Text version
USCGC STRATTON (WMSL 752)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: Hayden E Hughes
(Rev-0, 18 June 2019)
USCGC STRATTON (WMSL-418) DOCKSIDE AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: Flex Hose Assemblies, Renew WORK ITEM 2: Ventilation Duct, Renew WORK ITEM 3: Piping and Valve Insulation, Renew WORK ITEM 4: Relief Valves, Inspect And Test WORK ITEM 5: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 6: Tank Sounding Tube, Replace WORK ITEM 7: Bulkhead Insulation, Renew WORK ITEM 8: Stern Launch Carriage and Centerline Winch, Overhaul WORK ITEM 9: Sewage Piping, Clean and Flush WORK ITEM 10: Sewage System Piping, Repair -Optional WORK ITEM 11: VCHT Pump Discharge Check Valve, Renew WORK ITEM 12: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 13: Tanks, Preserve “Partial”-Optional WORK ITEM 14: Tanks, Preserve “100%”-Optional WORK ITEM 15: General Welding, Provide-Optional WORK ITEM 16: Dual Point Davit ,Biennial Maintenance, Perform WORK ITEM 17: Helo Hangar Door, Inspect and Test WORK ITEM 18: Helo Hangar Door Curtain Assembly, Preserve (100 %) WORK ITEM 19: Starboard Capstan. Slew Gear, Renew WORK ITEM 20: Temporary Services, Provide – Home Pier WORK ITEM 21: Tenting, Provide WORK ITEM 22: Deck Covering (Slip-Resistant), Renew WORK ITEM 23: Cargo Handling Elevator, Level 2 Inspect and Repair WORK ITEM 24: Tanks (Fuel Oil), Clean and Inspect WORK ITEM 25: Tank (Vacuum Collection Holding Tank), Preserve “100%”-Optional iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL-100-001, Rev -, General Arrangements
Coast Guard Drawing 418A-WMSL-540-001, Rev -, Fuel Oil Diagram
Coast Guard Drawing 418A-WMSL-551-001, Rev -, Compressed Air Diagram
Coast Guard Drawing 418A-WMSL-593-002, Rev -, Sewage System Diagram
Coast Guard Drawing 418A-WMSL-801-001, Rev -, Booklet of General Plans
Coast Guard Drawing 750 WMSL 100-001, Rev L, General Arrangements (ASC100001)
Coast Guard Drawing 750 WMSL 169-001, Rev E, Helo Hangar Door Installation (ASC169001)
Coast Guard Drawing 750 WMSL 801-004, Rev B, Booklet of General Plans (ASC801001C)
Coast Guard Drawing 750 WMSL-572-002, Rev D, Elevator Arr & Instl (ASC572002)
Coast Guard Drawing 750-WMSL 100-062, Rev B, Topside Configuration for NSC 3 Only (AS3100004)
Coast Guard Drawing 750-WMSL 100-514, Rev F, General Arrangements NSC 3 Fellow
Coast Guard Drawing 750-WMSL 583-004, Rev H, Stern Launch & Recovery Arrangement & Details
ASC583004
Coast Guard Drawing 750-WMSL 593-027, Rev D, Sewage System Unit 2120
Coast Guard Drawing 750-WMSL 801-004, Rev A, Booklet of General Plans NSC 3 SRD
(ASC801001C)
Coast Guard Drawing 750-WMSL-085-021, Rev C, Tank Capacity Curves (WMSL 752
ONNLY)(ASC085013C)
Coast Guard Drawing 750-WMSL-100-060, Rev C, General Arrangements NSC 3 Only (ASC100001C)
Coast Guard Drawing 750-WMSL-100-060, Rev C, General Arrangements NSC 3 ONLY
Coast Guard Drawing 750-WMSL-100-061, Rev A, Inboard and Outboard Profile
Coast Guard Drawing 750-WMSL-101-004, Rev G, C & A, First Platform (ASC101004)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship
Wide (ASC167001)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details
Coast Guard Drawing 750-WMSL-320-40, Rev B, Electrical One LINE Diagram (NSC3 - SRD)
