74292.pdf
PDF 26 MB Posted
- Solicitation number
- 74292
- Issued by
- Cook County, Illinois
About this file
This is a sealed bid solicitation (Solicitation #74292, Specification Number 1334861) issued by the City of Chicago Department of Water Management for a block-level lead service line replacement (LSLR) project on South Emerald Avenue between West 45th Street and West 46th Street. The project encompasses 21 line items covering mobilization, traffic control, televised sewer inspection, test holes, sewer and house drain replacement using ductile iron pipe and PVC pipe, water service installations via trenchless and open-cut methods, meter installations, waste disposal, soil boring, and temporary surfacing. Target quantities include 1 lump sum for mobilization, 105 days of traffic control, 160 linear feet of sewer inspection, 25 test holes, 80 linear feet of sewer replacement pipe, 80 linear feet of house drain replacement, 30 linear feet of water main connection, 660 linear feet of exterior water service lines, 610 linear feet of interior water service lines, 25 meter installations, 35 cubic yards of waste disposal, and 250 linear feet of PVC casing pipe. The pre-solicitation conference is scheduled for September 3, 2026, at 10:00 AM at the Sawyer Water Purification Plant. The deadline for bidder questions is September 15, 2026, at 3:00 PM, with bid submissions due by September 29, 2026, at 11:00 AM. The contract term is 105 calendar days from the start date.
Bids must be submitted electronically through the City's iSupplier portal, with a 5% bid deposit of the total base bid required from the first and second apparent low bidders within 2 business days of bid opening. A performance bond of 33⅓% of the contract value is required of the awarded contractor. The project is restricted to Small Local Business Enterprises (SBI-2) under the City's Small Business Initiative program. Funding is provided by the Illinois Environmental Protection Agency (IEPA) and the City of Chicago for lead service line replacement under the Public Water Supply Loan Program (35 IL ADMIN. CODE 663). Prevailing wage requirements apply under Davis-Bacon wage guidance for federally funded projects. Contractor responsibilities include 25% of work performance with own forces, full compliance with environmental laws, soil characterization analysis, proper waste disposal, and adherence to all City of Chicago Municipal Code provisions, including economic disclosure statements, insurance requirements, and business diversity program reporting obligations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City Of Chicago Solicitation #74292
BRANDON JOHNSON SHARLA ROBERTS
MAYOR CHIEF PROCUREMENT OFFICER
Specification Number: 1334861 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
Construction Solicitation #74292 (BID)
1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald Ave: W. 45th St. to W. 46th St.
Specification Number:1334861
Required for use by: DEPARTMENT OF WATER MANAGEMENT
Bid/Proposal Submittal Date and Time: 11:00 AM Central Time, 29-SEP-2026
Deadline for Questions: 03:00 PM Central Time, 15-SEP-2026 Buyer: BEJAR, LUIS Email Address: Luis.Bejar@cityofchicago.org Phone Number: 312-744-7284 Pre-Solicitation Conference Date and Time: 10:00 AM Central Time, 03-SEP-2026 Pre-Solicitation Conference Location: Sawyer Water Purification Plant, 3300 E. Cheltenham Pl., Chicago, IL 60649
Site Visit Date & Time: N/A Site Visit Location: N/A
Please submit your response to:
http://www.cityofchicago.org/eProcurement iSupplier vendor portal registration is required.
Allow 3 business days to complete registration.
Specification Number: 1334861 Page 2 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
Table of Contents
1 Header Information
1.1 General Information
1.2 Terms
1.3 Requirements
1.4 Attachments
1.5 Response Rules
2 Price Schedule
2.1 Line Information
2.2 Line Details
2.2.1 Line 1
2.2.2 Line 2
2.2.3 Line 3
2.2.4 Line 4
2.2.5 Line 5
2.2.6 Line 6
2.2.7 Line 7
2.2.8 Line 8
2.2.9 Line 9
2.2.10 Line 10
2.2.11 Line 11
2.2.12 Line 12
2.2.13 Line 13
2.2.14 Line 14
2.2.15 Line 15
2.2.16 Line 16
2.2.17 Line 17
2.2.18 Line 18
2.2.19 Line 19
2.2.20 Line 20
2.2.21 Line 21
Specification Number: 1334861 Page 3 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
1 Header Information
1.1 General Information
Title 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S.
Emerald Description 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S.
Emerald Ave: W. 45th St. to W. 46th St.
Preview Date 17-AUG-2026 12:00:00 Open Date 17-AUG-2026 12:00:00
Close Date 11:00 AM Central Time, 29-SEP-2026
Award Date Not Specified
Time Zone Central Time Buyer BEJAR, LUIS Quote Style Sealed Email Luis.Bejar@cityofchicago.
org Event Construction Outcome Standard Purchase Order
1.2 Terms
Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
Bill-To Address 088-3060 PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
Payment Terms IMMEDIATE Carrier FOB Freight Terms Paid
1.3 Requirements
<B>KEY SOLICITATION PARAMETERS</B>
BID DEPOSIT: 5% OF TOTAL BASE BID.
Type No Response Required
PERFORMANCE BOND: 33 1/3% OF THE CONTRACT (AWARDEE ONLY).
Type No Response Required
FUNDING SOURCE: IEPA/CITY FUNDED.
Type No Response Required
DPS UNIT: CONSTRUCTION.
Type No Response Required
DRAWINGS: YES.
Type No Response Required Value Type Numeric Value only
CONTRACT TERM: 105 CALENDAR DAYS FROM START OF CONTRACT.
Type No Response Required
PRE-BID CONFERENCE: STRONGLY SUGGESTED.
Type No Response Required
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
This is a checklist of all supporting documents that must be attached to your bid response. Attach all documents specified below. After attaching, click "YES" to indicate that the attachment was completed.
Specification Number: 1334861 Page 4 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
Type No Response Required
- Bid Form properly completed. - (Construction)
Circle one from the response values below:
YES
NO
- Schedule of Prices, completed and totaled. - (Construction)
Circle one from the response values below:
YES
NO
- Proposal Page completed, signed and notarized - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Corporation - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Partnership - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Joint Venture - (ALL)
Circle one from the response values below:
YES
NO
- Proposal To Be Completed By a Sole Proprietor - (ALL)
Circle one from the response values below:
YES
NO
- Bid Execution Page - (ALL)
Circle one from the response values below:
YES
NO
- Certificate of Filing of Economic Disclosure Statement and Affidavit (EDS) - (ALL)
Circle one from the response values below:
YES
NO
- Certificate of Insurance
Circle one from the response values below:
YES
Specification Number: 1334861 Page 5 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
<B>COMMODITIES/WORK
SERVICES/HEAVY EQUIPMENT/SMALL
ORDERS/CONSTRUCTION/JOC
CHECKLIST</B>
NO
SMALL BUSINESS ENTERPRISE (SBE) DOCUMENTS
Type No Response Required
- Schedule B-6 - Affidavit of SBE Joint Venture
Circle one from the response values below:
No Yes
- Schedule C-6-P - Letter of Intent to Perform as a Prime Contractor
Circle one from the response values below:
No Yes
- Schedule C-6-S - Letter of Intent to Perform as a Supplier or Subcontractor
Circle one from the response values below:
No Yes
- Schedule D-6 - Affidavit of Prime Contractor SBI-2 Compliance Plan
Circle one from the response values below:
No Yes
- Letters of Certification for all SBE's
Circle one from the response values below:
No Yes
1.4 Attachments
Name Data Type Description
ATTACHMENT 00: E-
PROCUREMENT
APPENDIX
File ATTACHMENT 00: E-PROCUREMENT
APPENDIX
ATTACHMENT 01: BOOK
File ATTACHMENT 01: BOOK 1
ATTACHMENT 02: BOOK
File ATTACHMENT 02: BOOK 2
ATTACHMENT 03: BOOK
File ATTACHMENT 03: BOOK 3
ATTACHMENT 04:
DRAWINGS
File ATTACHMENT 04: DRAWINGS
1.5 Response Rules
Solicitation is restricted to invited suppliers Suppliers are allowed to view other suppliers' contract terms, notes and attachments Suppliers are allowed to respond to selected lines X Suppliers are required to respond with full quantity on each line X Suppliers are allowed to provide multiple responses Buyer may close the solicitation before the Close Date
Specification Number: 1334861 Page 6 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
Buyer may manually extend the solicitation while it is open
Specification Number: 1334861 Page 7 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
2 Price Schedule
2.1 Line Information
Display Rank As No indicator displayed
Ranking Price Only Cost Factors None
Line Item, Rev Target Quantity
Unit Unit Price Amount
1 100 - Mobilization / Job Set-Up
1 Lump Sum
2 101 - Traffic Control and Protection
105 Day
3 102 - Televised Inspection of Sewers and Sewer Structures
160 Linear Foot
4 113 - Test Hole 25 Each 5 129a - Replacement of Existing Sewer with Ductile Iron Pipe, 6- Inch Dia.
50 Linear Foot
6 129b - Replacement of Existing Sewer with Ductile Iron Pipe, 8- Inch Dia.
30 Linear Foot
7 129c - Replacement of Existing House Drain with PVC Pipe, 6-Inch Dia.
50 Linear Foot
8 129d - Replacement of Existing House Drain with PVC Pipe, 8-Inch Dia.
30 Linear Foot
9 135 - Water Main Quality PVC Drain Connection 6-Inch by Pipe Bursting
30 Linear Foot
10 143a - New Exterior Water Service, from the Water Main to the Roundway, Trenchless (1-inch)
550 Linear Foot
11 143b - New Exterior Water Service, from the Water Main to the Roundway, Open Cut (1-inch)
110 Linear Foot
12 143g - New Exterior Water Service, from the Roundway into the Building, Trenchless (1-inch)
549 Linear Foot
13 143h - New Exterior Water Service, from the Roundway into the Building, Open Cut (1-inch)
61 Linear Foot
14 143m - Extra Copper Interior Water
125 Linear Foot
Specification Number: 1334861 Page 8 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
Line Item, Rev Target Quantity
Unit Unit Price Amount
Service (1-inch) 15 143t - Meter Installation (Interior)
21 Each
16 143u - Meter Installation - 1¿ (Exterior)
4 Each
17 160a - Special Soils Waste Disposal
35 Cubic Yard
18 160b - Waste Characterization Analysis
1 Each
19 160c - Soil Boring Mobilization
1 Each
20 191a - PVC Casing Pipe, 2-Inch to 4-Inch Diameter
250 Linear Foot
21 241m - Temporary Surfacing ¿ Cold Patch or Hot-Mix Asphalt
65 Ton
2.2 Line Details
2.2.1 Line 1 100 - Mobilization / Job Set-Up
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.2 Line 2 101 - Traffic Control and Protection
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.3 Line 3 102 - Televised Inspection of Sewers and Sewer Structures Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
Specification Number: 1334861 Page 9 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
2.2.4 Line 4 113 - Test Hole
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.5 Line 5 129a - Replacement of Existing Sewer with Ductile Iron Pipe, 6-Inch Dia.
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.6 Line 6 129b - Replacement of Existing Sewer with Ductile Iron Pipe, 8-Inch Dia.
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.7 Line 7 129c - Replacement of Existing House Drain with PVC Pipe, 6-Inch Dia.
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.8 Line 8 129d - Replacement of Existing House Drain with PVC Pipe, 8-Inch Dia.
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.9 Line 9 135 - Water Main Quality PVC Drain Connection 6-Inch by Pipe Bursting Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Specification Number: 1334861 Page 10 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
2.2.10 Line 10 143a - New Exterior Water Service, from the Water Main to the Roundway, Trenchless (1-inch)
Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified
Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.11 Line 11 143b - New Exterior Water Service, from the Water Main to the Roundway, Open Cut (1-inch)
Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified
Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.12 Line 12 143g - New Exterior Water Service, from the Roundway into the Building, Trenchless (1-inch)
Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified
Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.13 Line 13 143h - New Exterior Water Service, from the Roundway into the Building, Open Cut (1-inch)
Category 91360. Start Price (USD) Not Specified Need-By Date Not Specified Target Price (USD) Not Specified
Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.14 Line 14 143m - Extra Copper Interior Water Service (1-inch) Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Specification Number: 1334861 Page 11 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
2.2.15 Line 15 143t - Meter Installation (Interior)
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.16 Line 16 143u - Meter Installation - 1¿ (Exterior)
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.17 Line 17 160a - Special Soils Waste Disposal
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.18 Line 18 160b - Waste Characterization Analysis
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.19 Line 19 160c - Soil Boring Mobilization
Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Chicago, IL 60604 United States
2.2.20 Line 20 191a - PVC Casing Pipe, 2-Inch to 4-Inch Diameter Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
Specification Number: 1334861 Page 12 Type of Funding:
Title: 1334861: Block Level Lead Service Line Replacement (LSLR) Project: S. Emerald
2.2.21 Line 21 241m - Temporary Surfacing ¿ Cold Patch or Hot-Mix Asphalt Category 91360. Start Price (USD) Not Specified
Need-By Date Not Specified Target Price (USD) Not Specified Ship-To Address 088-3060
PURCHASING
333 S STATE STREET
APPENDIX 1
ePROCUREMENT
This is an eProcurement Bid. Bids are to be submitted through the City's "iSupplier" system, the City's eProcurement computer system for electronic bidding and providing Contractors with access to contract, ordering and payment information for their City contracts. The following provisions apply to this bid and supersede any conflicting provisions in Books 1, 2, and 3.
1. Obtaining the Bid Documents Bidders are solely responsible for obtaining all Bid Documents, including Clarifications and Addenda.
Documents may be downloaded from the Department of Procurement Service's ("DPS") website at the following
URL:
http://www.cityofchicago.org/eProcurement
Click on "Current Bids."
In order to receive notice of clarifications and addenda, Bidders must be registered for and log-in to iSupplier, search for the solicitation number, open the solicitation for review, and accept the disclaimer. This will sign Bidders up for notifications.
Bid Document Holders are listed on the Bid & Bond Room Opportunity Take Out List. The Opportunity Take Out List is public information and is posted to the DPS web site at www.cityofchicago.org/TOL. To find Opportunity
Started Online, click "Opportunities" and search by the specification number.
2. Clarifications and Addenda The City will send an email notification to suppliers who have indicated intent in a Bid that an addendum or clarification has been issued. The Clarifications and Addenda incorporated into the electronic bid document available at the following URL:
https://www.cityofchicago.org/eProcurement
Suppliers that have indicated interest in a Bid will receive email notification that an addendum or clarification has been issued. There may be multiple Clarifications and Addenda. Failure to obtain Clarifications and/or Addenda, for whatever cause, will not relieve a Bidder from the obligation to bid according to and comply with any changed or additional terms and conditions contained in the Clarifications and Addenda.
Electronic Acknowledgement of Clarifications and/or Addenda is mandatory to submit an electronic Bid. Any harm to the bidder resulting from failure to obtain all necessary documents, for whatever cause, will not be valid grounds for a protest against award(s) made under this bid solicitation.
3. Questions Regarding the Bid Documents; Bidder Inquiry Deadline All inquiries regarding the Bid Documents or procurement process may be directed to the Procurement Specialist/Senior Procurement Specialist in iSupplier via online discussion or via email at the email address listed on the front cover of the Bid Documents.
The Bidder Inquiry Deadline is listed on the front cover of the Bid Documents under "Deadline for Questions." Inquiries received after the Bidder Inquiry Deadline will not be answered except at the discretion of the Chief Procurement Officer.
Bidders may only rely on written answers in a Clarification or in an Addendum duly issued by the Chief Procurement Officer. Bidders cannot rely on oral or informal responses; such answers will not be binding upon the City.
4. Preparation of Bids & Completion of the Bid Documents
Each Bidder must complete all of the forms listed on the Bid Submittal Checklist (with the exception of the Proposal Pages) in the Requirements section and scan and upload them as attachments to the electronic bid submission.
Bidders may not change any of the Bid Documents. Any changes made by a Bidder to the Bid Documents may result in rejection of the Bid, and will not be binding upon the City.
Bidders must submit their pricing electronically by filling out bid lines in the electronic Price Schedule in the iSupplier system.
Bidders must use the Bid Execution Page that is appropriate for their form of business organization (e.g., sole proprietorship, corporation, partnership, or joint venture). The individual(s) that sign the Bid Execution Page on behalf of the Bidder, by their signature, represents and warrants to the City that such individual is authorized to execute bids and contracts on behalf of the Bidder, and that the Bidder agrees and shall be bound to all of the terms and conditions of the Bid Documents and, upon execution by the City, the Contract Documents. Signatures must be sworn before a Notary Public. The form must be printed, signed, notarized and scanned then uploaded as an attachment to the electronic bid submission.
5. Submission of Bids - Date, Time, and Place
Bids are to be submitted electronically to the Department of Procurement on the date and prior to the time stated on the Cover Page of the Bid Documents, or any addendum issued by the City to change such Bid Opening Date. No bid will be accepted after the Bid Opening Date. The time of the receipt of the bid will be determined solely by the
6. Bid Deposit 5% of the Total Base Bid
When submitting an electronic bid, scan and upload a copy of your bid deposit with your submittal documents. The 1st and 2nd apparent low bidders will be required to deliver their original and properly executed bid deposit to the Bid & Bond Room within 2 business days following the Bid Opening Date.
Department of Water Management Terms and Conditions for Construction Contract - Book 1
(Revised April 2022)
Small Business Initiative Bidding Restricted to Small Local Business Enterprise: [SBI 2]
BOOK 1
TERMS AND CONDITIONS FOR CONSTRUCTION
Block Level Lead Service Line Replacements (LSLR) Project S. Emerald Ave: W. 45th St. to W. 46th St.
SPECIFICATION NO.: 1334861
CITY OF CHICAGO
DEPARTMENT OF WATER MANAGEMENT
BRANDON JOHNSON
MAYOR
Issued by the
DEPARTMENT OF PROCUREMENT SERVICES
SHARLA D. ROBERTS
CHIEF PROCUREMENT OFFICER
April 2022
(The City may from time to time revise these terms and conditions)
City & IEPA Funding
TABLE OF CONTENTS
I. GENERAL PROVISIONS
A. ACRONYMS
B. DEFINITIONS
C. USAGE AND CONTRACT INTERPRETATION
D. SEVERABILITY
E. ESTIMATES OF QUANTITIES
F. ORDER OF PRECEDENCE OF COMPONENT CONTRACT PARTS
G. ENTIRE AGREEMENT
II. PROJECT ORGANIZATION
A. THE COMMISSIONER
B. THE CHIEF PROCUREMENT OFFICER
C. CONTRACTOR
III. CONTRACTOR’S OBLIGATIONS
A. CONTRACTOR
B. SUBCONTRACTORS
C. SITE CONDITIONS AND INSPECTION
D. CLEANING UP
E. CONTRACTOR'S WARRANTIES AND REPRESENTATIONS
IV. PROPERTY
A. OWNERSHIP OF PROPERTY
B. OWNERSHIP OF DETAILED SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS
C. RIGHT OF ENTRY
D. DAMAGE TO CITY OR PROPERTY OWNERS PROPERTY
E. RIGHT TO OCCUPY BEFORE SUBSTANTIAL COMPLETION
F. FINAL COMPLETION AND ACCEPTANCE OF THE WORK
V. SHOP DRAWINGS, PRODUCT DATA, RECORDS AND SAMPLES
A. CONTRACTOR'S RESPONSIBILITIES AND SUBMITTAL PROCEDURES
B. REVIEW BY THE COMMISSIONER
C. SOURCE OF MATERIALS
D. RECORD DOCUMENTS
E. RECORD DRAWINGS
F. RECORD SHOP DRAWINGS AND PRODUCT DATA
G. CONSTRUCTION PROGRESS PHOTOGRAPHS
H. INSTRUCTIONS, PARTS LIST AND OPERATION AND MAINTENANCE MANUALS
I. ADJUSTMENT OF EQUIPMENT
J. PROJECT ACCOUNT RECORDS
VI. ASSIGNMENT
A. ASSIGNMENT OF CONTRACT BY CONTRACTOR
B. ASSIGNMENT OF FUNDS OR CLAIMS BY CONTRACTOR
C. ASSIGNMENT OF CONTRACT BY CITY
D. ASSIGNS
E. REQUESTS TO SUBCONTRACT
VII. QUALITY OF WORKMANSHIP, EQUIPMENT AND MATERIALS
A. STANDARD OF PERFORMANCE
B. CORRECTION OF WORK
C. MATERIALS AND EQUIPMENT
D. SUBSTITUTION OF MATERIALS
E. WARRANTIES
VIII. PERSONNEL
A. COMPETENCY OF WORKERS
B. SUPERVISION AND SUPERINTENDENCE
C. CONTRACTOR’S PROJECT PERSONNEL
D. KEY PERSONNEL
E. DAVIS-BACON PREVAILING WAGES
F. WAGES
G. [INTENTIONALLY OMITTED]
H. WORKING HOURS IN CITY CONTRACTS
IX. PERMITS AND LICENSES
A. CONTRACTOR OBTAINS PERMITS
B. CONTRACTOR PAYS PERMIT FEES
C. OCCUPANCY PLACARD AND FEES
X. COORDINATION WITH OTHER CITY DEPARTMENTS
A. WATER SYSTEM WORK AND USAGE
B. SEWER SYSTEM WORK
C. PARKING METER REMOVAL AND REPLACEMENT
D. TRAFFIC AND PARKING SIGN REMOVAL AND REPLACEMENT
E. TREES
F. DEMOLITION
XI. SCHEDULE
A. TIME
B. PROGRESS SCHEDULE
C. CONSTRUCTION OPERATIONS PLAN
D. CRITICAL PATH METHOD (“CPM”) SCHEDULE
E. RECOVERY SCHEDULE
F. TIME FOR COMPLETING PUNCH LIST
G. NO DAMAGES FOR DELAY; EXTENSIONS OF TIME
H. SUSPENSION OF WORK
I. LIQUIDATED DAMAGES
XII. MEETINGS
A. PRE-CONSTRUCTION MEETING
B. WEEKLY REVIEW MEETINGS
C. MONTHLY REVIEW MEETINGS
XIII. PAYMENTS
A. CONTRACT PRICE
B. PROCEDURE FOR MONTHLY PAYMENT REQUESTS AND FINAL PAYMENT
C. PAYMENT FOR STORED MATERIAL
D. RETAINAGE
E. PROMPT PAYMENT TO SUBCONTRACTORS
F. PAYMENTS WITHHELD
G. PAYMENT FOR CHANGES
H. NIGHT, SUNDAY AND HOLIDAY WORK
I. ACCELERATION
J. INTENTIONALLY OMITTED
K. ELECTRONIC ORDERING AND INVOICES
XIV. CHANGES IN THE WORK
A. CITY’S RIGHT TO CHANGE WORK
B. PROPERTY OWNER REQUEST
C. CONTRACTOR’S REQUEST
D. CONTRACT MODIFICATION
E. CONTRACTOR'S RELEASE
F. PERFORMANCE OF CHANGED WORK
G. CHANGE CLAIMS AND DISPUTES
XV. TESTING & INSPECTION
A. MATERIAL, INSPECTION AND RESPONSIBILITY
B. INSPECTION OF THE WORK
C. MATERIALS AND EQUIPMENT TESTING AND INSPECTION
D. TESTING LABORATORY LABELS
XVI. CONTRACTOR PRACTICES AT SITE
A. COOPERATION AMONG CONTRACTORS
B. PROTECTION OF PERSONS AND PROPERTY
C. PROTECTION OF STREETS, ALLEYS AND PUBLIC GROUNDS
D. PROTECTION OF EXISTING TREES IN THE RIGHT OF WAY
E. CARE OF EXISTING STRUCTURES AND PROPERTY
F. PRECAUTIONS AND SAFETY
G. HEALTH, SAFETY AND SANITATION
H. HAZARDOUS OPERATIONS AND SECURITY
I. SERVICES AND USE OF SITE
J. REPORTS AND PLANS
XVII. ENVIRONMENTAL REQUIREMENTS
A. COMPLIANCE WITH ENVIRONMENTAL LAWS
B. ENVIRONMENTAL PERMITS
C. DISPOSAL OF MATERIALS, CONSTRUCTION DEBRIS, SOIL AND WASTE
D. EQUIPMENT AND ENVIRONMENTAL CONTROL DURING TRANSPORT
E. ENVIRONMENTAL CONTROL
F. OPEN DUMPING PROHIBITED
G. ENVIRONMENTAL PROTECTION
H. CLEAN DIESEL FLEET: EMISSIONS REDUCTION (MCC 2-92-595) (WHERE APPLICABLE)
XVIII. INSURANCE, INDEMNITY AND BONDS
A. INDEMNITY
B. CONTRIBUTION
C. ADMIRALTY
D. PERFORMANCE AND PAYMENT BONDS
E. INSURANCE
XIX. CLAIMS AND DISPUTES
A. GENERAL
B. CLAIMS
C. DISPUTES
XX. EVENTS OF DEFAULT AND TERMINATION
A. CHIEF PROCUREMENT OFFICER'S RIGHT
B. EVENTS OF DEFAULT
C. REMEDIES
D. NONEXCLUSIVITY OF REMEDIES
E. ADJUDICATION OF TERMINATION
F. EARLY TERMINATION
G. NON-APPROPRIATION
XXI. COMPLIANCE WITH ALL LAWS
A. CONTRACTOR MUST COMPLY WITH ALL LAWS
B. CIVIL RIGHTS ACT OF 1964, TITLE VI, COMPLIANCE WITH NONDISCRIMINATION REQUIREMENTS
C. BUSINESS RELATIONSHIPS WITH ELECTED OFFICIALS
D. CHICAGO INSPECTOR GENERAL
E. GOVERNMENTAL ETHICS ORDINANCE
F. FALSE STATEMENTS
G. AMERICANS WITH DISABILITIES ACT
H. PROHIBITION ON CERTAIN CONTRIBUTIONS – MAYORAL EXECUTIVE ORDER NO. 2011-4
I. LICENSING OF GENERAL CONTRACTORS
J. BUY AMERICA
K. STEEL PRODUCTS
L. NO WASTE DISPOSAL IN PUBLIC WAY MCC 11-4-1600(E)
M. DUTY TO REPORT CORRUPT ACTIVITY
O. EQUAL PAY
P. 2014 CITY HIRING PLAN PROHIBITIONS
Q. CONTRACTOR’S LIABILITY – SAFETY BARRIERS AND LIGHTS
R. ELECTRONIC MAIL COMMUNICATION
S. EDS UPDATE OBLIGATION
T. DISCLOSURE OF OWNERSHIP INTEREST IN ENTITIES (ELECTRONIC DISCLOSURE STATEMENT)
U. WHEEL TAX (CITY STICKER)
V. ECONOMIC DISCLOSURE STATEMENT AND AFFIDAVIT ("EDS")
W. SAFETY ENHANCING VEHICLE EQUIPMENT CONTRACTING (MCC 2-92-597)
X. POLICY PROHIBITING SEXUAL HARASSMENT (SECTION 2-92-612 OF THE CHICAGO MUNICIPAL CODE)
Y. DEEMED INCLUSION
Z. FIRMS OWNED OR OPERATED BY PEOPLE WITH DISABILITIES
AA. POLICY ON NON-DISCLOSURE OF SALARY HISTORY (SECTION 2-92-385 OF THE CHICAGO MUNICIPAL
CODE) 106
BB. BUSINESS DIVERSITY PROGRAM REPORTING
XXII. MISCELLANEOUS
A. COUNTERPARTS
B. MODIFICATIONS
C. NO WAIVER OF LEGAL RIGHTS
D. GOVERNING LAW
E. CONSENT TO SERVICE OF PROCESS AND JURISDICTION
F. CONTRACTOR COOPERATION
G. JOINT AND SEVERAL LIABILITY
H. NO THIRD PARTY BENEFICIARIES
I. NOTICES
J. AUTHORITY
K. SOFTWARE LICENSE AGREEMENTS
XXIII. SPECIAL CONDITIONS FOR THE SMALL BUSINESS INITIATIVE CONSTRUCTION
PROGRAM
XXIV. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY (IEPA) REQUIREMENTS
A. IEPA LOAN PROVISIONS
A. FOR WATER PROJECTS, THE CONTRACT BETWEEN THE CITY OF CHICAGO AND THE CONTRACTOR WILL
BE SUBJECT TO REGULATIONS CONTAINED IN THE PROCEDURES FOR LOANS FROM THE PUBLIC WATER SUPPLY
LOAN PROGRAM (35 IL ADMIN. CODE 662)
B. FOR SEWER PROJECTS, THE CONTRACT BETWEEN THE CITY OF CHICAGO AND THE CONTRACTOR WILL
BE SUBJECT TO REGULATIONS CONTAINED IN THE PROCEDURES FOR LOANS FROM THE WATER POLLUTION
CONTROL LOAN PROGRAM: WASTEWATER (35 IL ADMIN. CODE 365)
C. FOR LEAD SERVICE LINE REPLACEMENT PROJECT, THE CONTRACT BETWEEN THE CITY OF CHICAGO AND
THE CONTRACTOR WILL BE SUBJECT TO REGULATIONS CONTAINED IN THE PROCEDURES FOR LOANS FROM THE PUBLIC
WATER SUPPLY LOAN PROGRAM TO PROVIDE FUNDING FOR LEAD SERVICE LINE REPLACEMENT (35 IL ADMIN. CODE
663). 121
B. USEPA/IEPA DAVIS-BACON WAGE GUIDANCE
(A) REQUIRED CONTRACT CLAUSES. IN ADDITION TO THE DAVIS-BACON WAGE REQUIREMENTS OF THIS
CONTRACT, THE FOLLOWING PROVISIONS ARE FROM U.S. DEPARTMENT OF LABOR REGULATIONS IN 29 CFR 5.5, “CONTRACT PROVISIONS AND RELATED MATTERS,” WHICH APPLY TO ALL FEDERAL-AID CONSTRUCTION
CONTRACTS IN EXCESS OF $2,000 IN ACCORDANCE WITH 29 CFR PART 5:
C. AMERICAN IRON AND STEEL
IEPA/City Funded I. General Provisions 1
I. GENERAL PROVISIONS
A. Acronyms
“ACI” - American Concrete Institute
“AED” - Associated Equipment Distributors
“AISC” - American Institute of Steel Construction.
“ANSI” - American National Standards Institute.
“ASME” - American Society of Mechanical Engineers.
“ASTM” - American Society for Testing and Materials
“EDS” - See Section XXI.R.
“CTA” - Chicago Transit Authority
“FEPC” - Fair Employment Practices Commission.
“IEPA” - Illinois Environmental Protection Agency.
“IDOT” - Illinois Department of Transportation.
“NEC” - National Electric Code.
“NFPA” - National Fire Protection Association
“NEMA” - National Electrical Manufacturer’s Association.
“OSHA” - U.S. Occupational Safety and Health Administration
B. Definitions
1. “Architect/Engineer” means the person designated by the Commissioner to provide the Contract drawings and Detailed Specifications for the Work you are to perform.
2. “Business Days” means Monday through Friday, unless an officially designated City holiday falls on one of those days. By contrast, see “Day” (I.B.15).
3. “Chief Procurement Officer” means the Chief Procurement Officer for the City of Chicago, and any representative duly authorized in writing to act on his/her behalf.
4. “City” means the City of Chicago, a municipal corporation and home rule unit of government existing under the Constitution of the State of Illinois.
5. “Commissioner” means the head of the Department and any designee duly authorized in writing to act on his/her behalf. See also I.B.17.
6. “Comptroller“ means City Comptroller or his designated representative.
7. “Consultant(s)” refers to the person, firm or corporation awarded a contract by the City to provide professional architectural or engineering design services or construction supervision for the Project.
8. “Contract” means this Contract, including your bid proposal (as accepted by the City), the City’s bid specification, which includes Books 1, 2, and 3, plans and drawings, addenda, all exhibits and schedules that are attached to it and documents incorporated in it by reference; fully executed performance and payments bond(s); and all amendments, modifications, or revisions made from time to time in accordance with its terms.
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 2
9. "Contract Completion Date" is the date, determined by the Commissioner, on which the Project is to reach Substantial Completion. The Contract Completion Date will be determined based on the duration for the Project set by the Contract as adjusted by any Contract modifications that extend or reduce the duration of the Project.
10. “Contract Modification” means a written modification of the terms and conditions of this Contract, signed by you, the Chief Procurement Officer, the Mayor and the Comptroller.
11. “Contractor” or “you” means the person who is awarded the Contract.
12. “Contract Price” is defined in Section XIII.A.
13. “Contract Time” is the duration of the Work from when the Work is required to begin until the scheduled date for Substantial Completion, including approved time extensions. See I.B.42.
14. “Corporation Counsel” means the head of the City’s Department of Law and any Assistant Corporation Counsel duly authorized to act on the Corporation Counsel’s behalf.
15. “Day” means calendar day.
16. “Daytime Work” means work performed between the hours of 6:00 a.m. to 6:00 p.m.
17. “Department” means the City Department identified on the cover of this Contract.
18. “Detailed Specifications” means the written requirements for materials and equipment to be used in the Work, including any plans or drawings, and standards of performance for the Work, which are set forth in Book 3 or incorporated by reference.
19. “Environmental Laws” means all applicable Federal, State, and local laws, ordinances, rules, regulations, and executive orders pertaining to environmental matters.
20. “Equipment” means all machinery and equipment, together with the necessary supplies for upkeep and maintenance, and all tools and apparatus necessary for the proper and acceptable completion of the Work.
21. “Field Order” means the written order to you, signed by the Commissioner, unilaterally directing changes in the Work or the Contract Time, or directing you to take corrective action and to adhere to Contract.
22. "Final Completion and Acceptance of the Work " means the last date on which all of the following events have occurred: (i) the Commissioner has determined that all Punch List Work and any other remaining Work have been completed in accordance with the Contract; (ii) final inspections have been completed and operations systems and equipment testing have been completed; (iii) final occupancy certifications have been issued; (iv) all deliverables have been provided to the Commissioner; and (v) all contractual requirements for final payment have been completed.
23. “Hazardous Materials” means asbestos and asbestos-containing materials, polychlorinated biphenyls (PCBs), oil or any other petroleum products, natural gas, special nuclear materials, and by-product materials regulated under the Atomic Energy Act (42 U.S.C. Sec. 2014, et seq.), pesticides under the Federal Insecticide, Fungicide and Rodenticide Act (7 U.S.C. Sec. 136, et seq.) and any hazardous waste, toxic
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 3 substance or related material, including any substance defined or treated as "hazardous waste," “special waste,” or "toxic substance" (or comparable term) in any Environmental Law.
24. “Include” (in all of its forms) means “include without limitation” unless the context clearly indicates otherwise.
25. “Management Consultant” or “Program Manager” means the organization or entity, if any, that the City has retained to oversee the planning, design, and construction of the Project.
26. “Municipal Code” means the Municipal Code of Chicago.
27. "Night Work" means work performed between the hours of 6:00 p.m. and 6:00 a.m.
unless otherwise defined in the plans.
28. “Notice to Bidders” means the Advertisement for Bids, the official notice inviting bids for the proposed Work to be done under this Contract.
29. “Notice to Proceed” means written authorization from the Commissioner for you to commence the Work on a specified date.
30. “Product Data” are illustrations, standard schedules, performance charts, instructions, descriptive literature, catalogs and brochures, performance and test data, test certifications, diagrams and other information furnished by you to illustrate a material, product or system for some portion of the Work.
31. “Project” means, collectively, the improvements you are to construct in accordance with the Contract.
32. “Property Owner” means the person(s) who have signed the Right of Entry and Release Form provided by the City to the Contractor.
33. “Provide” means furnish and install, unless otherwise specified in this Contract.
34. “Punch List” or “Punch List work” means minor adjustments, repairs or deficiencies in the Work, as determined by the Commissioner in his sole discretion.
35. “Record Documents” are all documents pertaining to the completed Work and the Project that the Contract requires you to provide to the City, including Record Drawings, Record Shop Drawings, product data, instructions, parts list, certified payrolls and operations and maintenance manuals.
36. “Record Drawings” means drawings reflecting the final built Project configuration, including approved modifications.
37. “Samples” mean physical examples that illustrate materials, equipment or workmanship.
Samples include materials, fabricated items, equipment, devices, appliances, or parts of them, as called for in the Detailed Specifications and any other Samples that may be required by the Commissioner to determine whether the kind, quality, construction, workmanship, finish, color and other characteristics of the materials proposed by you conform to the required characteristics.
38. “Shop Drawings” means drawings, diagrams, schedules and other data specially prepared for the Work by you or any Subcontractor, manufacturer, supplier or distributor
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 4 to illustrate some portion of the Work. Shop Drawings include: fabrication, erection, layout and setting drawings; manufacturer's standard drawings; schedules; wiring and control diagrams; and other drawings pertaining to materials, equipment and systems and methods of construction that may be required to show that the materials, equipment or system conform to the Contract requirements. Shop drawings must establish the actual detail of all manufactured and fabricated items and indicate the proper relation to the adjoining Work.
39. “Special Wastes” means those substances as defined in the Illinois Environmental Protection Act, 415 ILCS 5/3.45, and further defined in Section 809.103 of 35 Illinois Administrative Code, Subtitle G, Ch. 1.
40. “Subcontractor” means any person or entity with whom you contract to provide any part of the Work, and all subcontractors of any tier, including suppliers and material persons, whether or not in privity with you.
41. “Submittal” means Schedule, Shop Drawings, Product Data or Samples and other items that the Contract may require you to submit to the Commissioner.
42. “Substantial Completion Date” is the date upon which you have met the requirements for Substantial Completion in the opinion of the Commissioner.
43. “Substantial Completion of the Project” or “Substantial Completion” means that, in the opinion of the Commissioner, you have completed all Work in accordance with the Contract, except for Punch List Work, and the City is able to occupy and use the Project for the purpose intended.
44. “Work” means all labor, materials, equipment, deliverables, and other incidentals to be provided by you under this Contract that are necessary or convenient to the successful completion of this Project and that are required by, incidental or collateral to the Contract.
45. “You” means “Contractor.” See above.
C. Usage and Contract Interpretation
1. Unless a contrary meaning is specifically noted elsewhere, words such as, “as required,” “as directed,” “as permitted,” and similar words mean that requirements, directions of, and permission of the Commissioner are intended. The words “approved,” “acceptable,” “satisfactory,” or words of like import, mean “approved by,” “acceptable to,” or “satisfactory to” the Commissioner. The words “necessary,” “proper,” or words of like import as used regarding the extent, conduct or character of the Work specified means that Work must be conducted in a manner, to the extent, or be of character that is “necessary” or “proper” in the opinion of the Commissioner. The Commissioner’s judgment in these matters is final and you are not permitted to contest it.
2. Where the imperative form of an address is used, such as “perform the excavating,” “provide equipment required,” “remove obstructions encountered,” “furnish and install reinforcing steel bars,” etc., that address is directed to you .
3. Any headings in this Contract are for convenience of reference only and do not define or limit its terms or provisions. All article and section references, unless otherwise
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 5 expressly indicated, are to sections of this Contract. Words importing persons include firms, associations, partnerships, trusts, corporations, joint ventures and other legal entities, including public bodies, as well as natural persons. Words of any gender include correlative words of other genders. Words importing the singular number include the plural and vice versa, unless the context otherwise indicates. All references to any exhibit or document include the latest version and all supplements and/or amendments to any such exhibits or documents. All references to any person or entity include any person or entity succeeding to the rights, duties, and obligations of those persons or entities in accordance with the terms and conditions of this Contract.
4. Whenever reference to a law is contained in this Contract, the reference includes any amendments to the law.
D. Severability
If any provision of this Contract is inoperative or unenforceable as applied in any particular case in any jurisdiction or jurisdictions because it conflicts with any other provision of this Contract, or of any constitution, statute, ordinance, rule of law, or public policy, or for any other reason, those circumstances will not render the provision in question inoperative or unenforceable in any other case or circumstance, or render any other provision or provisions of this Contract invalid, inoperative, or unenforceable to any extent whatever. The invalidity of any phrases, sentences, clauses, or sections contained in this Contract will not affect the remaining portions of this Contract or any part of it.
E. Estimates of Quantities
If an estimate of quantities of Work is listed in the Bid Schedule of Prices, you understand that:
1. the estimate is approximate only;
2. the City does not expressly or by implication represent or warrant that the actual quantities involved will correspond to the estimate;
3. payment to you will be made only for the actual quantities furnished and installed in accordance with the terms of this Contract; and
4. the Chief Procurement Officer and the Commissioner reserve the right to jointly order, in writing, to increase, decrease or delete quantities of Work pursuant to all terms and conditions of the Contract.
F. Order of Precedence of Component Contract Parts
The order of precedence of the component contract parts is as follows:
1. Terms and Conditions;
2. Addenda if any;
3. Plans or City Drawings;
4. Detailed Specifications;
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 6
5. Standard Specifications of the City, State or Federal Government, if any;
6. Advertisement for Bids;
7. Requirements for Bidding and Instructions to Bidders; and
8. Performance Bond, if required.
The foregoing order of precedence governs the interpretation of the Contract in all cases of conflict or inconsistency in it.
G. Entire Agreement
The Contract constitutes the entire agreement between the parties with respect to its subject matter, and no other oral or written understandings, representations, inducements, consideration, promises, or interpretations are implied or impressed upon this Contract that are not expressly addressed in it.
II. PROJECT ORGANIZATION
A. The Commissioner
For the purposes of this Contract, the Commissioner, or any successor office to the Commissioner, will represent the City in all matters relating to the performance of your Work under this Contract and will constitute the point of receipt for all deliverables required under this Contract, unless expressly specified otherwise in this Contract. The Commissioner will decide all questions that arise with regard to the administration of the Contract such as to the quality and acceptability of materials furnished, the Work performed and rate of progress of the Work. The Commissioner will determine the amount and quality of Work performed and materials furnished and their estimates. The Commissioner's estimate will be a condition precedent to your right to receive money due under the Contract, but then only if the modifications or amendments to the Contract are approved in accordance with Article XIV, “Changes in the Work."
B. The Chief Procurement Officer
The approval of the Chief Procurement Officer is required to enter this Contract and to modify it.
C. Contractor
The Work is under your charge and care until Final Completion and Acceptance of the Work, unless otherwise specified elsewhere in the Contract.
III. CONTRACTOR’S OBLIGATIONS
A. Contractor
1. Except as may be expressly provided otherwise in the Contract, you are solely responsible for selecting the means, methods, techniques, sequences, and procedures used in performing the Work. The intent of the Detailed Specifications is to describe the
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 7 completed Work that you must provide to fulfill the requirements of the Contract. The Detailed Specifications are not intended to cover every detail of materials, parts, or activities necessary to complete the Work. You must perform all activities that may be required or necessary to complete the Work in accordance with the Contract. For the Contract Price, you must construct, furnish and install all materials, parts and labor necessary to complete the entire Work, whether or not the Contract particularly specifies or shows the details of Work.
2. The Work under this Contract has not been completely segregated into divisions of Work to be performed by any trade or Subcontractor. You are responsible for all division of work. However, wherever any provision of any section of the specifications conflicts with any agreements or regulations of any kind at any time in force among members of any trade or craft associations, unions or councils that regulate or distinguish that work is or is not included in the work of any particular trade, you must make all necessary arrangements to reconcile any such conflict without delay, damage, or cost to the City.
3. Before submission of your bid, you must (i) inspect the site of the proposed Work and familiarize yourself with all the site conditions that may affect your performance of the Work; and (ii) review the Detailed Specifications, plans and drawings provided with the bid documents, as required in the “Requirements for Bidding and Instructions to Bidders,” in Book 2. If at any time before the bid opening you discover any errors, discrepancies or omissions in the Contract or any discrepancy between the Contract and the physical conditions at the site or in any drawings that may be provided later, you must notify the Chief Procurement Officer immediately, in writing for an interpretation through an Addendum.
4. This written request must be received by the Chief Procurement Officer no later than 10 days before bid opening, or no response will be provided. You will not be allowed to take advantage of your discovery of any such error or omission or discrepancy in the Contract after the award of the Contract. Any Work done after the discovery, unless authorized by the Chief Procurement Officer, will be done at your expense.
5. Except as otherwise expressly provided in the Contract, the Contract Price includes all costs and expenses for which you will be compensated in connection with the Contract, including
a. the costs of performing any or all of your obligations and duties under the Contract;
b. the costs of all materials, equipment, supplies, tools, machinery, labor, supervision, management and items of any and all kinds that are or may be necessary and incidental to the full and satisfactory completion of the Work, whether or not specified or indicated in the Contract;
c. the costs of permits, insurance, bonds and license;
d. the costs associated with any risks you assume under the Contract;
e. the costs associated with all warranties and guarantees;
f. the costs of complying with the directives of the Chief Procurement Officer and/or the Commissioner;
g. the costs of complying with all laws applicable to the Contract; and
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 8
h. all overhead and profit.
No term of the Contract that further specifically indicates that you must bear the costs of an item or that further specifically indicates that an item will be performed at no additional cost to the City will be construed or interpreted to in any way limit the foregoing.
6. You must begin the Work on the date specified in the Notice to Proceed. In addition, upon receipt of the Notice to Proceed, you must assign and maintain during the term of the Contract and any extension of it, an adequate staff of competent personnel who are fully equipped, licensed as appropriate, available as needed, and qualified to perform the Work. You must include among your staff such personnel and positions as the Contract may require.
If, in the reasonable opinion of the Commissioner, the performance of your personnel assigned to the Work is at an unacceptable level, or does not comply with the provisions of Section VIII.A, “Competency of Workers,” those personnel must cease to be assigned to this Work and must return to you. You must then furnish to the Commissioner the name of a substitute person or persons in accordance with Section III.A.6. Absence of sufficient qualified personnel for the Work constitutes an event of default.
7. You must supervise and direct the Work competently and efficiently, devoting such attention and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract. You are responsible for providing a finished Project that complies fully with the Contract.
8. Risk of Loss. The Work is under your charge and care until Final Completion and Acceptance of the Work by the Commissioner, unless otherwise specified in the Contract. You assume all responsibility for injury or damage to the Work by action of the elements, fire or any other causes whatsoever, including injury or damage arising from the execution or non-execution of the Work. You must rebuild, repair, restore and make good, at no additional cost to the City, all injuries or damages to any portion of your Work before Final Completion and Acceptance of the Work.
9. When the City furnishes equipment or materials to you for use or inclusion in the Work, you must safeguard all such equipment and materials as you would equipment and materials that you furnished.
10. The Work will not be considered to be completed and accepted until you receive written notice from the Commissioner confirming the Final Completion and Acceptance of the Work.
11. If you have any questions or concerns with respect to the Detailed Specifications or Contract drawings, you must raise them with the Commissioner.
12. Except as specified below, you must perform with your own organization and forces not less than 25% of the total amount of Work that is performed at the Project site, computed on the basis of cost. You must require each Subcontractor to become familiar with all provisions of the Contract documents that may affect Subcontractor's work.
(Revised April 2022)
IEPA/City Funded III. Contractor's Obligation 9
B. Subcontractors
1. All rights and obligations under this Contract are by and between the City and you.
Except as may otherwise be provided in the Contract, there is no privity between Subcontractors and the City. Subcontractors have no rights as third-party beneficiaries under this Contract except as may be provided in Article XXIII. You must implement such measures as may be necessary to ensure that your Subcontractors are bound by all applicable provisions of the Contract.
2. All Subcontractors are subject to the approval of the Chief Procurement Officer. You must not substitute a Subcontractor previously accepted by the Chief Procurement Officer unless the substitution is acceptable to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .