About this file
This document is a solicitation for the ELP Panel Annunciators' Relocation project. The solicitation is being amended by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The project involves relocating panel annunciators at the El Paso VA Healthcare System facility in El Paso, Texas. Services required include installing new signal wiring and conduits, disconnecting existing wiring, and terminating new wiring on instrumentation devices. Drawings and specifications are provided to guide the work. The response due date for proposals is April 15, 2023. The period of performance for the awarded contract is 120 calendar days with an anticipated award date of May 1, 2023. The solicitation is designated as a small business set-aside.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 36C25724B0008 Amendment 0004.pdf | ||
| S06 36C25724B0008 Amendment 0004 Additional RFI Questions.pdf | ||
| 36C25724B0008 Amendment 0003.pdf | ||
| 36C25724B0008 Amendment 0002.pdf | ||
| S02_36C25724B0008 Amendment 0001.pdf | ||
| 75622203 Panel Annunciators Relocation IFC Specifications_01.pdf | ||
| S02_36C25724B0008 REVISED.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:0
P
M
03/22/2023 G001
PROJECT COVER SHEET/SHEET
INDEX
PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
EL PASO VA HEALTHCARE SYSTEM
PANEL ANNUNCIATOR'S RELOCATION
EL PASO, TEXAS
PIERCE AVENUE
A L
A B
A M
A S
T R
E E
T
ALA
BAM
A S
TR
EE
T
RODRIGUEZ STREET
L O
U
IS
IA
N
A S
T R
E E
T
H O
L M
E S
G
IN
N C
IR
C
L E
H O
L M
E S
G
IN
N C
IR
C
L E
EL PASO VA
MEDICAL
CENTER
WILLIAM BEAUMONT
MEDICAL CENTER
PATIENT
PARKING
PATIENT
PARKING LOT
EMPLOYEE
PARKING
PATIENT
PARKING
PATIENT
PARKING
HELIPAD
PATIENT
PARKING
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 C
90% - CONSTRUCTION DOCUMENTS 12/08/2022 B
60% - DESIGN DEVELOPMENT 08/12/2022 A
ISSUED FOR CONSTRUCTION 03/22/2023 0
3/22/23
ABBREVIATIONS
1PH SINGLE PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC FREQUENCY
CONTROL, OR AVAILABLE FAULT CURRENT
AFCI ARC-FAULT CURRENT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
Ah AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BRK RBREAKER
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTRACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FINISHED
CF/CI CONTRACTOR FINISHED/CONTRACTOR INSTALLED
CFE CONTRACTOR FINISHED EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
OR C/B
CLF CURRENT LIMITING FUSE
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CUR CURRENT
dB DECIBEL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELCIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR PNL DISTRIBUTION PANEL
DMR SW DIMMER SWITCH
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
EPRF EXPLOSION PROOF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST OR(E) EXISTING
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FIXT FIXTURE
FLA FULL LOAD AMPS
FLUOR FLUORESCENT
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
FVNR FULL VOTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G ELECTRICAL GROUND
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF
NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAh KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWh KILOWATT HOUR kWhM KILOWATT HOUR METER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLA MAIN LUGS ONLY
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PB PULL BOX
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
SYMBOLS
DEMO CONDUIT
EXISTING CONDUIT
NEW CONDUIT
EXISTING FIXTURES, EQUIPMENT, ETC.
DEMO FIXTURES, EQUIPMENT, ETC.
NEW FIXTURES, EQUIPMENT, ETC.
TSH
TSL
O2
FT
H2O
MLH
PSH
PBX
PSL
TEMPERATURE SWITCH, HIGH
TEMPERATURE SWITCH, LOW
CONTROL PANEL
O2 DETECTOR SWITCH
FLOW TRANSMITTER
TEMPERATURE SWITCH, HIGH
MOISTURE LEVEL, HIGH
PBX SENSOR
PRESSURE SWITCH, HIGH
PRESSURE SWITCH, LOW
CP
PRESSURE SWITCH, LOWJ
LIMIT OF DEMOLITION
CONNECT TO EXISTING
GENERAL NOTES
A. RE: DIVISION 26 ELECTRICAL
1. REQUIREMENTS FOR ELECTRICAL INSTALLATIONS
a. FURNISH AND INSTALL ELECTRICAL SYSTEMS, MATERIALS, EQUIPMENT, AND ACCESSORIES IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. CAPACITIES AND RATINGS OF MOTORS, TRANSFORMERS, CONDUCTORS AND CABLE, SWITCHBOARDS, SWITCHGEAR, PANELBOARDS, MOTOR CONTROL CENTERS, GENERATORS, AUTOMATIC TRANSFER SWITCHES, AND OTHER ITEMS AND ARRANGEMENTS FOR THE SPECIFIED ITEMS ARE SHOWN ON THE DRAWINGS.
b. ELECTRICAL SERVICE ENTRANCE EQUIPMENT AND ARRANGEMENTS FOR TEMPORARY AND PERMANENT CONNECTIONS TO THE ELECTRIC UTILITY COMPANY’S SYSTEM SHALL CONFORM TO THE ELECTRIC UTILITY COMPANY'S REQUIREMENTS.
COORDINATE FUSES, CIRCUIT BREAKERS AND RELAYS WITH THE ELECTRIC UTILITY COMPANY’S SYSTEM, AND OBTAIN
ELECTRIC UTILITY COMPANY APPROVAL FOR SIZES AND SETTINGS OF THESE DEVICES.
c. CONDUCTOR AMPACITIES SPECIFIED OR SHOWN ON THE DRAWINGS ARE BASED ON COPPER CONDUCTORS, WITH THE
CONDUIT AND RACEWAYS SIZED PER NEC. ALUMINUM CONDUCTORS ARE PROHIBITED.
d. THE LATEST INTERNATIONAL BUILDING CODE (IBC), UNDERWRITERS LABORATORIES, INC. (UL), INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE), AND NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES AND STANDARDS
ARE THE MINIMUM REQUIREMENTS FOR MATERIALS AND INSTALLATION.
e. THE DRAWINGS AND SPECIFICATIONS SHALL GOVERN IN THOSE INSTANCES WHERE REQUIREMENTS ARE GREATER THAN
THOSE STATED IN THE ABOVE CODES AND STANDARDS.
f. ALL MATERIALS AND EQUIPMENT SHALL BE LISTED, LABELED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) TO MEET UNDERWRITERS LABORATORIES, INC. (UL), STANDARDS WHERE TEST STANDARDS HAVE BEEN ESTABLISHED. MATERIALS AND EQUIPMENT WHICH ARE NOT COVERED BY UL STANDARDS WILL BE ACCEPTED, PROVIDING THAT MATERIALS AND EQUIPMENT ARE LISTED, LABELED, CERTIFIED OR OTHERWISE DETERMINED TO MEET THE SAFETY REQUIREMENTS OF A NRTL. MATERIALS AND EQUIPMENT WHICH NO NRTL ACCEPTS, CERTIFIES, LISTS, LABELS, OR DETERMINES TO BE SAFE, WILL BE CONSIDERED IF INSPECTED OR TESTED IN ACCORDANCE WITH NATIONAL INDUSTRIAL STANDARDS, SUCH AS ANSI, NEMA, AND NETA. EVIDENCE OF COMPLIANCE SHALL INCLUDE CERTIFIED TEST
REPORTS AND DEFINITIVE SHOP DRAWINGS.
g. MATERIALS AND EQUIPMENT SHALL BE PROTECTED DURING SHIPMENT AND STORAGE AGAINST PHYSICAL DAMAGE, VERMIN, DIRT, CORROSIVE SUBSTANCES, FUMES, MOISTURE, COLD AND RAIN.
h. ALL ELECTRICAL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST NFPA 70 (NEC), NFPA 70B, NFPA 70E, NFPA 99, NFPA 110, OSHA PART 1910 SUBPART J – GENERAL ENVIRONMENTAL CONTROLS, OSHA PART 1910 SUBPART K – MEDICAL AND FIRST AID, AND OSHA PART 1910 SUBPART S – ELECTRICAL, IN ADDITION TO OTHER REFERENCES REQUIRED BY
CONTRACT.
i. JOB SITE SAFETY AND WORKER SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR.
j. COORDINATE LOCATION OF EQUIPMENT AND CONDUIT WITH OTHER TRADES TO MINIMIZE INTERFERENCE.
k. EQUIPMENT LOCATION SHALL BE AS CLOSE AS PRACTICAL TO LOCATIONS SHOWN ON THE DRAWINGS.
l. WORKING CLEARANCES SHALL NOT BE LESS THAN SPECIFIED IN THE NEC.
m. ELECTRICAL SERVICE ENTRANCE EQUIPMENT AND ARRANGEMENTS FOR TEMPORARY AND PERMANENT CONNECTIONS TO
THE ELECTRIC UTILITY COMPANY’S SYSTEM SHALL CONFORM TO THE ELECTRIC UTILITY COMPANY'S REQUIREMENTS.
COORDINATE FUSES, CIRCUIT BREAKERS AND RELAYS WITH THE ELECTRIC UTILITY COMPANY’S SYSTEM, AND OBTAIN
ELECTRIC UTILITY COMPANY APPROVAL FOR SIZES AND SETTINGS OF THESE DEVICES.
n. IN ADDITION TO THE REQUIREMENTS OF THE NEC, INSTALL AN IDENTIFICATION SIGN WHICH CLEARLY INDICATES INFORMATION REQUIRED FOR USE AND MAINTENANCE OF ITEMS SUCH AS SWITCHBOARDS AND SWITCHGEAR, PANELBOARDS, CABINETS, MOTOR CONTROLLERS, FUSED AND NON-FUSED SAFETY SWITCHES, GENERATORS, AUTOMATIC TRANSFER SWITCHES, SEPARATELY ENCLOSED CIRCUIT BREAKERS, INDIVIDUAL BREAKERS AND CONTROLLERS IN SWITCHBOARDS, SWITCHGEAR AND MOTOR CONTROL ASSEMBLIES, CONTROL DEVICES AND OTHER SIGNIFICANT
EQUIPMENT.
o. INSTALL ADHESIVE ARC FLASH WARNING LABELS ON ALL EQUIPMENT AS REQUIRED BY THE LATEST NFPA 70E. LABEL SHALL SHOW SPECIFIC AND CORRECT INFORMATION FOR SPECIFIC EQUIPMENT BASED ON ITS ARC FLASH CALCULATIONS.
p. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES IN APPROPRIATE SUBMITTAL PACKAGES.
q. APPROVAL SHALL BE OBTAINED FOR ALL MATERIALS AND EQUIPMENT BEFORE DELIVERY TO THE JOB SITE. DELIVERY, STORAGE OR INSTALLATION OF MATERIALS AND EQUIPMENT WHICH HAS NOT HAD PRIOR APPROVAL WILL NOT BE
PERMITTED.
r. ALL SUBMITTALS SHALL INCLUDE ONE HARD COPY, ONE ELECTRONIC COPY OF ADEQUATE DESCRIPTIVE LITERATURE, CATALOG CUTS, SHOP DRAWINGS, TEST REPORTS, CERTIFICATIONS, SAMPLES, AND OTHER DATA NECESSARY FOR THE TO ASCERTAIN THAT THE PROPOSED MATERIALS AND EQUIPMENT COMPLY WITH DRAWING AND SPECIFICATION REQUIREMENTS. CATALOG CUTS SUBMITTED FOR APPROVAL SHALL BE LEGIBLE AND CLEARLY IDENTIFY SPECIFIC
MATERIALS AND EQUIPMENT BEING SUBMITTED.
s. SUBMITTALS FOR INDIVIDUAL SYSTEMS AND EQUIPMENT ASSEMBLIES WHICH CONSIST OF MORE THAN ONE ITEM OR COMPONENT SHALL BE MADE FOR THE SYSTEM OR ASSEMBLY AS A WHOLE. PARTIAL SUBMITTALS WILL NOT BE
CONSIDERED FOR APPROVAL.
t. SUBMIT AS REQUIRED FOR SYSTEMS AND EQUIPMENT SPECIFIED IN THE TECHNICAL SECTIONS. FURNISH IN HARDCOVER
BINDERS OR AN APPROVED EQUIVALENT.
u. APPROVALS WILL BE BASED ON COMPLETE SUBMISSION OF SHOP DRAWINGS, MANUALS, TEST REPORTS, CERTIFICATIONS, AND SAMPLES AS APPLICABLE.
v. ALL WORK PERFORMED AND ALL EQUIPMENT AND MATERIAL FURNISHED UNDER THIS DIVISION SHALL BE FREE FROM DEFECTS AND SHALL REMAIN SO FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE OF THE ENTIRE INSTALLATION. THE FOLLOWING ASSEMBLIES SHALL REQUIRE CLIENT REPRESENTATIVE INSPECTION AND WRITTEN APPROVAL AFTER EACH INITIAL ASSEMBLY AND PRIOR TO EACH SUBSEQUENT STEP OF EACH ASSEMBLY:
• RACEWAY / JUNCTION BOX ROUGH-IN PRIOR TO PULL-STRING
• PLASTIC BUSHINGS PRIOR TO PULL STRINGS, PRIOR TO CABLE PULLS
• CABLE PULLS PRIOR TO RACEWAY ENCLOSURE / J-BOX ENCLOSURES
w. ALL WORK SHALL BE PERFORMED MONDAY THRU SATURDAY BETWEEN THE HOURS OF 5:00 PM - 2:00 AM.
B. RE: DIVISION 27: COMMUNICATIONS
1. REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS
2. GROUNDING AND BONDING FOR COMMUNICATTIONS SYSTEMS
3. RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS
4. CONTROL, COMMUNICATION AND SIGNAL WIRING
5. COMMUNICATIONS STRUCTURED CABLING
C. RE: DIVISION 28 - ELECTRONIC SAFETY AND SECURITY SPECIFICATIONS
1. REQUIREMENTS FOR ELECTRONIC SAFETY AND SECURITY INSTALLATIONS
2. CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY
3. GROUNDING AND BONDING FOR ELECTROINIC SAFETY AND SECURITY
4. CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY
D. RE: DIVISION 27 CONTROL WIRING
1. GENERAL
a. THIS SECTION INCLUDES CONTROL, COMMUNICATION AND SIGNAL WIRING FOR A COMPREHENSIVE SYSTEMS
INFRASTRUCTURE.
b. SUBMIT WRITTEN CERTIFICATION FROM OEM:
1. INDICATE WIRING AND CONNECTION DIAGRAMS MEET NATIONAL AND GOVERNMENT LIFE SAFETY GUIDELINES, NFPA, NEC, NRTL, JOINT COMMISSION, OEM.
2. INCLUDE INSTRUCTIONS, REQUIREMENTS, RECOMMENDATIONS, AND GUIDANCE FOR PROPER PERFORMANCE OF
SYSTEM AS DESCRIBED HEREIN.
3. IDENTIFY ENVIRONMENTAL SPECIFICATIONS ON TECHNICAL SUBMITTALS; IDENTIFY REQUIREMENTS FOR INSTALLATION.
4. PROVIDE CONDUIT SIZE REQUIREMENTS.
2. PRODUCTS
a. PROVIDE CONTROL WIRING LARGE ENOUGH SO VOLTAGE DROP UNDER IN-RUSH CONDITIONS DOES NOT ADVERSELY
AFFECT OPERATION OF CONTROLS.
b. PROVIDE CABLE MEETING SPECIFICATIONS FOR TYPE OF CABLE.
c. OUTSIDE LOCATION (I.E. ABOVE GROUND, UNDERGROUND IN CONDUIT, DUCTS, PATHWAYS, ETC.): PROVIDE CABLES FILLED
WITH A WATERPROOFING COMPOUND BETWEEN OUTSIDE JACKET (NOT TOUCHING ANY PROVIDED ARMOR) AND INTER
CONDUCTORS TO SEAL PUNCTURES IN JACKET AND PROTECT CONDUCTORS FROM MOISTURE.
d. REMOTE CONTROL CABLE:
1. MULTI-CONDUCTOR WITH STRANDED CONDUCTORS ABLE TO HANDLE POWER AND VOLTAGE REQUIRED TO CONTROL
SPECIFIED SYSTEM EQUIPMENT, FROM A REMOTE LOCATION.
2. NRTL LISTED AND PASS VW-1 VERTICAL WIRE FLAME TEST (UL 83) (FORMERLY FR-1).
3. COLOR-CODED CONDUCTORS: COMBINED MULTI-CONDUCTOR AND COAXIAL CABLES ARE ACCEPTABLE FOR THIS
INSTALLATION, ON CONDITION SYSTEM PERFORMANCE STANDARDS ARE MET.
4. TECHNICAL CHARACTERISTICS:
1. LENGTH: AS REQUIRED, IN 1K (3,000 FT.) REELS MINIMUM.
2. CONNECTORS: AS REQUIRED BY SYSTEM DESIGN.
3. SIZE:
a. 18 AWG, MINIMUM, OUTSIDE.
b. 20 AWG, MINIMUM, INSIDE.
c. COLOR CODING: REQUIRED, EIA INDUSTRY STANDARD.
d. BEND RADIUS: 10 TIMES CABLE OUTSIDE DIAMETER.
e. IMPEDANCE: AS REQUIRED.
f. SHIELD COVERAGE: AS REQUIRED BY OEM SPECIFICATION.
e. DISTRIBUTION SYSTEM SIGNAL WIRES AND CABLES:
1. PROVIDE SYSTEM ABLE TO WITHSTAND ADVERSE ENVIRONMENTAL CONDITIONS WITHOUT DETERIORATION, IN THEIR
RESPECTIVE LOCATION.
2. PROVIDE ENTERING OF EACH EQUIPMENT ENCLOSURE, CONSOLE, CABINET OR RACK IN SUCH A MANNER THAT ALL
DOORS OR ACCESS PANELS CAN BE OPENED AND CLOSED WITHOUT REMOVAL OR DISRUPTION OF CABLES.
3. TERMINATE ON AN ITEM OF EQUIPMENT BY DIRECT CONNECTION.
3. GENERAL:
a. INSTALL WIRING IN CABLE TRAY OR RACEWAY.
b. CONTROL, COMMUNICATION AND SIGNAL WIRING INSTALLATION:
1. UNLESS OTHERWISE SPECIFIED IN OTHER SECTIONS, PROVIDE WIRING AND CONNECT TO EQUIPMENT/DEVICES TO
PERFORM REQUIRED FUNCTIONS AS INDICATED.
2. INSTALL SEPARATE CABLES FOR EACH SYSTEM SO THAT MALFUNCTIONS IN ANY SYSTEM DOES NOT AFFECT OTHER
SYSTEMS, EXCEPT WHERE OTHERWISE REQUIRED.
3. GROUP WIRES AND CABLES ACCORDING TO SERVICE (I.E. AC, GROUNDS, SIGNAL, DC, CONTROL, ETC.); DC, CONTROL
AND SIGNAL CABLES CAN BE INCLUDED WITH ANY GROUP.
4. CONCEALED SPLICES ARE NOT ALLOWED.
5. SEPARATE, ORGANIZE, BUNDLE, AND ROUTE WIRES OR CABLES TO RESTRICT EMI, CHANNEL CROSSTALK, OR
FEEDBACK OSCILLATION INSIDE ANY ENCLOSURE.
6. LOOKING AT ANY ENCLOSURE FROM THE REAR (WALL MOUNTED ENCLOSURES, JUNCTION, PULL OR INTERFACE BOXES
FROM THE FRONT), LOCATE AC POWER, DC AND SPEAKER WIRES OR CABLES ON THE LEFT; COAXIAL, CONTROL, MICROPHONE AND LINE LEVEL AUDIO AND DATA WIRES OR CABLES, ON THE RIGHT.
7. INSTALL WIRES OR CABLES OUTSIDE OF BUILDINGS IN CONDUIT, SECURED TO SOLID BUILDING STRUCTURES.
8. LAYING WIRES OR CABLES DIRECTLY ON ROOF TOPS, LADDERS, DROOPING DOWN WALLS, WALKWAYS, FLOORS, ETC. IS
NOT PERMITTED.
c. AC POWER:
1. BOND TO GROUND CONTRACTOR-INSTALLED EQUIPMENT AND IDENTIFIED GOVERNMENT-FURNISHED EQUIPMENT, TO ELIMINATE SHOCK HAZARDS AND TO MINIMIZE GROUND LOOPS, COMMON MODE RETURNS, NOISE PICKUP, CROSSTALK, ETC. FOR TOTAL GROUND RESISTANCE OF 0.1 OHM OR LESS.
2. USE OF CONDUIT, SIGNAL DUCT OR CABLE TRAYS AS SYSTEM OR ELECTRICAL GROUND IS NOT PERMITTED; USE THESE ITEMS ONLY FOR DISSIPATION OF INTERNALLY GENERATED STATIC CHARGES (NOT TO BE CONFUSED WITH EXTERNALLY GENERATED LIGHTNING) THAT CAN BE APPLIED OR GENERATED OUTSIDE MECHANICAL AND PHYSICAL CONFINES OF SYSTEM TO EARTH GROUND. DISCOVERY OF IMPROPER SYSTEM GROUNDING IS GROUNDS TO DECLARE
SYSTEM UNACCEPTABLE AND TERMINATION OF ALL SYSTEM ACCEPTANCE TESTING.
