This document contains a spreadsheet with work items and questions and answers related to the solicitation for the USCGC KIMBALL drydocking in fiscal year 2023. The spreadsheet lists 49 work items requiring services such as hull inspection and preservation, machinery maintenance and overhaul, electrical work, and drydocking services. The questions and answers seek clarification on issues such as surface preparation methods, structure dimensions, and technical representative requirements. The related solicitation is for the drydocking and maintenance of the USCGC KIMBALL to be conducted by the Department of Homeland Security United States Coast Guard.

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Items

CountWIWORK ITEM DESCRIPTIONESTSUB NOTESACTION ITEMSISSUESSCHEDULE NOTESGOV'T QUESTIONSGOV'T ANSWERS
11Hull 3D, Laser ScanGJSea Engineering

Kilohana Construction

See Tech Rep ListKC - Derek - General overviewPlease provide a copy of the 3D model referenced in paragraph 3.2.1: …"Non-Uniform Rational Basis Spline (NURBS) surface developed and provided by U.S. Coast Guard SFLC…"
22Hull Plates (Freeboard), InspectGJNDTKC - Derek - General overview
33Hull Plates (U/W Body), InspectGJNACE III

NDT

44Freeboard, Preserve (Full)GJNACE III
PRESSurface prep: SP-10/Abrasive water blasting1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value.

2. For estimating purposes, please provide surface areas for the regions shown in Table 1 as well as the "adjacent structural members" referenced in paragraph 3.4 & 4.1.

55Superstructure, Preserve (Partial)GJNACE III
PRESSurface prep: SP-10/Abrasive water blasting1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value.

2. For estimating purposes, please provide surface areas for each location listed in Table 1, Table 2, and Table 3 as well as all the structures noted in paragraph 4.1 and 4.2.

66U/W Body Hull, Preserve (Full)GJNACE III
PRESSurface prep: SP-10/Abrasive water blasting1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value.

2. For estimating purposes, please provide surface areas for each location listed in Table 1 and paragraph 4.1.1.

77Tenting, ProvideGJSCAFPotential question about where to include the cost of tenting all work items
1010Tenting (Mast), Provide (Option)GJSCAF
1111Propulsion Shaft Fairwaters And Rope Guards, InspectTASCAFSurface prep: SP-10/Abrasive water blastingQuestion: Surface Prep

12 12 Chain Lockers and Sump, Preserve GJ NACE III

PRES

13 13 Chain Lockers and Sump, Clean and Inspect GJ NACE III

NDT

D&D

1414Voids (Non-Accessible), PreserveGJD&D
1515Voids (Non-Accessible), Leak TestGJD&D
1616Sideport Shell Door, Level 2, InspectKCTK

ELEC

BERNELL

1717Mast, PreserveGJNACE III
NDTKC - Bob - General overview recommend sub support
1818Propulsion Shaft Alignment & Bearings (External) Clearances, CheckTADIEHL
SPSIs it the requirement of the contractor or the Coast Guard to …. Liquid loading… align. Note on PG 163
1919Propulsion Shaft Coverings (MIL-STD-2199B), Inspect and RepairTANDT
SPSKC - Derek - General overviewPara 3.1.6 references a work item to remove shafts "Propulsion Shafts, Remove, Inspect, and Install." Does the Coast Guard intend to invoke a work spec that will require the shafts to be removed
2020Propulsion Shaft Seals (Mechanical), OverhaulTASHAFT
2121Controllable Pitch Propeller Hub Assembly, General MaintenanceTACPP

D&D 22 22 Controllable Pitch Propeller System, Perform General Maintenance TA CPP D&D

2323Doppler Speed Log Valve, OverhaulKCSPERRYKC - Ask Noe about sub sperry options
2424Doppler Speed Log, General MaintenanceKCSPERRY
2525Fathometer Transducer (Deep Water), General MaintenanceTASHAFT
2626Shallow Water Transducer, RenewTASHAFT
2727Sea Valves and Waster Pieces, Overhaul Or RenewKCTK
2828Seawater Strainers (All Sizes), Overhaul and InspectKCTK
2929Rudder Stock Bearings, Check ClearancesTASHAFT
3030Rudder Stock Seals, OverhaulTASHAFT
3131Bow Thruster Unit (General), OverhaulTACPP

D&D

LUBE OIL SAMPLE

BLADE POLISHING

NDT

32 32 Anchors Chains and Ground Tackles, Inspect and Preserve GJ PRES

NDT

33 33 Stern Ramp, Preserve 100% KC NACE III

NDT

34 34 Transom Doors, Inspect And Repair KC TRANSOM DOOR

HPU

SCAF

PRES

MACHINE SHOP

D&D

3535Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), RenewTAICCP
3636Impressed Current Cathodic Protection System, Inspect and MaintainTAICCP
3737Cathodic Protection (Zincs), RenewTATK
3838Impressed Current Cathodic Protection System Anodes, RenewTATK

ICCP

39 39 Impressed Current Cathodic Protection System Reference Cells, Renew TA TK

ICCP

4040Ship Service Diesel Generator (No. 3) Exhaust Piping, ModifyKCTK
4141Transom Double Doors and Tow Outfits, ModifyKCTK

TRANSOM DOOR

HPU

NACE III

NDT

D&D 42 42 Stern Door Hydraulic and Control System, Modify KC TRANSOM DOOR

SPECIALTY FLUSH

SCAF

D&D

LAG

43 43 Stern Ramp Rails, Modify KC TK

NACE III

NDT

D&D

LAG

PRES

44 44 Cascade Orificial Resistive Device, Clean And Inspect KC TK D&D 45 45 Deck Covering (Slip-Resistant) Mast, Preserve GJ DECK

PRES

SCAF

NDT

ELEC

4646Drydocking, AccomplishMYDIVEENG - Prep drydocking calculations
4747Vessel in Drydock Temporary Services, ProvideGJD&D

WASA

48 48 Sea Trial Performance, Support, Provide KC

Questions

WIWORK ITEM DESCRIPTIONQUESTIONSANSWERS
4, 5, 6, 10, 14, 15, 38, 39, 40, 42VariousPlease confirm that the Coating Tech Rep requirements are in accordance with SFLC STANDARD SPECIFICATION 0000 paragraph 3.2.4.2.STD Spec 0000 states tech rep shall be QP1 or CIP Level 3. The specification intentionally further narrows that down to CIP Level 3. For all of the work items listed below, the preservation Tech Rep is:

Tech Rep. The Contractor must provide the services of a Certified Coating Inspector having successfully completed the NACE International Coatings Inspector Program (CIP), Level 3 – Peer Review with Marine Specialty to:

• Serve as an Independent Coating Tech Rep.

• Accomplish applicable requirements in SFLC Std Spec 0000, Paragraph 3.2.4.2.2 (Coating Tech Rep).

• Oversee the Preservation Plan requirements in SFLC Std Spec 6310, Paragraph 3.2 (Preservation Plan).

• Review and sign daily reports summarizing work. See forms QA-1 thru QA-5 provided in the General Requirements.

Qualifications/certifications. Submit the Coating Tech Rep’s qualifications/certifications in accordance with SFLC Std Spec 0000, 3.2.4.2.2.3 and 3.2.4.2.4, include name, certificate number and documented completion of NACE Marine Coating Technology Course and Exam.

Submit the name and the certification of the Tech Rep to the COR at the Arrival Conference. Include the dates of services the Qualified Tech Reps will be on site as per their subcontract documentation and identified in the planning document.