About this file
Amendment to extend proposal due date and answer RFIs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Ysleta_Elevator_Modernization _Solicitation_Package _5-1-15.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
The purpose of this amendment is to extend the proposal due date for the Ysleta LPOE, Elevator Modernization FROM: 6/4/15 TO: 6/11/15, an extension of 7 days. Proposals will be due by 5PM CST on 6/11/15.
Ysleta Elevator Modernization, Amendment 0001, RFI Responses 6/1/15. ...See Continuation Page
1 3
0001 JUN 01, 2015 7PM-15-0159
7PQ
GSA PBS 7PQ
ACQUISITION MANAGEMENT DIVISION
819 TAYLOR ST RM 12B01
FORT WORTH TX 76102
See Block 6
GS-07P-15-UK-P-0027
MAY 01, 2015
See Schedule
Continuation Page
PAGE 2 OF 3 GS-07P-15-UK-P-0027/0001
Continued from Block 14...
1. We will extend the proposal due date FROM: 6/4/15 TO: 6/11/15. The specifications are considered to be the minimum standard. Anything above and beyond is acceptable. Anything below the specification standard is not acceptable.
2. Q. Is it acceptable to propose a holeless elevator?
2. A. Holeless is not only acceptable but preferred.
3. Q. Clarify which Buy American clause applies to this project.
3. A. FAR 52.225-9 Buy American, Construction Materials (MAY 2014), it starts on page 84 of the solicitation documents and is page 20 of 'The Agreement' portion of the documents.
4. Q. When are the manuals due?
4. A. Due upon completion.
5. Q. Weekly exams of a hydraulic elevator are unusual. Are monthly exams acceptable?
5. A. Yes
6. Q. There is a potential, when removing a cylinder, that the hole may cave in and require a steel casing to hold open. Should contractors assume the worst case scenario and include monies to redrill, remove contaminated soils and install steel casing or will contractor be able to request a change order for this?
6. A. Any unforeseen site condition found will be verified by GSA, and work will stop until a change order is agreed upon and in effect.
7. Please refer to the specifications provided. They include the specifications for the tallest cab height that code will allow with the existing overhead.
8. Specifications state "similar to" Forms and Surfaces. Does not have to be a specific supplier, but must look "similar to" the specified cab materials. Contractors will submit the intended product and GSA will approve or reject the submittal.
9. This is an occupied facility. Any work that will be extremely loud, dirty, or disruptive, must be performed after normal work hours. The work space and building area must be clean and free of dirt and debris prior to the building opening every morning.
10. Q. Does code require installation a fire sprinkler system?
10. A. No
11. Q. If a shunt trip disconnect is required to be installed, is this due to the installation of a fire sprinkler system in the future?
11. A. Yes
12. Q. Is there enough clearance to install lighting with covers in the hoist way?
12. A. Unknown, but there is probably a way to get it done
Continuation Page
PAGE 3 OF 3 GS-07P-15-UK-P-0027/0001
13. Q. Does the existing structure allow to install a hoist beam rated at 5000lbs?
13. A. Unknown. Contractor would have to verify
14. Q. How many telephone lines is required and how far?
14. A. One line will be provided and ran to the elevator machine room. The elevator contractor will connect to their equipment.
DO NOT FORGET TO ACKNOWLEDGE THE AMENDMENT WHEN SUBMITTING YOUR PROPOSAL