8. 21037- Bldg.154- Water Softener Replacement drawings March 10 2022.pdf

PDF 5 MB Posted

Attached to
Install Multiplex Water Softener Federal contract opportunity
Solicitation number
12505B22R0005
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This document provides details for a federal contract solicitation to install a multiplex water softener. The United States Department of Agriculture Agricultural Research Service is seeking proposals for installing a water softener located in Ames, Iowa under solicitation number 12505B22R0005. The requirement is set aside as a 100% small business opportunity with a North American Industry Classification System code of 238220 and a small business size standard of $16.50 million. The magnitude of construction is estimated between $250,000 to $500,000. The period of performance is 365 days from receipt of the notice to proceed. Organized site visits are scheduled for June 8 and 9, 2022 and interested parties must pre-register by June 7. Questions regarding the solicitation are due by June 17, 2022 with answers posted as an amendment. Proposals are due in response to the request for proposals and will be evaluated using the criteria specified in the solicitation document.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:

Task

Order #:

Drawing Title:PROJECT TITLE:

FEU Project #:

Drawing Number:

Agricultural Research Service U.S. Department of Agriculture

NCAH

1920 Dayton Avenue Ames, Iowa 50010

Revision:

Client:

Sheet: Of

Designer:

Date:

Date:

GO.00

M1.01

PROJECT COVER SHEET

LOWER LEVEL-MECHANICAL-NEW WORK

1 2

BUILDING 154 WATER SOFTENER REPLACEMENT

Thomas.Walker Text Box

UNITED STATES DEPARTMENT OF AGRICULTURE

AGRICULTURE RESEARCH SERVICE

NATIONAL CENTERS FOR ANIMAL HEALTH

Thomas.Walker Line

Thomas.Walker Snapshot

Thomas.Walker Text Box

Thomas.Walker Stamp

Randy.Ferriss Text Box

Randy.Ferriss Callout SITE ENTRANCE 1920 Dayton Avenue

Randy.Ferriss Callout

BUILDING 154

Randy.Ferriss Cross-Out

BOILER ROOM

EXISTING 1004

2.6

A.2A.4A.6A.8

1.1

3.1

5.6

1.8

FEC.9 DCBA

1.6

EX FLOOR

DRAIN

EX BOILER

CHEMICAL FEED

TANK (PHOSPHATE)

CONTROL PANEL

EX WINDBOX

EX BOILER NO 3

EX FLOOR

DRAIN

EX. PLANT

MASTER CONTROL

PANEL1/8" CF

EX SINK

EX CFP-7

EX CFP-6

EX CFP-4

EX CFP-3

EX CFP-2

EX CFP-1

EX 1/8" CF

EX 1/8" CF

EX 2 1/2" FW

EX 2"

35NG

EX 8" 10NG

EX 2" 35NG

EX 1" NG

EX 1" 35NG

(PILOT)

EX 3" 35NG

EX 3" 35NG

EX INSERTION

FLOW METER

EX 2" VENT

(35NG)

EX 1/2" VENT

(PILOT)

EX BOILER NO 3

EX 2" FW

EX 1" FOS

& FOR

EX 2" VENT

(PILOT)

EX 1" 10NG

(PILOT)

EX 1/2"

VENT (PILOT)

EX 3/4"

VENT

(35NG)

4"FWS

6"FWS

ROLLER SUPPORT

FWP-E

1/8" CF

CHEMICAL FEED TANK

FLEX CONNECTOR

BOILER CONTROL PANEL

PLANT PANEL

1/8" CF

2"FW

1/8" CF

2"FW DN

6"FW

6"FWS

2"BO

2"BO

FIRE CYLINDER

CABINET

4" GROUND PAD

12x16 MANWAY

2"ED

3"ED

6"PC

CNDP-E

CNDP-E

CNDP-E

1" PC

2"BO

2"CW

2"CW

BLOW-OFF TANK

8"V

6"ED

1 1/2"SS

2 1/2"V

2"V

STRAINER

AIR RECEIVER

1"IA

1/4" CF

4"SW

4"SW

1/2"SW

3/4"CBD

3/4"CBD

3/4"CBD

3/4"CBD

3/4"CBD

3/4"CBD

3/4"CBD

3/8" CBD

3/8" FWS

3/8" PC

SAMPLE COOLER

(TYP.7)

CHEMICAL CABINET

CBD SAMPLE SINK

1 1/2"BO

1 1/2"BO

2"FW

LADDER

1 1/2"BO

1 1/2"BO

3/4"SC125

1 1/2"S125

3/4"SC125

1/2"CO2

3/4"CO2

1 1/2"IA

3/4"SC125

1"S125

2"BO

2"BO

BLR-4

1/8" CF

3/4"CBD

2" FW UP

1" FOR UP

1" FOS UP

3/4" PA UP

3/4" SC125 UP

1" S125 UP

3" 35NG UP

6" S125 UP

1" S125 UP

1" SC125 UP

1" S125 UP

1 1/2"BO

1 1/2"BO

SRV UP

3" 35NG

1" 10NG

3" 35NG

1" S125 UP

GV AND PROPANE

REGULATOR

VENT UP

N

Softener Skid 12'10" by 4'2" by 12' high

Brine tank

Trench Drain

Electric panels

Roll up door.

Drawing Number

Sheet: Of

Drawing Title:

LOWER LEVEL-MECHANICAL-NEW WORK

M1.01

2 2T N

O R H

1/4" = 1'-0"1

LOWER LEVEL - MECHANICAL - NEW WORK

Randy.Ferriss Oval

Randy.Ferriss Sticky Note

Randy.Ferriss Rectangle

Randy.Ferriss Oval

Randy.Ferriss Oval

Randy.Ferriss Text Box 3" inlet/outlet ProPress valves located no more than 8' off of the floor.

Randy.Ferriss Line

Randy.Ferriss Line

Randy.Ferriss Line

Randy.Ferriss Line

Randy.Ferriss Line

Randy.Ferriss Line

Randy.Ferriss Line

Randy.Ferriss Text Box 3/4" Rigid Conduit

Randy.Ferriss Line

Combine drawings for softener.pdf
2 Drawings mod for softener project 100%_CD_Submittal_drawings.pdf
USDA_Mechanical_05-31-18
Sheets
M2.02 - LOWER LEVEL - AREA A - MECHANICAL - NEW WORK
EPM Dropdown: [Ben A'Hearn]
CO Dropdown: [--]
COR Dropdown: [Randy Ferriss]
LC: Randy Ferriss
PROJECT TITLE: Building 154- Water Softener Replacement
Task Order-Contract #:
Task Order-Contract Award Date=:
Drawing Title:: PROJECT COVER SHEET
Revision Date::
File Name=:
Drawing Number: G0.00
FEU Project #: 21037
Client=ARU, APHIS, CVB, etc:
Sheet Of:
Sheet # Total:
Project Title:
PAGE:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
16:
17:
DESCRIPTION:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
15:
16:

Revision: [--]

File details come from the government source that posted it. Updated .