3. CABINET BUS: EXTEND A COMMON GROUND BUS OF AT LEAST #10 AWG SOLID COPPER WIRE THROUGHOUT EACH EQUIPMENT CABINET AND BOND TO SYSTEM GROUND. PROVIDE A SEPARATE ISOLATED GROUND CONNECTION FROM EACH EQUIPMENT CABINET GROUND BUS TO SYSTEM GROUND. DO NOT TIE EQUIPMENT GROUND BUSSES TOGETHER.
4. EQUIPMENT: BOND EQUIPMENT TO CABINET BUS WITH COPPER BRAID EQUIVALENT TO AT LEAST #12 AWG. SELF- GROUNDING EQUIPMENT ENCLOSURES, RACKS OR CABINETS, THAT PROVIDE OEM CERTIFIED FUNCTIONAL GROUND CONNECTIONS THROUGH PHYSICAL CONTACT WITH INSTALLED EQUIPMENT, ARE ACCEPTABLE ALTERNATIVES.
d. CONTROL, COMMUNICATION AND SIGNAL SYSTEM IDENTIFICATION:
1. INSTALL A PERMANENT WIRE MARKER ON EACH WIRE AT EACH TERMINATION.
2. IDENTIFY CABLES WITH NUMBERS AND LETTERS ON THE LABELS CORRESPONDING TO THOSE ON WIRING DIAGRAMS
USED FOR INSTALLING SYSTEMS.
3. CABLE AND WIRES (HEREINAFTER REFERRED TO AS “CABLE”): LABEL CABLES AT BOTH ENDS IN ACCORDANCE WITH
INDUSTRY STANDARD. PROVIDE PERMANENT LABELS IN CONTRASTING COLORS. IDENTIFY CABLES MATCHING SYSTEM
RECORD WIRING DIAGRAMS.
4. CONDUIT, CABLE DUCT, AND CABLE TRAY: LABEL CONDUIT, DUCT AND TRAY, INCLUDING UTILIZED GFE, WITH PERMANENT MARKING DEVICES OR SPRAY PAINTED STENCILING A MINIMUM OF 3 METERS (10 FT.) IDENTIFYING
SYSTEM. LABEL EACH ENCLOSURE ACCORDING TO THIS STANDARD.
DETAIL NUMBER
DRAWING SYMBOLS
DRAWING NUMBER WHERE DRAWN
SECTION LETTER
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION (PUMP)
PP105
PP105
P
PUMP NO. 3 IN BUILDING NO. 26
TYPICAL UNIT NUMBER
CALLOUT
(ENLARGED VIEW)
SECTION
EQUIPMENT TAG
EQUIPMENT TAG
SAN
RISER TAG
RISER SYSTEM
RISER NUMBER
2-26
BUILDING NO. WHERE EQUIPMENT IS LOCATED
SERVED BY AIR HANDLER UNIT NO. 1
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
P 2-26 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023 E001
COVER SHEET - GENERAL NOTES,
SYMBOLS & LEGENDS
PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
EL PASO VA HEALTHCARE SYSTEM (EPVAHCS)
PANEL ANNUNCIATOR'S RELOCATION
756-22-203
EL PASO, TEXAS
SHEET INDEX
SHEET
NUMBER NAME
G001 PROJECT COVER SHEET/SHEET INDEX
E001 COVER SHEET - GENERAL NOTES, SYMBOLS & LEGENDS
ED110 DEMO PLAN - FIRST FLOOR
ED120 DEMO PLAN - SECOND FLOOR
ED130 DEMO PLAN - THIRD FLOOR
ED140 DEMO PLAN - FOURTH FLOOR
ED401 ENLARGED DEMO PLANS
EP130 POWER PLAN - THIRD FLOOR
EP601 ELECTRICAL ONE LINE - ANNUNCIATOR
ET110 COMMUNICATIONS PLAN - FIRST FLOOR
ET120 COMMUNICATIONS PLAN - SECOND FLOOR
ET130 COMMUNICATIONS PLAN - THIRD FLOOR
ET140 COMMUNICATIONS PLAN - FOURTH FLOOR
ET401 ENLARGED PLANS
ET601 LEGENDS, NOTES, SHEET LIST, & SCHEDULES
ET901 3D VIEWS
SHEET LOG
SHEET CURRENT REVISION
NUMBER NAME REV DATE DESCRIPTION
G001 PROJECT COVER SHEET/SHEET INDEX 0 03/22/2023 ISSUED FOR CONSTRUCTION
E001 COVER SHEET - GENERAL NOTES, SYMBOLS & LEGENDS 0 03/22/2023 ISSUED FOR CONSTRUCTION
ED110 DEMO PLAN - FIRST FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ED120 DEMO PLAN - SECOND FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ED130 DEMO PLAN - THIRD FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ED140 DEMO PLAN - FOURTH FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ED401 ENLARGED DEMO PLANS 0 03/22/2023 ISSUED FOR CONSTRUCTION
EP130 POWER PLAN - THIRD FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
EP601 ELECTRICAL ONE LINE - ANNUNCIATOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET110 COMMUNICATIONS PLAN - FIRST FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET120 COMMUNICATIONS PLAN - SECOND FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET130 COMMUNICATIONS PLAN - THIRD FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET140 COMMUNICATIONS PLAN - FOURTH FLOOR 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET401 ENLARGED PLANS 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET601 LEGENDS, NOTES, SHEET LIST, & SCHEDULES 0 03/22/2023 ISSUED FOR CONSTRUCTION
ET901 3D VIEWS 0 03/22/2023 ISSUED FOR CONSTRUCTION
DESCRIPTION DATE REV
100% - FINAL CONSTRUCTION DOCUMENTS 03/22/2023 E
100% - CONSTRUCTION DOCUMENTS 02/23/2023 D
90% - CONSTRUCTION DOCUMENTS 12/08/2022 C
60% - DESIGN DEVELOPMENT 08/12/2022 B
30% - SCHEMATIC DESIGN 03/25/2022 A
TSH
PSL
TSHCP
PSH
PSL
FT
TSH
TSH
PSL
H O2
TSH H O2
H O2
PSH PSLMLH H O2
H O2
PBX
SPB 117
CP
FT PSH PSL
FT PSH PSL
M
M
1. RE: SHEET ED120 FOR CONDUIT UP.
2. FIELD VERIFY (E) CONDUIT TO BE RE-USED 3/4"Ø OR LARGER. NOTIFY CLIENT CONTRACT POC IF (E)
CONDUIT IS 1/2"Ø.
