About this file

This is Amendment A00001 to solicitation 75H70125Q00012 for the J Davis Septic and Water Line project, issued by the Indian Health Services (IHS) Division of Engineering Services in Dallas. The amendment makes updates to various FAR provisions and clauses in response to recent Executive Orders, specifically EO 14148 which revoked EO14057, and Section 2 of EO 14208.

The amendment updates seven FAR clauses related to annual representations, simplified acquisitions, labor standards, biobased products, and commercial services. It also deletes four FAR clauses concerning apprentices/trainees, equal opportunity, affirmative action compliance, and sustainable products. The proposal due date remains March 6, 2025 at 2:00pm CST. The amendment includes a notice about potential System for Award Management (SAM) lag times in updating these changes, noting that contracting officers will not consider or enforce certain representations during award decisions.

View the file

Other files for this federal contract opportunity

Other files attached to J Davis Septic and Water Line, newest first.
File Type Posted
75H70125Q00012-A00002.pdf PDF
4 -US DOL WD OR20250079 Dated 1-10-2025.pdf PDF
3-Measure and Payment.pdf PDF
2-Site Plan.pdf PDF
A11 Pre-Solicitation SAM Notice.pdf PDF
1-SOW.pdf PDF
B01 75H70125Q00012.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

4. REQUISITION/PURCHASE REQ. NO.

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED 16C. DATE SIGNED

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

2. AMENDMENT/MODIFICATION NO.

A00001

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project No. PO-22-D09H, J Davis Septic and Water Line, Amendment A00001.

1. See page 2 below - The purpose of this amendment is to Add & Remove Solicitation Provision and Clauses HHS FAR Class Deviation

2025-02 re Section 2 of Executive Order (EO) 14148, which revoked EO14057, and Section 2 of EO 14208 (CAAC Letter 2025-02 Supplement 1).

Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 106-840 Dallas, TX 75202-5433

Indian Health Services (IHS) Division of Engineering Services (DES) - Dallas 1301 Young Street, Suite 106-840 Dallas, TX 75202-5433

10A. MODIFICATION OF CONTRACT/ORDER NO.

5. PROJECT NO. (If applicable)

PO-22-D09H

PAGE OF PAGES

10B. DATED (SEE ITEM 13)

3. EFFECTIVE DATE

2-24-2025

75H701-25-Q-00012

2/6/2025 is not extended.

One (1)

X

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

X X

ROBERT S. MILLER

romiller Cross-Out

J Davis Septic and Water Line Solicitation No.: 75H70125Q00012 A00001

1. "As a result of HHS FAR Class Deviation 2025-01 (re Executive Order (EO) 14173 and EO 14168 (CAAC Letter 2025-01

Supplement 1)) and HHS FAR Class Deviation 2025-02, (re Section 2 of Executive Order (EO) 14148, which revoked EO14057, and

Section 2 of EO 14208 (CAAC Letter 2025-02 Supplement 1)), and Amendment 1 to HHS FAR Class Deviation 2025-02 (re Executive

Order (EO) 14148, “Initial Rescissions of Harmful Executive Orders and Actions,” which revoked EO 14057 and Section 2 of EO

14208, “Ending Procurement and Forced Use of Paper Straws." (CAAC Letter 2025-02 Supplement 1)) the following FAR Provisions and Clauses have been updated or deleted as indicated:

• Updated:

▪ 52.204-8, Annual Representations and Certifications (JAN 2025) (DEVIATION FEB 2025)

▪ 52.213-4, Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services)

(JAN 2025) (DEVIATION FEB 2025)

▪ 52.222-11 Subcontracts (Labor Standards) (MAY 2014) (DEVIATION FEB 2025)

▪ 52.222-12 Contract Termination—Debarment (MAY 2014) (DEVIATION FEB 2025)

▪ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024) (DEVIATION FEB

2025)

▪ 52.223-23, Sustainable Products and Services (MAY 2024 (DEVIATION FEB 2025))

▪ 52.244-6, Subcontracts for Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)

• Deleted:

▪ 52.222-9, Apprentices and Trainees

▪ 52.222-26, Equal Opportunity

▪ 52.222-27, Affirmative Action Compliance Requirements for Construction

▪ 52.223-23, Sustainable Products and Services (MAY 2024)

• The following notice is provided:

System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals— Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services as well as 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial

Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

2. The clauses above can be viewed utilizing the following link until they are incorporated into the FAR:

https://www.acquisition.gov/caac-letters

3. “System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action

Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial

Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.”

4. The solicitation's proposal date remains unchanged at March 6, 2025 @ 2:00pm CST.

5. All other terms and conditions remain unchanged and in full effect.

https://www.acquisition.gov/caac-letters

Standard Detailed Drawings WPS Enclosure.pdf
WELL-Model.pdf
Sheets and Views
Model
ADP2A03.tmp
M96 Bid Abstract
ADP675E.tmp
Bid Schedule
B05 PLANSET - Miller Heights Sewer Main Replacement (Revised 3-1-2021) (signed).pdf
Sheets and Views
Miller Heights sewer main030121-COVER & LOCATION
Miller Heights sewer main030121-11x17 Notes and Legend
Miller Heights sewer main030121-11X17 Abbreviations
Miller Heights sewer main030121-PROPOSED
Miller Heights sewer main030121-DETAILS
Miller Heights sewer main030121-DETAILS (2)
B05 TECHNICAL SPECIFICATIONS - Miller Heights Sewer Replacement (revised 3-1-2021) (signed).pdf
00 01 01 Project Title Page
CONFEDERATED TRIBES OF WARM SPRINGS
INDIAN RESERVATION
JEFFERSON COUNTY, OREGON
CONTRACT DOCUMENTS
INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL HEALTH
AND ENGINEERING
PORTLAND AREA OFFICE
WESTERN OREGON FIELD OFFICE
FEBRUARY 2020
00 01 10 Table of Contents - 20-M96
VOLUME I
Division 00 – Procurement and Contracting Requirements
Division 01 – General Requirements
Division 31 – Earthwork
Division 33 – Utilities
01 11 00 Summary of Work - 20-M96
PART 1 - GENERAL
1.01 SUMMARY
A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
B. Location of Work: Warm Springs, Warm Springs Reservation, Jefferson County, Oregon
C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and per...
1.02 WORK REQUIRED
A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that a...
B. Description of Work: This project proposes to make specific improvements to the Miller Heights Community Sewage Collection System. The proposed improvements include: 1. Cleanup of soils contaminated with raw sewage. 2. Replacement of failed 8” wo...
3. Install adapters and necessary pipe support structures to firmly connect the new 8” PVC sewer main to the existing manholes.
C. Sewer Main Replacement is shown on the drawings.
1.03 SITE CONDITIONS
A. Utilities
1. Known buried utilities are shown on the drawings as an indication as to what the contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material, and sizes of any shown are approximate and not meant as a complete representation. Contractor...
a. Water and Sewer, Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
2. Protect existing utilities during construction.
3. Immediately notify project engineer and the utility owner of any damaged utilities.
4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs.)
B. Roads 1. Oregon Department of Transportation 63055 North Highway 97, Bldg. K Bend, OR 97703 Aaron Smith – ODOT Dist. 10 Permits Phone: (541)-388-6054 63055 N Hwy 97, Bldg. K Bend, OR 97703 aaron.k.s...
2. Bureau of Indian Affairs, https://www.bia.gov/regional-offices/northwest/warm-springs-agency
3. Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
C. Tribal Employment Rights Ordinance (TERO) 1. Contractor must comply with the Warms Springs TERO. Visit https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ to contact Warm Springs TERO and obtain the necessary forms.
D. Rights-of-Way 1. All the work will be performed within existing rights-of-way of the Warm Springs Tribe.
E. Site Ownership 1. The construction site is entirely located inside the Warm Springs Indian Reservation and on the land controlled by the Warm Springs Tribe.
1.04 SEQUENCE OF WORK
A. The Contractor shall construct in phases or stages to accommodate continuous and uninterrupted operation of the existing facility. The Contractor shall coordinate the construction schedule and operations with the Project Engineer. The contractor sh...
01 27 00 Price & Payment - 20-M96
PRICE AND PAYMENT
PART 1 - GENERAL
PART 2 – BID SCHEDULE ITEMS
A. SCHEDULE
1. Mobilization:
2. ODOT Permitting and Traffic Control:
3. Removal and Disposal of Contaminated Soils:
4. Temporary Erosion and Sediment Control:
5. Temporary Sewage Bypass Pumping:
6. Connections to Existing Manholes:
7. PVC Sanitary Sewer Pipe, 8 In. Diam.:
8. Fencing Repairs and Site Restoration:
01 31 00 Project Management and Coordination - 20-M96
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
END OF SECTION
01 33 00 Submittal Procedures - 20-M96
SUBMITTAL PROCEDURES
PART 1 - GENERAL
END OF SECTION
01 42 00 References - 20-M96
REFERENCES
PART 1 - GENERAL
B. Federal Agencies
C. State Agencies
END OF SECTION
American Association of State Highway and
American Water Works Association (AWWA)
01 43 00 Quality Assurance-Quality Control - 20-M96
QUALITY ASSURANCE/QUALITY CONTROL
PART 1 - GENERAL
END OF SECTION
01 50 00 Temporary Facilities and Controls - 20-M96
TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
PART 2 – PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
END OF SECTION
01 77 00 Closeout Procedures - 20-M96
CLOSEOUT PROCEDURES
PART 1 - GENERAL
END OF SECTION
01 78 00 Closeout Submittals - 20-M96
CLOSEOUT SUBMITTALS
PART 1 - GENERAL
PART 2 – PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
END OF SECTION
31 23 10 Excavation,Trenching, & Backfill - 20-M96
SECTION 31 23 10
EXCAVATION, TRENCHING AND BACKFILL
PART 1 - GENERAL
A. This section includes excavation, trenching and backfill necessary for the construction of the facilities as indicated on the plans including, but not limited to concrete sewer manholes, piping, and other structures.
1.05 QUALITY ASSURANCE
PART 2 – PRODUCTS
PART 3 - EXECUTION
END OF SECTION
31 25 00 Erosion and Sediment Control - 20-M96
PART 1 - GENERAL
PART 2 - PRODUCTS
Sieve Size Percent Passing
PART 3 – EXECUTION
END OF SECTION
33 01 31 Temporary Sewer Bypass - 20-M96
TEMPORARY SEWER BYPASS
PART 1 - GENERAL
PART 2 - PRODUCTS
PART 3 - EXECUTION
END OF SECTION
33 30 00 Sanitary Sewerage - 20-M96
SANITARY SEWERAGE
PART 1 - GENERAL
PART 2 - PRODUCTS
A. Manholes:
1. Concrete compressive strength will meet or exceed 4000 pounds per square inch at 28 days.
B. Sewer Pipe Connection:
1. Connect pipes using a rigid watertight pipe adapter gasket conforming to ASTM C1173 and ASTM D5926.
2. Gasket
a. Manufactured to meet the material requirements of:
1) ASTM C1173 - Flexible Transition Couplings for Underground Piping Systems
2) ASTM D5926 – Poly (Vinyl Chloride) (PVC) Gaskets for Drain, Waste, and Vent (DWV), Sewer, Sanitary, and Storm Plumbing Systems
3) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe
3. Clamps
a. Manufactured to meet the material requirements of:
1) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe
4. Shear Ring
a. Length manufactured according to coupling diameter.
b. Clamps spot welded in place.
5. Couplings
a. Manufactured to conform to the performance requirements of:
1) ASTM C1173 - Flexible Transition Couplings for Underground Piping Systems
2) CSA B602 - Mechanical Couplings for Drain, Waste, Vent Pipe and Sewer Pipe
b. Maximum Test Pressure: 4.3 PSI
c. Maximum Operating Temperature: 140 F non-consistent
PART 3 - EXECUTION
END OF SECTION
00 01 01 Project Title Page.pdf
CONFEDERATED TRIBES OF WARM SPRINGS
INDIAN RESERVATION
JEFFERSON COUNTY, OREGON
CONTRACT DOCUMENTS
INDIAN HEALTH SERVICE
OFFICE OF ENVIRONMENTAL HEALTH
AND ENGINEERING
PORTLAND AREA OFFICE
WESTERN OREGON FIELD OFFICE
FEBRUARY 2020
01 11 00 Summary of Work - 20-M96.pdf
PART 1 - GENERAL
1.01 SUMMARY
A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
B. Location of Work: Warm Springs, Warm Springs Reservation, Jefferson County, Oregon
C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and per...
1.02 WORK REQUIRED
A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that a...
B. Description of Work: This project proposes to make specific improvements to the Miller Heights Community Sewage Collection System. The proposed improvements include: 1. Cleanup of soils contaminated with raw sewage. 2. Replacement of failed 8” wo...
3. Install adapters and necessary pipe support structures to firmly connect the new 8” PVC sewer main to the existing manholes.
C. Sewer Main Replacement is shown on the drawings.
1.03 SITE CONDITIONS
A. Utilities
1. Known buried utilities are shown on the drawings as an indication as to what the contractor may encounter, NOT FOR LOCATION PURPOSES. Locations, material, and sizes of any shown are approximate and not meant as a complete representation. Contractor...
a. Water and Sewer, Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
2. Protect existing utilities during construction.
3. Immediately notify project engineer and the utility owner of any damaged utilities.
4. Any and all damage that results from work under this contract shall be promptly repaired at the expense of the Contractor (exception is utilities owned and located incorrectly by the Tribe. Contractor will repair damage and be reimbursed for costs.)
B. Roads 1. Oregon Department of Transportation 63055 North Highway 97, Bldg. K Bend, OR 97703 Aaron Smith – ODOT Dist. 10 Permits Phone: (541)-388-6054 63055 N Hwy 97, Bldg. K Bend, OR 97703 aaron.k.s...
2. Bureau of Indian Affairs, https://www.bia.gov/regional-offices/northwest/warm-springs-agency
3. Warm Springs Public Works, https://warmsprings-nsn.gov/program/public-utilities-branch/
C. Tribal Employment Rights Ordinance (TERO) 1. Contractor must comply with the Warms Springs TERO. Visit https://warmsprings-nsn.gov/program/tribal-employment-rights-office/ to contact Warm Springs TERO and obtain the necessary forms.
D. Rights-of-Way 1. All the work will be performed within existing rights-of-way of the Warm Springs Tribe. Use of Oregon DOT right-of-way to access site shall be coordinated with ODOT.
E. Site Ownership 1. The construction site is located inside the Warm Springs Indian Reservation along a utilities easement owned by the Warm Springs Tribe. The site access along OR HWY 26 requires permitting and coordination with ODOT.
1.04 SEQUENCE OF WORK
A. The Contractor shall construct in phases or stages to accommodate continuous and uninterrupted operation of the existing facility. The Contractor shall coordinate the construction schedule and operations with the Project Engineer. The contractor sh...
01 27 00 Price & Payment - 20-M96.pdf
PRICE AND PAYMENT
PART 1 - GENERAL
PART 2 – BID SCHEDULE ITEMS
A. SCHEDULE
1. Mobilization:
2. ODOT Permitting and Traffic Control:
3. Removal and Disposal of Contaminated Soils:
4. Temporary Erosion and Sediment Control:
5. Temporary Sewage Bypass Pumping:
6. Connections to Existing Manholes:
7. PVC Sanitary Sewer Pipe, 8 In. Diam.:
8. Fencing Repairs and Site Restoration: