Price Schedule
| ATTACHMENT 1: Price Schedule | ||||||
| USCGC POLAR STAR DRY DOCK FY19 | ||||||
| 70Z08519RP4505100 | ||||||
| Contract Line Item (CLIN) | Funding Code | Oct | Unit Price | Unit | Quantity | Extended Price |
| D-001 | 45 | Hull Plating (U/W Body), Inspect | $ - 0 | Job | 1 | $0.00 |
| D-002 | 45 | Hull Plating (U/W Body), Ultrasonic Testing | $ - 0 | Job | 1 | $0.00 |
| D-003 | 45 | Appendages (U/W), Leak Test | $ - 0 | Job | 1 | $0.00 |
| D-004 | 30 | Tanks (Aviation Fuel Service), Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-005 | 45 | Tanks (Mp Fuel Storage, Service And Overflow) Clean and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-006 | 45 | Propulsion Shafting - Strain Gage and Air Gap Readings (All) | $ - 0 | Job | 1 | $0.00 |
| D-007 | 45 | Centerline Propulsion Hub Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| D-008 | 45 | Port Propulsion Hub Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| D-009 | 45 | Starboard Propulsion Hub Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| D-010 | 45 | Centerline Propulsion Shafting Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| D-011 | 45 | Port Propulsion Shafting Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| D-012 | 45 | Starboard Propulsion Shafting Removal and Reinstallation | $ - 0 | Job | 1 | $0.00 |
| D-013 | 45 | Propulsion Shaft Bearings (External), Check Clearances | $ - 0 | Job | 1 | $0.00 |
| D-014 | 45 | Propulsion Shaft Seal Renewal and Sealing Surface Recondition | $ - 0 | Job | 1 | $0.00 |
| D-015 | 42 | Fathometer Transducer, Renew | $ - 0 | Job | 1 | $0.00 |
| D-016 | 45 | Shaft Handling Equipment, Maintenance | $ - 0 | Job | 1 | $0.00 |
| D-017 | 45 | Sea Strainers (Hayward) Open, Clean, and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-018 | 45 | Sea Valves and Waster Pieces, Overhaul or Renew | $ - 0 | Job | 1 | $0.00 |
| D-019 | 30 | Boiler, Biennial Maintenance, Perform & Water Jet Clean | $ - 0 | Job | 1 | $0.00 |
| D-020 | 45 | Boiler, Tube Renewals | $ - 0 | Job | 1 | $0.00 |
| D-021 | 30 | Damage Control and Firefighting Systems, Perform Maintenance | $ - 0 | Job | 1 | $0.00 |
| D-022 | 45 | Rudder And Rudder Stock, Remove and Inspect | $ - 0 | Job | 1 | $0.00 |
| D-023 | 45 | Cathodic Protection / Zinc Anodes, Renew | $ - 0 | Job | 1 | $0.00 |
| D-024 | 45 | Temporary Fuel Oil Offload and Storage Drydock | $ - 0 | Job | 1 | $0.00 |
| D-025 | 45 | Drydock | $ - 0 | Job | 1 | $0.00 |
| D-026 | 45 | Temporary Services, Drydock Contractor Facility, Provide | $ - 0 | Job | 1 | $0.00 |
| D-027 | 45 | Sea Trial Performance, Support, Provide | $ - 0 | Job | 1 | $0.00 |
| D-028 | 30 | Miranda Davit, Biennial Inspection and Test | $ - 0 | Job | 1 | $0.00 |
| D-029 | 30 | Allied K280-70 Crane, Starboard, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| D-030 | 30 | Allied K280-70 Crane, Port, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| D-031 | 30 | Allied T60-60 Crane, Annual Inspect and Repair | $ - 0 | Job | 1 | $0.00 |
| D-032 | 30 | Deck (Polymeric) Replace | $ - 0 | Job | 1 | $0.00 |
| D-033 | 45 | Plate Renewal | $ - 0 | Job | 1 | $0.00 |
| D-034 | 30 | Flex Hose Assemblies, Renew | $ - 0 | Job | 1 | $0.00 |
| D-035 | 45 | Fuel Oil Purifier (FOP) Overhaul, 4000 Hour | $ - 0 | Job | 1 | $0.00 |
| D-036 | 45 | Lube Oil Purifier (LOP) Overhaul, 4000 hour | $ - 0 | Job | 1 | $0.00 |
| D-037 | 45 | Hydraulic Oil Purifier (HOP) Overhaul, 4000 Hour | $ - 0 | Job | 1 | $0.00 |
| D-038 | 45 | Fuel Oil Purifier Feed Pump, Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-039 | 45 | Ventilation Systems, Commercial Clean | $ - 0 | Job | 1 | $0.00 |
| D-040 | 45 | Fan Room 1-155-4-L, Recondition | $ - 0 | Job | 1 | $0.00 |
| D-041 | 45 | Vaneaxial Fan Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-042 | 45 | Centrifugal Fan Overhaul | $ - 0 | Job | 1 | $0.00 |
| D-043 | 45 | Vent Ducting Renewal, Diesel 2 | $ - 0 | Job | 1 | $0.00 |
| D-044 | 45 | Vent Ducting Renewal, Motor Room | $ - 0 | Day | 4 | $0.00 |
| D-045 | 45 | Chilled Water System Insulation Renewal | $ - 0 | Job | 1 | $0.00 |
| D-046 | 45 | CPO Shower, Repair | $ - 0 | Job | 1 | $0.00 |
| D-047 | 45 | Main Motor Temperature Regulators, Overhaul and Reposition | $ - 0 | Job | 1 | $0.00 |
| D-048 | 45 | EDG Vent Louver, Free Up | $ - 0 | Job | 1 | $0.00 |
| D-049 | 45 | Anchor Chain Pipe, Insulate | $ - 0 | Job | 1 | $0.00 |
| D-050 | 45 | Mooring Bitt Renewal | $ - 0 | Job | 1 | $0.00 |
| Total price of Definite items | $0.00 | |||||
| O-051 | 45 | U/W Body, Preserve, Partial | $ - 0 | Job | 1 | $0.00 |
| GROWTH CLIN PRICING |
Quantities below are estimated for evaluation purposes only. Order quantities may not exceed the number of units specified or may in fact exceed these quantities. The unit price will be the maximum rate used during execution of this contract.
| O-00A3 | 45/30/424 | Composite Labor Rate - Provide the all inclusive mark-up/loading rate for materials and subcontractors: _____%. This rate will be incorporated into the contract and used on change request (CR). Work is ordered against this CLIN on authorized CRs by the Contracting Officer. | $ - 0 | Hour | 20000 | $ - 0 |
| O-00B | 45/30/42 | Materials and Subs Growth including loading | $ - 0 | 120% | $ - 0 | |
| O-00B5 | 45 | Lay Days | $ - 0 | Day | 45 | $ - 0 |
| O-00B5 | 45 | Temp Services during Lay Days (45 days) | $ - 0 | Day | 45 | $ - 0 |
| O-00B5 | 45 | Crane Hours including rigging (200) | $ - 0 | Hour | 200 | $ - 0 |
| O-00B5 | 45 | Forklift Hours including rigging (200) | $ - 0 | Hour | 200 | $ - 0 |
| O-00B5 | 45 | Oily Rag Disposal (barrel) | $ - 0 | Each | 200 | $ - 0 |
| O-00B5 | 45 | Filter Disposal (75) | $ - 0 | Each | 75 | $ - 0 |
| O-00B5 | 45 | Bilge Water Oily Waste Disposal (15000) | $ - 0 | Gallon | 15000 | $ - 0 |
| O-00B5 | 45 | Jacket Water Disposal (Gal) | $ - 0 | Gallon | 1000 | $ - 0 |
| O-00B5 | 45 | Lead Testing (EA) | $ - 0 | Each | 100 | $ - 0 |
| O-00B5 | 45 | Asbestos Testing (EA) | $ - 0 | Each | 100 | $ - 0 |
| O-00B5 | 45 | Hydraulic Fluid Disposal (gal) | $ - 0 | Gallon | 2500 | $ - 0 |
| O-00B5 | 45 | Marine Chemist Certification | $ - 0 | Each | 30 | $ - 0 |
| O-00B5 | 45 | Manlift Rental 135' (week) | $ - 0 | Week | 4 | $ - 0 |
| O-00B5 | 45 | Manlift Rental 60' (week) | $ - 0 | Week | 4 | $ - 0 |
| Total Growth | $ - 0 |
TOTAL PRICE $0.00
| Note: |
| 1 Weekday is Monday, Tuesday, Wednesday, Thursday and Friday. |
| 2 Weekend day is Saturday and Sunday |
| 3 Estimated Quantity. The quantity shown is an estimate only and may be exceeded at the unit prices offered. |
| 4 Funding code correlates to original CLIN work is to be performed under. |
| 5 Estimated Quantity. Period of Performance is after dry dock work completion. The quantity shown is an estimate only and may be exceeded at the unit prices offered. |