7-Attachment I Specifications.pdf
PDF 2 MB Posted
- Solicitation number
- 545190
- Issued by
- Wayne County, Detroit City, Michigan
About this file
Summary of MLK Memorial Park Improvements - General and Technical Specifications
This document is a comprehensive specifications guide issued by the City of Detroit Office of Contracting and Procurement for improvements to Martin Luther King Memorial Park. The specifications are organized into two divisions: General Requirements (Division 1) and Technical Specifications (Division 2), following the Construction Specifications Institute (CSI) format. The work scope includes installation of playground equipment, trellis structures, brick paver installation, asphalt and concrete work, site amenities such as benches and picnic tables, topsoiling, sod lawn work, park restoration, and miscellaneous related work as shown on project drawings. The contract is awarded as a single lump sum bid for the complete project, with proposals evaluated based on criteria outlined in the Request for Proposal. A pre-award meeting will be conducted prior to contract award to assist in the review process. The successful contractor must obtain the general building permit and all trade or special permits at its own expense, with final permit clearances serving as a condition of final payment. The contractor is responsible for providing all necessary surveying points, grade stakes, and staking maintenance throughout the project duration.
Specific technical requirements include providing structural soil (CU-Structural Soil), various fill and subbase materials, asphalt and concrete paving, play area protective surfacing, landscape materials, and irrigation systems. The contractor must submit detailed submittals within three weeks of contract award, including a material status report, progress schedule, concrete mix designs, shop drawings, and equipment catalogs. A pre-construction conference will be held prior to issuance of the Notice to Proceed to clarify labor standards, permits, schedules, and safety regulations. The contractor must employ a full-time field superintendent and conduct monthly project meetings at minimum. All materials require City Representative approval before delivery to the site, with field check testing permitted even after previous approval. The contractor bears all costs for testing and inspection services, including geotechnical testing performed by qualified independent laboratories acceptable to the City. As-built drawings, operation and maintenance manuals, equipment warranties, and subcontractor guarantees must be submitted prior to final payment, and the site must be cleaned to commercial standards upon project completion.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Detroit
Office of Contracting and Procurement (OCP)
MLK Memorial Park – Improvements Request for Proposal
GENERAL AND TECHNICAL
SPECIFICATIONS
GENERAL REQUIREMENTS AND TECHNICAL
SPECIFICATIONS
TABLE OF CONTENTS
DIVISION ONE: GENERAL REQUIREMENTS
GS General Specifications
1. Specifications GS 1
2. Publications by Reference GS 1-3
3. Abbreviations GS 3
4. Materials by Reference GS 3
5. Equipment GS 3-4
6. Information by Contractor GS 4-6
7. Samples, Certifications, and Tests GS 6-8
8. Materials, Delivery, Storage, and Handling GS 8-9
9. Water for Construction GS 9
10. Temporary Power and Light GS 9
11. Hours of Work GS 9-10
12. Progress Schedule GS 10
13. Working Area and Maintenance of Traffic GS 11
14. Signs + Attachment A (Project Sign) GS 12
15. Field Office GS 12
16. Temporary Construction Facilities, Controls & Fencing GS 13-14
17. Cleanliness of Work and Streets GS 14
18. Sanitary Requirements GS 15
19. First Aid GS 15
20. Barricades and Lights GS 15
21. Cleanout of Manholes, and Catch Basins GS 15
22. Temporary Enclosures GS 15
23. Temporary Heat GS 16
24. Final Cleaning and Building GS 16
25. Equipment Startup and Testing GS 16-17
26. Soil Conditions GS 17
27. Ventilation GS 17
28. Existing Utilities GS 17-18
29. Maintenance Sewage Flow and Drainage GS 18-19
30. Detroit Water and Sewerage Department Stop Boxes and Gate Wells GS 19
31. Name and Date GS 19
32. Existing Structures GS 19
33. Safety Precautions GS 19-20
34. Pumping and Drainage GS 20
35. Connections to Existing Sewers GS 20
36. Provisions for the Handicapped GS 21
37. Government Regulations GS 21
38. Erosion Control Program GS 21
39. Code Requirements GS 21
40. Existing Landscaping GS 21
41. Historical Specimens GS 21
01000 Summary of Work………………………………………………………………. 01000-1-01000-6
01200 Project Meetings & Coordination……………………………………………….. 01200-1-01200-2
01300 Submittals……………………………………………………………………….. 01300-1-01300-5
01400 Construction Staking……………………………………………………………. 01400-1-01400-3
01700 Project Close Out………………………………………….…………………….. 01700-1-01700-3
DIVISION TWO: TECHNICAL SPECIFICATIONS
02100 Clearing & Demolition …….………………………………………….……….… 02100-1-02100-2
02200 Earthwork………………………………………………………………………… 02200-1-02200-10
02235 Cu-Structural Soil……….………………………………………………………...02235-1-02235-12
02700 Site Drainage and Utilities………………………………………………………...02700-1-02200-5
02710 Drinking Fountain……….………………………………………………………...02710-1-02710-5
02715 Water Supply……….………………………………………………………….…...02715-1-02715-5
02730 Protective Surfacing-Rubber…………………………….………………………...02730-1-02730-10
02731 Protective Surfacing-Eng. Wood Fiber………………….………………………...02731-1-02731-4
02800 Play Area Site Improvements………...………………….………………………...02800-1
02740 Hot Mix Asphalt Paving…………………………………………………………...02740-1-02740-7
02780 Concrete Pavers and Retaining walls……………………………………………...02780-1-02780-4
02800 Site Improvements – Play Areas…….……………………………………………...02800-1-02800-3
02810 Irrigation System…………………………………………………………………...02810-1-02810-7
02821 Chain Link Galvanized Fencing…………………………………………………...02821-1-02821-6
02823 Split Rail Fencing, Bollards & Gates……………………………………………...02823-1-02823-5
02830 Site Amenities………...…….………………………………………………….….02830-1-02830-6
