8-RFP 545190-Attachment C Bid Form.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
RFP 545190- MLK Memorial Park Corridor Improvements
Solicitation number
545190
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a bid form attachment for RFP 545190 issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department for improvements to Martin Luther King Memorial Park and Williams Park in Detroit, Michigan. The project encompasses multiple design plans with varying scopes of work, including demolition and site preparation, environmental services, concrete and paving work, landscaping, site amenities such as benches, picnic tables, grills, and signage, playground equipment for certain plans, and infrastructure improvements. The bid form is structured around five main design plans (Plans A through E) for the MLK Memorial Park area, with separate line items for the Williams Park work and right-of-way improvements. Quantities vary significantly by plan, with concrete work ranging from 700 to 8,800 square feet, tree plantings from 4 to 19 units depending on the plan, and various site furnishings and recreational amenities specified throughout.

The bid form establishes pricing for specific components with fixed-fee items totaling $625,000 for the base bid, including $150,000 for water fountain restoration and operation, $125,000 for lighting design and build, $200,000 for splash pad construction at Williams Park, and $150,000 as an allowance for additional services. All soft costs including mobilization, site restoration, layout and survey, bonds, insurance, general conditions, and miscellaneous close-out work are to be provided by the bidding contractor with costs calculated within the overall bid structure. The form requires contractors to complete detailed unit rate pricing for future contingency work including engineered wood fiber surfacing, poured-in-place surfacing, topsoil, seed and mulch, natural sod, and irrigation, as well as fully burdened hourly rates for construction management personnel including project manager, superintendent, engineer, estimator, and general contractor journeyman and laborer positions.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Sheet

MLK MEMORIAL PARK CORRIDOR IMPROVEMENTS - Bid Form
DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL
BIDDING CONTRACTOR:
MLK MEMORIAL PARK BASECOSTQTYUNITBID COSTAll Fees/Bonds/Insurance/GC's listed under Soft Costs
1SOIL EROSION AND SEDIMENTATION CONTROL MEASURES$ - 0
aSESC Measures$ - 01LSUM$ - 0
bTemporary Construction Sign$ - 02EA$ - 0
2ENVIRONMENTAL SERVICES$ - 0
aEnvironmental Mitigation$ - 01LSUM$ - 0
3DEMOLITION AND INSPECTION$ - 0R.O.W price should include permit fee
a7' Wooden Fence Removal260LF$ - 0
bTree Pruning$ - 028EA$ - 0
cTree/Shrub/Vegetation Removal, 5" or less$ - 01EA$ - 0
dTree Removal, 6"-18"$ - 026EA$ - 0
eTree Removal, 19"-36"$ - 04EA$ - 0
fExposed Aggregate Concrete Removal$ - 04,500SF$ - 0
gBrick Paver Removal and Salvage$ - 02,650SF$ - 0
hSawcut Brick Curb and Salvage Material$ - 046LF$ - 0
iMisc. Light Poles, Footings, Site Furniture$ - 01LSUM$ - 0
jRemove and Replace R.O.W. Walks$ - 0200SF$ - 0
kCatch Basin Clean-up and Inspection, 4 catch basins$ - 01LSUM$ - 0
lPressure Wash Face of Raised Concrete Planters$ - 0650LF$ - 0
4PLAN A$ - 0
a4" Concrete$ - 06080SF$ - 0
b10' x 30' Steel Custom trellis$ - 02EA$ - 0
c6' Swing Bench$ - 02EA$ - 0
d6' Picnic Table$ - 03EA$ - 0
eLarge BBQ Grill$ - 01EA$ - 0
fPrep Table$ - 01EA$ - 0
gCoal Bin$ - 01EA$ - 0
hTrash Receptacles$ - 04EA$ - 0
i4' Park Sign$ - 01EA$ - 0
j2.5" Caliper Tree$ - 014EA$ - 0
k10' HT Confier Tree$ - 03EA$ - 0
5PLAN B$ 275,000.00include permit fees
aWater Fountain Restoration and Operation$ 150,000.001LSUM$ 150,000.00Fixed Fee GMP Pricing
bDrinking Fountain + Tap Connection$ - 01EA$ - 0
cMLK Bust Assessment and Restoration1LSUM$ - 0
dLighting, Design and Build$ 125,000.001LSUM$ 125,000.00Fixed Fee GMP Pricing
e4" Concrete$ - 0700SF$ - 0
f4" Concrete w/ Exposed Aggregate Finish$ - 05150SF$ - 0
gBrick Pavers, 1 1/8" x 8" x 8"$ - 02900SF$ - 0
hBrick Curbing, 2 1/4" x 4" x 8"$ - 052LF$ - 0
iSidewalk Replacement, Right-of-Way, incl. concrete curb$ - 0200SF$ - 0
j10' x 30' Steel Custom trellis$ - 02EA$ - 0
k6' Bench$ - 024EA$ - 0
lTrash Receptacles$ - 04EA$ - 0
m4' Park Sign$ - 01EA$ - 0
nTriangular Plyon Wayfinding Sign$ - 01EA$ - 0
o2.5" Caliper Tree$ - 04EA$ - 0
p2.5" Ornamental Tree$ - 019EA$ - 0
6PLAN C$ - 0
a4" Concrete$ - 08800SF$ - 0
b4" Asphalt Parking include striping$ - 01300SF$ - 0
c10' x 20' Steel Custom trellis$ - 01EA$ - 0
dUniversal Carousel, Play Equipment$ - 01EA$ - 0
eGiant Rope Swing, Play Equipment$ - 01EA$ - 0
fMoku-Yama 7.1 (Wood Mountain)$ - 01EA$ - 0
gChimes (Set of 4), Outdoor Musical Instrument$ - 01EA$ - 0
hMarimba, Outdoor Musical Instrument$ - 01EA$ - 0
iTalk Tubes$ - 01EA$ - 0
jPlayground Grass, Synthetic Turf Playground Surfacing$ - 03070SF$ - 0price to include surfacing post installation test (G-Max and H.I.C testing)
k6' Swing Bench$ - 05EA$ - 0
l6' Picnic Table$ - 02EA$ - 0
m6' Backless Bench$ - 03EA$ - 0
nSmall BBQ Grill$ - 01EA$ - 0
oCoal Bin$ - 01EA$ - 0
pTrash Receptacles$ - 05EA$ - 0
q4' Ornamental Fence w/ Concrete Maintenace Strip$ - 0206LF$ - 0
r2.5" Caliper Tree$ - 04EA$ - 0
s2.5" Ornamental Tree$ - 012EA$ - 0
t96" Round Tree Grate$ - 07EA$ - 0
u4' Park Sign$ - 01EA$ - 0
7PLAN Dsf$ - 0
a2.5" Caliper Tree$ - 016EA$ - 0
8PLAN E$ - 0
a4" Concrete$ - 03140SF$ - 0
b4" Asphalt Parking include striping$ - 01600SF$ - 0
c10' x 20' Steel Custom trellis$ - 01EA$ - 0
dConcrete Horseshoe Court$ - 01EA$ - 0
e6' Picnic Table$ - 02EA$ - 0
f6' Bench$ - 02EA$ - 0
gTrash Receptacles$ - 02EA$ - 0
hTriangular Plyon Wayfinding Sign$ - 01EA$ - 0
i2.5" Caliper Tree$ - 05EA$ - 0
j2.5" Ornamental Tree$ - 09EA$ - 0
9R.O.W$ - 0
a4" Concrete$ - 0410SF$ - 0
b2.5" Caliper Tree$ - 02EA$ - 0
10MISCELLANEOUS$ - 0
aGreen Stormwater Infrastructure (GSI) Build$ - 01LSUM$ - 0
b4' Min. Boulders$ - 075EA$ - 0
WILLIAMS PARK BASE
11SOIL EROSION AND SEDIMENTATION CONTROL MEASURES$ - 0
aSESC Measures$ - 01LSUM$ - 0
bTemporary Construction Sign$ - 01EA$ - 0
12DEMOLITION$ - 0R.O.W price should include permit fee
aAsphalt Removal$ - 010,000SF$ - 0
bConcrete Removal$ - 01000SF$ - 0
cBrick Wall Removal$ - 01LSUM$ - 0
dHorseshoe Pit Removal$ - 01LSUM$ - 0
eSplash Pad Removal$ - 01LSUM$ - 0
13REC. CENTER ENTRY RAMP$ - 0R.O.W price should include permit fee
aRemoval of Existing Entry$ - 01LSUM$ - 0
bInstall New Ramp$ - 01LSUM$ - 0
14CONCRETE WORK$ - 0
a4" Concrete$ - 06080SF$ - 0
b9" Concrete$ - 0350SF$ - 0
c6" Integral Curb$ - 0200LF$ - 0
15SITE WORK$ - 0
aGrading and MH Adjustments$ - 01LSUM$ - 0
16SPLASH PAD$ 200,000.00
aSplash Pad Concrete, Spray Features, Water Channel, Etc.$ 200,000.001LSUM$ 200,000.00Fixed Fee GMP Pricing
17SERVICE DRIVE$ - 0
a6' Black Vinyl Fence$ - 040LF$ - 0
bMill and Resurface Asphalt Service Drive$ - 04500SF$ - 0
SOFT COSTS
18Site Restoration$ - 0$ - 0
19Mobilization$ - 0$ - 0
20Layout & Field Survey$ - 0$ - 0
21Bonds & Insurance$ - 0$ - 0
22General Conditions$ - 0$ - 0Fixed duration cost. To include staffing
23Miscellaneous & Close-Out Work$ - 0$ - 0
ALLOWANCESAll fees/Bonds/Insurance to be calcualted for Allowances below under soft costs
24Additional Services$ 150,000.00$ 150,000.00Fixed Fee
TOTAL BASE BID$ 625,000.00
BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE)
L11. Alternate 1 -
L22. Alternate 2 -
L3
L4

BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED

UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID
DescriptionValueValueUnit
ENGINEERED WOOD FIBER (EWF), SURFACING$ - 0$ - 0100 SF @ 12" DEPTH PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
POURED-IN-PLACE (PIP), SURFACING$ - 0$ - 0PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS -
TOPSOIL$ - 0$ - 050 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
TOPSOIL SEED/MULCH$ - 0$ - 0PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
NATURAL SOD$ - 0$ - 0PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
IRRIGATION$ - 0$ - 0PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS
Construction Manager's Project Personnel*Hourly Rate**Hourly Rate**Provide Fully Burdened Labor Rates*
Project Manager$0.00$0.00
Project Superintendent$0.00$0.00
Project Engineer$0.00$0.00
Project Estimator$0.00$0.00
Accounting$0.00$0.00
Clerical$0.00$0.00
Journeyman for General Contractor$0.00$0.00
Laborer$0.00$0.00
Others:$0.00$0.00

File details come from the government source that posted it. Updated .