(ASC320001C)
Coast Guard Drawing 750-WMSL-505-001, Rev C, List of Relief Valves (ASC505001)
Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses (ASC505006) v (Rev-0)
Coast Guard Drawing 750-WMSL-506-015, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2100
(ASC506210-AE)
Coast Guard Drawing 750-WMSL-506-016, Rev E, Overflow / Air Escapes / Sounding Tubes Unit 2110
(ASC506211-AE)
Coast Guard Drawing 750-WMSL-506-020, Rev D, Overflow / Air Escapes / Sounding Tubes Unit 2200
(ASC506220-AE)
Coast Guard Drawing 750-WMSL-506-021, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2210
(ASC506221-AE)
Coast Guard Drawing 750-WMSL-506-022, Rev B, Overflow / Air Escapes / Sounding Tubes Unit 2220
(ASC506222-AE)
Coast Guard Drawing 750-WMSL-506-023, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2230
(ASC506223-AE)
Coast Guard Drawing 750-WMSL-506-025, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2300
(ASC506230-AE)
Coast Guard Drawing 750-WMSL-506-026, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2330
(ASC506233-AE)
Coast Guard Drawing 750-WMSL-506-034, Rev E, Overflow / Air Escapes Sounding Tubes Unit 3240
(ASC506324-AE)
Coast Guard Drawing 750-WMSL-506-039, Rev D, Overflows / Air Escapes / Sounding Tubes Unit 2310
(ASC506231-AE)
Coast Guard Drawing 750-WMSL-506-040, Rev B, Overflow / Air Escapes / Sounding Tubes Unit 2320
(ASC506232-AE)
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M
(ASC508001)
Coast Guard Drawing 750-WMSL-509-001, Rev A, HVAC Insulation Schedule and L/M (ASC509001)
Coast Guard Drawing 750-WMSL-512-001, Rev H, HVAC System Diagram (ASC512001)
Coast Guard Drawing 750-WMSL-512-004, Rev A, Vent and Air Conditioning Standard Instruction
(ASC512007)
Coast Guard Drawing 750-WMSL-512-008, Rev C, Vent & Air Cond Fan Rm (P) Mn Dk Unit 2140
(ASC512011)
Coast Guard Drawing 750-WMSL-512-020, Rev D, Vent & Air Cond Arrgt 1st Platf Unit 1320
(ASC512132)
Coast Guard Drawing 750-WMSL-512-025, Rev C, Vent & Air Conditioning Arr 2nd Deck, Unit 2130
(ASC512213)
Coast Guard Drawing 750-WMSL-512-026, Rev C, Vent & Air Conditioning Arr Mn Dk Unit 2140
(ASC512214)
Coast Guard Drawing 750-WMSL-512-037, Rev F, Vent & Air Cond Arr 2nd Dk Unit 3130
(ASC512313)
Coast Guard Drawing 750-WMSL-512-038, Rev G, Vent & Air Cond Arr Mn Dk Unit 3140
(ASC512314)
Coast Guard Drawing 750-WMSL-512-040, Rev F, Vent & Air Cond Arr 2nd Deck Unit 3230
(ASC512323)
Coast Guard Drawing 750-WMSL-512-044, Rev E, Vent & Air Cond Arr 02 Lvl Unit 4120
(ASC512412)
Coast Guard Drawing 750-WMSL-512-046, Rev F, Vent & Air Cond Arr 02 Lvl Unit 4220
(ASC512422)
vi (Rev-0)
Coast Guard Drawing 750-WMSL-512-059, Rev C, HVAC Equipment List (ASC512004)
Coast Guard Drawing 750-WMSL-512-061, Rev D, Vent & Air Cond Cps Fan Rm (P) 01 Lvl Unit 4210
(ASC512020)
Coast Guard Drawing 750-WMSL-512-062, Rev C, Vent & Air Cond Fan Room 02-29-1-Q Unit 4120
(ASC512021)
Coast Guard Drawing 750-WMSL-512-068, Rev C, Vent & Air Conditioning Arr Mn Dk Unit 2140
(AS3512214)
Coast Guard Drawing 750-WMSL-512-069, Rev B, Vent & Air Cond Arr Mn Dk Unit 2240
(ASC3512224)
Coast Guard Drawing 750-WMSL-516-004, Rev B, Chilled Water Unit 1230 (ASC516123-CW)
Coast Guard Drawing 750-WMSL-516-006, Rev F, Chilled Water System Diagram (ASC516002)
Coast Guard Drawing 750-WMSL-516-008, Rev B, Chilled Water - Unit 1340 (ASC516134-CW)
Coast Guard Drawing 750-WMSL-516-025, Rev D, Chilled Water Unit 4420 (ASC516442-CW)
Coast Guard Drawing 750-WMSL-516-046, Rev -, A/C & Refrigeration piping Diagram WMSL 752
Only (ASC516001C)
Coast Guard Drawing 750-WMSL-516-046, Rev -, A/C & Refrigeration Piping Diagram WMSL 752
ONLY (ASC516001C)
Coast Guard Drawing 750-WMSL-516-047, Rev A, Chilled Water System Diagram WMSL 752 Only
(ASC516002C)
Coast Guard Drawing 750-WMSL-520-023, Rev A, Seawater Cooling System WMSL 752 Only
(ASC520001C)
Coast Guard Drawing 750-WMSL-528-001, Rev - , Plmb & Int Dk Drains & Vent Sys Schematic
(ASC528001)
Coast Guard Drawing 750-WMSL-530-001, Rev F, Potable Water Systems Diagram (ASC530001)
Coast Guard Drawing 750-WMSL-530-018, Rev B, Potable Water Unit 2340 (ASC530234-PW)
Coast Guard Drawing 750-WMSL-551-021, Rev D, Compressed Air Unit 2310 (ASC551231-CA)
Coast Guard Drawing 750-WMSL-556-042, Rev -, Gas Turbine Starting Module Hydraulic System
Diagram WMSL 752 Only (ASC556001C)
Coast Guard Drawing 750-WMSL-556-048, Rev -, Bow Thruster HPU Sys Diagram WMSL 752 Only
(ASC556009C)
Coast Guard Drawing 750-WMSL-582-001, Rev D, Anchoring, Mooring, and Towing Arrangement
(ASC582001)
Coast Guard Drawing 750-WMSL-582-002, Rev A, Mooring and Towing Arrangement (ASC582002)
Coast Guard Drawing 750-WMSL-593-007, Rev H, Sewage System Diagram (ASC593004)
Coast Guard Drawing 750-WMSL-593-009, Rev B, Sewage System Schematic (ASC593020)
Coast Guard Drawing 750-WMSL-631-002, Rev P, Paint Schedule (ASC631002)
Coast Guard Drawing 750-WMSL-635-001, Rev -, Thermal & Acoustic Insulation (ASC635001)
Coast Guard Drawing 750-WMSL-635-002, Rev K, Insulation ARR & Details Thermal, Acoustic & Fire
Coast Guard Drawing 750-WMSL-801-004, Rev A, Booklet of General Plans NSC 3 SRD
(ASC801001C)
Guard Drawing 750-WMSL-512-001, Rev E, HVAC System Diagram (ASC512001)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual vii (Rev-0)
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Coatings and Color Manual
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 7065, 15-JUN-07, FORWARD and Aft CAPSTAN - Model
20834
Coast Guard Technical Publication (TP) 7087, Mar 2011, Pressure Relief Valve
Coast Guard Technical Publication (TP) 7181, 02-OCT-07, Helo Hangar Doors
Coast Guard Technical Publication (TP) 7184, SWBS 593, Oct 2007, Vacuum Sewage System –
Operation, Maintenance & Parts List
Coast Guard Technical Publication (TP) 7348A, 29-MAR-11, Small Boat Retrieval System Equipment
Manual
Coast Guard Technical Publication (TP) 7525, 26-MAR-08, Cutter Information Book (Cib) - Auxiliary
Machinery (Vol. IV) (Hull
Coast Guard Technical Publication (TP) 7902, 09-December-13, Preliminary" Dual Point Davit - Models
DDP11000CTS & SP2200 (S/N - 2313 & 2315)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0450 (SFLC Std Spec 0450), 2014, Electrical
Power for Contractor Tools and Equipment
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machinery Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install New
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
Air Capable Ship Aviation Bulletin 1L (2009)
Air Capable Ship Aviation Facility Bulletin 1L (2009).
American National Standards Institute (ANSI/EASA) AR100, 2010, Recommended Practice for
ASTM International (ASTM) D1330, 12/1/2004, Standard Specification for Rubber Sheet Gaskets viii (Rev-0)
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2017, Occupational Safety and Health
Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health
Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
International Standards Organization (ISO) 4406, 1996, Hydraulic Fluid Power – Fluids – Method for
Coding the Level of Contamination by Solid Particles
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2018, Pipe
Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-DTL-15024F, General Specification for Plates, Tags, and Bands for Identification of Equipment
MIL-PRF-24176C, Oct 2004, Cement, Epoxy, Metal Repair and Hull Smoothing
MIL-PRF-24613, Nov 2007, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-STD-777, Feb 2018, Schedule of Piping, Valves, Fittings, And Associated Piping Components for
Naval Surface Ships
Naval Sea Systems Command (NAVSEA) 0640-LP-111-4501, Apr 2012, NAVSEA OP 4 Rev 10, Ammunition And Explosives Safety Afloat
Naval Sea Systems Command (NAVSEA) S6435-TL-MMI-010, Angle Relief Valve – Type D50
Naval Sea Systems Command Dwg No. 2145532, Rev B, Indicator/Indicating System Liquid Level
Application/Selection Guide
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets the Repair of Rotating Electrical Apparatus
The Society for Protective Coatings (SSPC SSPC-SP 3, 2007, Power Tool Cleaning
The Society for Protective Coatings (SSPC) NACE 2/SSPC SP-10-, 2007, near white metal blast finish.
The Society for Protective Coatings (SSPC) SSPC-SP 1, 2007, solvent cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.2 (SSPC-SP 2), 2004, Hand Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2018, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast
Cleaning ix (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning x (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 N Check Valve NSN: 4820-01-541-5446 2ea. 1,168.00
19 N Slew Gear J188484 2 ea. 5000.00
23 N Guide rollers, Northern
Elevator, Drawing
20793020
J184796 4 ea. $2555.79
23 N Wire rope .25 inch dia x 40’, IWRC, SST 7-9 strand
J188209 40 ft. $15.00
23 N Wire Rope 34’ Long each. 0.438 in 6 x 36
Right regular lay, IWRC Extra improved plow steel.
J188005 4 ea. $791.38
23 N Rail Weldment J187988 2 3711.29 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Flex Hose Assemblies, Renew
3 Piping and Valve Insulation, Renew
16 Dual Point Davit ,Biennial Maintenance, Perform
17 Helo Hangar Door, Inspect and Test
22 Deck Covering (Slip-Resistant), Renew
24 Tanks (Fuel Oil), Clean and Inspect xii (Rev-0)
PRINCIPAL CHARACTERISTICS
418' WMSL
PHYSICAL
Length overall 418' 0"
Length between perpendiculars 390' 0"
Maximum beam 54' 0"
Beam @ 01 level 47' 9-1/8"
Depth (01 level @ side to baseline) 39' 2-3/4"
01 deck camber foredeck 1/4" in 1'-0"
Minimum berth depth 20' 0"
Height of highest projection Approximately 119'
Draft, design 14.40'
Design displacement 3925 long tons
MACHINERY
Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each
One gas turbine General Electric LM2500; 29,500 SHP
Type of propulsion CODAG
Electrical system 24 Volt DC
Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max
Two reduction gears RENK
One cross connect gear RENK
HULL
Hull material 5086 Aluminum
HSLA-80 Steel
ABS EH 36 Steel
ABS AH 36
Frame spacing
FWD of FR 9 2' 3"
FR 9 to FR 10 6' 9"
FR 10 to FR 98 4' 1"
FR 98 to FR 99 3'-8"
ELECTRICAL
Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators
Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each
TANK CAPACITIES
Diesel oil 220,359 gal
Fresh water 12,454 gal
JP-5 Fuel 35,182 gal
1 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is 7690390037.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
3 (Rev-0)
Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
4 (Rev-0)
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint
Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of
SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay
(RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
8 (Rev-0)
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
12 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
13 (Rev-0)
S19_XXX_50500_FlxHsAssmblyRnw_RTK_0419_752
WORK ITEM 1: Flex Hose Assemblies, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the designated hose assemblies for equipment listed in Table 1.
TABLE 1– LIST OF EQUIPMENT FOR HOSE RENEWAL
EQUIPMENT
HOSE
LOCATION
MATERIAL
HOSE
LISTING
Air Compressor No. 1 5-36-01-E Synthetic Rubber Table 3
Air Compressor No. 2 5-52-01-E Synthetic Rubber Table 4
STBD Carriage Winch 2-89-0-Q Synthetic Rubber Table 5
PORT Carriage Winch 2-89-0-Q Synthetic Rubber Table 6
Main Propulsion Diesel Engine No. 1 5-52-01-E Various Table 7
Main Propulsion Diesel Engine No. 2 5-52-01-E Various Table 8
Refrigeration Unit No. 1 2-64-0-E Various Table 9
Refrigeration Unit No. 2 2-64-0-E Various Table 10
STBD Rudder Seal 5-94-0-Q Fabric or Reinforced Yarn Table 11
PORT Rudder Seal 5-94-0-Q Fabric or Reinforced Yarn Table 12
Bow Thruster 3-10-0-Q Synthetic Rubber Table 13
Moisture Separator Control Panel 2-45-0-Q Synthetic Rubber Table 14
MPAC Baffle Box No. 1 5-36-01-E Synthetic Rubber Table 15
MPAC Baffle Box No. 2 5-52-01-E Synthetic Rubber Table 16
Air Conditioning Plant No. 1 3-22-0-Q Synthetic Rubber Table 17
Air Conditioning Plant No. 2 3-22-0-Q Synthetic Rubber Table 18
Air Conditioning Plant No. 3 3-22-0-Q Synthetic Rubber Table 19
Gas Turbine Hydraulic Starter 5-44-01-E Synthetic Rubber Table 20
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 418A-WMSL-100-001, Rev -, General Arrangements
Coast Guard Drawing 418A-WMSL-540-001, Rev -, Fuel Oil Diagram
Coast Guard Drawing 418A-WMSL-551-001, Rev -, Compressed Air Diagram
Coast Guard Drawing 418A-WMSL-801-001, Rev -, Booklet of General Plans
14 (Rev-0)
Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses (ASC505006)
Coast Guard Drawing 750-WMSL-516-046, Rev -, A/C & Refrigeration piping Diagram WMSL
752 Only (ASC516001C)
Coast Guard Drawing 750-WMSL-516-047, Rev A, Chilled Water System Diagram WMSL 752
Only (ASC516002C)
Coast Guard Drawing 750-WMSL-520-023, Rev A, Seawater Cooling System WMSL 752 Only
(ASC520001C)
Coast Guard Drawing 750-WMSL-556-042, Rev -, Gas Turbine Starting Module Hydraulic
System Diagram WMSL 752 Only (ASC556001C)
Coast Guard Drawing 750-WMSL-556-048, Rev -, Bow Thruster HPU Sys Diagram WMSL 752
Only (ASC556009C)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machinery Systems
OTHER REFERENCES
MIL-DTL-15024F, General Specification for Plates, Tags, and Bands for Identification of
Equipment
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.3.1: Hose inspection and verification
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.3.1 Protective measures, hydraulic system(s). Maintain existing hydraulic system cleanliness and take all necessary precautions to prevent the introduction of contaminants into the hydraulic system.
Immediately after disconnecting or removing components from the hydraulic system, seal all openings to the rest of the system using caps for externally threaded connection points, bolt-on blanks, or taped-on discs/covers made of durable plastic or sheet-metal that is no less than 1/16-inch thick.
15 (Rev-0)
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Deck plates
Piping
Electrical wiring & cables
Machinery
NOTE
A verification ship check by the contractor prior to bidding is recommended to determine accuracy of Tables. Information listed was provided by contractor from previous availability. For ship check, the contractor shall contact Port Engineer.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.3 Hose renewal. The Contractor shall renew the hose assemblies for the equipment listed in Table 1 in accordance with SFLC Std Spec 5000, Appendix C, Paragraph C2.2 (Hose assemblies).
3.3.1 Hose inspection and verification. The attached tables show an approximation of hose lengths, sizes, part numbers, and fittings to be renewed that are listed for bidding purposes only. In the presence of the CG Inspector, the Contractor shall validate the hoses and fittings requiring renewal, noting any deviations from the tables. Submit a CIR.
3.3.2 Prior to each hose disconnection, the Contractor shall record equipment, supply, and return line information for use in later reconnection.
WARNING
Do not drain any fluids including fresh water, into any space, bilge, or exterior location.
3.3.3 System fluid disposal. The Contractor remove and dispose of fluids in accordance with all applicable Federal, state, and local regulations.
NOTE
Some systems may require complete draining to remove hoses.
3.3.4 Immediately after disconnecting or removing hoses, seal all openings to the rest of the system using threaded caps, threaded plugs, or bolt-on blanks made of durable plastic or sheet-metal that is no less than
1/16-inch thick.
16 (Rev-0)
Plastic bags, rubber gloves, and rags of any kind are prohibited from being used to prevent leaking from hoses and system protection.
3.3.5 The Contractor shall inspect all shipboard hose connections and hardware/fasteners for any damage or defects. Submit a CFR for any damaged components that are not suitable for reuse. Shipboard hose connections and hardware/fasteners that are deemed satisfactory shall be retained for reinstallation.
3.3.6 The Contractor shall template new hose length from each removed hose. New hose type and size shall be determined from hose removed. If hose has excess length, verify with CG inspector if excess length is required. Renew hose end fittings. Renew all O-rings, two part clamps, and mounting bolts.
Dispose of removed hoses in accordance with all applicable Federal, state, and local regulations. Submit a
CFR for any additional hose connections that require replacement not on the renewed hose.
3.3.7 Pressure test. The Contractor shall pressure test all new hose assemblies IAW SFLC Spec 5000, Appendix C, Paragraph C2.2.1.3. Ensure no leakage from or permanent deformation of pressure-containing parts by repairing all leaks and discrepancies. Submit a CFR documenting all certifications of pressure test results.
3.3.8 The Contractor shall install fire sleeves to all Fuel Oil Hoses & Lube Oil Hoses. Suggested Source of Supply is: Eaton Aeroquip Marine Military (Firesleeve 624, Firesleeve clamp FF9217).
3.3.9 The Contractor shall wrap all hose end fittings exposed to weather with a suitable commercially available protective tape, completely covering all exposed metal. The tape shall be a petrolatum base compound on a fabric carrier. Suggested sources of supply are: Densyl Tape (www.densona.com), Carbowrap Marine Tape (www.carboline.com), or Petro tape (www.pertotape.co.za).
3.3.10 Fluid renewal. The Contractor shall renew all removed system fluids. Hydraulic fluid shall be renewed, sampled, and tested in accordance with SFLC Std Spec 5000, Appendix C, Paragraphs C2.1
(Fluids), C2.1.1, and C2.1.3. The fluid shall meet the acceptance criteria as stated in SFLC Std Spec 5000, Appendix C, Paragraph C2.1.4.
3.3.11 Hose Fitting Documentation. For each renewed hose assembly, the Contractor shall provide information listed in Table 2. Submit a CFR.
TABLE 2 - HOSE FITTINGS DOCUMENTATION
SYSTEM OR COMPONENT AND LOCATION ON CUTTER:________________________
HOSE SERIAL NUMBER:_________________
Hydrostatic Test
Pressure (PSIG)
Location on
Cuter
(Compartment)
System and Service
Descriptions
Material Size
Inches
Length
Inches
Part
Number
HOSE FITTING NO.1
Design Pressure Reusable Y/N Material Type Size
Inches
Part
Number
Source of
Supply
17 (Rev-0)
HOSE FITTING NO.2
Design Pressure Reusable Y/N Material Type Size
Inches
Part
Number
Source of
Supply
3.4 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and/or ship’s representative and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition without leaks. Submit a CFR.
4. NOTES
TABLE 3 - AIR COMPRESSOR NO. 1 (COMPARTMENT: 5-36-01-E)
HOSE
SERIAL #
LENGTH
(IN.)
SIZE
(IN.)
PART
NUMBER NSN FITTING #1 FITTING #2
DESIGN
PRESS
(PSI)
1CA-A-001 42 2 AE2580-32 (2 1/2") 300#
ANSI B16.5
FLG
(2 1/2") 300#
ANSI B16.5
FLG
1CA-A-002 36 1 AE371-32 (3/4") 90DEG
O-RING X
(1")
STRAIGHT
O-RING
(3/4") 90DEG
O-RING X
(1")
STRAIGHT
O-RING
TABLE 4 - AIR COMPRESSOR NO. 2 (COMPARTMENT: 5-52-01-E)
HOSE
SERIAL #
LENGTH
(IN.)
SIZE
(IN.)
PART
NUMBER NSN FITTING #1 FITTING #2
DESIGN
PRESS
(PSI)
2CA-A-001 42 2 AE2580-32 (2 1/2") 300#
ANSI B16.5
FLG
(2 1/2") 300#
ANSI B16.5
FLG
2CA-A-002 36 1 AE371-32 (3/4") 90DEG
O-RING X
(1")
STRAIGHT
O-RING
(3/4") 90DEG
O-RING X
(1")
STRAIGHT
O-RING
18 (Rev-0)
TABLE 5 - STBD CARRIAGE WINCH (COMPARTMENT: 2-89-0-Q)
HOSE
SERIAL #
LENGTH
(IN.)
SIZE
(IN.)
PART
NUMBER NSN FITTING #1 FITTING #2
DESIGN
PRESS
(PSI)
SCW-A-001 1/2 160
SCW-A-002 1/4
SCW-A-003 1/4
SCW-G-001 1/4 P2-937-
SCW-G-002 1/4 P2-937-
TABLE 6 - PORT CARRIAGE WINCH (COMPARTMENT: 2-89-0-Q)
SERIAL #
LENGTH
(IN.)
SIZE
(IN.)
PART
NUMBER NSN FITTING #1 FITTING #2
DESIGN
PRESS
(PSI)
PCW-A-001 1/2 160
PCW-A-002 18 1/4
PCW-A-003 12 1/4
PCW-G-001 1/4 P2-937-
PCW-G-002 1/4 P2-937-
TABLE 7 - MAIN PROPULSION DIESEL ENGINE NO. 1 (COMPARTMENT: 5-52-01-E)
SERIAL #
LENGTH
(IN.)
SIZE
(IN.)
PART
NUMBER NSN FITTING #1
FITTING
#2
DESIGN
PRESS
(PSI)
1MDE-A-001 45 1-1/2 AE371-24 SAE 37 DEG
FLARE
SWIVEL JIC
ELBOW 518
1MDE-A-002 25 3/8 AE372-6 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-A-003 18 3/8 150
19 (Rev-0)
SERIAL #
LENGTH
(IN.)
SIZE
(IN.)
PART
NUMBER NSN FITTING #1
FITTING
#2
DESIGN
PRESS
(PSI)
1MDE-A-004 18 3/8 150
1MDE-A-005 18 3/8 150
1MDE-A-006 18 3/8 150
1MDE-A-007 18 3/8 150
1MDE-A-008 18 3/8 150
1MDE-A-009 18 3/8 150
1MDE-F/O-
21 1/2 AE372-08 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-F/O-
27 1-1/4 AE372-20 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-F/O-
21 1/2 AE372-08 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-F/O-
32 2 FC300-32 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-J/W-
3013-DSL-
762459
1 1/2"
COMM
1 1/2"
COMM
1MDE-J/W-
29 2 AE372-32 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-J/W-
23 1-1/2 AE372-24 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-J/W-
23 1-1/2 AE372-24 SAE 37 DEG
FLARE
SWIVEL JIC
SAE 37 DEG
FLARE
SWIVEL JIC
1MDE-J/W-
21 1/2 AE372-8 SAE 37 DEG