About this file

This document is an amendment to a solicitation for the ELP Panel Annunciators' Relocation project. The amendment extends the response date to November 13, 2023 at 10:00 AM CST for bids to be submitted via email only to the Contract Specialist. It provides responses to requests for information and attaches sign-in sheets from pre-bid site visits. The project involves relocating panel annunciators at the El Paso VA Healthcare System facility.

View the file

Other files for this federal contract opportunity

Other files attached to ELP Panel Annunciators' Relocation - Amendment 0004, newest first.
File Type Posted
S06 36C25724B0008 Amendment 0004.pdf PDF
S06 36C25724B0008 Amendment 0004 Additional RFI Questions.pdf PDF
36C25724B0008 Amendment 0003.pdf PDF
S02_36C25724B0008 Amendment 0001.pdf PDF
S02_36C25724B0008 REVISED.docx DOCX document
75622203 Panel Annunciators Relocation IFC Specifications_01.pdf PDF
75622203 Panel Annunicators Relocation Drawings_01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

756-22-203

36C257

Department Of Veterans Affairs Network Contracting Office 17 1901 Veterans Memorial Drive Bldg 171 Temple TX 76504

36C257

Department Of Veterans Affairs Network Contracting Office 17 1901 Veterans Memorial Drive Bldg 171 Temple TX 76504

To all Offerors/Bidders

36C25724B0008

09-18-2023

X

X X

**HOUR & DATE for Receipt of Offers is EXTENDED to: November 13, 2023 @ 10:00 AM CST**

X 1

See SF30 Continuation Page

Makarim Abdul-Jabbar Contracting Officer

AMENDMENT 36C25724B0008 0002

STANDARD FORM 30 CONTINUATION PAGE

BLOCK 14:

Amendment 0002 is issued to provide responses to RFI’s; to post the Sign in Sheets from the Pre-Bid Site Visits; to update the Bid Opening instructions; and to extend the Bid Closing Date to November 13, 2023 @ 10:00 AM CST.

The Contracting Officer for this requirement has been changed to Makarim Abdul-Jabbar.

The Bids are due via email only to the Contract Specialist Anitra Carter at anitra.carter@va.gov on 11/13/2023 by 10:00 AM CST.

BID OPENING INSTRUCTIONS ARE UPDATED AS FOLLOWS:

1. A public Bid Opening shall be a virtual public bid opening conducted on November 16, 2023 @ 2:45 PM CST. The time for this virtual public bid opening will start at 2:45 p.m. Central Standard Time (CST) with bid opening beginning promptly at 3:00 p.m. CST.

2. Attendance at the bid opening is not mandatory. If you are interested in attending, you are to email the Contract Specialist a separate email requesting attendance via email to: anitra.carter@va.gov. You must have access to Microsoft Teams or the ability to dial-in. No other opportunities for a bid opening will be provided. Questions will not be answered at the bid opening. Bids shall be opened by the bid opening officer and recorded on an official Bid Abstract. Bid Abstracts will be available upon request via email to: anitra.carter@va.gov.

All other terms and conditions remain the same.

See attached document: ELP Panel Annunciators Relocation 36C25724B0008 Pre-Bid RFI Responses.

See attached document: 2023.10.19 - Panel Annunciators Relocation 756-22-203 Addendum 001 Drawings.

See attached document: S04 756-22-203 Panel Annunciators Pre-Bid Roster.

See attached document: S04 2023.10.12 Pre-Bid Site Visit 2 Roster 756-22-203 Panel Annunciators.

mailto:anitra.carter@va.gov mailto:anitra.carter@va.gov mailto:anitra.carter@va.gov

Contractor Questions- 36C25724B0008 ELP Panel Annunciators' Relocation

1. Are HEPA carts required in order to work in above ceiling grid?

EPVA Answered: Yes. Contractor to comply with all safety requirements.

RE: Spec Sections 01000 General Requirements, 013526 Safety Requirements.

2. Is all conduit to be reused?

EPVA Answered: Contractor to field verify raceway installation and coordinate with COR prior to performing the work. The base bid scope of work includes re-using raceway in identified areas and replacing raceway in other identified areas. Contractor to propose re-using existing raceway where replacement is not feasible. RE: ED#, EP#, ET# Floor Plan Sheets.

3. Annunciator on third floor is not shown on drawings. Please advise.

EPVA Answered: Will Comply. RE: Sheet ET130.

4. Can underground raceway from main building to room F104 be utilized for any conduit needed to be ran to this area?

EPVA Answered: Contractor to field verify integrity of existing conduit in these areas and coordinate with COR prior to installation. RE: Sheets

ET110, ED110.

5. Who is providing the controls cabinet?

EPVA Answered: Contractor to provide control cabinet. In addition, Contractor to send submittal for COR and A/E approval.

6. Due to the age of the annunciators if during relocation the equipment stops functioning correctly will additional unit be provided?

EPVA Answered: No. Existing equipment shall be handled with care to avoid damage. RE: Spec Sections 01000 General Requirements, 024100 Demolition for property protection.

7. If annunciators end up needing to be replaced what approved unit is available?

EPVA Answered: All annunciators are functioning correctly as verified prior to construction. Coordinate annunciators damaged during construction with COR. Contractor to provide current generation Sensaphone Annunciator. RE: Sheet E601.

8. Will the Annunciator’s be offline once the project starts?

EPVA Answered: No. Work is to be planned, phased, and performed in a manner that minimizes downtime. Submit system downtime requests to COR two (2) weeks in advance of performing the work. RE: Spec Sections 01000 General Requirements; 024100 Demolition.

9. Will there be phases in place for the project due to the multiple locations where work is to be performed?

EPVA Answered: Phases to be determined with coordination between CO, COR, Contractor, and Commissioning Agent. RE: Spec Section 01000 General Requirements.

10. Will there be an end user escort after hours available to open all areas/doors for the duration of the contract?

EPVA Answered: Yes.

11. What are the allowed working hours anticipated by the end user?

EPVA Answered: Please review Statement of Work for working hours. RE:

Spec Section 01000 General Requirements.

12. 3rd floor Drawing-ET130, Key Note #3. Will this work to be an amendment to existing contract?

EPVA Answered: No. Scopes of work related to Key Note #3 will be removed from Sheet ET130.

13. Do we demo first? Or install new conduit and j-boxes for close interception of existing conduit?

EPVA Answered: Contractor to field verify. Work is to be planned, phased, and performed to minimize system downtime. Install new conduit and j- boxes to facilitate re-use of existing conduit and device terminations.

14. Per Section 26 08 00 Commissioning of Electrical System, Part 1 - General, Paragraph 1.1 C. Upon selection of the (3) requested commissioning agents by the GC. Will the VA COR determine the approval of the third-party commissioning agency prior to the proposal?

EPVA Answered: VA to establish a committee to review Commissioning Agent qualifications. Committee shall consist of VA-CO, VA-COR, and VA- Engineering Technicians. RE: Spec Sections 013216.15 Project Schedules, Spec Section 019100 for Submittal Requirements.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023 G001

PROJECT COVER SHEET/SHEET

INDEX

PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

EL PASO VA HEALTHCARE SYSTEM

PANEL ANNUNCIATOR'S RELOCATION

EL PASO, TEXAS

PIERCE AVENUE

A L

A B

A M

A S

T R

E E

T

ALA

BAM

A S

TR

EE

T

RODRIGUEZ STREET

L O

U

IS

IA

N

A S

T R

E E

T

H O

L M

E S

G

IN

N C

IR

C

L E

H O

L M

E S

G

IN

N C

IR

C

L E

EL PASO VA

MEDICAL

CENTER

WILLIAM BEAUMONT

MEDICAL CENTER

PATIENT

PARKING

PATIENT

PARKING LOT

EMPLOYEE

PARKING

PATIENT

PARKING

PATIENT

PARKING

HELIPAD

PATIENT

PARKING

DESCRIPTION DATE REV

60% - DESIGN DEVELOPMENT 08/12/2022 A

90% - CONSTRUCTION DOCUMENTS 12/08/2022 B

100% - CONSTRUCTION DOCUMENTS 02/23/2023 C

ISSUED FOR CONSTRUCTION 03/22/2023 0

ADDENDUM 001 10/19/2023 1

ABBREVIATIONS

1PH SINGLE PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR ARMORED CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

AF AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC FREQUENCY

CONTROL, OR AVAILABLE FAULT CURRENT

AFCI ARC-FAULT CURRENT INTERRUPTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

Ah AMPERE HOUR

AHJ AUTHORITY HAVING JURISDICTION

AIC AMPERE INTERRUPTING CAPACITY

ALT ALTERNATE

AMB AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BD BOARD

BFF BELOW FINISHED FLOOR

BLDG BUILDING

BRK RBREAKER

BYP BYPASS

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTRACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FINISHED

CF/CI CONTRACTOR FINISHED/CONTRACTOR INSTALLED

CFE CONTRACTOR FINISHED EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

OR C/B

CLF CURRENT LIMITING FUSE

CLG CEILING

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CUR CURRENT

dB DECIBEL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELCIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR PNL DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST OR(E) EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FIXT FIXTURE

FLA FULL LOAD AMPS

FLUOR FLUORESCENT

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G ELECTRICAL GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF

NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAh KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWh KILOWATT HOUR kWhM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT PROTECTION

MLA MAIN LUGS ONLY

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT

NA NOT APPLICABLE

NC NORMALLY CLOSED

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEUT OR N NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PB PULL BOX

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

RM ROOM

RMS ROOT MEAN SQUARE

REQD REQUIRED

SCC SHORT CIRCUIT CAPACITY

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TEL TELEPHONE

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

SYMBOLS

DEMO CONDUIT

EXISTING CONDUIT

NEW CONDUIT

EXISTING FIXTURES, EQUIPMENT, ETC.

DEMO FIXTURES, EQUIPMENT, ETC.

NEW FIXTURES, EQUIPMENT, ETC.

TSH

TSL

O2

FT

H2O

MLH

PSH

PBX

PSL

TEMPERATURE SWITCH, HIGH

TEMPERATURE SWITCH, LOW

CONTROL PANEL

O2 DETECTOR SWITCH

FLOW TRANSMITTER

TEMPERATURE SWITCH, HIGH

MOISTURE LEVEL, HIGH

PBX SENSOR

PRESSURE SWITCH, HIGH

PRESSURE SWITCH, LOW

CP

PRESSURE SWITCH, LOWJ

LIMIT OF DEMOLITION

CONNECT TO EXISTING

GENERAL NOTES

A. RE: DIVISION 26 ELECTRICAL

1. REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

a. FURNISH AND INSTALL ELECTRICAL SYSTEMS, MATERIALS, EQUIPMENT, AND ACCESSORIES IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. CAPACITIES AND RATINGS OF MOTORS, TRANSFORMERS, CONDUCTORS AND CABLE, SWITCHBOARDS, SWITCHGEAR, PANELBOARDS, MOTOR CONTROL CENTERS, GENERATORS, AUTOMATIC TRANSFER SWITCHES, AND OTHER ITEMS AND ARRANGEMENTS FOR THE SPECIFIED ITEMS ARE SHOWN ON THE DRAWINGS.

b. ELECTRICAL SERVICE ENTRANCE EQUIPMENT AND ARRANGEMENTS FOR TEMPORARY AND PERMANENT CONNECTIONS TO THE ELECTRIC UTILITY COMPANY’S SYSTEM SHALL CONFORM TO THE ELECTRIC UTILITY COMPANY'S REQUIREMENTS.

COORDINATE FUSES, CIRCUIT BREAKERS AND RELAYS WITH THE ELECTRIC UTILITY COMPANY’S SYSTEM, AND OBTAIN

ELECTRIC UTILITY COMPANY APPROVAL FOR SIZES AND SETTINGS OF THESE DEVICES.

c. CONDUCTOR AMPACITIES SPECIFIED OR SHOWN ON THE DRAWINGS ARE BASED ON COPPER CONDUCTORS, WITH THE

CONDUIT AND RACEWAYS SIZED PER NEC. ALUMINUM CONDUCTORS ARE PROHIBITED.

d. THE LATEST INTERNATIONAL BUILDING CODE (IBC), UNDERWRITERS LABORATORIES, INC. (UL), INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE), AND NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) CODES AND STANDARDS

ARE THE MINIMUM REQUIREMENTS FOR MATERIALS AND INSTALLATION.

e. THE DRAWINGS AND SPECIFICATIONS SHALL GOVERN IN THOSE INSTANCES WHERE REQUIREMENTS ARE GREATER THAN

THOSE STATED IN THE ABOVE CODES AND STANDARDS.

f. ALL MATERIALS AND EQUIPMENT SHALL BE LISTED, LABELED, OR CERTIFIED BY A NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) TO MEET UNDERWRITERS LABORATORIES, INC. (UL), STANDARDS WHERE TEST STANDARDS HAVE BEEN ESTABLISHED. MATERIALS AND EQUIPMENT WHICH ARE NOT COVERED BY UL STANDARDS WILL BE ACCEPTED, PROVIDING THAT MATERIALS AND EQUIPMENT ARE LISTED, LABELED, CERTIFIED OR OTHERWISE DETERMINED TO MEET THE SAFETY REQUIREMENTS OF A NRTL. MATERIALS AND EQUIPMENT WHICH NO NRTL ACCEPTS, CERTIFIES, LISTS, LABELS, OR DETERMINES TO BE SAFE, WILL BE CONSIDERED IF INSPECTED OR TESTED IN ACCORDANCE WITH NATIONAL INDUSTRIAL STANDARDS, SUCH AS ANSI, NEMA, AND NETA. EVIDENCE OF COMPLIANCE SHALL INCLUDE CERTIFIED TEST

REPORTS AND DEFINITIVE SHOP DRAWINGS.

g. MATERIALS AND EQUIPMENT SHALL BE PROTECTED DURING SHIPMENT AND STORAGE AGAINST PHYSICAL DAMAGE, VERMIN, DIRT, CORROSIVE SUBSTANCES, FUMES, MOISTURE, COLD AND RAIN.

h. ALL ELECTRICAL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST NFPA 70 (NEC), NFPA 70B, NFPA 70E, NFPA 99, NFPA 110, OSHA PART 1910 SUBPART J – GENERAL ENVIRONMENTAL CONTROLS, OSHA PART 1910 SUBPART K – MEDICAL AND FIRST AID, AND OSHA PART 1910 SUBPART S – ELECTRICAL, IN ADDITION TO OTHER REFERENCES REQUIRED BY

CONTRACT.

i. JOB SITE SAFETY AND WORKER SAFETY IS THE RESPONSIBILITY OF THE CONTRACTOR.

j. COORDINATE LOCATION OF EQUIPMENT AND CONDUIT WITH OTHER TRADES TO MINIMIZE INTERFERENCE.

k. EQUIPMENT LOCATION SHALL BE AS CLOSE AS PRACTICAL TO LOCATIONS SHOWN ON THE DRAWINGS.

l. WORKING CLEARANCES SHALL NOT BE LESS THAN SPECIFIED IN THE NEC.

m. ELECTRICAL SERVICE ENTRANCE EQUIPMENT AND ARRANGEMENTS FOR TEMPORARY AND PERMANENT CONNECTIONS TO

THE ELECTRIC UTILITY COMPANY’S SYSTEM SHALL CONFORM TO THE ELECTRIC UTILITY COMPANY'S REQUIREMENTS.

COORDINATE FUSES, CIRCUIT BREAKERS AND RELAYS WITH THE ELECTRIC UTILITY COMPANY’S SYSTEM, AND OBTAIN

ELECTRIC UTILITY COMPANY APPROVAL FOR SIZES AND SETTINGS OF THESE DEVICES.

n. IN ADDITION TO THE REQUIREMENTS OF THE NEC, INSTALL AN IDENTIFICATION SIGN WHICH CLEARLY INDICATES INFORMATION REQUIRED FOR USE AND MAINTENANCE OF ITEMS SUCH AS SWITCHBOARDS AND SWITCHGEAR, PANELBOARDS, CABINETS, MOTOR CONTROLLERS, FUSED AND NON-FUSED SAFETY SWITCHES, GENERATORS, AUTOMATIC TRANSFER SWITCHES, SEPARATELY ENCLOSED CIRCUIT BREAKERS, INDIVIDUAL BREAKERS AND CONTROLLERS IN SWITCHBOARDS, SWITCHGEAR AND MOTOR CONTROL ASSEMBLIES, CONTROL DEVICES AND OTHER SIGNIFICANT

EQUIPMENT.

o. INSTALL ADHESIVE ARC FLASH WARNING LABELS ON ALL EQUIPMENT AS REQUIRED BY THE LATEST NFPA 70E. LABEL SHALL SHOW SPECIFIC AND CORRECT INFORMATION FOR SPECIFIC EQUIPMENT BASED ON ITS ARC FLASH CALCULATIONS.

p. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES IN APPROPRIATE SUBMITTAL PACKAGES.

q. APPROVAL SHALL BE OBTAINED FOR ALL MATERIALS AND EQUIPMENT BEFORE DELIVERY TO THE JOB SITE. DELIVERY, STORAGE OR INSTALLATION OF MATERIALS AND EQUIPMENT WHICH HAS NOT HAD PRIOR APPROVAL WILL NOT BE

PERMITTED.

r. ALL SUBMITTALS SHALL INCLUDE ONE HARD COPY, ONE ELECTRONIC COPY OF ADEQUATE DESCRIPTIVE LITERATURE, CATALOG CUTS, SHOP DRAWINGS, TEST REPORTS, CERTIFICATIONS, SAMPLES, AND OTHER DATA NECESSARY FOR THE TO ASCERTAIN THAT THE PROPOSED MATERIALS AND EQUIPMENT COMPLY WITH DRAWING AND SPECIFICATION REQUIREMENTS. CATALOG CUTS SUBMITTED FOR APPROVAL SHALL BE LEGIBLE AND CLEARLY IDENTIFY SPECIFIC

MATERIALS AND EQUIPMENT BEING SUBMITTED.

s. SUBMITTALS FOR INDIVIDUAL SYSTEMS AND EQUIPMENT ASSEMBLIES WHICH CONSIST OF MORE THAN ONE ITEM OR COMPONENT SHALL BE MADE FOR THE SYSTEM OR ASSEMBLY AS A WHOLE. PARTIAL SUBMITTALS WILL NOT BE

CONSIDERED FOR APPROVAL.

t. SUBMIT AS REQUIRED FOR SYSTEMS AND EQUIPMENT SPECIFIED IN THE TECHNICAL SECTIONS. FURNISH IN HARDCOVER

BINDERS OR AN APPROVED EQUIVALENT.

u. APPROVALS WILL BE BASED ON COMPLETE SUBMISSION OF SHOP DRAWINGS, MANUALS, TEST REPORTS, CERTIFICATIONS, AND SAMPLES AS APPLICABLE.

v. ALL WORK PERFORMED AND ALL EQUIPMENT AND MATERIAL FURNISHED UNDER THIS DIVISION SHALL BE FREE FROM DEFECTS AND SHALL REMAIN SO FOR A PERIOD OF ONE YEAR FROM THE DATE OF ACCEPTANCE OF THE ENTIRE INSTALLATION. THE FOLLOWING ASSEMBLIES SHALL REQUIRE CLIENT REPRESENTATIVE INSPECTION AND WRITTEN APPROVAL AFTER EACH INITIAL ASSEMBLY AND PRIOR TO EACH SUBSEQUENT STEP OF EACH ASSEMBLY:

• RACEWAY / JUNCTION BOX ROUGH-IN PRIOR TO PULL-STRING

• PLASTIC BUSHINGS PRIOR TO PULL STRINGS, PRIOR TO CABLE PULLS

• CABLE PULLS PRIOR TO RACEWAY ENCLOSURE / J-BOX ENCLOSURES

w. ALL WORK SHALL BE PERFORMED MONDAY THRU SATURDAY BETWEEN THE HOURS OF 5:00 PM - 2:00 AM.

B. RE: DIVISION 27: COMMUNICATIONS

1. REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS

2. GROUNDING AND BONDING FOR COMMUNICATTIONS SYSTEMS

3. RACEWAYS AND BOXES FOR COMMUNICATIONS SYSTEMS

4. CONTROL, COMMUNICATION AND SIGNAL WIRING

5. COMMUNICATIONS STRUCTURED CABLING

C. RE: DIVISION 28 - ELECTRONIC SAFETY AND SECURITY SPECIFICATIONS

1. REQUIREMENTS FOR ELECTRONIC SAFETY AND SECURITY INSTALLATIONS

2. CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

3. GROUNDING AND BONDING FOR ELECTROINIC SAFETY AND SECURITY

4. CONDUITS AND BACKBOXES FOR ELECTRONIC SAFETY AND SECURITY

D. RE: DIVISION 27 CONTROL WIRING

1. GENERAL

a. THIS SECTION INCLUDES CONTROL, COMMUNICATION AND SIGNAL WIRING FOR A COMPREHENSIVE SYSTEMS

INFRASTRUCTURE.

b. SUBMIT WRITTEN CERTIFICATION FROM OEM:

1. INDICATE WIRING AND CONNECTION DIAGRAMS MEET NATIONAL AND GOVERNMENT LIFE SAFETY GUIDELINES, NFPA, NEC, NRTL, JOINT COMMISSION, OEM.

2. INCLUDE INSTRUCTIONS, REQUIREMENTS, RECOMMENDATIONS, AND GUIDANCE FOR PROPER PERFORMANCE OF

SYSTEM AS DESCRIBED HEREIN.

3. IDENTIFY ENVIRONMENTAL SPECIFICATIONS ON TECHNICAL SUBMITTALS; IDENTIFY REQUIREMENTS FOR INSTALLATION.

4. PROVIDE CONDUIT SIZE REQUIREMENTS.

2. PRODUCTS

a. PROVIDE CONTROL WIRING LARGE ENOUGH SO VOLTAGE DROP UNDER IN-RUSH CONDITIONS DOES NOT ADVERSELY

AFFECT OPERATION OF CONTROLS.

b. PROVIDE CABLE MEETING SPECIFICATIONS FOR TYPE OF CABLE.

c. OUTSIDE LOCATION (I.E. ABOVE GROUND, UNDERGROUND IN CONDUIT, DUCTS, PATHWAYS, ETC.): PROVIDE CABLES FILLED

WITH A WATERPROOFING COMPOUND BETWEEN OUTSIDE JACKET (NOT TOUCHING ANY PROVIDED ARMOR) AND INTER

CONDUCTORS TO SEAL PUNCTURES IN JACKET AND PROTECT CONDUCTORS FROM MOISTURE.

d. REMOTE CONTROL CABLE:

1. MULTI-CONDUCTOR WITH STRANDED CONDUCTORS ABLE TO HANDLE POWER AND VOLTAGE REQUIRED TO CONTROL

SPECIFIED SYSTEM EQUIPMENT, FROM A REMOTE LOCATION.

2. NRTL LISTED AND PASS VW-1 VERTICAL WIRE FLAME TEST (UL 83) (FORMERLY FR-1).

3. COLOR-CODED CONDUCTORS: COMBINED MULTI-CONDUCTOR AND COAXIAL CABLES ARE ACCEPTABLE FOR THIS

INSTALLATION, ON CONDITION SYSTEM PERFORMANCE STANDARDS ARE MET.

4. TECHNICAL CHARACTERISTICS:

1. LENGTH: AS REQUIRED, IN 1K (3,000 FT.) REELS MINIMUM.

2. CONNECTORS: AS REQUIRED BY SYSTEM DESIGN.

3. SIZE:

a. 18 AWG, MINIMUM, OUTSIDE.

b. 20 AWG, MINIMUM, INSIDE.

c. COLOR CODING: REQUIRED, EIA INDUSTRY STANDARD.

d. BEND RADIUS: 10 TIMES CABLE OUTSIDE DIAMETER.

e. IMPEDANCE: AS REQUIRED.

f. SHIELD COVERAGE: AS REQUIRED BY OEM SPECIFICATION.

e. DISTRIBUTION SYSTEM SIGNAL WIRES AND CABLES:

1. PROVIDE SYSTEM ABLE TO WITHSTAND ADVERSE ENVIRONMENTAL CONDITIONS WITHOUT DETERIORATION, IN THEIR

RESPECTIVE LOCATION.

2. PROVIDE ENTERING OF EACH EQUIPMENT ENCLOSURE, CONSOLE, CABINET OR RACK IN SUCH A MANNER THAT ALL

DOORS OR ACCESS PANELS CAN BE OPENED AND CLOSED WITHOUT REMOVAL OR DISRUPTION OF CABLES.

3. TERMINATE ON AN ITEM OF EQUIPMENT BY DIRECT CONNECTION.

3. GENERAL:

a. INSTALL WIRING IN CABLE TRAY OR RACEWAY.

b. CONTROL, COMMUNICATION AND SIGNAL WIRING INSTALLATION:

1. UNLESS OTHERWISE SPECIFIED IN OTHER SECTIONS, PROVIDE WIRING AND CONNECT TO EQUIPMENT/DEVICES TO

PERFORM REQUIRED FUNCTIONS AS INDICATED.

2. INSTALL SEPARATE CABLES FOR EACH SYSTEM SO THAT MALFUNCTIONS IN ANY SYSTEM DOES NOT AFFECT OTHER

SYSTEMS, EXCEPT WHERE OTHERWISE REQUIRED.

3. GROUP WIRES AND CABLES ACCORDING TO SERVICE (I.E. AC, GROUNDS, SIGNAL, DC, CONTROL, ETC.); DC, CONTROL

AND SIGNAL CABLES CAN BE INCLUDED WITH ANY GROUP.

4. CONCEALED SPLICES ARE NOT ALLOWED.

5. SEPARATE, ORGANIZE, BUNDLE, AND ROUTE WIRES OR CABLES TO RESTRICT EMI, CHANNEL CROSSTALK, OR

FEEDBACK OSCILLATION INSIDE ANY ENCLOSURE.

6. LOOKING AT ANY ENCLOSURE FROM THE REAR (WALL MOUNTED ENCLOSURES, JUNCTION, PULL OR INTERFACE BOXES

FROM THE FRONT), LOCATE AC POWER, DC AND SPEAKER WIRES OR CABLES ON THE LEFT; COAXIAL, CONTROL, MICROPHONE AND LINE LEVEL AUDIO AND DATA WIRES OR CABLES, ON THE RIGHT.

7. INSTALL WIRES OR CABLES OUTSIDE OF BUILDINGS IN CONDUIT, SECURED TO SOLID BUILDING STRUCTURES.

8. LAYING WIRES OR CABLES DIRECTLY ON ROOF TOPS, LADDERS, DROOPING DOWN WALLS, WALKWAYS, FLOORS, ETC. IS

NOT PERMITTED.

c. AC POWER:

1. BOND TO GROUND CONTRACTOR-INSTALLED EQUIPMENT AND IDENTIFIED GOVERNMENT-FURNISHED EQUIPMENT, TO ELIMINATE SHOCK HAZARDS AND TO MINIMIZE GROUND LOOPS, COMMON MODE RETURNS, NOISE PICKUP, CROSSTALK, ETC. FOR TOTAL GROUND RESISTANCE OF 0.1 OHM OR LESS.

2. USE OF CONDUIT, SIGNAL DUCT OR CABLE TRAYS AS SYSTEM OR ELECTRICAL GROUND IS NOT PERMITTED; USE THESE ITEMS ONLY FOR DISSIPATION OF INTERNALLY GENERATED STATIC CHARGES (NOT TO BE CONFUSED WITH EXTERNALLY GENERATED LIGHTNING) THAT CAN BE APPLIED OR GENERATED OUTSIDE MECHANICAL AND PHYSICAL CONFINES OF SYSTEM TO EARTH GROUND. DISCOVERY OF IMPROPER SYSTEM GROUNDING IS GROUNDS TO DECLARE

SYSTEM UNACCEPTABLE AND TERMINATION OF ALL SYSTEM ACCEPTANCE TESTING.

3. CABINET BUS: EXTEND A COMMON GROUND BUS OF AT LEAST #10 AWG SOLID COPPER WIRE THROUGHOUT EACH EQUIPMENT CABINET AND BOND TO SYSTEM GROUND. PROVIDE A SEPARATE ISOLATED GROUND CONNECTION FROM EACH EQUIPMENT CABINET GROUND BUS TO SYSTEM GROUND. DO NOT TIE EQUIPMENT GROUND BUSSES TOGETHER.

4. EQUIPMENT: BOND EQUIPMENT TO CABINET BUS WITH COPPER BRAID EQUIVALENT TO AT LEAST #12 AWG. SELF- GROUNDING EQUIPMENT ENCLOSURES, RACKS OR CABINETS, THAT PROVIDE OEM CERTIFIED FUNCTIONAL GROUND CONNECTIONS THROUGH PHYSICAL CONTACT WITH INSTALLED EQUIPMENT, ARE ACCEPTABLE ALTERNATIVES.

d. CONTROL, COMMUNICATION AND SIGNAL SYSTEM IDENTIFICATION:

1. INSTALL A PERMANENT WIRE MARKER ON EACH WIRE AT EACH TERMINATION.

2. IDENTIFY CABLES WITH NUMBERS AND LETTERS ON THE LABELS CORRESPONDING TO THOSE ON WIRING DIAGRAMS

USED FOR INSTALLING SYSTEMS.

3. CABLE AND WIRES (HEREINAFTER REFERRED TO AS “CABLE”): LABEL CABLES AT BOTH ENDS IN ACCORDANCE WITH

INDUSTRY STANDARD. PROVIDE PERMANENT LABELS IN CONTRASTING COLORS. IDENTIFY CABLES MATCHING SYSTEM

RECORD WIRING DIAGRAMS.

4. CONDUIT, CABLE DUCT, AND CABLE TRAY: LABEL CONDUIT, DUCT AND TRAY, INCLUDING UTILIZED GFE, WITH PERMANENT MARKING DEVICES OR SPRAY PAINTED STENCILING A MINIMUM OF 3 METERS (10 FT.) IDENTIFYING

SYSTEM. LABEL EACH ENCLOSURE ACCORDING TO THIS STANDARD.

DETAIL NUMBER

DRAWING SYMBOLS

DRAWING NUMBER WHERE DRAWN

SECTION LETTER

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

EQUIPMENT ABBREVIATION (PUMP)

PP105

PP105

P

PUMP NO. 3 IN BUILDING NO. 26

TYPICAL UNIT NUMBER

CALLOUT

(ENLARGED VIEW)

SECTION

EQUIPMENT TAG

EQUIPMENT TAG

SAN

RISER TAG

RISER SYSTEM

RISER NUMBER

2-26

BUILDING NO. WHERE EQUIPMENT IS LOCATED

SERVED BY AIR HANDLER UNIT NO. 1

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

P 2-26 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023 E001

COVER SHEET - GENERAL NOTES,

SYMBOLS & LEGENDS

PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

EL PASO VA HEALTHCARE SYSTEM (EPVAHCS)

PANEL ANNUNCIATOR'S RELOCATION

756-22-203

EL PASO, TEXAS

SHEET INDEX

SHEET

NUMBER NAME

G001 PROJECT COVER SHEET/SHEET INDEX

E001 COVER SHEET - GENERAL NOTES, SYMBOLS & LEGENDS

ED110 DEMO PLAN - FIRST FLOOR

ED120 DEMO PLAN - SECOND FLOOR

ED130 DEMO PLAN - THIRD FLOOR

ED140 DEMO PLAN - FOURTH FLOOR

ED401 ENLARGED DEMO PLANS

EP130 POWER PLAN - THIRD FLOOR

EP601 ELECTRICAL ONE LINE - ANNUNCIATOR

ET110 COMMUNICATIONS PLAN - FIRST FLOOR

ET120 COMMUNICATIONS PLAN - SECOND FLOOR

ET130 COMMUNICATIONS PLAN - THIRD FLOOR

ET140 COMMUNICATIONS PLAN - FOURTH FLOOR

ET401 ENLARGED PLANS

ET601 LEGENDS, NOTES, SHEET LIST, & SCHEDULES

ET901 3D VIEWS

SHEET LOG

SHEET CURRENT REVISION

NUMBER NAME REV DATE DESCRIPTION

G001 PROJECT COVER SHEET/SHEET INDEX 1 10/19/2023 ADDENDUM 001

E001 COVER SHEET - GENERAL NOTES, SYMBOLS & LEGENDS 1 10/19/2023 ADDENDUM 001

ED110 DEMO PLAN - FIRST FLOOR 1 10/19/2023 ADDENDUM 001

ED120 DEMO PLAN - SECOND FLOOR 1 10/19/2023 ADDENDUM 001

ED130 DEMO PLAN - THIRD FLOOR 1 10/19/2023 ADDENDUM 001

ED140 DEMO PLAN - FOURTH FLOOR 1 10/19/2023 ADDENDUM 001

ED401 ENLARGED DEMO PLANS 1 10/19/2023 ADDENDUM 001

EP130 POWER PLAN - THIRD FLOOR 1 10/19/2023 ADDENDUM 001

EP601 ELECTRICAL ONE LINE - ANNUNCIATOR 1 10/19/2023 ADDENDUM 001

ET110 COMMUNICATIONS PLAN - FIRST FLOOR 1 10/19/2023 ADDENDUM 001

ET120 COMMUNICATIONS PLAN - SECOND FLOOR 1 10/19/2023 ADDENDUM 001

ET130 COMMUNICATIONS PLAN - THIRD FLOOR 1 10/19/2023 ADDENDUM 001

ET140 COMMUNICATIONS PLAN - FOURTH FLOOR 1 10/19/2023 ADDENDUM 001

ET401 ENLARGED PLANS 1 10/19/2023 ADDENDUM 001

ET601 LEGENDS, NOTES, SHEET LIST, & SCHEDULES 1 10/19/2023 ADDENDUM 001

ET901 3D VIEWS 1 10/19/2023 ADDENDUM 001

DESCRIPTION DATE REV

30% - SCHEMATIC DESIGN 03/25/2022 A

60% - DESIGN DEVELOPMENT 08/12/2022 B

90% - CONSTRUCTION DOCUMENTS 12/08/2022 C

100% - CONSTRUCTION DOCUMENTS 02/23/2023 D

100% - FINAL CONSTRUCTION DOCUMENTS 03/22/2023 E

TSH

PSL

TSHCP

PSH

PSL

FT

TSH

TSH

PSL

H O2

TSH H O2

H O2

PSH PSLMLH H O2

H O2

PBX

SPB 117

CP

FT PSH PSL

FT PSH PSL

M

M

1. RE: SHEET ED120 FOR CONDUIT UP.

2. FIELD VERIFY (E) CONDUIT TO BE RE-USED 3/4"Ø OR LARGER. NOTIFY CLIENT CONTRACT POC IF (E)

CONDUIT IS 1/2"Ø.

3. CONDUIT SHOWN OFFSET FOR CLARITY.

GENERAL NOTES

14 12345678910111213

A

B

C

D

E

F

G

H

J

K

L

ED401

F101 F107

F105

F102 F103 F104

F108

D122

D122B

D122A D121A

D121K D121 D121M D105

A106

P-4

P-1P-2

P-3

A101

C1-16

A100DA100C

D121I

D121G D121H

D121F

MV-1

MA-17

44 4

ET901

TRUE

PLAN

N 0'

SCALE: 1/16" = 10'

10' 20' 50'30' 40'5'

2'-6" 7'-6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

ED110

DEMO PLAN - FIRST FLOOR PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

KEY NOTES

NO. DESCRIPTION

4 (E) RACEWAY INCLUDING CONDUIT, J-BOX ENCLOSURES, ETC. IN THIS AREA TO BE RE-USED.

DISCONNECT FROM (E) DEVICE AND REMOVE WIRE. SALVAGE DEVICE FOR RE-USE. MODIFY (E)

CONDUIT @ DEVICE FOR NEW CONSTRUCTION AS REQUIRED.

5 (E) CONDUIT ROUTED BELOW SLAB IN THIS AREA TO REMAIN. FIELD VERIFY (E) ROUTING AND

TERMINATION TO ROOM A101.

6 DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT

ASSEMBLIES FROM DEVICE AND REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR

RE-USE. FIELD VERIFY.

7 (E)MV-1, (E)MA-1: (E) MED-VAC PUMP, MED-AIR COMPRESSOR TO REMAIN. DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT ASSEMBLIES FROM DEVICE AND

REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR RE-USE. FIELD VERIFY.

8 REMOVE (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT ASSEMBLIES

ROUTED TO ROOM A101 AS REQUIRED. FIELD VERIFY.

11 (E) NITROGEN CYLINDER ROOM. (E) CONDUIT ROUTED TO (E) ANNUNCIATOR PANEL. (E) DUPLICATE

SET OF CONDUIT ROUTED TO (E) MED-GAS MASTER ALARM PANEL.

12 (E) NITROUS OXIDE CYLINDER ROOM. (E) CONDUIT ROUTED TO (E) ANNUNCIATOR PANEL. (E)

DUPLICATE SET OF CONDUIT ROUTED TO (E) MED-GAS MASTER ALARM PANEL.

13 (E) OXYGEN STORAGE CYLINDER ROOM. (E) CONDUIT ROUTED TO (E) ANNUNCIATOR PANEL. (E)

DUPLICATE SET OF CONDUIT ROUTED TO (E) MED-GAS MASTER ALARM PANEL.

14 REMOVE (E) WIRE, RACEWAY INCLUDING CONDUIT, J-BOXES AND RELATED SUPPORT ASSEMBLIES

ROUTED TO A101 AS REQUIRED. FIELD VERIFY.

SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - FIRST FLOOR

DESCRIPTION DATE REV

30% - SCHEMATIC DESIGN 03/25/2022 A

60% - DESIGN DEVELOPMENT 08/12/2022 B

90% - CONSTRUCTION DOCUMENTS 12/08/2022 C

100% - CONSTRUCTION DOCUMENTS 02/23/2023 D

B 203 C

B 203 D

B

D

A

204 B

204 C

B 204

B 204AB 204B

D 262B

D

A

D

B

C238 C241 A C243

1. RE: SHEET ED110 FOR CONDUIT DOWN.

2. RE: SHEET ED130 FOR CONDUIT UP.

3. CONDUIT SHOWN OFFSET FOR CLARITY.

GENERAL NOTES

14 12345678910111213

A

B

C

D

E

F

G

H

J

K

L

ET901

TRUE

PLAN

N 0'

SCALE: 1/16" = 10'

10' 20' 50'30' 40'5'

2'-6" 7'-6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

ED120

DEMO PLAN - SECOND FLOOR PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

KEY NOTES

NO. DESCRIPTION

1 (E) CONDUIT RISERS. REMOVE RACEWAY INCLUDING CONDUIT, J-BOXES AND SUPPORT ASSEMBLIES

AS REQ'D, FIELD VERIFY.

SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - SECOND FLOOR

DESCRIPTION DATE REV

30% - SCHEMATIC DESIGN 03/25/2022 A

60% - DESIGN DEVELOPMENT 08/12/2022 B

90% - CONSTRUCTION DOCUMENTS 12/08/2022 C

100% - CONSTRUCTION DOCUMENTS 02/23/2023 D

D364 A D365

A375

B232

B231

B230

B

A

B

A

B

A

B355

A375 A

PSHPSL

1. RE: SHEET ED120 FOR CONDUIT DOWN.

2. RE: SHEET ED140 FOR CONDUIT UP.

3. CONDUIT SHOWN OFFSET FOR CLARITY.

GENERAL NOTES

14 12345678910111213

C

D

E

F

H

J

K

L

SHOWN OFFSET

FOR CLARITY

ET901

TRUE

PLAN

N 0'

SCALE: 1/16" = 10'

10' 20' 50'30' 40'5'

2'-6" 7'-6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

ED130

DEMO PLAN - THIRD FLOOR PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

KEY NOTES

NO. DESCRIPTION

1 (E) CONDUIT RISERS. REMOVE (E) RACEWAY INCLUDING CONDUIT, J-BOXES, AND RELATED SUPPORT

ASSEMBLIES AS REQUIRED. FIELD VERIFY.

2 DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT

ASSEMBLIES FROM DEVICE AND REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR

RE-USE. FIELD VERIFY.

SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - THIRD FLOOR

DESCRIPTION DATE REV

30% - SCHEMATIC DESIGN 03/25/2022 A

60% - DESIGN DEVELOPMENT 08/12/2022 B

90% - CONSTRUCTION DOCUMENTS 12/08/2022 C

100% - CONSTRUCTION DOCUMENTS 02/23/2023 D

PSHPSL

1. RE: SHEET ED130 FOR CONDUIT DOWN.

2. CONDUIT SHOWN OFFSET FOR CLARITY.

GENERAL NOTES

14 12345678910111213

A

B

C

D

E

F

G

H

J

K

L

2 2

TRUE

PLAN

N 0'

SCALE: 1/16" = 10'

10' 20' 50'30' 40'5'

2'-6" 7'-6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

ED140

DEMO PLAN - FOURTH FLOOR PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

KEY NOTES

NO. DESCRIPTION

1 (E) CONDUIT RISERS. REMOVE (E) RACEWAY INCLUDING CONDUIT, J-BOXES, AND RELATED SUPPORT

ASSEMBLIES AS REQUIRED. FIELD VERIFY.

2 DISCONNECT (E) WIRE, RACEWAY INCLUDING CONDUIT/J-BOXES AND RELATED SUPPORT

ASSEMBLIES FROM DEVICE AND REMOVE. (E) DEVICE TO REMAIN. SALVAGE DEVICE IN PLACE FOR

RE-USE. FIELD VERIFY.

SCALE: 1/16" = 1'-0"1 COMMUNICATIONS DEMOLITION PLAN - FOURTH FLOOR

DESCRIPTION DATE REV

30% - SCHEMATIC DESIGN 03/25/2022 A

60% - DESIGN DEVELOPMENT 08/12/2022 B

90% - CONSTRUCTION DOCUMENTS 12/08/2022 C

100% - CONSTRUCTION DOCUMENTS 02/23/2023 D

F

P-3 P-4

C1-16

D121K D121 D121M

A101

ED401

F

1 2 3

A101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

ED401

ENLARGED DEMO PLANS PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

SCALE: 1/4" = 1'-0"1 ENLARGED COMMUNICATIONS PLAN - FIRST FLOOR

SCALE: 1/2" = 1'-0"3 COMMUNICATIONS PLAN - FIRST FLOOR (35%) - Callout 1 - Callout 1

KEY NOTES

NO. DESCRIPTION

1 IDENTIFY & LABEL EACH ANNUNCIATOR, SIGNAL CABLE, CONTROLLED DEVICE PRIOR TO

DISCONNECTION.

2 DISCONNECT CABLES FROM ANNUNCIATORS AND REMOVE SALVAGE ANNUNCIATORS FOR RE-USE.

3 (E) RACEWAY INCLUDING CONDUIIT, J-BOXES, ETC. TO REMAIN. MODIFY AS REQ'D FOR NEW

CONSTRUCTION. FIELD VERIFY ROUTING.

9 CONDUIT ROUTING SHOWN AND OFFSET FOR CLARITY IN THIS AREA. FIELD VERIFY.

DESCRIPTION DATE REV

30% - SCHEMATIC DESIGN 03/25/2022 A

60% - DESIGN DEVELOPMENT 08/12/2022 B

90% - CONSTRUCTION DOCUMENTS 12/08/2022 C

100% - CONSTRUCTION DOCUMENTS 02/23/2023 D

A375

B232

B231

B230

B

A

B

A

B

A

B355

A375 A

PSHPSL

14 12345678910111213

A

B

C

D

E

F

H

J

K

L

ET901

EP130

EP130

H

(PNL 3ACLA)

(PNL 3ACLA)

K

PNL 3ACLA

PNL 3ALHA

PNL 3ACHA

PNL 3ANLD P

N

L

A N

L E

P N

L

A N

L F

PNL 3ANLG

PNL 3ANLC

PNL 3ANLB

PNL 3ANLA

PNL D3ANL

PNL 3ALLA

TF-X3AN

TF-X3AL

TF-X3AC

7 8 9

16 PNL 3ANHA

TRUE

PLAN

N 0'

SCALE: 1/16" = 10'

10' 20' 50'30' 40'5'

2'-6" 7'-6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

EP130

POWER PLAN - THIRD FLOOR PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

Checker Author

SCALE: 1/16" = 1'-0"1 POWER PLAN - THIRD FLOOR

KEY NOTES

NO. DESCRIPTION

1 (E) TF- X3AN: LOW VOLTAGE TRANSFORMER. (E) TRANSFORMER “X3AN” TO REMAIN. FIELD VERIFY.

(DRY TYPE TRANSFORMER, 150 kVA, 480-208/120V) (PRIMARY: PANEL D2ANH, SECONDARY: PANEL

D3ANL, 225A DS).

2 (E) PNL D3ANL: DISTRIBUTION PANEL. (E) PANEL “D3ANL” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 600A).

3 (E) PNL 3ANLA: DISTRIBUTION PANEL. (E) PANEL “3ANLA” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).

4 (E) PNL 3ANLB: DISTRIBUTION PANEL. (E) PANEL “3ANLB” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).

5 (E) PNL 3ANLC: DISTRIBUTION PANEL. (E) PANEL “3ANLC” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).

6 (E) PNL 3ANLG: DISTRIBUTION PANEL. (E) PANEL “3ANLG” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 125A).

7 (E) PNL 3ANLD: DISTRIBUTION PANEL. (E) PANEL “3ANLD” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).

8 (E) PNL 3ANLE: DISTRIBUTION PANEL. (E) PANEL “3ANLE” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).

9 (E) PNL 3ANLF: DISTRIBUTION PANEL. (E) PANEL “3ANLF” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 225A).

10 (E) PNL 3ALLA: DISTRIBUTION PANEL. (E) PANEL “3ALLA” TO REMAIN. FIELD VERIFY. (PANEL, 208/120V, 3PH, 4W, 100A).

11 (E) TF- X3AL: LOW VOLTAGE TRANSFORMER. (E) TRANSFORMER “X3AL” TO REMAIN. FIELD VERIFY.

(DRY TYPE TRANSFORMER, 15 kVA, 480-208/120V)

12 (E) PNL 3ALHA: DISTRIBUTION PANEL. (E) PANEL “3ALHA” TO REMAIN. FIELD VERIFY. (PANEL, 480/277V, 3PH, 4W, 100A).

13 (E) PNL 3ACLA: DISTRIBUTION PANEL. (E) PANEL “3ACLA” TO REMAIN. CONNECT (N) ANNUNCIATOR RECEPTACLES CIRCUIT #31, #32 TO (E) PANEL 3ACLA SPARE CIRCUITS AS INDICATED. FIELD VERIFY.

(PANEL, 208/120V, 3PH, 4W, 100A).

14 (E) TF- X3AC: LOW VOLTAGE TRANSFORMER. (E) TRANSFORMER “X3AC” TO REMAIN. FIELD VERIFY.

(DRY TYPE TRANSFORMER, 30 kVA, 480-208/120V) (PRIMARY: PANEL 3ACHA, SECONDARY: PANEL

3ACLA, 100A DS).

15 (E) PNL 3ACHA: DISTRIBUTION PANEL. (E) PANEL “3ACHA” TO REMAIN. FIELD VERIFY. (PANEL, 480/277V, 3PH, 4W, 100A).

16 (E) PNL 3ANHA: DISTRIBUTION PANEL. (E) PANEL “3ANHA” TO REMAIN. FIELD VERIFY. (PANEL, 480/277V, 3PH, 4W, 225A).

17 (N) WALL MOUNTED RECEPTACLES: COORDINATE LOCATION WITH MANUFACTURE PANEL

KNOCKOUTS. CONNECT (N) RECEPTACLES TO (E) PANEL 3ACLA SPARE CIRCUITS AS INDICATED.

ROUTE CIRCUITS IN 3/4" CONDUITS MINIMUM. FIELD VERIFY ROUTING.

SCALE: 1/8" = 1'-0"3 3-Third Floor Enlarged Power Plan (A308A) - Callout

SCALE: 1/8" = 1'-0"2 3-Third Floor Enlarged Power Plan (A328) - Callout

DESCRIPTION DATE REV

100% - CONSTRUCTION DOCUMENTS 02/23/2023 A

PANEL 3ACHA

480/277V 3Ø, 3W , 100A BUS

T-X3AC

30KVA,

480-208/120V

3Ø, 4W

MAIN SWITCHBOARD 'MSA'

480/277V 3Ø, 4W , 3000A BUS

2000KVA,

13.2KV:480/277V

3Ø, 4W, X/R = 8.0

FROM ELECTRIC UTILITY

3000A

MSA-12

200A

MSA-2

250A

MSA-6

1200A

PANEL 3ACLA

208/120V 3Ø, 4W , 100A BUS

20AT 20AT

ANNUNCIATOR

RECEPTACLE

CKT #31

20AT

SPARE

20AT

SPAREANNUNCIATOR

RECEPTACLE

CKT #32

PANEL 1DCHA

480/277V 3Ø, 3W , 225A BUS

AUTOMATIC

TRANSFER

SWITCH

"ATS-CR1"

260A

EMERGENCY

DISTRIBUTION

SWITCHBOARD

'EDS'

PNL

3ACLA

100A

PNL

3ACHA

100A

PNL

1DCHA

225A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

EP601

ELECTRICAL ONE LINE -

ANNUNCIATOR

PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

Checker AuthorDESCRIPTION DATE REV

100% - CONSTRUCTION DOCUMENTS 02/23/2023 A

100% - FINAL CONSTRUCTION DOCUMENTS 03/22/2023 B

TSH

TSHCP

TSH

TSH

PSL

H O2

TSH H O2

H O2

PSH PSLMLH H O2

H O2

PBX

SPB 117

CP

M

M

1. RE: SHEET ET120 FOR SIGNAL WIRING AND CONDUIT ROUTED UP.

2. TERMINATE WIRING AND CONDUIT AT DEVICES/EQUIPMENT PER MANUFACTURER'S INSTALLATION

DETAILS.

3. RE: SHEET ET601 FOR RACEWAY SYSTEM DETAILS.

4. RE: DEVICE SCHEDULE FOR SENSOR, SWITCH, ANNUNCIATOR, PANEL LIST OF POINTS,

INSTRUMENTATION DEVICE TYPE, WIRE/CABLE TYPE, WIRE/CABLE SIZE, RACEWAY SIZE.

5. TRACE (E) SIGNAL WIRING FROM (E) ANNUNCIATOR PANELS/KEYPADS TO (E) INSTRUMENTATION

DEVICES. CLEARLY MARK BOTH ENDS WITH DEVICE ID / ANNUNCIATOR PANEL ID.

6. INSTALL NEW SIGNAL WIRING AND RACEWAY PRIOR TO DISCONNECTING FROM EXISTING.

7. COORDINATE SWITCHOVER WITH CONTRACT POC. DISCONNECT (E) SIGNAL WIRING. TERMINATE NEW

WIRING ON INSTRUMENTATION DEVICE. REMOVE (E) SIGNAL WIRING AND RACEWAY.

8. FIELD VERIFY ROUTES. COORDINATE WITH CONTRACT POC PRIOR TO INSTALLATION.

GENERAL NOTES

14 12345678910111213

A

B

C

D

E

F

G

H

J

K

L

1 2

20 21

13 14

15 16

ET401

ET401

ET901

TRUE

PLAN

N 0'

SCALE: 1/16" = 10'

10' 20' 50'30' 40'5'

2'-6" 7'-6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

APPROVING OFFICIAL

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

THESE DOCUMENTS

ARE FOR INTERIM

REVIEW AND ARE NOT

INTENDED FOR

CONSTRUCTION,

BIDDING, OR PERMIT

PURPOSES.

TEXAS PE #

MEP:

COR: MR. ANGEL MORALES

O'BRIEN ENGINEERING, INC

MANAGING PARTNER

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

O'BRIEN ENGINEERING, INC

2340 E. TRINITY MILLS RD. STE 220

CARROLLTON, TX 75006

(972) 233-2288 www.obrieneng.com

ISSUED FOR

CONSTRUCTION 1

LARRY R. LAMETTE, JR.

B

IM

/0

.0

V A

E P

P a n e l A n n u n c ia to rs

R e lo c a ti o n /2

V

A E

P A n n u n c ia to r

E le c tr ic a l.

rv t

/1

/2

:2

:1

A

M

10/19/2023

ET110

COMMUNICATIONS PLAN - FIRST

FLOOR

PANEL ANNUNCIATOR’S

RELOCATION

EL PASO, TX

756-22-203

LRL DMB

KEY NOTES

NO. DESCRIPTION

1 (E) GENERATOR CONTROL PANEL. (CAT EMP4.2, RS-485 ANNUNCIATOR) ROUTE NEW SIGNAL WIRE IN

(E) CONDUIT FROM CP-1,2 TO (E) ANNUNCIATORS IN NEW LOCATION.

2 (E) TEMPERATURE SENSOR (PHARMACY CACHE): ROUTE NEW SIGNAL WIRE IN (E)RACEWAY FROM

(E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.

3 (E) O2 IN-USE FLOW SENSORS, PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY

FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.

4 (E) O2 SYSTEM MED-GAS SENSOR AND SWITCH ASSEMBLIES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E) INSTRUMENTATION DEVICES TO MEDICAL GAS MASTER ALARM PANEL IN NEW

LOCATION. RE: PLUMBING SHEETS.

5 (E) N2O CYLINDER IN-USE FLOW SENSORS, PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN

(E)RACEWAY FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.

6 (E) N2O CYLINDER MED-GAS SENSORS AND PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E) INSTRUMENTATION DEVICES TO MEDICAL GAS MASTER ALARM PANEL IN NEW

LOCATION. RE: PLUMBING SHEETS.

7 (E) N CYLINDER IN-USE FLOW SENSORS, PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E)

RACEWAY FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.

8 (E) N CYLINDER MED-GAS SENSORS AND PRESSURE SWITCHES. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E) INSTRUMENTATION DEVICES TO MEDICAL GAS MASTER ALARM PANEL IN NEW

LOCATION. RE: PLUMBING SHEETS.

9 (E) TEMPERATURE SENSOR (COOLING TOWER): ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E)

SENSOR TO ANNUNCIATOR IN NEW LOCATION.

10 (E) TEMPERATURE SENSOR (CHILLED WATER TEMP): ROUTE NEW SIGNAL WIRE IN (E) RACEWAY

FROM (E) SENSOR TO ANNUNCIATOR IN NEW LOCATION.

11 (E) WATER DETECTION SENSOR (CHILLER PLANT FLOOR): REPLACE (E) WATER DETECTORS WITH NEW. FIELD VERIFY LOCATION WITH COR. ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E)

SENSOR TO ANNUNCIATOR IN NEW LOCATION.

12 (E) TEMPERATURE SENSOR (WAREHOUSE): ROUTE NEW SIGNAL WIRE IN (E) RACEWAY FROM (E)

SENSOR TO ANNUNCIATOR IN NEW LOCATION.

13 (E) MV-1,2 SYSTEM SENSORS/SWITCHES. ROUTE NEW SIGNAL WIRE AND RACEWAY FROM (E)

CONTROL…