02840 Horseshoe Courts…………………………………………………………………...02840-1-02840-3
02875 Prefabricated Park Shelter……………………………………………………..…...02875-1-02875-4
02900 Landscaping Work………………….……………………………………………...02900-1-02900-19
02920 Turf Restoration Blanket & Maint……………………………………..…………..02920-1-02920-6
02931 Lawn Hydro-Seeding & Landscape Maint. Work………………………..………..02931-1-02931-8
02932 Site Restoration……………………………………………………………………02932-1-02932-7
02990 Landscape Guarantee Maintenance Period…..………………………..…………..02990-1-02990-8
03300 Concrete Work………………………………………………………………….…03300-1-03300-10
01000 -1
SECTION 01000
SUMMARY OF WORK
PART 1: GENERAL
1.1 WORK COVERED UNDER THIS CONTRACT
A. Description
The work covered under this Contract shall consist of the installation of playground equipment, trellis structures, brick paver installation, asphalt and concrete work, and other site amenities/elements (benches, picnic tables, litter receptacles, restoration, and other miscellaneous park work) as shown on the plans as called for in these Specifications. This work shall include permit and inspections, park benches, picnic tables, trash receptacles, topsoiling, sod lawn work, and other miscellaneous park work as shown on the Plans and as called for in these Specifications.
B. Alternates
The Alternate work is described under this Section "Alternates". There are no “Alternates” shown on the plans.
C. Incidental Work
The Contractor shall be responsible for all incidental work that may be deemed necessary for proper and complete performance and installation of the specified work items.
1.2 DIVISION OF CONTRACT DOCUMENTS
A. The work is described by the Contract Documents in three parts:
1. Scope of Work and Bid Forms
2. General Requirements and Technical Specifications
3. Construction Drawings
B. Scope of Work and Bid Forms contains the required Proposal Forms to be used in the submission of a Bid for the Project. It also includes other information relative to the preparation and submission of a bid, bonds, and general conditions, EEO
Requirements.
C. General Requirements and Technical Specifications consist of separate specifications for the Construction Contract. For the contract, the specifications are divided into two divisions per the CSI format.
1. Division 1: General Requirements
01000 -2
The General Requirements cover matters generally applicable to more than one phase of the work, i.e. meetings, submittals, temporary facilities project closeout, and the General Specifications.
2. Division 2: Technical Specifications
a) The technical specifications are subdivided into sections corresponding to a particular aspect of the work. It is not the intent nor shall it be so construed that work included in any one Section be performed by a particular trade or subcontract. Likewise, the work to be performed by a particular trade is not necessarily restricted to that of any one Section. Any item mentioned under any heading must be supplied though it is not called for again under the heading for that respective work.
b) Specific requirements stated in the various sections as though applicable to a single item or one unit of work shall also apply to all additional like items or units of work required by the Contract
Documents, and shall not be interpreted as designating that only a single item or unit is required.
c) Where reference is made in the Technical Specifications to
Publications, such as specifications or standards of a technical society, trade association, governmental agency, and the like, it is understood and agreed that such publications are a part of the
Technical Specifications, to the extent indicated by the specific references thereto, as though fully repeated therein.
d) A copy of each referenced publication at file in the City
Engineering Department is available for inspection by the
Contractor. However, it is assumed that a Contractor experienced in the type of work involved will have his own source of access to the referenced publications.
e) The Contractor shall comply with all rules, regulations, orders, etc.
of any governmental agencies applicable to the work under this
Contract. The Contractor shall cooperate with the City in promptly furnishing any information required by such agencies. It shall be an obligation of the Contractor to keep himself informed of governmental rules, regulations, orders, etc., which are applicable to his work. The Contractor shall make the requirements of this article a part of any subcontract he may enter into.
1.3 CONTRACT
01000 -3
A. Contract Award, if made, is for a complete project in accordance with the plans and specifications under a single lump sum bid. Proposals will be reviewed based on the evaluation criteria provided in the Request for Proposal. There will be a pre-award meeting to assist in the review process before the award.
1.4 FIELD ENGINEERING
A. All necessary surveying points and grade stakes are to be provided by the
Contractor. The grades and staking maintenance is the responsibility of the
Contractor.
1.5 PERMITS
A. The general building permit will be obtained and paid for by the Contractor. The
Contractor is also responsible for obtaining and paying for all trade or other special permits and related inspection and any other costs under the permits for the work. Final permit clearances/acceptances are a condition of final payment.
1.6 PREPARATION OF SITE
A. Providing and maintaining all security fencing around the area, barricades, warning signs, lights, and danger signals, for the protection of life, work, and adjacent property so as not to affect adjacent property owners is the sole responsibility of the Contractor.
B. Protecting and maintaining all conduits, wires, pipes, sewers, and other utilities and structures that are to remain on the property is the sole responsibility of the
Contractor.
C. Removing all protection and guards when the work is completed or when directed by the City Representative is the sole responsibility of the Contractor.
1.7 EXISTING UTILITIES
A. Contractor shall contract "MISS DIG" before construction to accurately locate all public utilities present on the site.
B. Contractor shall notify all public utilities owning conduits, wires, cables, pipes, poles, or lights running through the property and arrange for the removal of such utilities that must be temporarily or permanently moved or abandoned and paying all costs, if any are required, for such work.
*END OF SUMMARY OF WORK SECTION*
01200 - 1
SECTION 01200
PROJECT MEETINGS AND COORDINATION
1.1 DESCRIPTION
A. In general, the work under this Section includes preconstruction and construction project meetings, site visits and job site administration necessary to understand, coordinate, and systematically discuss problems that may arise concerning the work.
PART 2: PRODUCTS
2.1 PRE-AWARD CONFERENCE
A. A Pre-award Conference may be called for by the City to assist in the determination of the lowest qualified Bidder, prior to the issuance of Contract
Documents for execution.
B. Minutes of this meeting will be issued by the City Representative.
2.2 PRE-CONSTRUCTION CONFERENCE
A. A Pre-construction Conference will be called for by the City Representative prior to issuance of the "Notice to Proceed" to clarify labor standards, payrolls, permits, progress schedule, submittals, safety regulations, job organization, communication procedures, change orders and monthly billing procedures.
B. Attendance of the Prime Contractor and all major sub-trade contractors will be required.
C. Minutes of this meeting will be issued by the City Representative.
2.3 PROJECT MEETINGS
A. During construction the General Contractor shall set up Project Meetings as the need arises for project coordination.
B. These meetings shall be held no less than once a month.
01200 - 2
C. Attendance of the Contractor, and City Representative is required and, to the extent possible, the same person(s) should represent each party throughout the progress of the Work. Sub-contractors, suppliers and other interested parties shall be invited to the meetings in which aspects of their work are under discussion, and during such time as their work is in progress on the site.
PART 3: EXECUTION
3.1 PROJECT MEETING
The General Contractor shall set up the agenda in cooperation with the City Representative prior to the meeting. Each meeting shall, in general, cover the following items:
1. Review job paper work and legal requirements including: Safety, payrolls, payment statements, insurance certificates, material delivery, status report, shop drawings and submittal status, bulletin and change order status.
2. Review progress of the work since the last meeting for all trades.
3. Review problem areas and develop corrective measures and procedures to maintain the job progress in accordance with the Progress Schedule.
4. The General Contractor shall issue the Project Meeting minutes to all parties concerned within four (4) days of the meeting.
3.2 JOB SITE ADMINISTRATION
A. The General Contractor shall employ a full-time field superintendent at the job site for the duration of the Work.
*END OF PROJECT MEETINGS & COORDINATION SECTION*
01240 - 1
SECTION 01240
COORDINATION
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
1.2 GENERAL
A. This Section includes requirements for coordinating construction operations including, but not necessarily limited to, the following:
1. Coordination drawings.
2. Administrative and supervisory personnel.
3. Cleaning and protection.
1.3 COORDINATION
A. Coordinate construction to assure efficient and orderly installation of each part of the
Work. Coordinate operations that depend on each other for proper installation, connection, and operation.
1. Schedule operations in the sequence required to obtain the best results where installation of one part depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to assure maximum accessibility for maintenance, service, and repair.
3. Make provisions to accommodate items scheduled for later installation.
B. Where necessary, prepare memoranda for distribution to each party involved, outlining procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.
1. Prepare similar memoranda for the Owner and separate contractors where coordination of their work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required procedures with other activities to avoid conflicts and assure orderly progress. Such activities include, but are not limited to, the following:
1. Preparation of schedules.
2. Delivery and processing of submittals.
3. Progress meetings.
4. Project closeout activities.
D. Conservation: Coordinate construction to assure that operations are carried out with consideration for conservation of energy, water, and materials.
1. Salvage materials and equipment involved in performance of, but not incorporated in, the Work.
01240 - 2
E. Coordination Drawings: Prepare coordination drawings if needed for installation of products and materials fabricated by separate entities. Prepare coordination drawings where limited space necessitates maximum utilization of space for efficient installation of different components.
1. Show the relationship of components shown on separate shop drawings.
2. Indicate required installation sequences.
3. Comply with requirements contained in Section "Submittals."
F. Staff Names: Within 15 days of commencement of construction, submit a list of the
Contractor's staff assignments, including the superintendent and other personnel at the Project Site.
PART 2 : PRODUCTS -- NOT APPLICABLE TO THIS SECTION
PART 3: EXECUTION
3.1 EXECUTION
A. Inspection of Conditions: Require Installers of major components to inspect substrate and conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have been corrected.
B. Coordinate temporary enclosures with inspections and tests to minimize the need to uncover completed construction.
C. Clean and protect construction in progress and adjoining materials, during handling and installation. Apply protective covering to assure protection from damage.
D. Clean and maintain completed construction as necessary through the construction period.
Adjust and lubricate operable components to assure operability without damaging effects.
E. Limiting Exposures: Supervise construction to assure that no part is subject to harmful, dangerous, or damaging exposure. Such exposures include, but are not limited to, the following:
1. Excessive static or dynamic loading.
2. Excessive internal or external pressures.
3. Excessively high or low temperatures.
4. Water or ice.
5. Solvents and chemicals.
6. Abrasion.
7. Soiling, staining, and corrosion.
8. Combustion.
* END OF SECTION *
01300 - 1
SECTION 01300
SUBMITTALS
A. In general, the work under this Section includes, but is not limited to the following:
1. Submission of concrete mix designs, and concrete cylinder test results.
2. Submission of shop drawings, catalog cuts, numbers, and manufacturer’s information for all site improvements listed, called for or required. In the beginning the Contractor shall submit a list of submittals, no later than the Pre Construction Meeting.
3. Submission of Schedule of Values, Construction Schedules and hours of work, no later than the Pre Construction Meeting.
B. Whenever possible throughout the Contract Documents, the minimum acceptable quality of workmanship and materials has been defined by the Manufacturer's name and catalogue number, reference to industry or governmental standards, or description of required attributes and performance.
C. To ensure that the specified products are furnished and installed in accordance with the design intent, the Contractor shall submit the various product samples, catalog cuts, descriptive literature and required drawings as called for in this article and in the various specification sections.
D. The Contractor shall make all required submittals, revise, and resubmit as necessary to establish compliance with these specifications in sufficient copies to allow the Recreation Department to retain four copies. All submittals shall be accompanied by a transmittal indicating the specifications section, submittal number, sub-contractor or supplier name, and a brief description. Submittals shall be made to the designated City Representative at the Office of the Detroit
Recreation Department, Planning & Capital Development Division, Landscape
Design Unit, 115 Erskine St, Detroit, Michigan 48214, or as otherwise directed.
1.2 QUALITY ASSURANCE
A. The Contractor shall, prior to making each submittal to the City Representative, review and coordinate all aspects of each item being submitted and verify that what is being submitted complies in all respects with the requirements of the
Contract Documents. The contractor shall affix his signature stamp to each submittal, certifying that this coordination has been performed.
B. No materials for which samples or shop drawings are required for approval shall be delivered to the site until they have been approved unless such requirement is
01300 - 2 expressly waived in writing by the City Representative and then only at the contractor's risk of subsequent rejection.
C. Samples: All samples shall be taken in such manner as to be truly representative of the entire lot and shall not be worked on in any way as to alter the quality or appearance. The samples shall be of such size; quality or number as to permit the City Representative to properly judge their acceptability and make such tests as may be required.
Samples shall be so packed that they reach their destination in good condition.
All samples shall be properly labeled, or otherwise marked, to show the material or product represented, its place of origin, the name of producer, the name of contractor, and the contract number for which it is intended.
The samples shall be delivered with all transportation charges prepaid by the
Contractor to the location designated.
D. Certificates: When stipulated in the Technical Specifications or required by the
City Representative, a certificate shall be submitted to the City Representative in triplicate, attesting that the materials, equipment, or accessory submitted complies with the contract requirements. The certificate shall include the following information:
1. Name and brand of the product, name of the manufacturer, location of the plant.
2. If the statement originates with the producer, the Contractor shall endorse all claims and submit the statement, in his own name. The Contractor shall also guarantee that all materials furnished for use under the contract will be in compliance with the samples and certificates.
3. An outline giving the chemical and physical properties of the material represented by the sample properties of the material represented by the sample submitted, and giving the name of the testing laboratory which made the test, and the dates of the tests. This information may be omitted in the case of materials required to conform to Federal Specifications or
ASTM Standards, provided a certified statement by an acceptable testing laboratory is furnished in lieu thereof.
E. Tests: Tests will be made by such methods and in such numbers as the City
Inspector shall determine to be adequate and equitable. Whenever materials are required to conform to Federal Specifications or ASTM Standards, and such specifications are accepted as establishing the technical qualities and testing methods, they shall not necessarily govern the number of tests required to be made. The City Representative may require laboratory tests on samples submitted or may approve materials on the basis of data submitted in certificates with the samples.
If the tests of the samples submitted indicate that the proposed material will not conform to the contract requirements, the City Representative will notify the
Contractor that the proposed material is unacceptable and rejected and will furnish the Contractor the basic reasons for such rejection.
F. City's Approval: Approval by the City Representative shall be general only and shall not constitute a waiver of the City's right to demand full compliance with the contract requirements. When a material has been approved, no change in brand or make will be permitted unless:
01300 - 3
1. The Manufacturer cannot make satisfactory delivery; or
2. The material as delivered fails to comply with the contract requirements.
G. Field Check Test: After actual deliveries of materials to the site, the City
Representative will make such check tests as they deem necessary to ensure compliance with the materials delivered or used with the contract requirements.
The City Representative may reject such materials for cause even though such materials have previously been given general approval.
If materials which fail to meet field check tests have been incorporated in he work, the City Representative shall have the authority to require their removal and replacement with proper materials conforming to the contract requirements, at no cost to the City.
PART 2: PRODUCTS
2.1 SUBMITTALS
A. Submittal Schedule, in the form of a material status report shall be submitted to the City Representative within three (3) weeks, twenty-one (21) days, of contract award indicating submittal date(s) and expected fabrication and delivery dates to job site. The material status report shall be kept current and updated every two
(2) weeks during the early stages of the contract submittal period, then as required thereafter.
B. The successful contractor shall submit a list of material suppliers for the City
Representative’s approval. Written notification and approval is required for any subsequent change to the original approval list.
C. The Contractor shall also submit his detailed billing breakdown on the standard
AIA Project Billing forms for approval of the City Representative prior to the pre construction meeting and commencement of the work.
D. Prior to commencing work, the Contractor shall submit a preliminary construction Progress Schedule. Contractor shall make any revisions deemed necessary and resubmit it to the City Representative for final approval. The final
Construction Progress Schedule shall include the following:
1. The anticipated date of commencement and completion of the various operations to be performed under the Contract, including submission of shop drawings and other information requiring approval of the City
Representative which directly controls the key operations.
2. The sequence and inter-relationship of each of these operations with the others and, when applicable, with those of other related contracts and;
3. The estimated time required for fabrication or delivery or both, of controlling materials and equipment required for the work.
E. The Schedule shall be predicted on the completion of all the work on or before the date specified herein and as called for in the Bid Documents.. No additional cost will be born by the City should the contractor fall behind the scheduled completion date and schedule timeframe. The Contractor shall take whatever means and methods he deems necessary, should work fall behind schedule, to get it back on schedule, at no additional costs to the City.
01300 - 4
The Schedule, once accepted as satisfactory by all parties concerned shall be strictly adhered to by the Contractor, subject, however, to the provisions below relating to revisions.
The accepted Schedule shall be revised by the Contractor and five copies submitted to the City Representative.
1. If the time allowed for completion is extended by the City.
2. If extra work was ordered by the City, which is not included in the original project scope of work operations originally called for.
3. If the actual progress of the work is such that, in the judgment of the City
Representative, the remaining work to be performed will not be started or completed, or both as indicated by the current schedule.
The revisions shall be made in such a manner as to not obliterate the original schedule but will show where and to what extent the schedule has been revised.
Any revised schedule shall, once accepted, be strictly adhered to by the
Contractor.
F. Specific Submittals:
1. Stone in Zip lock Bags of Asphalt Trail and Play Area sub base materials, per section 02200.
2. Asphalt mix design, and sealer material, per Section 02740,
3. Play equipment cuts for all new materials called for under Section 02800,
4. Galvanized fence pipe (s), fabric and sureloc materials, per Section
02820,
5. Catalogue cuts, numbers and literature for all site Amenities and other improvements, per Section 02830,
6. Material spec sheets and turf submittals called for under the several
02900 Sections,
7. Concrete mix designs and results to be attained per Section 03300
8. Concrete cylinder test results per Section 03300
9. Any other submittals specifically called for in the General or Technical
Specifications,
10. A List of all sub contractors and suppliers including Company Name, address, contact name and phone number for the Project.
3.1 MATERIALS
A. In general, consecutively number all submittals and forward to the City
Representative with letter of transmittal.
B. All submittals shall be scheduled to allow at least ten (10) working days for the
Review Process by the City Representative.
C. Delays in submission of submittals will not be an acceptable basis for extension of the contract completion date.
01300 - 5
D. City Representative’s review shall not be construed as a complete check, but that the general method of construction and detailing is satisfactory. Review shall not relieve the contractor from responsibility for errors or omissions, which may exist.
Review notations shall be one of the following.
1. "Approved": Contractor authorized to proceed with fabrication, purchase, or both.
2. "Approved as Noted": Contractor authorized to proceed with fabrication, purchase or both subject to the items so noted, subject to the revisions, if any, requested by the City Representative’s review comments.
3. Approval as Noted-Resubmit": Contractor not to proceed with purchase or fabrication. Submittal to be revised as called for and re-submitted for approval.
4. Not Approved": Contractor to re-review and re-submit submittal which is in compliance with the Contract Documents and in accordance with any review notations by the City Representative. If the Contractor considers any required revision to be a change, he shall so notify the City Representative as provided under "Changes" in the General Conditions.
*END OF SUBMITTALS SECTION*
01400 - 1
SECTION 01400
CONSTRUCTION STAKING
1.1 RESPONSIBILITY FOR STAKING
A. The Contractor shall establish the property lines and a benchmark on the site, as required by the extent of the work to be performed as indicated on the Drawings. The Contractor shall make and pay all costs associated with the setting of stakes for the grades and layout of the complete work including but not limited to all measurements and establish such points, lines, and elevations necessary for construction. The Contractor shall set all required stakes and markers showing the survey locations and grades for the complete layout of the various parts of the Work.
B. The Contractor shall utilize the proper lasers, or other surveying instruments, run by qualified competent personnel to control the construction installation Work. If the method being used by the Contractor fails to give proper alignment and grade control to the Work, the City shall be empowered to order the Contractor to use such other method(s) as will provide adequate control.
C. The City may require the Contractor, at the Contractor’s expense, to provide such masts, scaffolds, batter-boards, straightedges, templates, or other devices as may be necessary to facilitate laying out the work, and for observing and constructing the Work.
D. The City Representative shall have the right at any time to determine, in accordance with the
Drawings or orders, the correctness and completeness of the measurements taken, or points, lines, and grades established by the Contractor, and any imperfect or incorrect construction resulting from errors in such measurements, points, lines, or grades made or established by the Contractor shall be corrected or replaced by construction which is strictly in accordance with the Contract requirements and at the Contractor’s expense. While the City Representative may draw the Contractor’s attention to errors or incompleteness in the Contractor’s measurements, points, lines, or grades, there is no admission on the part of the City Representative to point out such errors or incompleteness, which would give the Contractor any right to make any claim against the City for additional costs or shall in any way relieve the Contractor of his obligations according to the terms of this Contract.
1.2 STAKING SCHEDULE
A. The Contractor shall submit a completed staking schedule on a form acceptable to the City Representative showing the order in which the Contractor proposes to conduct the construction operation prior to the starting of any Work. The schedule shall be submitted to the City Representative a minimum of three (3) working days prior to the start of construction.
01400 - 2
1.3 LINE AND GRADE
A. The Contractor shall be responsible for any additional line and grade stakes that need replacement regardless of the reason or need. The Contractor shall provide proper protection and preserve all established lines and grade stakes, including any permanent benchmarks.
1.4 RELOCATION AND RE-ESTABLISHMENT
A. Construction Stakes - Where change of location of stakes has been requested by the Contractor, or where the Contractor fails to properly preserve the original construction survey stakes, such resetting or relocations of stakes shall be promptly done by the Contractor and at his expense.
B. Survey Control Points - The Contractor shall bear all expense involved in re-establishing and/or resetting any survey control point, land survey point or monument lost or disturbed during his construction operation. Such Work shall be done under the direct supervision of a licensed land surveyor.
1.5 STAKING PIPELINES
A. Provide sufficient staking at all pipelines to properly install the piping to required slope and grades. Line and grade points shall be established at each structure and at not less than 100 -foot intervals, with benchmarks at maximum 1/4-mile intervals.
1.6 STAKING EXISTING DRAINAGE
A. Unless otherwise indicated on the Plans or specified herein, the Contractor shall bear all expenses including the staking of lines and grades required to restore proper grading of all surface drainage, including swales and ditches disturbed during the construction operation.
1.7 STAKING EARTH WORK
A. Parks, Parking Lots, Or Other Site Improvements -First staking: Line points at 100 - foot intervals for clearing and grubbing. Subsequent staking: Final grade points on 50-foot grid or less as necessary for all grade changes and as necessary to layout and construct the complete Work.
B. Site Improvement Paving - First staking: Line points at 100-foot intervals for clearing and grubbing. Subsequent staking: Final grade points at 50-foot intervals or less on centerline and proper offsets, and at grade changes.
1.8 STAKING ROADWAY & PATHWAYS
A. Line and grade points for walking trail centerline finish surface at 50-foot intervals and at grade changes, points of curve and at 25-foot intervals or less on curves.
01400 - 3
1.9 STAKING OF BUILDINGS AND STRUCTURES
A. Initial staking of two (2) intersecting base lines and a minimum of two bench marks on the site. Thereafter as required to establish and construct the work.
PART 2 NOT USED
3.1 STAKING GENERAL INSTRUCTIONS AND INTENT
A. Walking Trail and Football Field Area
1. The general intent for the walking trail is to be not more than 1-inch above finish lawn grades. Minor surface irregularities are to be smoothed out with the walking trail finish grade generally following the existing grade with smooth vertical and horizontal alignment contusive to the activities that will be taking place upon the surface, namely walking, jogging, and roller blading if installed in asphalt. The areas immediately adjacent shall be smoothed out to allow for easy mowing and maintenance activities when the lawn fine grading is completed.
2. The walking trail shall be first staked for alignment down the centerline and the City Representative’s approval called for as to alignment. Any adjustments in the alignment shall be done promptly and at no additional costs to the City, until alignment approval is obtained.
3. Once the alignment has been approved, the walking trail have grade stakes established along with necessary off set staking in preparation for the excavation of the walking trail. Once the grade stakes have been set, final approval shall be called for.
4. The football field shall be layed out by staking at the four corners of the field and as called for on the drawings. Once the layout stakes have been set, approval shall be called for.
5. Following the field layout approval permanent irons shall be set at each corner, and all additional staking shall occur for the setting of the football fields goal line pylons, posts and the field stripping for the Football Field game. The surveyor shall check the layout work of the stripping prior to the actual stripping to insure that the fields are properly marked, whenever that activity is scheduled to take place.
B. Play Areas
1. The Play Areas shall have all play equipment appropriately staked to allow for the proper protective zones that are required around each piece of the play equipment. The Contractor shall coordinate this portion of the work with the vendor manufacturer representatives to insure that the layout between the various equipment pieces is correct. The Contractor, at his expense, is responsible for any final revisions to the AutoCAD drawings based upon the various equipment manufacturers used for the project. It is anticipated that there could be more than one company’s equipment being used on the site. Coordination between the
01400 - 4 various suppliers is at the sole expense of the Contractor.
2. No additional costs of any kind will be allowed because the selected equipment might require additional space and thus require additional excavation and protective surfacing underneath the equipment.
C. Other Park Survey Work
1. Various site amenities will need to be located and staked per the drawings.
2. If the contract includes trees, the City Represenatitive will work with the
Contractor in the staking of all locations for the trees. The Contractor shall provide the stakes and labor to place them.
*END OF CONSTRUCTION STAKING SECTION*
01700 - 1
SECTION 01700
PROJECT CLOSE OUT
PART 1: GENERAL
1.1 DESCRIPTION
A. In general, the work under this Section includes the following items:
1. Project cleanup.
2. Operation and maintenance data.
3. As built drawings.
4. Guarantees and warranties.
5. Permit clearances/or acceptance.
PART 2: PRODUCTS
2.1 CLEANING MATERIALS AND EQUIPMENT
A. Provide all required personnel, equipment and materials needed to maintain the specified standard of cleanliness. Use only materials and equipment, which are compatible with the surface being cleaned as recommended by the manufacturer of the material or as approved by the Owner.
B. Obtain from the City the necessary manufacture cleaning kit for the Gametime slide.
2.2 OPERATION AND MAINTENANCE DATA
A. The Contractor shall obtain from the various sub-trade contractors various operation and maintenance data, replacement parts lists, maintenance schedule requirements, etc., and bind into a notebook. Two sets shall be turned over to the Owner prior to request for final payment.
2.3 AS BUILT DRAWINGS
A. Final record "As Built" drawings shall be neatly prepared on copies of the contract drawings by the Contractor and turned over to the Owner. The Owner will provide one reproducible copy of each drawing to the Contractor for his purpose and at his request.
2.4 GUARANTEES AND WARRANTIES
A. The Contractor shall also, once the work has been completed and the work in its totality accepted by all parties, forward a general guarantee for the project as indicated under the General & Technical Specifications.
01700 - 2
B. Subcontractor's guarantees, equipment and material warranties shall also be included as part of the guarantee submittal for the time length pertaining to each Section of the work.
C. The general guarantee should specifically identify individual portions of the work, which receive greater than that indicated in the individual Sections of the Specifications.
2.5 PERMIT CLEARANCES/ACCEPTANCES
All permits shall have final clearances or acceptances issued as a condition for final payment.
3.1 PROJECT CLEAN - UP
A. Proper cleaning shall be done periodically so as not to allow the accumulation of scrap, debris, waste materials and other items on the project site.
B. In general, the site and storage areas should be kept in a reasonably neat and orderly condition at all times.
C. Construction shall be cleaned on a daily basis to ensure workman safety. Waste materials shall be deposited in an approved container such as a dumpster.
D. Clean up shall include that which is called for individual sections of the Technical
Specifications
3.2 FINAL CLEANING
A. Final cleaning shall be construed to mean a level of cleanliness generally provided by skilled cleaners using commercial quality, site maintenance equipment and materials.
B. Final site cleaning shall consist of hosing down and sweeping all hard surfaced areas including any public roads, which shows visible signs of dust and debris from construction traffic. All debris shall be removed and disposed of off site.
C. The Contractor shall schedule final cleaning as approved by the Owner to enable the Owner to accept a completely clean project, and prior to the established Dedication Date.
01700 - 3
3.3 OPERATION AND MAINTENANCE MANUAL
A. Operation and maintenance manuals shall be neatly bound into a loose leaf style notebook with each trade so indexed. In some cases, approved shop drawings and submittals may suffice for use in this regard.
B. Equipment parts lists for replacement purposes shall be included wherever possible.
B. Equipment subject to winterization procedures shall be accompanied with both winterization and spring start-up instructions.
3.4 AS BUILT DRAWINGS
A. Final "As-Built" drawings shall be prepared by the Contractor from the job set maintained on the job. All markings showing changes should be shown in colored pencil. If the job set has been kept in a neat and orderly condition throughout the progress of the work, and they are acceptable to the Owner, they may be used as the record "As-built" drawings submittal.
*END OF PROJECT CLOSE OUT SECTION*
02100 - 1
SECTION 02100
CLEARING AND DEMOLITION
A. In general, the work under this Section includes all clearing, removals and grubbing work indicated on the Plans and as required, complete with cutting and removal of brush, roots and undergrowth, removals of sidewalks, curbing, metals, fencing, light poles and other types of debris, footings, and foundations, old posts and signs, and any other items called for on the drawings. All items of clearing, removals, and demolition shall be legally disposed of offsite.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Summary of Work, Section 01000
B. Measurement & Payment, Section 01025
C. Alternates, Section 01100
D. Earthwork, Section 02200
E. Hot-Mix Asphalt Paving, Section 02740
F. Play Area Site Improvements, Section 02800
G. Landscape Work, Section 02900
H. Lawn Hydro-Seeding & Landscape Maintenance Work, Section 02931
I. Concrete Work, Section 03300
PART 2: PRODUCTS
2.1 Provide all necessary permits, equipment, tools, labor, supervision and disposal necessary.
3.1 EXECUTION
A. Contract "Miss Dig" prior to beginning any work in order to locate any underground utilities.
B. Unless otherwise noted, demolition shall include the removal of all items as shown on the drawings and indicated above or in other Sections of these specifications.
C. Demolition Material: All materials removed during the construction as, indicated on the Drawings shall be removed from the site and legally disposed of at an approved dumping site within two days time. No burning of rubbish or debris will be permitted. No large quantities of debris shall be allowed to accumulate on the site.
02100 - 2
3.2 CONCRETE SIDEWALK & MISC. DEMOLITION
A. The Contractor shall remove and dispose of damaged existing concrete sidewalks and any small foundations or footings that may be encountered in the site prep and installation work and/or as indicated on the plans for the construction of all work as shown on the Drawings. Once removed the Contractor shall erect appropriate barricades and maintain them until sidewalk flag replacement work is completed.
3.3 TREE, STUMP AND VEGETATION REMOVAL
A. Remove and dispose of all vegetation, and stumps growing within the existing fence lines, necessary for the construction of all work, unless otherwise directed by the City Represenatitive. This includes the clearing of any trees or shrubbery roots that are in and along the fence lines. All existing stumps shall also be removed by grinding or other approved means.
B. Protect existing trees, which are to remain. Contractor shall protect all trees to remain by the erection of protective fencing as indicated in the Demolition and
Tree Protection Plan, or as further directed by the City Represenatitive.
3.4 MISCELLANEOUS
A. The work shall include all protection, clearing, demolition and disposal as necessary for the complete implementation of the work as shown on the
Drawings, and as recommended by the City Representative without any additional cost to the Owner.
*END OF CLEARING, DEMOLITION AND RELOCATION SECTION*
02200-1
SECTION 02200
EARTHWORK
1.1 RELATED DOCUMENTS
A. The Drawings and general provisions of this Contract, apply to this Section.
1.2 SUMMARY
A. This Section includes the following general earthwork complete with: preserving topsoil, suitable stone sub base and sand materials, protection of all existing utility’s both above and below ground, contacting Miss Dig to mark all site utilities, site improvements and structures to remain on the site, protection of trees and other types of landscape vegetation to remain, excavation for all pavements, parking areas, walking trails, sidewalks, driveways, curbing, fence line maintenance strips and drive approaches, restoration and compaction of backfill along sidewalks, and all other paved elements, grading of the site, construction of berms and other landscape topographic features, miscellaneous excavation for all play areas which includes all areas of protective surfacing and curbing around play areas in which new equipment will be placed by others, all site elements and amenities, soil erosion and sedimentation control permit from the DRD, and removal, transportation, and legal disposal of excess excavation materials from the site, supply and installation of all materials of fill, including submittals and any required testing, topsoiling and spreading of topsoil to depths called for, fine-grading, removal of all sticks, stones and other deleterious materials from the surface ready for the finish surfaces or lawn as specified elsewhere.
1.3 RELATED WORK SPECIFIED ELSEWHERE
A. Summary of Work, Section 01000 B. Measurement & Payments, Section 01025 C. Alternates, Section 01100 D. Clearing & Demolition, Section 02100 E. Protective Surfacing - Rubber, Section 02730 F. Play Area Site Improvements, Section 02800 G. Site Amenities, Section 02830 H. Lawn Hydro-Seeding & Landscape Maintenance Work, Section 02931 I. Concrete, Section 03300
1.4 DEFINITIONS
A. Excavation consists of removal of material encountered to subgrade elevations either required or indicated and subsequent disposal off-site.
B. Unauthorized excavation consists of removal of materials beyond required subgrade elevations or dimensions without specific direction of City Representative. Unauthorized excavation, as well as remedial work directed by City Representative, shall be at Contractor's expense.
02200-2
C. Additional Excavation: When excavation has reached required subgrade elevations, notify City Representative, who will make an inspection of conditions. If City Representative determines that bearing materials at required subgrade elevations are unsuitable, continue excavation until suitable bearing materials are encountered and replace excavated material as directed by City Representative. The Contract Sum may only be adjusted by an approved appropriate Contract Modification. Do not proceed with extra work or incur additional costs without written authorization by the City.
1. Removal of unsuitable material and its replacement as directed will be paid on basis of Conditions of the Contract, as and if stated in the Proposal Unit Prices relative to changes in work.
D. Subgrade: The undisturbed earth or the compacted soil layer immediately below granular subbase, drainage fill, or topsoil materials.
E. Structure: Buildings, foundations, slabs, curbs, or other man-made stationary features occurring below ground surface.
1.5 SUBMITTALS
A. Test Reports: Submit the following reports directly to the City Representative from the testing services agency, with a copy to the Contractor:
1. Test reports on all stone or other backfill material proposed to be used, clearly indicating what each is to be used for. Supply small sample of each material, if so requested.
B. Plan for Soil Erosion & Sedimentation Control measures to be implemented throughout the construction Period. The Permit is to be obtained from the Detroit Recreation Department.
1.6 QUALITY ASSURANCE
A. Codes and Standards: Perform excavation work in compliance with applicable requirements of the standard Detroit Building Codes.
B. Testing and Inspection Service: The Contractor shall employ and pay for a qualified independent geotechnical testing and inspection laboratory, acceptable to the City, to perform soil testing and inspection service during earthwork operations.
1. Testing Laboratory Qualifications: To qualify for acceptance, the geotechnical testing laboratory must demonstrate to City's satisfaction, based on evaluation of laboratory-submitted criteria conforming to ASTM E 699, that it has the experience and capability to conduct required field and laboratory geo-technical testing without delaying the progress of the Work.
1.7 PROJECT CONDITIONS
A. Soil test borings and other exploratory operations may be performed by Contractor, at the
Contractor's option; however, no change in the Contract Sum will be authorized for such exploration.
B. Existing Utilities: Call MISS DIG prior to any excavation. Locate existing underground utilities in areas of excavation work. If utilities are indicated to remain in place, provide adequate means of support and protection during earthwork operations.
02200-3
1. Should uncharted, or incorrectly charted, piping or other utilities be encountered during excavation, consult utility owner immediately for directions. Cooperate with City and utility companies in keeping respective services and facilities in operation.
Repair damaged utilities to satisfaction of utility owner.
2. Do not interrupt existing utilities serving facilities occupied by the City or others, during occupied hours, except when permitted in writing by the City and then only after acceptable temporary utility services have been provided.
a. Provide minimum of 48-hour notice to City, and receive written notice to proceed before interrupting any utility.
3. Coordinate with utility companies for shutoff of services if lines are active.
C. Use of Explosives: Use of explosives is not permitted.
D. Protection of Persons and Property: The Contractor shall install proper and substantial
OSHA compliant barricades, fencing, planks and or other protective measures over open excavations occurring as part of this work and post with warning lights and appropriate warning signage.
1. Operate warning lights as recommended by authorities having jurisdiction.
2. Protect existing or newly installed work, structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.
3. Prior to excavation in and around existing trees the contractor shall install protective fencing around the tree as indicated on the Demolition and Tree Protection Plan.
4. The contractor and all sub-contractors shall not park personal vehicles or company trucks on the site, but at the curb on the street.
6. The contractor shall take every precaution possible to disturb the least amount of the existing park lawn as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .