A002.pdf

PDF 378 KB Posted

Attached to
Waterfront Repairs at USCG Sector Key West, Florida
Solicitation number
70Z08219BPACP0400
Issued by

About this file

AMENDMENT 0002 WITH ATTACHED SECTION B

View the file

Other files

File Type Posted
ABSTRACT.pdf PDF
Revised_APPENDIX_B.pdf PDF
A005.pdf PDF
A004.pdf PDF
J&A_Sole_Source_Brand_Name.pdf PDF
M2254-E03_SHEET_9.pdf PDF
A003.pdf PDF
A001.pdf PDF
IFB_Construction.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO.

04/26/2019 4. REQUISITION/PURCHASE REQ. NO.

21-19-829PACP0400

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

PROSPECTIVE CONTRACTORS

9A. AMENDMENT OF SOLICITATION NO.

70Z08219BPACP0400

9B. DATED (SEE ITEM 11)

04/05/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

SOLICITATION NUMBER: 70Z08219BPACP0400 – WATERFRONT REPAIRS AT U.S. COAST GUARD SECTOR KEY WEST, FL

IS AMENDED AS FOLLOWS:

A. AMENDMENT ISSUED TO CORRECT ESTIMATED QUANTITY OF 5 CY (CUBIC YARD) TO READ 5 CF (CUBIC FEET) FOR ITEM 1B, 1C AND 1D. CONTRACTORS SHALL REPLACE SECTION B – SUPPLIES OR SERVICES AND PRICES IN ITS ENTIRETY WITH THE

ATTACHED SECTION B.

B. DELETE DRAWING (S0-5), SHEET 6 IN ITS ENTIRETY FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION

PERMITS.

C. BID OPENING DATE OF MAY 7, 2019 AT 2:00 P.M. LOCAL TIME MIAMI, FL REMAINS UNCHANGED.

D. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID.

15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ADA HOGGARD, CONTRACT SPECIALIST, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

70Z08219BPACP0400

CEU MIAMI – IFB_Construction 3 (Rev 1/22/2019 FAC 2019-01)

SECTION B - SUPPLIES OR SERVICES AND PRICES

**ALL ITEMS ARE TO BE PRICED SEPARATELY**

GENERAL SCOPE OF WORK

Contractor shall provide all labor, equipment, tools, and materials and supervision necessary for Waterfront Repairs at the U.S. Coast Guard Sector Key West, FL. All work shall be performed in strict accordance with the specifications (10247347), Drawings (M2254-D) and the contract.

ITEM 1A:

1. Perform all superstructure repairs to the small boat timber piers 1, 2 & 3 and fueling pier as indicated on drawings.

2. Perform all electrical repairs to small boat timber piers 1, 2 & 3 and fueling pier as indicated in electrical drawings and as per the requirements of “Appendix A” of these specifications.

3. Repair bulkhead concrete cap on south side of Pier D2 BY performing 50 LF of type CR1 and 50 LF of type CR2 crack repairs and 10 CF of type SP1, 10 CF of type SP2 and 180 CF of type SP3 concrete repairs along upper side of concrete seawall and cap. All work to be above mean high water level.

4. Perform an asbestos and lead base paint survey at the areas indicated as per the requirements contained in Appendix B, “Scope of Services for Limited Asbestos & Lead-Based Paint Survey Hurricane Irma Repair Waterfront, CG Sector Key West”.

ONE LUMP SUM $_______________________

ITEM 1B: Provide a unit price per cubic feet for an estimated quantity of 5 cubic feet to perform concrete spall repairs type SP1.

EST. QUANTITY: 5 CF x UNIT PRICE: $______________________ = TOTAL: $___________________________

ITEM 1C: Provide a unit price per cubic feet for an estimated quantity of 5 cubic feet to perform concrete spall repairs type SP2.

ITEM 1D: Provide a unit price per cubic feet for an estimated quantity of 5 cubic feet to perform concrete spall repairs type SP3.

CEU MIAMI – IFB_Construction 4 (Rev 1/22/2019 FAC 2019-01)

SECTION B - SUPPLIES OR SERVICES AND PRICES

CONTINUED

ITEM 1E: Provide a unit price per linear feet for an estimated quantity of 5 linear feet to perform concrete crack repairs type CR1.

EST. QUANTITY: 5 LF x UNIT PRICE: $______________________ = TOTAL: $___________________________

ITEM 1F: Provide a unit price per linear feet for an estimated quantity of 5 linear feet to perform concrete crack repairs type CR2.

EST. QUANTITY: 5 LF x UNIT PRICE: $______________________ = TOTAL: $___________________________

ITEM 1G: Provide a unit price item per cubic feet to abate asbestos containing materials.

EST. QUANTITY: 1 CF x UNIT PRICE: $______________________ = TOTAL: $___________________________

ITEM 1H: Provide a unit price item per 5 square feet to abate lead-based paint.

EST. QUANTITY: 5 SF x UNIT PRICE: $______________________ = TOTAL: $___________________________

TOTAL BID PRICE: $ ________________________________

(SUM OF ITEMS 1A, 1B, 1C, 1D, 1E, 1F, 1G, 1H)

Section B Pricing.pdf
SECTION B - SUPPLIES OR SERVICES AND PRICES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CONTINUED

File details come from the government source that posted it.