENGTH
2. EXCAVATE INTERMITTENT CHECK SLOT 6" DEEP AND 6" WIDE ACROSS
EROSION CONTROL PRODUCTS.
THE WIDTH OF THE CHANNEL TO PREVENT UNDERMINING OF THE ROLLED
1. EXCAVATE INITIAL ANCHOR TRENCH 1'-0" DEEP AND 6" WIDE ACROSS
NOTES:
TERMINAL ANCHOR TRENCH
DETAIL A
INTERMITTENT CHECK SLOT
CROSS SECTION
TYPICAL V-DITCH
CHANNEL CROSS SECTION
TYPICAL TRAPEZOIDAL
NOT TO SCALE
ROLLED EROSION CONTROL PRODUCTS (RECP)
FLOW
FOR ANCHOR PATTERN
SEE SHEET 5
ANCHOR (TYP),
4"
EMBANKMENT MATERIAL (TYP)
EMBANKMENT MATERIAL (TYP)
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
REV
NO
REVISIONS DATE BY APPD
7 7-T-478DAUPHIN8-0
MIFFLIN TOWNSHIP
-J
U L
-2
:1
P
L O
T T
E D
O P
E R
A T
O R
F
IL
E N
A M
E c h a r tz
P
\0
\0
M if f li n \O
R D
\E S
C \T
E
S C
P L
.d g n
SOIL BOUNDARY
SOIL TYPE
LIMIT OF DISTURBANCE
CONCRETE WASHOUT
STOCKPILE & STAGING AREA
SANDBAG COFFERDAM
LEGEND
Bc
COMPOST FILTER SOCK, 12" DIAMETER
PUMPED WATER FILTER BAG
NATURAL STREAMBED MATERIAL*
GROUTED AND CHOKED WITH ROCK, CLASS R-4 AND
SELECTED BORROW EXCAVATION ROCK, CLASS R-7
ROCK ENERGY DISSIPATER FOR PUMP DISCHARGE
CW
S & S
FB
RD
TEMPORARY ROLLED EROSION CONTROL PRODUCT
UTILITY FACILITY TO BE RELOCATED (BY OTHERS)
F FILL LINE
CFS
LOD
CUT LINE - APPROXIMATE STRUCTURE EXCAVATION LIMITS
WESTERN SIDE OF POLE #CT CO EV 1
BM# 3 ELEV 571.95
CUT LINEC
EXCAVATION LIMITS
APPROXIMATE STRUCTURE
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
HARRISBURG, PA 17111
369 EAST PARK DRIVE
HERBERT, ROWLAND & GRUBIC, INC.
ASSUMED 50' FLOODWAY LINE
INSTR #2022030212
N/F MICHAEL & DOROTHY LAPP
INSTR #20210008693
N/F AMOS M & LINDA J STOLTZFUS
INSTR #20060020700
N/F S & L SPINDLES, LLC
SCALE
0 25 50 FEET
ENGINEER
A I
N A
VLYS
N
N
E P
PROFESSIONAL
REGISTERED
F O
H
TLAEWN
O M
M
O C
RAJESH KUMAR MOOLA
PE089722
ROCK. (SEE STRUCTURE PLANS FOR ADDITIONAL INFORMATION)
ALLOWING THE STREAM TO DIRECTLY CONTACT THE NEW GROUTED
MONITOR THE DISCHARGE UNTIL THE PH FALLS BELOW 9.0 BEFORE
INTO THE STREAM. USE A PROPERLY CALIBRATED PH METER TO
MANNER THAT PREVENTS EROSION AND RE-ENTRY OF THE WATER
STREAM WATER AND PUMP TO AN UPLAND AREA TO DISCHARGE IN A
HARDEN ENOUGH TO SUPPORT FOOT TRAFFIC. FLUSH GROUT WITH
* FOR ALL GROUT WORK WITHIN STREAMBANKS, ALLOW GROUT TO
C T
C O
E V
E V
C T
C O
"N O
P A
R K
IN
G
C O
N C D
R
IV
E
SI
G
N
T-478 (WEAVER RD)
LI
TT
LE
W
IC
O
NI
SCO
C
REE
K
BM #3
FOR TOWNSHIP ROAD
LEGAL RIGHT-OF-WAY LINE
FOR TOWNSHIP ROAD
LEGAL RIGHT-OF-WAY LINE
STA 10+84.00
RECONSTRUCTION
BEGIN FULL DEPTH
STA 12+05.00
RECONSTRUCTION
END FULL DEPTH
R E
S E
T
(AS NEEDED)
REMOVE AND RESET FENCE
T-478
STA 9+88.00
START WORK
DAUPHIN COUNTY
MIFFLIN TOWNSHIP
T-478
STA 9+38.00
LIMIT OF WORK
DAUPHIN COUNTY
MIFFLIN TOWNSHIP
T-478
STA 13+57.00
LIMIT OF WORK
T-478
STA 13+07.00
STOP WORK
T-478 SURVEY & CONST �9 10 11 12 13 1410 S21°38'14"E
CW
S & S
PUMP
PUMP
RD
FB
CFS
C
FS
Bc
Bc
F L O
O D
W A
Y
A S S
U M
E D
FILTER BAG (AS NEEDED)
LINE TO PUMPED WATER
TEMPORARY DE-WATERING
BYPASS LINE TO STREAM
TEMPORARY CLEAN-WATER
CFS
' F
LO
O D
W
AY
ASS
U
M
ED
CFS CFS
CFS
CFS
CFS CFS CFS
(AS NEEDED)
REMOVE AND RESET FENCE
CFS
File details come from the government source that posted it. Updated .