Attachment I IDIQ Pricing Sheet
| WORK ITEM PRICING (IAW SPECIFICATION USCGC POLAR STAR (WAGB-10) Dry Dock Repairs FY 2019) | |||||
| SCHEDULE OF SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |
| D-001 | Hull Plating (U/W Body), Inspect | 1 | JB | $ - 0 | $ - 0 |
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | 1 | JB | $ - 0 | $ - 0 |
| D-003 | Appendages (U/W), Leak Test | 1 | JB | $ - 0 | $ - 0 |
| D-004 | Tanks (Aviation Fuel Service), Clean and Inspect | 1 | JB | $ - 0 | $ - 0 |
| D-005 | Tanks (Mp Fuel Storage, Service And Overflow) Clean and Inspect | 1 | JB | $ - 0 | $ - 0 |
| D-006 | Propulsion Shafting - Strain Gage and Air Gap Readings (All) | 1 | JB | $ - 0 | $ - 0 |
| D-007 | Centerline Propulsion Hub Removal and Reinstallation | 1 | JB | $ - 0 | $ - 0 |
| D-008 | Port Propulsion Hub Removal and Reinstallation | 1 | JB | $ - 0 | $ - 0 |
| D-009 | Starboard Propulsion Hub Removal and Reinstallation | 1 | JB | $ - 0 | $ - 0 |
| D-010 | Centerline Propulsion Shafting Removal and Reinstallation | 1 | JB | $ - 0 | $ - 0 |
| D-011 | Port Propulsion Shafting Removal and Reinstallation | 1 | JB | $ - 0 | $ - 0 |
| D-012 | Starboard Propulsion Shafting Removal and Reinstallation | 1 | JB | $ - 0 | $ - 0 |
| D-013 | Propulsion Shaft Bearings (External), Check Clearances | 1 | JB | $ - 0 | $ - 0 |
| D-014 | Propulsion Shaft Seal Renewal and Sealing Surface Recondition | 1 | JB | $ - 0 | $ - 0 |
| D-015 | Fathometer Transducer, Renew | 1 | JB | $ - 0 | $ - 0 |
| D-016 | Shaft Handling Equipment, Maintenance | 1 | JB | $ - 0 | $ - 0 |
| D-017 | Sea Strainers (Hayward) Open, Clean, and Inspect | 1 | JB | $ - 0 | $ - 0 |
| D-018 | Sea Valves and Waster Pieces, Overhaul or Renew | 1 | JB | $ - 0 | $ - 0 |
| D-019 | Boiler, Biennial Maintenance, Perform & Water Jet Clean | 1 | JB | $ - 0 | $ - 0 |
| D-020 | Boiler, Tube Renewals | 1 | JB | $ - 0 | $ - 0 |
| D-021 | Damage Control and Firefighting Systems, Perform Maintenance | 1 | JB | $ - 0 | $ - 0 |
| D-022 | Rudder And Rudder Stock, Remove and Inspect | 1 | JB | $ - 0 | $ - 0 |
| D-023 | Cathodic Protection / Zinc Anodes, Renew | 1 | JB | $ - 0 | $ - 0 |
| D-024 | Temporary Fuel Oil Offload and Storage Drydock | 1 | JB | $ - 0 | $ - 0 |
| D-025 | Drydock | 1 | JB | $ - 0 | $ - 0 |
| D-026 | Temporary Services, Drydock Contractor Facility, Provide | 1 | JB | $ - 0 | $ - 0 |
| D-027 | Dock and Sea Trial Performance, Support, Provide | 1 | JB | $ - 0 | $ - 0 |
| D-028 | Miranda Davit, Biennial Inspection and Test | 1 | JB | $ - 0 | $ - 0 |
| D-029 | Allied K280-70 Crane, Starboard, Annual Inspect and Repair | 1 | JB | $ - 0 | $ - 0 |
| D-030 | Allied K280-70 Crane, Port, Annual Inspect and Repair | 1 | JB | $ - 0 | $ - 0 |
| D-031 | Allied T60-60 Crane, Annual Inspect and Repair | 1 | JB | $ - 0 | $ - 0 |
| D-032 | Deck (Polymeric) Replace | 1 | JB | $ - 0 | $ - 0 |
| D-033 | Plate Renewal | 1 | JB | $ - 0 | $ - 0 |
| D-034 | Flex Hose Assemblies, Renew | 1 | JB | $ - 0 | $ - 0 |
| D-035 | Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | 1 | JB | $ - 0 | $ - 0 |
| D-036 | Lube Oil Purifier (LOP) Overhaul, 4000 hour | 1 | JB | $ - 0 | $ - 0 |
| D-037 | Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | 1 | JB | $ - 0 | $ - 0 |
| D-038 | Fuel Oil Purifier Feed Pump, Overhaul | 1 | JB | $ - 0 | $ - 0 |
| D-039 | Ventilation Systems, Commercial Clean | 1 | JB | $ - 0 | $ - 0 |
| D-040 | Fan Room 1-155-4-L, Recondition | 1 | JB | $ - 0 | $ - 0 |
| D-041 | Vaneaxial Fan Overhaul | 1 | JB | $ - 0 | $ - 0 |
| D-042 | Centrifugal Fan Overhaul | 1 | JB | $ - 0 | $ - 0 |
| D-043 | Vent Ducting Renewal, Diesel 2 | 1 | JB | $ - 0 | $ - 0 |
| SCHEDULE OF SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |
| D-044 | Vent Ducting Renewal, Motor Room | 1 | JB | $ - 0 | $ - 0 |
| D-045 | Chilled Water System Insulation Renewal | 1 | JB | $ - 0 | $ - 0 |
| D-046 | CPO Shower, Repair | 1 | JB | $ - 0 | $ - 0 |
| D-047 | Main Motor Temperature Regulators, Overhaul and Reposition | 1 | JB | $ - 0 | $ - 0 |
| D-048 | EDG Vent Louver, Free Up | 1 | JB | $ - 0 | $ - 0 |
| D-049 | Anchor Chain Pipe, Insulate | 1 | JB | $ - 0 | $ - 0 |
| D-050 | Mooring Bitt Renewal | 1 | JB | $ - 0 | $ - 0 |
| O-051 | U/W Body, Preserve, Partial | 1 | JB | $ - 0 | $ - 0 |
| TOTAL DEFINITE WORK ITEM PRICING | $ - 0 | ||||
| TASK ORDER GROWTH, NEW TASK ORDERS, NEW TASK ORDER CLIN PRICING. |
Quantities below are estimated for evaluation purposes only. Order quantities may not exceed the number of units specified or may in fact exceed these quantities. The unit price will be the maximum rate used in any task order changes or new task orders during execution of this contract.
| SCHEDULE OF SUPPLIES/SERVICES | EST QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| Composite Labor Rate: In accordance with "Composite Labor Rate" in FAR 52.212-4, amended, Terms and Conditions 17. | 20000 | HR | $ - 0 | $ - 0 |
| Loading Rate: All inclusive loading rate to be added to materials and subcontracts (Unit Price should be 1.X) | 750000 | % | $ - 0 | $ - 0 |
| WI-25 Dry Dock Extension/ Lay Days in accordance with HSAR 3052.217-94 | 45 | DA | $ - 0 | $ - 0 |
| WI-26 Temporary Services Provide Extension. The price for day consists of a daily rate for all services in the "Temporary Services" Task Order Work Item except Heavy Lift and Hazardous Waste | 45 | DA | $ - 0 | $ - 0 |
| Crane Hour: Price for crane service per hour including operator and riggers | 200 | HR | $ - 0 | $ - 0 |
| Forklift Hour: Forklift service per hour including operator and riggers | 200 | HR | $ - 0 | $ - 0 |
| Oily Rag Disposal (barrel) | 200 | LB | $ - 0 | $ - 0 |
| Filter Disposal (75) | 75 | EA | $ - 0 | $ - 0 |
| Bilge Water Oily Waste Disposal (15000) | 15000 | GA | $ - 0 | $ - 0 |
| Jacket Water Disposal (Gal) | 1000 | GA | $ - 0 | $ - 0 |
| Lead Testing (EA) | 100 | EA | $ - 0 | $ - 0 |
| Asbestos Testing (EA) | 100 | EA | $ - 0 | $ - 0 |
| Hydraulic Fluid Disposal (gal) | 2500 | GA | $ - 0 | $ - 0 |
| Marine Chemist Certification | 30 | EA | $ - 0 | $ - 0 |
| Manlift Rental 135' including fuel | 4 | WK | $ - 0 | $ - 0 |
| Manlift Rental 60' including fuel | 4 | WK | $ - 0 | $ - 0 |
&"Times New Roman,Regular"IDIQ Contract 70Z08519CP45&KFF000001000&K01+000 Attachment I IDIQ Pricing Sheet
&"Times New Roman,Regular"5
Sheet2
File details come from the government source that posted it.