Copy of 4. Blank SOSS.xls

XLS spreadsheet 46 KB Posted

Attached to
USCGC CYPRESS FY22 DS
Solicitation number
70Z085-22-Q-P45010
Issued by

About this file

This pricing schedule outlines costs for various dockside repair and maintenance items for the USCGC CYPRESS (WLB-225B). Definite line items include cleaning and preservation of the main diesel engine and exhaust piping, ship service diesel generator and exhaust piping, exterior decks, temporary services, compartment insulation, electrical matting, piping insulation, internal water tight hatches, interior deck covering, and wet/dry deck sealing. Optional items include a composite labor rate, GFP report, travel and per diem, and laydays. Pricing is to be provided per unit with extended totals. The schedule also includes templates for cost estimate breakdowns by labor type and material/subcontractor costs with assumed G&A and profit factors.

The related solicitation is for dockside repairs of the USCGC CYPRESS (WLB 210) in accordance with the attached specification. The contractor shall furnish all necessary labor, materials, services, equipment and supplies to perform various repairs of the cutter while homeported in Kodiak, AK. The Department of Homeland Security US Coast Guard is the contracting agency.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC CYPRESS (WLB-225B) DOCKSIDE AVAILABILITY FY2022
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Main Diesel Engine, MDE, Exhaust Piping, Commercial CleanJOB$0.00
D-002Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial CleanJOB$0.00
O-003Decks – Exterior (Buoy or Construction Deck), Preserve 100%JOB$0.00
D-004Temporary Services, Provide - CutterJOB$0.00
D-005Compartment Insulation, General, RenewJOB$0.00
D-006Deck Covering, Electrical Matting, RenewJOB$0.00
D-007Piping Insulation, RenewJOB$0.00
D-008Water Tight Hatches, Internal DC Deck and Below, RenewJOB$0.00
D-009Deck Covering, Interior, Wet and Dry, RenewJOB$0.00
D-010Deck Covering, Wet/ Dry, SealJOB$0.00
O-00AComposite Labor RateHour00
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB$0.00
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(7/12/2021) Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE