1-2026.07 Re-AD Project Manual.pdf

PDF 12 MB Posted

Attached to
REBID of R000208. 0558 - 2023 TISIP Program – Bundle #1
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a Project Manual and Bid Form for the 2023 Transportation Infrastructure Safety Improvement Program (TISIP) - Bundle #1, a construction project issued by Dauphin County, Pennsylvania, and prepared by Herbert, Rowland & Grubic, Inc. The project encompasses drainage improvements, guide rail upgrades, ADA ramp upgrades, and culvert replacement across four municipalities: Middle Paxton Township, Mifflin Township, Lykens Borough, and Millersburg Borough. The work involves multiple construction items organized by township, including clearing and grubbing, excavation, asphalt paving (base course and wearing course), pipe installation, guide rail replacement, erosion control, seeding, sidewalk and curb work, and traffic control. Specific quantities are detailed for each item; for example, Middle Paxton Township includes 500 cubic yards of Class 1 excavation, 485 square yards of subbase, and 52 linear feet of 60" x 38" elliptical reinforced concrete pipe. Bids were to be submitted online via PennBID until Friday, August 28, 2026, at 2:00 PM local time, with public opening and reading of bids at that time. All bids remain valid for 60 days after the opening date. The project does not specify a pre-bid conference in this document version, though bidders are required to conduct site visits during normal working hours and examine all documents thoroughly.

Bid security of 10 percent is required in the form of a certified check or bid bond. The contract is structured on a unit price basis with bidders submitting prices for each line item across the four municipalities. No specific set-asides or incumbent vendors are identified in the documents. The project is funded by Dauphin County and is subject to the Pennsylvania Prevailing Wage Act, as the estimated project cost exceeds $25,000. All bidders must comply with the Public Works Employment Verification Act (Act 141 of 2022), requiring use of the E-Verify system for employee verification. Bidders must submit multiple certifications and forms including non-collusion affidavits, EEO certifications, contractor responsibility certifications, and proof of authorization to do business in Pennsylvania. The design professionals of record include Daniel Franklin Long (PE073631), Rajesh Kumar Moola (PE089722), and Jacob Aidan Hoffman (PE095766). A general permit (GP112203225-013) for culvert replacement has been obtained from the Pennsylvania Department of Environmental Protection, authorizing work under the State Programmatic General Permit (PASPGP-6) for Section 404 of the Clean Water Act compliance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2023 TISIP PROGRAM – BUNDLE #1

Submitted to: Dauphin County, Pennsylvania

ATTN: Dauphin County Commissioners

2 South Second Street, Harrisburg, Pennsylvania 17101

R000208.0558

369 East Park Drive

Harrisburg, PA 17111

717.564.1121 www.hrg-inc.com

Herbert, Rowland & Grubic, Inc.

Engineering | Planning | Infrastructure Solutions Submitted: July, 2026

BIDDING DOCUMENTS

DESIGN PROFESSIONALS OF RECORD Seal & Signature

PROJECT ENGINEER

The following Sections:

Daniel Franklin Long

PE073631

Divisions 01 - 49 Sections except where indicated as prepared by other design professionals of record

DESIGN ENGINEER

Rajesh Kumar Moola

PE089722

Special Provisions – Dauphin County TISIP – for Mifflin Township, Lykens Borough &

Millersburg Borough

DESIGN ENGINEER

Jacob Aidan Hoffman

PE095766

Special Provisions – Dauphin County TISIP – for Middle Paxton Township

07/28/2026 tabel Snapshot tabel Text Box 2026.07.28 dlong Stamp dlong Stamp dlong Signed Date

Herbert, Rowland & Grubic, Inc. 00 01 10 - 1 R000208.0558

2023 TISIP PROGRAM – BUNDLE #1

DAUPHIN COUNTY, PA

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION: PAGES

SEALS PAGE ....................................................................................................................................... 00 01 07: 1

Procurement Requirements ADVERTISEMENT FOR BIDS ............................................................................................................... 00 11 13: 2

INSTRUCTIONS TO BIDDERS .............................................................................................................. 00 21 13: 11

PERMITS ............................................................................................................................................ 00 31 46: 3

BID FORM .......................................................................................................................................... 00 41 13: 15

BID BOND .......................................................................................................................................... 00 43 13: 2

NON-COLLUSION AFFIDAVIT ............................................................................................................. 00 45 19: 1

NON-SEGREGATED FACILITIES & NON-EMPLOYMENT OF ILLEGAL ALIEN LABOR CERTIFICATE ....... 00 45 33: 1

EEO CERTICATE ................................................................................................................................. 00 45 36: 1

PUBLIC WORKS EMPLOYMENT VERIFICATION FORM ....................................................................... 00 45 46: 1

DAUPHIN COUNTY CONTRACTOR RESPONSIBILITY CERTIFICATION ................................................. 00 45 49.1 3

CONTRACTOR COMPLIANCE FORM

DAUPHIN COUNTY SUBCONTRACTOR RESPONSIBILITY CERTIFICATION .......................................... 00 45 49.2 3

SUBCONTRACTOR COMPLIANCE FORM

Contracting Requirements AGREEMENT BETWEEN OWNER and CONTRACTOR for CONSTRUCTION CONTRACT ..................... 00 52 00: 7

NOTICE TO PROCEED FORM.............................................................................................................. 00 55 00: 1

PROJECT FORMS ............................................................................................................................... 00 60 00: 1

PERFORMANCE BOND ...................................................................................................................... 00 61 13.13: 4

PAYMENT BOND ............................................................................................................................... 00 61 13.16: 4

CONTRACTORS APPLICATION FOR PAYMENT ................................................................................... 00 62 76: 6

REQUEST FOR INFORMATION FORM ................................................................................................ 00 63 13: 1

FIELD ORDER FORM .......................................................................................................................... 00 63 36: 1

WORK CHANGE DIRECTIVE FORM .................................................................................................... 00 63 49: 1

CHANGE ORDER FORM ..................................................................................................................... 00 63 63: 1

CERTIFICATE OF SUBSTANTIAL COMPLETION FORM ........................................................................ 00 65 16: 1

AFFIDAVIT OF RELEASE OF LIENS FORM ........................................................................................... 00 65 19.16: 1

CONSENT OF SURETY FOR FINAL PAYMENT FORM .......................................................................... 00 65 19.19: 1

NOTICE OF ACCEPTABILITY OF WORK ............................................................................................... 00 65 19.23: 1

GENERAL CONDITIONS ...................................................................................................................... 00 72 00: 85

EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.................................................................... 00 73 36: 4

WAGE RATE REQUIREMENTS ............................................................................................................ 00 73 43: 4

WAGE DETERMINATION SCHEDULE ................................................................................................. 00 73 46: 7

ANTI-POLLUTION MEASURES ............................................................................................................ 00 73 53: 1

STATUTORY REQUIREMENTS ............................................................................................................ 00 73 73: 7

STEEL PRODUCTS PROCUREMENT CERTIFICATION ........................................................................... 00 73 73a: 1

Specifications

DIVISION 01 – GENERAL REQUIREMENTS PAGES

01 10 00 PROJECT SUMMARY

01 22 00 UNIT PRICES

01 25 00 SUBSTITUTION PROCEDURES

01 25 00.1 SUBSTITUTION REQUEST (AFTER BID)

01 26 00 CONTRACT MODIFICATION PROCEDURES

01 26 13 REQUEST FOR INTERPRETATION

01 31 13 PROJECT COORDINATION

01 31 19 PROJECT MEETINGS

01 32 16 CONSTRUCTION PROGRESS SCHEDULE

TABLE OF CONTENTS

Herbert, Rowland & Grubic, Inc. 00 01 10 - 2 R000208.0558

01 32 26 CONSTRUCTION PROGRESS REPORTING

01 32 33 PHOTOGRAPHIC DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 40 00 QUALITY REQUIREMENTS

01 42 00 REFERENCES

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 61 00 PRODUCT REQUIREMENTS

01 73 00 EXECUTION REQUIREMENTS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 77 00 CLOSEOUT PROCEDURES

01 78 39 PROJECT RECORD DOCUMENTS

SPECIAL PROVISIONS

PLANS

MIDDLE PAXTON TISIP CONSTURCTION & ESC PLAN ............................................................................................. 1-9

MIFFLIN TISIP CONSTURCTION PLAN, DETOUR PLAN, ESC PLAN & STRUCTURE PLAN .......................................... 1-20

LYKENS TISIP CONSTRUCTION PLAN ....................................................................................................................... 1-12

LYKENS TISIP HOP PLAN .......................................................................................................................................... 1-5

MILLERSBURG TISIP CONSTRUCTION PLAN ............................................................................................................ 1-11

Herbert, Rowland & Grubic, Inc. 00 11 13 - 1 R000208.0558

ADVERTISEMENT FOR BIDS

DAUPHIN COUNTY

PENNSYLVANIA

2023 TISIP PROGRAM – BUNDLE #1

General Notice

Dauphin County (Owner) is requesting Bids for the construction of the following Project:

2023 TISIP Program – Bundle #1

Bids for the construction of the Project will be received online via PennBID, until Friday, August 28, 2026, at 2:00 PM local time. At that time the Bids received will be publicly opened and read.

The Project includes the following Work:

The work generally consists of drainage improvements, guide rail upgrades, ADA ramp upgrades, and culvert replacement at several locations throughout portions of Mifflin Township, Lykens Borough, Middle Paxton Township, and Millersburg Borough.

Bids are requested for the following Contract: 2023 TISIP Program – Bundle #1

Obtaining the Bidding Documents

Information and Bidding Documents for the Project can be found at the following designated website:

https://pennbid.bonfirehub.com/

Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other

Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

The Issuing Office for the Bidding Documents is:

Herbert, Rowland & Grubic, Inc.

369 East Park Drive

Harrisburg, PA 17111

Instructions to Bidders

Bid security in the form of a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%.

All questions about the meaning or intent of the Bidding Documents are to be submitted via PennBID in accordance with the Instructions to Bidders. Telephone inquiries are unacceptable.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Statutory Requirements

Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project, and will be required to submit an executed non-collusion affidavit with the bid.

Herbert, Rowland & Grubic, Inc. 00 11 13 - 2 R000208.0558

Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and preservation of public natural resources that affect the project, pursuant to Act No. 247 of the General Assembly of the Commonwealth of Pennsylvania, approved

October 26, 1972.

This Project falls under The Commonwealth of Pennsylvania enacted Act 141 of 2022 , known as the Public

Works Employment Verification Act (‘the Act’) which requires all public work contractors and subcontractors to utilize the Federal Government’s E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States. All Bidders are required to submit a Public Works Employment Verification Form as a precondition for the Contract

Award.

The estimated cost for this project is greater than Twenty-five Thousand Dollars ($25,000) and the

Pennsylvania Prevailing Wage Act shall apply.

All bids shall be irrevocable for 60 days after the bid opening date as provided by the Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142).

All bidders are hereby notified that in regard to any contract pursuant to this advertisement, businesses will be afforded full opportunity to submit bids in response to this notice and will not be subjected to discrimination on the basis of gender, race, color, creed, sex, age, physical disability or national origin in consideration for an award. Similarly the successful bidder shall in no manner discriminate against or intimidate any employee involved in the manufacture of supplies, the performance of work, or any other activity required under the contract on account of gender, race, creed or color.

Dauphin County reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of Dauphin County, and to reject any or all proposals.

This Advertisement is issued by:

Owner: Dauphin County

By: Dauphin County Commissioners

Justin Douglas, Chairman

Mike Pries, Vice-Chairman

George P. Hartwick, III, Secretary

Date: July 31, 2026

August 14, 2026

Herbert, Rowland & Grubic, Inc. 00 21 13 - 1 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

Article 21— Sales and Use Taxes

Herbert, Rowland & Grubic, Inc. 00 21 13 - 2 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ARTICLE 1—DEFINED TERMS

1.1 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.1 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents

(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is

Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.2 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.3 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by

Owner.

2.4 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding

Documents are available, such documents will be made available to the Bidders as Electronic

Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 8.0 or later. It is the intent of the

Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the

Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in

Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents

Herbert, Rowland & Grubic, Inc. 00 21 13 - 3 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.1 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 5 days of Owner’s request, Bidder must submit the following information:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the

Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

3.2 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.3 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.4 The Owner will not award any Contract to a Bidder that has been debarred by the Pennsylvania

Department of Labor and Industry for noncompliance with the Pennsylvania Prevailing Wage Act

(43 P.S. §165.17).

3.5 If any portion of the Work is to be accomplished on rights-of-way of the Pennsylvania Department of Transportation or under a PENNDOT permit, the owner will not award any Contract to a bidder that has been debarred under Title 67, Chapter 459.3(1).

3.6 When so required in the Bid Form, each bidder must provide evidence of Pennsylvania

Department of Transportation Prequalification for the indicated types of Work.

3.7 All Bidders must complete and execute the enclosed Non-Collusion Affidavit. This Affidavit is material to any Contract awarded pursuant to this project and is in accordance with Pennsylvania

Antibid-Rigging Act, 62 P.S. §4501 et seq. The Affidavit should be executed by an officer or the person approved to sign the Bid. In the case of joint ventures, all parties must execute separately.

Failure to file an Affidavit in compliance with these instructions may result in disqualification of the bid.

3.8 This Project falls under The Commonwealth of Pennsylvania enacted Act 141 of 2022, known as the Public Works Employment Verification Act (‘the Act’) which requires all Public Work

Contractors and Subcontractors to utilize the Federal Government’s E-Verify system to ensure that all employees performing work on Public Work Projects are authorized to work in the United

Herbert, Rowland & Grubic, Inc. 00 21 13 - 4 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

States. All Bidders are required to submit a Public Works Employment Verification Form (00 45

46) as a precondition for the Contract Award.

ARTICLE 4—PRE-BID CONFERENCE

4.1 A pre-bid conference will not be conducted for this Project.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

5.1 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.2 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain

Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental

Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any

Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the

Supplementary Conditions. Bidder is responsible for any interpretation or conclusion

Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of

Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in

Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

Herbert, Rowland & Grubic, Inc. 00 21 13 - 5 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

5.3 Other Site-related Documents

A. No other Site-related documents are available.

5.4 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the

Site.

B. Bidders visiting the Site are required to arrange their own transportation to the Site.

C. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the Owner or Engineer. Bidder must conduct the required Site visit during normal working hours.

D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

E. On request, and to the extent Owner has control over the Site, and schedule permitting, the

Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

F. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

G. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.5 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.

5.6 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the

Site by Owner or others (such as utilities and other prime contractors) and relates to the

Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.1 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the

Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and

Herbert, Rowland & Grubic, Inc. 00 21 13 - 6 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.1 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the

Bidding Documents.

7.2 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to

Engineer in writing. Contact information and submittal procedures for such questions are as follows:

A. All questions shall be submitted using Bidding Documents Website (PennBid).

7.3 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

7.4 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract

Documents unless set forth in an Addendum that expressly modifies or supplements the Contract

Documents.

ARTICLE 8—BID SECURITY

8.1 A Bid must be accompanied by Bid security made payable to Owner in an amount of 10 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check or a Bid bond issued by a surety meeting the requirements of

Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the

Bidding Documents.

8.2 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required

Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if

Bidder defaults.

8.3 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the

Herbert, Rowland & Grubic, Inc. 00 21 13 - 7 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.4 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.1 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.2 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial

Completion, or completion of the Work in readiness for final payment, are set forth in the

Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.1 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.

10.2 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of

“or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.1 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective

Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

11.2 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work within five days after Bid opening:

A. All portions of work.

11.3 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such

Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent

Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by

Herbert, Rowland & Grubic, Inc. 00 21 13 - 8 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.4 If apparent Successful Bidder declines to make any such substitution, Owner may award the

Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in

Paragraph 7.07 of the General Conditions.

ARTICLE 12—PREPARATION OF BID

12.1 The Bid Form is included with the Bidding Documents.

A. Bid Form must be completed on PennBID. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

12.2 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the

Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the

Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

12.3 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.4 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

12.5 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

12.6 A Bid by an individual must show the Bidder’s name and official address.

12.7 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.8 All names must be printed in ink below the signatures.

12.9 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

Herbert, Rowland & Grubic, Inc. 00 21 13 - 9 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the

Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

ARTICLE 13—BASIS OF BID

13.1 Unit Price

A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the

Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 14—SUBMITTAL OF BID

14.1 Sealed bids are to be submitted online through PennBID. Bidders can submit, update, and withdraw bids until the date and time described in the Advertisement for Bids. All bidders shall submit all executed documents included with the bids in original form to the Owner within 3 business days of the bid opening date.

14.2 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the

Bidder unopened.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.1 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.2 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

15.3 If within 24 hours two business days after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner

Herbert, Rowland & Grubic, Inc. 00 21 13 - 10 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 16—OPENING OF BIDS

16.1 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.1 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT

18.1 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor

Bid informalities not involving price, time, or changes in the Work.

18.2 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

18.3 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the

Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then

Owner will reject the Bid as nonresponsive.

18.4 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

18.5 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the

Bid Form or prior to the Notice of Award.

B. In the comparison of Bids, alternates may or may not be applied in the same order of priority as listed in the Bid Form. For comparison purposes alternates will be accepted until doing so would cause the Owner's budget to be exceeded. Owner reserves the right to prioritize alternates to the Owner’s greatest advantage upon reviewing the Bids. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.

C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

Herbert, Rowland & Grubic, Inc. 00 21 13 - 11 R000208.0558

This document is a MODIFIED version of EJCDC® C-200, Instructions to Bidders for Construction Contract. Copyright© 2018 National Society of

Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

18.6 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.7 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19—BONDS AND INSURANCE

19.1 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

19.2 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 20—SIGNING OF AGREEMENT

20.1 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful

Bidder, together with printed and electronic copies of the Contract Documents as stated in

Paragraph 2.02 of the General Conditions.

ARTICLE 21—SALES AND USE TAXES

21.1 Owner is exempt from Pennsylvania state sales and use taxes on materials and equipment to be incorporated in the Work. Said taxes must not be included in the Bid. Refer to Paragraph 7.10 of the General Conditions for additional information.

00 31 46 PERMITS

Herbert, Rowland & Grubic, Inc. 00 31 46 - 1 R000208.0558

SECTION 00 31 46 – PERMITS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Available Permitting Information

1.2 PERMITTING INFORMATION

A. This Section with its attachments is referenced in Paragraph 7.09 of Section 00 72 00 –

General Conditions as Permits and Licenses. They provide Owner's information for

Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. This Document and its attachments are not part of the Contract

Documents.

B. The following permit has been obtained and is attached to this Document.

1. DEP General Permit GP112203225-013

END OF SECTION

NORTHCENTRAL REGIONAL OFFICE

208 West Third Street, Suite 101 | Williamsport, PA 17701-6448 | 570.327.3636 | www.dep.pa.gov

October 30, 2025

Wanda Hockenberry Mifflin Township 543 Municipal Road Millersburg, PA 17061

Re: General Permit (GP) Acknowledgment Notification MT-101 Culvert Replacement

GP112203225-013, APS ID# 1138328, AUTH ID# 1528871

Mifflin Township, Dauphin County

Dear Ms. Hockenberry:

This letter acknowledges receipt of your notification to use and registers your use of a General Permit (GP) under the authority of the Dam Safety and Encroachments Act (32 P. S. § 693.1 et. seq.) and 25 Pa. Code Chapter 105. You are responsible for assuring the work is done in accordance with the drawings, terms and conditions contained in the GP. Please direct special attention to all time sensitive issues associated with GP authorization(s). You may proceed with your project after making the required notifications stipulated in the GP(s) and securing all other approvals that may be necessary.

Enclosed is an acknowledged copy of your GP Registration Form. Please place this letter and the acknowledged GP Registration form with your copy of the GP Registration package, the applicable GP terms and conditions, required Federal authorizations, and the Erosion and Sediment Control plan and maintain on site during construction. Please review the complete permit authorization package so that you are aware of the extent of authorization(s) and the conditions that apply to that authorization(s).

We have determined that your proposed work, if accomplished in accordance with the enclosed terms and conditions, is authorized by the Pennsylvania State Programmatic General Permit (PASPGP-6). This PASPGP-6 verification provides U.S. Army Corps of Engineers authorization pursuant to Section 10 of the Rivers and Harbors Act and/or Section 404 of the Clean Water Act. This authorization may be subject to modification, suspension, or revocation if any of the information contained in the application, including the plans, is later found to be in error.

The enclosed list of conditions must be followed for the PASPGP-6 (Enclosure 1).

Any person aggrieved by this action may appeal the action to the Environmental Hearing Board (Board), pursuant to Section 4 of the Environmental Hearing Board Act, 35 P.S. § 7514, and the Administrative Agency Law, 2 Pa.C.S. Chapter 5A. The Board’s address is:

Environmental Hearing Board Rachel Carson State Office Building, Second Floor 400 Market Street P.O. Box 8457 Harrisburg, PA 17105-8457

TDD users may contact the Environmental Hearing Board through the Pennsylvania Relay Service, 800-654-5984.

MT-101 Culvert Replacement Page 2 October 30, 2025

Appeals must be filed with the Board within 30 days of receipt of notice of this action unless the appropriate statute provides a different time. This paragraph does not, in and of itself, create any right of appeal beyond that permitted by applicable statutes and decisional law.

A Notice of Appeal form and the Board's rules of practice and procedure may be obtained online at www.ehb.pa.gov or by contacting the Secretary to the Board at 717-787-3483.

The Notice of Appeal form and the Board's rules are also available in braille and on audiotape from the Secretary to the Board.

IMPORTANT LEGAL RIGHTS ARE AT STAKE. YOU SHOULD SHOW THIS

DOCUMENT TO A LAWYER AT ONCE. IF YOU CANNOT AFFORD A LAWYER,

YOU MAY QUALIFY FOR FREE PRO BONO REPRESENTATION. CALL THE

SECRETARY TO THE BOARD AT 717-787-3483 FOR MORE INFORMATION. YOU

DO NOT NEED A LAWYER TO FILE A NOTICE OF APPEAL WITH THE BOARD.

IF YOU WANT TO CHALLENGE THIS ACTION, YOUR APPEAL MUST BE FILED WITH

AND RECEIVED BY THE BOARD WITHIN 30 DAYS OF RECEIPT OF NOTICE OF THIS

ACTION.

The PAyback program amends the former Permit Decision Guarantee program. Executive Order 2023-07 requires the Department to abide by established review times for each authorization. The PAyback program became effective November 1, 2023, as required by Executive Order 2023-07. Chapter 105 applications or registrations received by the Department on or after that date are subject to this policy and are potentially eligible for Pennsylvania’s PAyback program.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .