8-RFP 545190-Attachment C Bid Form.xlsx
XLSX spreadsheet 31 KB Posted
- Solicitation number
- 545190
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is a bid form attachment for RFP 545190 issued by the City of Detroit Office of Contracting and Procurement on behalf of the General Services Department for improvements to Martin Luther King Memorial Park and Williams Park in Detroit, Michigan. The project encompasses multiple design plans with varying scopes of work, including demolition and site preparation, environmental services, concrete and paving work, landscaping, site amenities such as benches, picnic tables, grills, and signage, playground equipment for certain plans, and infrastructure improvements. The bid form is structured around five main design plans (Plans A through E) for the MLK Memorial Park area, with separate line items for the Williams Park work and right-of-way improvements. Quantities vary significantly by plan, with concrete work ranging from 700 to 8,800 square feet, tree plantings from 4 to 19 units depending on the plan, and various site furnishings and recreational amenities specified throughout.
The bid form establishes pricing for specific components with fixed-fee items totaling $625,000 for the base bid, including $150,000 for water fountain restoration and operation, $125,000 for lighting design and build, $200,000 for splash pad construction at Williams Park, and $150,000 as an allowance for additional services. All soft costs including mobilization, site restoration, layout and survey, bonds, insurance, general conditions, and miscellaneous close-out work are to be provided by the bidding contractor with costs calculated within the overall bid structure. The form requires contractors to complete detailed unit rate pricing for future contingency work including engineered wood fiber surfacing, poured-in-place surfacing, topsoil, seed and mulch, natural sod, and irrigation, as well as fully burdened hourly rates for construction management personnel including project manager, superintendent, engineer, estimator, and general contractor journeyman and laborer positions.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet
| MLK MEMORIAL PARK CORRIDOR IMPROVEMENTS - Bid Form | ||||||
| DO NOT EDIT ANY OF THE COLUMNS - THESE ARE CALCULATED FIELDS - PRICE SHEET TO BE ISSUED IN EXCEL | ||||||
| BIDDING CONTRACTOR: | ||||||
| MLK MEMORIAL PARK BASE | COST | QTY | UNIT | BID COST | All Fees/Bonds/Insurance/GC's listed under Soft Costs | |
| 1 | SOIL EROSION AND SEDIMENTATION CONTROL MEASURES | $ - 0 | ||||
| a | SESC Measures | $ - 0 | 1 | LSUM | $ - 0 | |
| b | Temporary Construction Sign | $ - 0 | 2 | EA | $ - 0 | |
| 2 | ENVIRONMENTAL SERVICES | $ - 0 | ||||
| a | Environmental Mitigation | $ - 0 | 1 | LSUM | $ - 0 | |
| 3 | DEMOLITION AND INSPECTION | $ - 0 | R.O.W price should include permit fee | |||
| a | 7' Wooden Fence Removal | 260 | LF | $ - 0 | ||
| b | Tree Pruning | $ - 0 | 28 | EA | $ - 0 | |
| c | Tree/Shrub/Vegetation Removal, 5" or less | $ - 0 | 1 | EA | $ - 0 | |
| d | Tree Removal, 6"-18" | $ - 0 | 26 | EA | $ - 0 | |
| e | Tree Removal, 19"-36" | $ - 0 | 4 | EA | $ - 0 | |
| f | Exposed Aggregate Concrete Removal | $ - 0 | 4,500 | SF | $ - 0 | |
| g | Brick Paver Removal and Salvage | $ - 0 | 2,650 | SF | $ - 0 | |
| h | Sawcut Brick Curb and Salvage Material | $ - 0 | 46 | LF | $ - 0 | |
| i | Misc. Light Poles, Footings, Site Furniture | $ - 0 | 1 | LSUM | $ - 0 | |
| j | Remove and Replace R.O.W. Walks | $ - 0 | 200 | SF | $ - 0 | |
| k | Catch Basin Clean-up and Inspection, 4 catch basins | $ - 0 | 1 | LSUM | $ - 0 | |
| l | Pressure Wash Face of Raised Concrete Planters | $ - 0 | 650 | LF | $ - 0 | |
| 4 | PLAN A | $ - 0 | ||||
| a | 4" Concrete | $ - 0 | 6080 | SF | $ - 0 | |
| b | 10' x 30' Steel Custom trellis | $ - 0 | 2 | EA | $ - 0 | |
| c | 6' Swing Bench | $ - 0 | 2 | EA | $ - 0 | |
| d | 6' Picnic Table | $ - 0 | 3 | EA | $ - 0 | |
| e | Large BBQ Grill | $ - 0 | 1 | EA | $ - 0 | |
| f | Prep Table | $ - 0 | 1 | EA | $ - 0 | |
| g | Coal Bin | $ - 0 | 1 | EA | $ - 0 | |
| h | Trash Receptacles | $ - 0 | 4 | EA | $ - 0 | |
| i | 4' Park Sign | $ - 0 | 1 | EA | $ - 0 | |
| j | 2.5" Caliper Tree | $ - 0 | 14 | EA | $ - 0 | |
| k | 10' HT Confier Tree | $ - 0 | 3 | EA | $ - 0 | |
| 5 | PLAN B | $ 275,000.00 | include permit fees | |||
| a | Water Fountain Restoration and Operation | $ 150,000.00 | 1 | LSUM | $ 150,000.00 | Fixed Fee GMP Pricing |
| b | Drinking Fountain + Tap Connection | $ - 0 | 1 | EA | $ - 0 | |
| c | MLK Bust Assessment and Restoration | 1 | LSUM | $ - 0 | ||
| d | Lighting, Design and Build | $ 125,000.00 | 1 | LSUM | $ 125,000.00 | Fixed Fee GMP Pricing |
| e | 4" Concrete | $ - 0 | 700 | SF | $ - 0 | |
| f | 4" Concrete w/ Exposed Aggregate Finish | $ - 0 | 5150 | SF | $ - 0 | |
| g | Brick Pavers, 1 1/8" x 8" x 8" | $ - 0 | 2900 | SF | $ - 0 | |
| h | Brick Curbing, 2 1/4" x 4" x 8" | $ - 0 | 52 | LF | $ - 0 | |
| i | Sidewalk Replacement, Right-of-Way, incl. concrete curb | $ - 0 | 200 | SF | $ - 0 | |
| j | 10' x 30' Steel Custom trellis | $ - 0 | 2 | EA | $ - 0 | |
| k | 6' Bench | $ - 0 | 24 | EA | $ - 0 | |
| l | Trash Receptacles | $ - 0 | 4 | EA | $ - 0 | |
| m | 4' Park Sign | $ - 0 | 1 | EA | $ - 0 | |
| n | Triangular Plyon Wayfinding Sign | $ - 0 | 1 | EA | $ - 0 | |
| o | 2.5" Caliper Tree | $ - 0 | 4 | EA | $ - 0 | |
| p | 2.5" Ornamental Tree | $ - 0 | 19 | EA | $ - 0 | |
| 6 | PLAN C | $ - 0 | ||||
| a | 4" Concrete | $ - 0 | 8800 | SF | $ - 0 | |
| b | 4" Asphalt Parking include striping | $ - 0 | 1300 | SF | $ - 0 | |
| c | 10' x 20' Steel Custom trellis | $ - 0 | 1 | EA | $ - 0 | |
| d | Universal Carousel, Play Equipment | $ - 0 | 1 | EA | $ - 0 | |
| e | Giant Rope Swing, Play Equipment | $ - 0 | 1 | EA | $ - 0 | |
| f | Moku-Yama 7.1 (Wood Mountain) | $ - 0 | 1 | EA | $ - 0 | |
| g | Chimes (Set of 4), Outdoor Musical Instrument | $ - 0 | 1 | EA | $ - 0 | |
| h | Marimba, Outdoor Musical Instrument | $ - 0 | 1 | EA | $ - 0 | |
| i | Talk Tubes | $ - 0 | 1 | EA | $ - 0 | |
| j | Playground Grass, Synthetic Turf Playground Surfacing | $ - 0 | 3070 | SF | $ - 0 | price to include surfacing post installation test (G-Max and H.I.C testing) |
| k | 6' Swing Bench | $ - 0 | 5 | EA | $ - 0 | |
| l | 6' Picnic Table | $ - 0 | 2 | EA | $ - 0 | |
| m | 6' Backless Bench | $ - 0 | 3 | EA | $ - 0 | |
| n | Small BBQ Grill | $ - 0 | 1 | EA | $ - 0 | |
| o | Coal Bin | $ - 0 | 1 | EA | $ - 0 | |
| p | Trash Receptacles | $ - 0 | 5 | EA | $ - 0 | |
| q | 4' Ornamental Fence w/ Concrete Maintenace Strip | $ - 0 | 206 | LF | $ - 0 | |
| r | 2.5" Caliper Tree | $ - 0 | 4 | EA | $ - 0 | |
| s | 2.5" Ornamental Tree | $ - 0 | 12 | EA | $ - 0 | |
| t | 96" Round Tree Grate | $ - 0 | 7 | EA | $ - 0 | |
| u | 4' Park Sign | $ - 0 | 1 | EA | $ - 0 | |
| 7 | PLAN D | sf | $ - 0 | |||
| a | 2.5" Caliper Tree | $ - 0 | 16 | EA | $ - 0 | |
| 8 | PLAN E | $ - 0 | ||||
| a | 4" Concrete | $ - 0 | 3140 | SF | $ - 0 | |
| b | 4" Asphalt Parking include striping | $ - 0 | 1600 | SF | $ - 0 | |
| c | 10' x 20' Steel Custom trellis | $ - 0 | 1 | EA | $ - 0 | |
| d | Concrete Horseshoe Court | $ - 0 | 1 | EA | $ - 0 | |
| e | 6' Picnic Table | $ - 0 | 2 | EA | $ - 0 | |
| f | 6' Bench | $ - 0 | 2 | EA | $ - 0 | |
| g | Trash Receptacles | $ - 0 | 2 | EA | $ - 0 | |
| h | Triangular Plyon Wayfinding Sign | $ - 0 | 1 | EA | $ - 0 | |
| i | 2.5" Caliper Tree | $ - 0 | 5 | EA | $ - 0 | |
| j | 2.5" Ornamental Tree | $ - 0 | 9 | EA | $ - 0 | |
| 9 | R.O.W | $ - 0 | ||||
| a | 4" Concrete | $ - 0 | 410 | SF | $ - 0 | |
| b | 2.5" Caliper Tree | $ - 0 | 2 | EA | $ - 0 | |
| 10 | MISCELLANEOUS | $ - 0 | ||||
| a | Green Stormwater Infrastructure (GSI) Build | $ - 0 | 1 | LSUM | $ - 0 | |
| b | 4' Min. Boulders | $ - 0 | 75 | EA | $ - 0 | |
| WILLIAMS PARK BASE | ||||||
| 11 | SOIL EROSION AND SEDIMENTATION CONTROL MEASURES | $ - 0 | ||||
| a | SESC Measures | $ - 0 | 1 | LSUM | $ - 0 | |
| b | Temporary Construction Sign | $ - 0 | 1 | EA | $ - 0 | |
| 12 | DEMOLITION | $ - 0 | R.O.W price should include permit fee | |||
| a | Asphalt Removal | $ - 0 | 10,000 | SF | $ - 0 | |
| b | Concrete Removal | $ - 0 | 1000 | SF | $ - 0 | |
| c | Brick Wall Removal | $ - 0 | 1 | LSUM | $ - 0 | |
| d | Horseshoe Pit Removal | $ - 0 | 1 | LSUM | $ - 0 | |
| e | Splash Pad Removal | $ - 0 | 1 | LSUM | $ - 0 | |
| 13 | REC. CENTER ENTRY RAMP | $ - 0 | R.O.W price should include permit fee | |||
| a | Removal of Existing Entry | $ - 0 | 1 | LSUM | $ - 0 | |
| b | Install New Ramp | $ - 0 | 1 | LSUM | $ - 0 | |
| 14 | CONCRETE WORK | $ - 0 | ||||
| a | 4" Concrete | $ - 0 | 6080 | SF | $ - 0 | |
| b | 9" Concrete | $ - 0 | 350 | SF | $ - 0 | |
| c | 6" Integral Curb | $ - 0 | 200 | LF | $ - 0 | |
| 15 | SITE WORK | $ - 0 | ||||
| a | Grading and MH Adjustments | $ - 0 | 1 | LSUM | $ - 0 | |
| 16 | SPLASH PAD | $ 200,000.00 | ||||
| a | Splash Pad Concrete, Spray Features, Water Channel, Etc. | $ 200,000.00 | 1 | LSUM | $ 200,000.00 | Fixed Fee GMP Pricing |
| 17 | SERVICE DRIVE | $ - 0 | ||||
| a | 6' Black Vinyl Fence | $ - 0 | 40 | LF | $ - 0 | |
| b | Mill and Resurface Asphalt Service Drive | $ - 0 | 4500 | SF | $ - 0 | |
| SOFT COSTS | ||||||
| 18 | Site Restoration | $ - 0 | $ - 0 | |||
| 19 | Mobilization | $ - 0 | $ - 0 | |||
| 20 | Layout & Field Survey | $ - 0 | $ - 0 | |||
| 21 | Bonds & Insurance | $ - 0 | $ - 0 | |||
| 22 | General Conditions | $ - 0 | $ - 0 | Fixed duration cost. To include staffing | ||
| 23 | Miscellaneous & Close-Out Work | $ - 0 | $ - 0 | |||
| ALLOWANCES | All fees/Bonds/Insurance to be calcualted for Allowances below under soft costs | |||||
| 24 | Additional Services | $ 150,000.00 | $ 150,000.00 | Fixed Fee | ||
| TOTAL BASE BID | $ 625,000.00 |
| BID ALTERNATES - ALTERNATES TO BE LISTED ON SCHEDULE FOR DURATION & ALL PRICING MUST INCLUDE ALL COSTS (FEE/GCS/BONDS/INSURANCE) | |
| L1 | 1. Alternate 1 - |
| L2 | 2. Alternate 2 - |
| L3 | |
| L4 |
BELOW USED FOR EVALUATION PURPOSES AND MUST BE COMPELTED
| UNIT RATES FOR FUTURE WORK WITHIN CONTRACT - FAILURE TO NOT INCLUDE UNIT PRICE CAN DISQUALIFY BID | ||||
| Description | Value | Value | Unit | |
| ENGINEERED WOOD FIBER (EWF), SURFACING | $ - 0 | $ - 0 | 100 SF @ 12" DEPTH PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| POURED-IN-PLACE (PIP), SURFACING | $ - 0 | $ - 0 | PER DETAIL - 100 SF PRICE INCLUDES ALL LABOR/EQUIPMENT/MATERIALS - | |
| TOPSOIL | $ - 0 | $ - 0 | 50 CYD PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| TOPSOIL SEED/MULCH | $ - 0 | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| NATURAL SOD | $ - 0 | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS | |
| IRRIGATION | $ - 0 | $ - 0 | PER DETAIL SF PRICE- INCLUDES ALL LABOR/EQUIPMENT/MATERIALS |
| Construction Manager's Project Personnel | *Hourly Rate* | *Hourly Rate* | *Provide Fully Burdened Labor Rates* | |
| Project Manager | $0.00 | $0.00 | ||
| Project Superintendent | $0.00 | $0.00 | ||
| Project Engineer | $0.00 | $0.00 | ||
| Project Estimator | $0.00 | $0.00 | ||
| Accounting | $0.00 | $0.00 | ||
| Clerical | $0.00 | $0.00 | ||
| Journeyman for General Contractor | $0.00 | $0.00 | ||
| Laborer | $0.00 | $0.00 | ||
| Others: | $0.00 | $0.00 |