3. CONDUIT SHOWN OFFSET FOR CLARITY.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
G
H
J
K
L
ED401
F101 F107
F105
F102 F103 F104
F108
D122
D122B
D122A D121A
D121K D121 D121M D105
A106
P-4
P-1P-2
P-3
A101
C1-16
A100DA100C
D121I
D121G D121H
D121F
MV-1
MA-17
44 4
ET901
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ED110
DEMO PLAN - FIRST FLOOR PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
NO. DESCRIPTION
4 (E) RACEWAY INCLUDING CONDUIT, J-BOX ENCLOSURES, ETC. IN THIS AREA TO BE RE-USED.
DISCONNECT FROM (E) DEVICE AND REMOVE WIRE. SALVAGE DEVICE FOR RE-USE. MODIFY (E)
CONDUIT @ DEVICE FOR NEW CONSTRUCTION AS REQUIRED.
5 (E) CONDUIT ROUTED BELOW SLAB IN THIS AREA TO REMAIN. FIELD VERIFY (E) ROUTING AND
TERMINATION TO ROOM A101.
6 DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT
ASSEMBLIES FROM DEVICE AND REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR
RE-USE. FIELD VERIFY.
7 (E)MV-1, (E)MA-1: (E) MED-VAC PUMP, MED-AIR COMPRESSOR TO REMAIN. DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT ASSEMBLIES FROM DEVICE AND
REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR RE-USE. FIELD VERIFY.
8 REMOVE (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT ASSEMBLIES
ROUTED TO ROOM A101 AS REQUIRED. FIELD VERIFY.
11 (E) NITROGEN CYLINDER ROOM. (E) CONDUIT ROUTED TO (E) ANNUNCIATOR PANEL. (E) DUPLICATE
SET OF CONDUIT ROUTED TO (E) MED-GAS MASTER ALARM PANEL.
12 (E) NITROUS OXIDE CYLINDER ROOM. (E) CONDUIT ROUTED TO (E) ANNUNCIATOR PANEL. (E)
DUPLICATE SET OF CONDUIT ROUTED TO (E) MED-GAS MASTER ALARM PANEL.
13 (E) OXYGEN STORAGE CYLINDER ROOM. (E) CONDUIT ROUTED TO (E) ANNUNCIATOR PANEL. (E)
DUPLICATE SET OF CONDUIT ROUTED TO (E) MED-GAS MASTER ALARM PANEL.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - FIRST FLOOR
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 D
90% - CONSTRUCTION DOCUMENTS 12/08/2022 C
60% - DESIGN DEVELOPMENT 08/12/2022 B
30% - SCHEMATIC DESIGN 03/25/2022 A
B 203 C
B 203 D
B
D
A
204 B
204 C
B 204
B 204AB 204B
D 262B
D
A
D
B
C238 C241 A C243
1. RE: SHEET ED110 FOR CONDUIT DOWN.
2. RE: SHEET ED130 FOR CONDUIT UP.
3. CONDUIT SHOWN OFFSET FOR CLARITY.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
G
H
J
K
L
ET901
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ED120
DEMO PLAN - SECOND FLOOR PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
NO. DESCRIPTION
1 (E) CONDUIT RISERS. REMOVE RACEWAY INCLUDING CONDUIT, J-BOXES AND SUPPORT ASSEMBLIES
AS REQ'D, FIELD VERIFY.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - SECOND FLOOR
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 D
90% - CONSTRUCTION DOCUMENTS 12/08/2022 C
60% - DESIGN DEVELOPMENT 08/12/2022 B
30% - SCHEMATIC DESIGN 03/25/2022 A
D364 A D365
A375
B232
B231
B230
B
A
B
A
B
A
B355
A375 A
1. RE: SHEET ED120 FOR CONDUIT DOWN.
2. RE: SHEET ED140 FOR CONDUIT UP.
3. CONDUIT SHOWN OFFSET FOR CLARITY.
GENERAL NOTES
14 12345678910111213
C
D
E
F
H
J
K
L
SHOWN OFFSET
FOR CLARITY
ET901
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ED130
DEMO PLAN - THIRD FLOOR PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
NO. DESCRIPTION
1 (E) CONDUIT RISERS. REMOVE (E) RACEWAY INCLUDING CONDUIT, J-BOXES, AND RELATED SUPPORT
ASSEMBLIES AS REQUIRED. FIELD VERIFY.
2 DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT
ASSEMBLIES FROM DEVICE AND REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR
RE-USE. FIELD VERIFY.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - THIRD FLOOR
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 D
90% - CONSTRUCTION DOCUMENTS 12/08/2022 C
60% - DESIGN DEVELOPMENT 08/12/2022 B
30% - SCHEMATIC DESIGN 03/25/2022 A
PSHPSL
1. RE: SHEET ED130 FOR CONDUIT DOWN.
2. CONDUIT SHOWN OFFSET FOR CLARITY.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
G
H
J
K
L
2 2
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ED140
DEMO PLAN - FOURTH FLOOR PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
NO. DESCRIPTION
1 (E) CONDUIT RISERS. REMOVE (E) RACEWAY INCLUDING CONDUIT, J-BOXES, AND RELATED SUPPORT
ASSEMBLIES AS REQUIRED. FIELD VERIFY.
2 DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT
ASSEMBLIES FROM DEVICE AND REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR
RE-USE. FIELD VERIFY.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - FOURTH FLOOR
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 D
90% - CONSTRUCTION DOCUMENTS 12/08/2022 C
60% - DESIGN DEVELOPMENT 08/12/2022 B
30% - SCHEMATIC DESIGN 03/25/2022 A
F
P-3 P-4
C1-16
D121K D121 D121M
A101
ED401
F
1 2 3
A101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ED401
ENLARGED DEMO PLANS PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
SCALE: 1/4" = 1'-0"1 ENLARGED COMMUNICATIONS PLAN - FIRST FLOOR
SCALE: 1/2" = 1'-0"3 COMMUNICATIONS PLAN - FIRST FLOOR (35%) - Callout 1 - Callout 1
KEY NOTES
NO. DESCRIPTION
1 IDENTIFY & LABEL EACH ANNUNCIATOR, SIGNAL CABLE, CONTROLLED DEVICE PRIOR TO
DISCONNECTION.
2 DISCONNECT CABLES FROM ANNUNCIATORS AND REMOVE SALVAGE ANNUNCIATORS FOR RE-USE.
3 (E) RACEWAY INCLUDING CONDUIIT, J-BOXES, ETC. TO REMAIN. MODIFY AS REQ'D FOR NEW
CONSTRUCTION. FIELD VERIFY ROUTING.
9 CONDUIT ROUTING SHOWN AND OFFSET FOR CLARITY IN THIS AREA. FIELD VERIFY.
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 D
90% - CONSTRUCTION DOCUMENTS 12/08/2022 C
60% - DESIGN DEVELOPMENT 08/12/2022 B
30% - SCHEMATIC DESIGN 03/25/2022 A
A375
B232
B231
B230
B
A
B
A
B
A
B355
A375 A
14 12345678910111213
A
B
C
D
E
F
H
J
K
L
ET901
EP130
EP130
H
(PNL 3ACLA)
(PNL 3ACLA)
K
PNL 3ACLA
PNL 3ALHA
PNL 3ACHA
PNL 3ANLD P
N
L
A N
L E
P N
L
A N
L F
PNL 3ANLG
PNL 3ANLC
PNL 3ANLB
PNL 3ANLA
PNL D3ANL
PNL 3ALLA
TF-X3AN
TF-X3AL
TF-X3AC
7 8 9
16 PNL 3ANHA
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
EP130
POWER PLAN - THIRD FLOOR PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
Checker Author
SCALE: 1/16" = 1'-0"1 POWER PLAN - THIRD FLOOR
KEY NOTES
NO. DESCRIPTION
1 (E) TF- X3AN: LOW VOLTAGE TRANSFORMER. (E) TRANSFORMER “X3AN” TO REMAIN. FIELD VERIFY.
(DRY TYPE TRANSFORMER, 150 kVA, 480-208/120V) (PRIMARY: PANEL D2ANH, SECONDARY: PANEL
D3ANL, 225A DS).
2 (E) PNL D3ANL: DISTRIBUTION PANEL. (E) PANEL “D3ANL” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 600A).
3 (E) PNL 3ANLA: DISTRIBUTION PANEL. (E) PANEL “3ANLA” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).
4 (E) PNL 3ANLB: DISTRIBUTION PANEL. (E) PANEL “3ANLB” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).
5 (E) PNL 3ANLC: DISTRIBUTION PANEL. (E) PANEL “3ANLC” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).
6 (E) PNL 3ANLG: DISTRIBUTION PANEL. (E) PANEL “3ANLG” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 125A).
7 (E) PNL 3ANLD: DISTRIBUTION PANEL. (E) PANEL “3ANLD” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).
8 (E) PNL 3ANLE: DISTRIBUTION PANEL. (E) PANEL “3ANLE” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).
9 (E) PNL 3ANLF: DISTRIBUTION PANEL. (E) PANEL “3ANLF” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).
10 (E) PNL 3ALLA: DISTRIBUTION PANEL. (E) PANEL “3ALLA” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 100A).
11 (E) TF- X3AL: LOW VOLTAGE TRANSFORMER. (E) TRANSFORMER “X3AL” TO REMAIN. FIELD VERIFY.
(DRY TYPE TRANSFORMER, 15 kVA, 480-208/120V)
12 (E) PNL 3ALHA: DISTRIBUTION PANEL. (E) PANEL “3ALHA” TO REMAIN. FIELD VERIFY. (PANEL, 480/277V, 3PH, 4W, 100A).
13 (E) PNL 3ACLA: DISTRIBUTION PANEL. (E) PANEL “3ACLA” TO REMAIN. CONNECT (N) ANNUNCIATOR RECEPTACLES CIRCUIT #31, #32 TO (E) PANEL 3ACLA SPARE CIRCUITS AS INDICATED. FIELD VERIFY.
(PANEL, 208/120V, 3PH, 4W, 100A).
14 (E) TF- X3AC: LOW VOLTAGE TRANSFORMER. (E) TRANSFORMER “X3AC” TO REMAIN. FIELD VERIFY.
(DRY TYPE TRANSFORMER, 30 kVA, 480-208/120V) (PRIMARY: PANEL 3ACHA, SECONDARY: PANEL
3ACLA, 100A DS).
15 (E) PNL 3ACHA: DISTRIBUTION PANEL. (E) PANEL “3ACHA” TO REMAIN. FIELD VERIFY. (PANEL, 480/277V, 3PH, 4W, 100A).
16 (E) PNL 3ANHA: DISTRIBUTION PANEL. (E) PANEL “3ANHA” TO REMAIN. FIELD VERIFY. (PANEL, 480/277V, 3PH, 4W, 225A).
17 (N) WALL MOUNTED RECEPTACLES: COORDINATE LOCATION WITH MANUFACTURE PANEL
KNOCKOUTS. CONNECT (N) RECEPTACLES TO (E) PANEL 3ACLA SPARE CIRCUITS AS INDICATED.
ROUTE CIRCUITS IN 3/4" CONDUITS MINIMUM. FIELD VERIFY ROUTING.
SCALE: 1/8" = 1'-0"3 3-Third Floor Enlarged Power Plan (A308A) - Callout
SCALE: 1/8" = 1'-0"2 3-Third Floor Enlarged Power Plan (A328) - Callout
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 A
PANEL 3ACHA
480/277V 3Ø, 3W , 100A BUS
T-X3AC
30KVA,
480-208/120V
3Ø, 4W
MAIN SWITCHBOARD 'MSA'
480/277V 3Ø, 4W , 3000A BUS
2000KVA,
13.2KV:480/277V
3Ø, 4W, X/R = 8.0
FROM ELECTRIC UTILITY
3000A
MSA-12
200A
MSA-2
250A
MSA-6
1200A
PANEL 3ACLA
208/120V 3Ø, 4W , 100A BUS
20AT 20AT
ANNUNCIATOR
RECEPTACLE
CKT #31
20AT
SPARE
20AT
SPAREANNUNCIATOR
RECEPTACLE
CKT #32
PANEL 1DCHA
480/277V 3Ø, 3W , 225A BUS
AUTOMATIC
TRANSFER
SWITCH
"ATS-CR1"
260A
EMERGENCY
DISTRIBUTION
SWITCHBOARD
'EDS'
PNL
3ACLA
100A
PNL
3ACHA
100A
PNL
1DCHA
225A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
EP601
ELECTRICAL ONE LINE -
ANNUNCIATOR
PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
Checker AuthorDESCRIPTION DATE REV
100% - FINAL CONSTRUCTION DOCUMENTS 03/22/2023 B
100% - CONSTRUCTION DOCUMENTS 02/23/2023 A
TSH
TSHCP
TSH
TSH
PSL
H O2
TSH H O2
H O2
PSH PSLMLH H O2
H O2
PBX
SPB 117
CP
M
M
1. RE: SHEET ET120 FOR SIGNAL WIRING AND CONDUIT ROUTED UP.
2. TERMINATE WIRING AND CONDUIT AT DEVICES/EQUIPMENT PER MANUFACTURER'S INSTALLATION
DETAILS.
3. RE: SHEET ET601 FOR RACEWAY SYSTEM DETAILS.
4. RE: DEVICE SCHEDULE FOR SENSOR, SWITCH, ANNUNCIATOR, PANEL LIST OF POINTS,
INSTRUMENTATION DEVICE TYPE, WIRE/CABLE TYPE, WIRE/CABLE SIZE, RACEWAY SIZE.
5. TRACE (E) SIGNAL WIRING FROM (E) ANNUNCIATOR PANELS/KEYPADS TO (E) INSTRUMENTATION
DEVICES. CLEARLY MARK BOTH ENDS WITH DEVICE ID / ANNUNCIATOR PANEL ID.
6. INSTALL NEW SIGNAL WIRING AND RACEWAY PRIOR TO DISCONNECTING FROM EXISTING.
7. COORDINATE SWITCHOVER WITH CONTRACT POC. DISCONNECT (E) SIGNAL WIRING. TERMINATE NEW
WIRING ON INSTRUMENTATION DEVICE. REMOVE (E) SIGNAL WIRING AND RACEWAY.
8. FIELD VERIFY ROUTES. COORDINATE WITH CONTRACT POC PRIOR TO INSTALLATION.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
G
H
J
K
L
1 2
20 21
13 14
15 16
ET401
ET401
ET901
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ET110
COMMUNICATIONS PLAN - FIRST
FLOOR
PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
NO. DESCRIPTION
1 (E) GENERATOR CONTROL PANEL. (CAT EMP4.2, RS-485 ANNUNCIATOR) ROUTE NEW SIGNAL WIRE IN
(E) CONDUIT FROM CP-1,2 TO (E) ANNUNCIATORS IN NEW LOCATION.
2 (E) TEMPERATURE SENSOR (PHARMACY CACHE): ROUTE NEW SIGNAL WIRE IN (E)RACEWAY FROM
(E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.
3 (E) O2 IN-USE FLOW SENSORS, PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY
FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.
4 (E) O2 SYSTEM MED-GAS SENSOR AND SWITCH ASSEMBLIES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E) INSTRUMENTATION DEVICES TO MEDICAL GAS MASTER ALARM PANEL IN NEW
LOCATION. RE: PLUMBING SHEETS.
5 (E) N2O CYLINDER IN-USE FLOW SENSORS, PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN
(E)RACEWAY FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.
6 (E) N2O CYLINDER MED-GAS SENSORS AND PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E) INSTRUMENTATION DEVICES TO MEDICAL GAS MASTER ALARM PANEL IN NEW
LOCATION. RE: PLUMBING SHEETS.
7 (E) N CYLINDER IN-USE FLOW SENSORS, PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E)
RACEWAY FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.
8 (E) N CYLINDER MED-GAS SENSORS AND PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E) INSTRUMENTATION DEVICES TO MEDICAL GAS MASTER ALARM PANEL IN NEW
LOCATION. RE: PLUMBING SHEETS.
9 (E) TEMPERATURE SENSOR (COOLING TOWER): ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E)
SENSOR TO ANNUNCIATOR IN NEW LOCATION.
10 (E) TEMPERATURE SENSOR (CHILLED WATER TEMP): ROUTE NEW SIGNAL WIRE IN (E) RACEWAY
FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.
11 (E) WATER DETECTION SENSOR (CHILLER PLANT FLOOR): REPLACE (E) WATER DETECTORS WITH NEW. FIELD VERIFY LOCATION WITH COR. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E)
SENSOR TO ANNUNCIATOR IN NEW LOCATION.
12 (E) TEMPERATURE SENSOR (WAREHOUSE): ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E)
SENSOR TO ANNUNCIATOR IN NEW LOCATION.
13 (E) MV-1,2 SYSTEM SENSORS/SWITCHES. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)
CONTROL PANEL, SENSORS, SWITCHES TO ANNUNCIATOR IN NEW LOCATION.
14 (E) MV-1,2 SYSTEM MED-GAS ALARM SENSORS/SWITCHES. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E) CONTROL PANEL, SENSORS, SWITCHES TO MEDICAL GAS MASTER ALARM PANEL IN NEW
LOCATION. (E) TERMINATION TO PRIMARY MED-GAS MASTER ALARM PANEL TO REMAIN.
15 (E) MA-1,2 SYSTEM SENSORS/SWITCHES. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)
CONTROL PANEL, SENSORS, SWITCHES TO ANNUNCIATOR IN NEW LOCATION.
16 (E) MA-1,2 SYSTEM MED-GAS ALARM SENSORS/SWITCHES. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E) CONTROL PANEL, SENSORS, SWITCHES TO MEDICAL GAS MASTER ALARM PANEL IN NEW
LOCATION. (E) TERMINATION TO PRIMARY MED-GAS MASTER ALARM PANEL TO REMAIN.
17 (E) WATER DETECTION SENSOR (MECH ROOM FLOOR): ROUTE NEW SIGNAL WIRE AND RACEWAY
FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.
18 (E) WATER DETECTION SENSOR (TELEPHONE ROOM FLOOR): REPLACE (E) WATER DETECTORS WITH
NEW. FIELD VERIFY LOCATION WITH COR. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)
SENSOR TO ANNUNCIATOR IN NEW LOCATION.
19 (E) PBX SYSTEM. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E) UNIT TO ANNUNCIATOR IN NEW
LOCATION.
20 (E) TEMPERATURE SENSOR (CPU ROOM): ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)
SENSOR TO ANNUNCIATOR IN NEW LOCATION.
21 (E) WATER DETECTION SENSOR (CPU ROOM FLOOR): REPLACE (E) WATER DETECTORS WITH NEW.
FIELD VERIFY LOCATION WITH COR. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E) SENSOR TO
ANNUNCIATOR IN NEW LOCATION.
22 ROUTE SIGNAL WIRING AND RACEWAY UP.
23 (E) WATER DETECTION SENSOR (STEAM PIPING ROOM FLOOR): REPLACE (E) WATER DETECTORS WITH NEW. FIELD VERIFY LOCATION WITH COR. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)
SENSOR TO ANNUNCIATOR IN NEW LOCATION.
24 SENSOR NOT SHOWN FOR CLARITY. REFER TO ENLARGED PLANS FOR SENSOR INFORMATION ON
ET401.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS PLAN - FIRST FLOOR
DESCRIPTION DATE REV
100% - FINAL CONSTRUCTION DOCUMENTS 03/22/2023 D
100% - CONSTRUCTION DOCUMENTS 02/23/2023 C
90% - CONSTRUCTION DOCUMENTS 12/08/2022 B
60% - DESIGN DEVELOPMENT 08/12/2022 A
B 203 D
B
D
A
204 B
204 C
B 204
B 204AB 204B
D 262B
D
A
D
B
C238 C241 A C243
E
E
A
E
B
1. RE: SHEET ET130 FOR SIGNAL WIRING AND RACEWAY ROUTED UP. RE: SHEET ET110 FOR WIRING
RACEWAY ROUTED DN.
2. TERMINATE WIRING AND CONDUIT AT DEVICES/EQUIPMENT PER MANUFACTURER'S INSTALLATION
DETAILS.
3. RE: SHEET ET601 FOR RACEWAY SYSTEM DETAILS.
4. RE: DEVICE SCHEDULE FOR SENSOR, SWITCH, ANNUNCIATOR, PANEL LIST OF POINTS,
INSTRUMENTATION DEVICE TYPE, WIRE/CABLE TYPE, WIRE/CABLE SIZE, RACEWAY SIZE.
5. TRACE (E) SIGNAL WIRING FROM (E) ANNUNCIATOR PANELS/KEYPADS TO (E) INSTRUMENTATION
DEVICES. CLEARLY MARK BOTH ENDS WITH DEVICE ID / ANNUNCIATOR PANEL ID.
6. INSTALL NEW SIGNAL WIRING AND RACEWAY PRIOR TO DISCONNECTING FROM EXISTING.
7. COORDINATE SWITCHOVER WITH CONTRACT POC. DISCONNECT (E) SIGNAL WIRING. TERMINATE NEW
WIRING ON INSTRUMENTATION DEVICE. REMOVE (E) SIGNAL WIRING AND RACEWAY.
8. FIELD VERIFY ROUTES. COORDINATE WITH CONTRACT POC PRIOR TO INSTALLATION.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
G
H
J
K
L
ET901
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ET120
COMMUNICATIONS PLAN -
SECOND FLOOR
PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
NO. DESCRIPTION
1 SIGNAL WIRING AND RACEWAY RISER. ROUTE UP IN (E) WALL TO NEW PB-3 AS INDICATED.
2 PB-3: PROVIDE NEW 35x21x3 PULL BOX. PROVIDE METAL STUD WALL ROUGH-IN ABOVE CEILING.
FIELD VERIFY ELEVATION.
3 ROUTE NEW CONDUIT FROM PB-3 UP THRU FLOOR THRU NEW WALL. FIELD VERIFY.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS PLAN - SECOND FLOOR
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 C
90% - CONSTRUCTION DOCUMENTS 12/08/2022 B
60% - DESIGN DEVELOPMENT 08/12/2022 A
A375
B232
B231
B230
B
A
B
A
B
A
B355
A375 A
1. RE: SHEET ET140 FOR SIGNAL WIRING AND RACEWAY ROUTED UP. RE: SHEET ET120 FOR WIRING
RACEWAY ROUTED DN.
2. TERMINATE WIRING AND CONDUIT AT DEVICES/EQUIPMENT PER MANUFACTURER'S INSTALLATION
DETAILS.
3. RE: SHEET ET601 FOR RACEWAY SYSTEM DETAILS.
4. RE: DEVICE SCHEDULE FOR SENSOR, SWITCH, ANNUNCIATOR, PANEL LIST OF POINTS,
INSTRUMENTATION DEVICE TYPE, WIRE/CABLE TYPE, WIRE/CABLE SIZE, RACEWAY SIZE.
5. TRACE (E) SIGNAL WIRING FROM (E) ANNUNCIATOR PANELS/KEYPADS TO (E) INSTRUMENTATION
DEVICES. CLEARLY MARK BOTH ENDS WITH DEVICE ID / ANNUNCIATOR PANEL ID.
6. INSTALL NEW SIGNAL WIRING AND RACEWAY PRIOR TO DISCONNECTING FROM EXISTING.
7. COORDINATE SWITCHOVER WITH CONTRACT POC. DISCONNECT (E) SIGNAL WIRING. TERMINATE NEW
WIRING ON INSTRUMENTATION DEVICE. REMOVE (E) SIGNAL WIRING AND RACEWAY.
8. FIELD VERIFY ROUTES. COORDINATE WITH CONTRACT POC PRIOR TO INSTALLATION.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
H
J
K
L
A308A
ET401
ET901
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R e lo c a ti o n
/2
V
A E
P A n n u n c ia to r
E le c tr ic a l.
rv t
/2
/2
:4
:1
P
M
03/22/2023
ET130
COMMUNICATIONS PLAN - THIRD
FLOOR
PANEL ANNUNCIATOR’S
RELOCATION
EL PASO, TX
756-22-203
LRL DMB
KEY NOTES
ZE DESCRIPTION
1 SIGNAL WIRING AND RACEWAY RISER.
2 ROUTE WIRING AND RACEWAY TO (E) SECURITY CONTROL PANEL. FIELD VERIFY LOCATION.
3 (E) FIRE ALARM CONTROL PANEL. WIRE AND RACEWAY ROUTED TO RELOCATED ANNUNCIATOR BY
OTHERS.
4 (E) PRESSURE SWITCH (DENTAL VAC LOW): ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)
CONTROL PANEL, SENSORS, SWITCHES TO ANNUNCIATOR IN NEW LOCATION.
5 (E) OE-1,2 SYSTEM MED-GAS ALARM SENSORS/SWITCHES. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E) CONTROL PANEL, SENSORS, SWITCHES TO MEDICAL GAS MASTER ALARM PANEL IN NEW
LOCATION. (E) TERMINATION TO PRIMARY MED-GAS MASTER ALARM PANEL TO REMAIN.
6 PB-4: PROVIDE NEW 35X21X3 PULL BOX. ROUGH-IN TO (E) METAL STUD FRAMING ABOVE CEILING AS
INDICATED. FIELD VERIFY ELEVATION.
7 ROUTE NEW CONDUIT WIRE ABOVE CEILING IN THIS AREA.
SCALE: 1/16" = 1'-0"1 COMMUNICATIONS PLAN - THIRD FLOOR
DESCRIPTION DATE REV
100% - CONSTRUCTION DOCUMENTS 02/23/2023 C
90% - CONSTRUCTION DOCUMENTS 12/08/2022 B
60% - DESIGN DEVELOPMENT 08/12/2022 A
PSHPSH
PSL
PSLPSH PSLPSH
PSL
PSHPSL
1. RE: SHEET ET130 FOR WIRING AND RACEWAY ROUTED DN.
2. TERMINATE WIRING AND CONDUIT AT DEVICES/EQUIPMENT PER MANUFACTURER'S INSTALLATION
DETAILS.
3. RE: SHEET ET601 FOR RACEWAY SYSTEM DETAILS.
4. RE: DEVICE SCHEDULE FOR SENSOR, SWITCH, ANNUNCIATOR, PANEL LIST OF POINTS,
INSTRUMENTATION DEVICE TYPE, WIRE/CABLE TYPE, WIRE/CABLE SIZE, RACEWAY SIZE.
5. TRACE (E) SIGNAL WIRING FROM (E) ANNUNCIATOR PANELS/KEYPADS TO (E) INSTRUMENTATION
DEVICES. CLEARLY MARK BOTH ENDS WITH DEVICE ID / ANNUNCIATOR PANEL ID.
6. INSTALL NEW SIGNAL WIRING AND RACEWAY PRIOR TO DISCONNECTING FROM EXISTING.
7. COORDINATE SWITCHOVER WITH CONTRACT POC. DISCONNECT (E) SIGNAL WIRING. TERMINATE NEW
WIRING ON INSTRUMENTATION DEVICE. REMOVE (E) SIGNAL WIRING AND RACEWAY.
8. FIELD VERIFY ROUTES. COORDINATE WITH CONTRACT POC PRIOR TO INSTALLATION.
GENERAL NOTES
14 12345678910111213
A
B
C
D
E
F
G
H
J
K
L
2 12 13 14 15
7 8 9 10 11
4 5
TRUE
PLAN
N 0'
SCALE: 1/16" = 10'
10' 20' 50'30' 40'5'
2'-6" 7'-6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
APPROVING OFFICIAL
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
THESE DOCUMENTS
ARE FOR INTERIM
REVIEW AND ARE NOT
INTENDED FOR
CONSTRUCTION,
BIDDING, OR PERMIT
PURPOSES.
TEXAS PE #
MEP:
COR: MR. ANGEL MORALES
O'BRIEN ENGINEERING, INC
MANAGING PARTNER
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
O'BRIEN ENGINEERING, INC
2340 E. TRINITY MILLS RD. STE 220
CARROLLTON, TX 75006
(972) 233-2288 www.obrieneng.com
ISSUED FOR
CONSTRUCTION 1
LARRY R. LAMETTE, JR.
B
IM
/P a n e l A n n u n c ia to rs
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .