810-FORM-0003H SRPO MRR Checklist.pdf

PDF 123 KB Posted

Attached to
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary Federal contract opportunity
Solicitation number
80GSFC21R0037-eLibrary
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a checklist for evaluating contractor performance during a Mission Readiness Review (MRR). The checklist addresses evaluation criteria such as presentations by support disciplines, integration and testing activities, issues addressed, flight sequences, risk assessments, and documentation requirements for the MRR package and memorandum. Key areas of evaluation include verification of system readiness, mitigation of issues, updated schedules and requirements documents, and approvals from NASA safety. The composite MRR evaluation is rated on a scale of unsatisfactory to exceptional.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary, newest first.
File Type Posted
NSROC CBA IAMAW 11.01.21 final FULLY EXECUTED.pdf PDF
Rocket_Report_1st_quarter_2019.pdf PDF
Rocket Report 2nd quarter 2021.pdf PDF
Rocket_Report_3rd_quarter_2019.pdf PDF
Rocket Report 4th quarter 2020.pdf PDF
Rocket Report 1st quarter 2021.pdf PDF
SRPO Annual Report 2017.pdf PDF
Rocket Report 1st quarter 2020.pdf PDF
SRWG_Findings_Jan_2021.pdf PDF
Sounding rocket litho 2017.pdf PDF
SRWG_Findings_July_2020.pdf PDF
GSFC-STD-8009T-SRPO WFF Range Safety Manual Rev B.pdf PDF
300-PG-8730.6.1 ESD Control Plan.pdf PDF
800-WI-8715.2.1B Severe Weather Notification.pdf PDF
810-PG-5100.1.3G NSROC Development and Routine Project Assignments Process.pdf PDF
GPR 4220.1.pdf PDF
GPR 1700.7.pdf PDF
GPR 1860.2.pdf PDF
GPR 8730.1.pdf PDF
GPR 8710.8.pdf PDF
GPR 8500.5.pdf PDF
GPR 5340.3.pdf PDF
NPR 2190.1.pdf PDF
GPR 8500.8.pdf PDF
GPR 1700.8.pdf PDF
GPR 1800.5.pdf PDF
NPR 8735.2.pdf PDF
NPD 1490.1.pdf PDF
NPD 4200.1.pdf PDF
NPR 1441.1.pdf PDF
GPR 8730.6.pdf PDF
NPD 6000.1.pdf PDF
NPD 2540.1.pdf PDF
NPD 1440.6.pdf PDF
803-PG-3410.2.2 WFF Safety Office Training and Certification Program.pdf PDF
NPD 1280.1.pdf PDF
NPR 8705.6.pdf PDF
810-FORM-0002G SRPO DR Checklist.pdf PDF
810-FORM-0004H SRPO MCR Checklist.pdf PDF
NPR 8715.5.pdf PDF
NPR 4200.1.pdf PDF
SRPO Cryogenic Safety Users Guide Revision A Final.pdf PDF
NSROC III NNG16WA70C Attachment M - Contract Historical Data 19-20.pdf PDF
SRPO Technology Roadmap June 2021.pdf PDF
NSROC III List of Ongoing Work - October 2021.pdf PDF
SRPO Annual Report 2016.pdf PDF
Rocket_Report_4th_quarter_2019.pdf PDF
SR User Handbook Final_July 2015.pdf PDF
SRPO Annual Report 2019.pdf PDF
Doing Business with Wallops.pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

810-FORM-0003H (July 2018) Mission Readiness Review Evaluation Checklist

Contract Number: NNG16WA70C Meeting Date:

Mission Number:

Estimated date of Mission Readiness Review (MRR) from applicable Design Review (DR) schedule:

RATINGS

Evaluate contractor performance for each evaluation criteria and provide ratings and/or comments as appropriate. Utilize the following guidelines:

Unsatisfactory Marginal Satisfactory Very Good Exceptional (Fails Requirements) (Low Performance) (Baseline Performance) (High Performance) (Exceeds Contract Requirements) 1 2 3 4 5

After completion of individual categories, circle the summary rating evaluation provided at the end of this form for the composite MRR evaluation of the MRR PACKAGE, MEETING, and

MEMORANDUM.

Evaluation Criteria Comments Presentations (with documentation) are made by each support discipline represented on the payload as follows:

Mission Manager (introduction, overview, and general information)

Principal Investigator Mechanical Performance Power Telemetry Guidance, Navigation and Control Systems (Including ACS, Boost Guidance, Uplink Command, etc.)

Vehicle Systems Safety For each support discipline represented on the payload:

Any changes from DR in design, test plan, approach, or procedures are presented and documented (including specifically those related to software)

Integration and testing activities and results are fully described: verifies that each system (telemetry, electrical, mechanical, environmental, range safety) has been checked to ensure a successful mission.

All problem and discrepancies encountered in integration and testing and final analyses are presented, documented in the MRR Package, and fully mitigated (including specifically those related to software)

Mission Readiness Review Evaluation Checklist (Page 1 of 4)

Details of any discipline relevant first flight items and any exceptions, deviations, waivers, testing anomalies, etc. that could affect mission success

Flight sequence of events is reviewed and included in MRR Package

MRR Package contains complete payload team assignment list

DR Action Items are closed and documented in MRR Package

MRR Package contains complete description of minimum and comprehensive success criteria (any change from DR noted)

Success criteria are approved (in writing) by the experimenter

DR Requirements Compliance Matrix is updated and any changes noted & explained concurred by SRPO

A comprehensive list of NCRs with dispositions is included and reviewed

MRR Package contains updated schedule from DR which contains completed activities and field operations and post launch activities

Schedule is realistic & adequate to meet mission requirements

GSE and range support assets and services are identified and scheduled in field operations schedule (available)

The Final Flight Worthiness Assessment is included as an attachment and any unusual or critical safety issues are discussed with proposed mitigation

MRR Package contains a final Mission Telemetry Requirements (MTR) addressing telemetry system parameters, ground support systems, and test requirements

MRR Package contains a final Flight Requirements Plan (FRP) which outlines range support requirements, flight performance aspects, data product requirements, and field schedules. Shall address fixed and mobile assets and personnel.

Resource conflicts (personnel, facilities, equipment, etc.) are identified and mitigated in MRR Package

Other potential problems are identified and mitigated in MRR Package

Launch Operation Countdown Procedure is included in MRR Package

MRR Package includes comprehensive Risk Matrix for the mission that also identifies risks associated with any new or modified software

Mission Readiness Review Package Evaluation Checklist (Page 2 of 4)

Any innovative/creative ideas or partnering with PI or others, to reduce mission costs without degrading scientific return (NSROC initiated exceeding contract requirements)

Any innovative/creative analyses, designs, and/or actions that improve the likelihood of mission success and/or exceed contract requirements (NSROC initiated)

Any innovative/creative measures implemented on mission which will continue to reduce overall program costs on future missions (NSROC initiated exceeding contract requirements)

MRR Package contains a Hazard Assessment; the Hazard Assessment includes a list of any items that require a waiver and the approval status of the waiver.

The MRR Package shall contain a Ground Safety presentation (provided by NSROC for WSMR missions and by the WFF Safety Office for missions at other locations). The MRR Package shall contain a copy of the finalized/approved Ground Safety Data Package or Ground Safety Plan.

A comprehensive list of procedures (involving hazardous operations, safety-related issues, and assembly of the launch vehicle and payload) is included (including a “remove before flight” items listing) with new or revised procedures noted and status of NASA Safety approval noted

Payload team engineering staff (or alternate representatives as necessary) is present at

MRR

NSROC management representation is present to participate in programmatic decisions

Review Panel chaired by NSROC and constructed of NASA Safety and contractor personnel from each discipline represented

Review Panel discussion resulted in appropriate Action Items that increase the probability of mission success

MRR conducted on schedule presented at DR (or appropriate explanation for variance)

Any launch schedule delays are attributable to NSROC functional areas of responsibility

MRR Package contains all documentation and material presented at MRR

Format of MRR Package Mission Readiness Review Package Evaluation Checklist (Page 3 of 4)

MRRM includes the MRR Package as an attachment, fully documents the MRR, identifies attendees, addresses significant topics of discussion, demonstrates that mission success criteria will be achieved, includes the updated mission schedule, and identifies Action Items resulting from MRR

MRR Memorandum (MRRM) received on time, within 5 working days of MRR

COMPOSITE MRR EVALUATION FOR MRR PACKAGE, MEETING, AND

MEMORANDUM

Unsatisfactory Marginal Satisfactory Very Good Exceptional (Fails Requirements) (Low Performance) (Baseline Performance) (High Performance) (Exceeds Contract Requirements) 1 2 3 4 5

COMMENTS:

Evaluator: Date:

(Signature)

COR: Date:

(Signature)

Mission Readiness Review Evaluation Checklist (Page 4 of 4)

File details come from the government source that posted it. Updated .