1 Additional Pre-bid RFI and Answer.pdf
PDF 135 KB Posted
- Attached to
- Sikeston Fencing Project
- Solicitation number
- 89503621BSW000022
About this file
This document includes a pre-bid request for information and response related to a federal solicitation for fencing replacement services. The U.S. Department of Energy Southwestern Power Administration intends to issue an invitation for bid to completely remove an existing chain-link fence and install a new electrically grounded eight-foot chain-link fence including six barbed wires, concertina wire, one-inch wire mesh fabric, and non-motorized cantilever slide gates with security latches at the Sikeston Substation located in Sikeston, Missouri. The pre-bid request for information confirms that the existing fence posts have concrete bases.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIKESTON SUBSTATION FENCING REPLACEMENT
Additional RFI Question with Response Solicitation No.: 89503621BSW000022
RKE CONTRACTORS
1. Does the existing fence post driven or are they concrete bases?
The existing fence posts have concrete bases.