751_26404 RFP Add 1 Harley Ensign BAS.pdf
PDF 168 KB Posted
- Attached to
- 751/26404. MNB; Harley BAS - BAS Improvement
- Solicitation number
- RFP 171 260000002566 2
- Issued by
- Macomb County, Michigan
About this file
This is Addendum No. 01 to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Harley Ensign Boating Access Site improvement project (File Number 751_26404.MNB). The addendum, dated September 28, 2026, provides clarifications and interpretations to the original RFP for professional design services. Key clarifications include confirmation that existing restroom and kiosk facilities operate year-round, direction to conduct soil sampling for subsurface contamination testing as part of Phase 100 R, and identification of the Michigan Department of Environment, Great Lakes and Energy (EGLE) as the storm water management authority requiring joint permitting with the U.S. Army Corps of Engineers (USACE). The proposal due date is October 8, 2026, with Project Director Chris M. Bahjet overseeing the project.
The addendum addresses several scope and budget questions raised by prospective proposers. Storm water detention requirements will be determined by the selected professional during the design phase, with focus on water quality improvements. Existing utility upgrades beyond the current work scope are excluded from the project. Regarding budget, the state has not predetermined a construction cost estimate at this stage and will use the construction cost estimates and design produced by the selected professional to determine required funding. The RFP expects proposers to provide an opinion of the expected project budget based on the defined work scope, with the state evaluating implementation through either one or two construction phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 01
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
9/28/2026
PROJECT NAME
Harely Ensign Boating Access Site
FILE NUMBER
751_26404.MNB
PROJECT DIRECTOR
Chris M. Bahjet
PROPOSAL DUE DATE:
10/8/2026
ADDENDUM ITEMS:
1. Are the existing restroom and kiosk facilities used year-round?
Yes
2. Does the state know if the site has any subsurface soil contamination?
No but take samples for testing. Part of Phase 100 R.
3. Please confirm who has jurisdiction over storm water management, review and permitting, i.e., state, county, township, city?
Storm water discharge is managed by EGLE. A joint permit from the USACE and Egle is required as part of this RFP.
4. Is detention required for storm water or will storm water review and permit only require water quality improvements?
To be determined by the selected professional.
5. Will other existing utilities require upgrades, i.e., water supply systems/hydrants(s), sanitary lines, from the existing pump station, communications, natural gas service, security system(s)?
Existing utility upgrades are not part of the work scope.
6. The proposal mentions notification of the budget for the project is unreasonable for The work is to be performed but does not give a construction cost/budget. What is the
At this stage we have not determined what the budget is. We will use the construction cost estimates produced by the professional during design to determine the funds required. One or two construction phases will also be evaluated from the estimate. For this RFP, we expect an opinion on what the expected budget is based on the work scope.
Page 2 o 2
APPROVED BY:
PROJECT DIRECTOR Chris Mustafa Bahjet DATE 9/28/2026
Budget?
File details come from the government source that posted it. Updated .