3-Measure and Payment.pdf
PDF 168 KB Posted
- Attached to
- J Davis Septic and Water Line Federal contract opportunity
- Solicitation number
- 75H70125Q00012
About this file
This is a Measurement and Payment document detailing the pricing structure and payment terms for a septic system and water line installation project at Warm Springs. The document outlines 8 line items including: mobilization/demobilization (lump sum), 1,500 gallon concrete septic tank with effluent filter and riser lids (lump sum), 4" sewer service line with 2-way cleanout (50 linear feet), gravel absorption serial distribution drainfield with four D boxes (600 linear feet), water service line 1" PEX with meter pit/meter/AMR register (75 linear feet), individual meter pit components (lump sum), optional rock removal (per cubic yard), and homeowner O&M training (lump sum).
The document specifies detailed compensation terms for each line item, including what is covered under each payment (materials, labor, testing, etc.). Notable requirements include that EZ Flow or chambered systems are not acceptable for the drainfield, rock removal payment is contingent on meeting SOW definitions, and O&M training must include printed manuals and on-site instruction. All installations must be complete and operational, with excavation, backfilling, and compaction included in the compensation for relevant line items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 75H70125Q00012-A00002.pdf | ||
| 75H70125Q00012-A00001.pdf | ||
| 4 -US DOL WD OR20250079 Dated 1-10-2025.pdf | ||
| 2-Site Plan.pdf | ||
| 1-SOW.pdf | ||
| B01 75H70125Q00012.pdf | ||
| A11 Pre-Solicitation SAM Notice.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Measurement and Payment – J. Davis
MEASUREMENT AND PAYMENT
1. MOBILIZATION & DEMOBILIZATION
Payment shall be made at the contract lump sum price for transportation of equipment, material, and personnel to and from the job site location (regardless of trips required), required permits for water and sewer, and all other necessary items to complete the work.
Mobilization & Demobilization 1 LS $___________________
2. 1,500 GALLON CONCRETE SEPTIC TANK WITH EFFLUENT FILTER AND RISER LIDS
Payment for septic tank, effluent filter, and riser lids shall be made at the contract lump sum price for the sizes listed. Compensation shall include payment for excavation, backfilling and compaction; septic tank, baffles, access risers, riser material, locking cover, effluent filter, inspection ports as required, and all other necessary items for a complete and operational installation.
1,500 Gallon Concrete Septic Tank 1 LS $___________________
3. 4” SEWER SERVICE LINE WITH 2-WAY CLEANOUT
Payment for 4” solid sewer pipe shall be made at the contract unit price per linear foot of 4” solid sewer pipe installed. Compensation shall include payment for the excavation, backfilling and compaction; all pipe and fittings; two-way cleanout; connection of the solid sewer pipe to the home, septic tank, and drainfield; testing; and all other necessary items for a complete and operational installation.
4” Solid Sewer Pipe 50 LF $___________________
4. GRAVEL ABSORPTION SERIAL DISTRIBUTION DRAINFIELD WITH FOUR D BOXES
Payment for gravel absorption serial distribution drainfield shall be made at the contract unit price per linear foot installed. EZ Flow or chambered systems are not acceptable. Compensation shall include payment for system layout/staking; excavation, backfilling and compaction; distribution and drop boxes; drainfield units and fittings, connections, clean drain gravel, drainfield filter fabric; and all other necessary items for a complete and operational installation.
Gravel Absorption Serial Distribution Drainfield 600 LF $__________________
5. WATER SERVICE LINE 1” PEX WITH INDIVIDUAL METER PIT, METER, AND AMR REGISTER
Payment for water service line 1” PEX shall be made at the contract unit price for the size of the line listed based on the number of linear feet installed. Compensation shall include payment for excavation, backfilling and compaction; all fittings, including locating and connecting to existing home connections and community water connections; saddle, corporation stop, curb stop, and curb stop box with stationary rod; meter pit, meter, and AMR register, and all other necessary items for a complete and operational installation.
Water Service Line 1” PEX 75 LF $____________________
Measurement and Payment – J. Davis
6. INDIVIDUAL METER PIT, METER, AMR REGISTER, AND PRV
Payment for individual meter pit, meter, AMR register, and PRV shall be made at the contract lump sum prize. Compensation shall include payment for excavation, backfilling, and compaction;
all fittings; meter pit, meter, AMR register, and PRV, and all other necessary items for a complete and operational installation.
Individual Meter Pit, Meter, AMR Register, and PRV 1 LS $____________________
7. ROCK REMOVAL (OPTION ITEM)
Payment for rock removal shall be made at the contract unit price if rock is encountered during excavation. Payment for rock removal shall only be made if the rock meets the definitions in the
SOW. Payment shall be made per cubic yard of rock removed at the contract unit price.
Rock Removal (Option Item) 1 CY $____________________
8. HOMEOWNER O&M TRAINING
Payment for homeowner O&M training shall be made at the contract lump sum price.
Homeowner O&M training includes printed binder of O&M manuals and on-site training on regular use of the system, replacement chemicals, and troubleshooting as defined in the SOW.
Homeowner O&M Training 1 LS $____________________