Copy of 4. Blank SOSS.xls
XLS spreadsheet 46 KB Posted
- Attached to
- USCGC CYPRESS FY22 DS
- Solicitation number
- 70Z085-22-Q-P45010
About this file
This pricing schedule outlines costs for various dockside repair and maintenance items for the USCGC CYPRESS (WLB-225B). Definite line items include cleaning and preservation of the main diesel engine and exhaust piping, ship service diesel generator and exhaust piping, exterior decks, temporary services, compartment insulation, electrical matting, piping insulation, internal water tight hatches, interior deck covering, and wet/dry deck sealing. Optional items include a composite labor rate, GFP report, travel and per diem, and laydays. Pricing is to be provided per unit with extended totals. The schedule also includes templates for cost estimate breakdowns by labor type and material/subcontractor costs with assumed G&A and profit factors.
The related solicitation is for dockside repairs of the USCGC CYPRESS (WLB 210) in accordance with the attached specification. The contractor shall furnish all necessary labor, materials, services, equipment and supplies to perform various repairs of the cutter while homeported in Kodiak, AK. The Department of Homeland Security US Coast Guard is the contracting agency.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC CYPRESS (WLB-225B) DOCKSIDE AVAILABILITY FY2022 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-002 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| O-003 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | $0.00 | ||
| D-004 | Temporary Services, Provide - Cutter | JOB | $0.00 | ||
| D-005 | Compartment Insulation, General, Renew | JOB | $0.00 | ||
| D-006 | Deck Covering, Electrical Matting, Renew | JOB | $0.00 | ||
| D-007 | Piping Insulation, Renew | JOB | $0.00 | ||
| D-008 | Water Tight Hatches, Internal DC Deck and Below, Renew | JOB | $0.00 | ||
| D-009 | Deck Covering, Interior, Wet and Dry, Renew | JOB | $0.00 | ||
| D-010 | Deck Covering, Wet/ Dry, Seal | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 0 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(7/12/2021) Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate