A0003 Attachment 1 - Q and A Spreadsheet.xlsx
XLSX spreadsheet 304 KB Posted
- Attached to
- USCGC KIMBALL DRYDOCK FY23 Federal contract opportunity
- Solicitation number
- 70Z08023QLREKIMB
About this file
This document contains a quality assurance and questions spreadsheet for the USCGC KIMBALL drydocking federal contract opportunity. The spreadsheet lists 47 work items required for drydocking and maintenance of the cutter, including 3D laser scanning of the hull, inspection and preservation of various areas, overhaul of mechanical components, and drydocking services. Surface areas and additional details are provided for several work items to facilitate contractor estimating. The related federal contract opportunity is for the USCGC KIMBALL drydocking scheduled for FY23 through the Department of Homeland Security Coast Guard. The solicitation number and additional identifying details are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0008 Attachment 1 - Q and A Spreadsheet.xlsx | XLSX spreadsheet | |
| AMENDMENT 0008 - KIMBALL DD_SIGNED.pdf | ||
| Specification REV-1 - 04 November 2022.pdf | ||
| AMENDMENT0007 page 1 KIMBALL FY23.pdf | ||
| A0006 Attachment 1 - Q and A Spreadsheet.xlsx | XLSX spreadsheet | |
| AMENDMENT 0006 - KIMBALL DD_SIGNED.pdf | ||
| A0005 Attachment 1 - Q and A Spreadsheet.xlsx | XLSX spreadsheet | |
| AMENDMENT 0005 - KIMBALL DD_SIGNED.pdf | ||
| A0004 Attachment 1 - Q and A Spreadsheet.xlsx | XLSX spreadsheet | |
| AMENDENT 0004 - KIMBALL DD_SIGNED.pdf | ||
| AMENDENT 0003 - KIMBALL DD_SIGNED.pdf | ||
| SF30 KIMBALL A00002 KO_Signed.pdf | ||
| SF30 KIMBALL A00001 KO_Signed.pdf | ||
| CGC KIMBALL DD Solicitation 70Z08023QLREKIMB.pdf | ||
| Attachment 2 - Statement of Work- Specification Rev 0 10MAR22.pdf | ||
| Attachment 3 -JOTFOC_Redacted.pdf | ||
| Attachment 1 - Schedule of Services.xls | XLS spreadsheet |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Work Items
| Count | WI | WORK ITEM DESCRIPTION | EST | SUB NOTES | ACTION ITEMS | ISSUES | SCHEDULE NOTES | GOV'T QUESTIONS | GOV'T ANSWERS |
| 1 | 1 | Hull 3D, Laser Scan | GJ | Sea Engineering |
Kilohana Construction
| See Tech Rep List | KC - Derek - General overview | Please provide a copy of the 3D model referenced in paragraph 3.2.1: …"Non-Uniform Rational Basis Spline (NURBS) surface developed and provided by U.S. Coast Guard SFLC…" | ||||
| 2 | 2 | Hull Plates (Freeboard), Inspect | GJ | NDT | KC - Derek - General overview | |
| 3 | 3 | Hull Plates (U/W Body), Inspect | GJ | NACE III |
NDT
| 4 | 4 | Freeboard, Preserve (Full) | GJ | NACE III | |
| PRES | Surface prep: SP-10/Abrasive water blasting | 1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value. |
2. For estimating purposes, please provide surface areas for the regions shown in Table 1 as well as the "adjacent structural members" referenced in paragraph 3.4 & 4.1.
| 5 | 5 | Superstructure, Preserve (Partial) | GJ | NACE III | |
| PRES | Surface prep: SP-10/Abrasive water blasting | 1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value. |
2. For estimating purposes, please provide surface areas for each location listed in Table 1, Table 2, and Table 3 as well as all the structures noted in paragraph 4.1 and 4.2.
| 6 | 6 | U/W Body Hull, Preserve (Full) | GJ | NACE III | |
| PRES | Surface prep: SP-10/Abrasive water blasting | 1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value. |
2. For estimating purposes, please provide surface areas for each location listed in Table 1 and paragraph 4.1.1.
| 7 | 7 | Tenting, Provide | GJ | SCAF | Potential question about where to include the cost of tenting all work items | |
| 10 | 10 | Tenting (Mast), Provide (Option) | GJ | SCAF | ||
| 11 | 11 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | TA | SCAF | Surface prep: SP-10/Abrasive water blasting | Question: Surface Prep |
12 12 Chain Lockers and Sump, Preserve GJ NACE III
PRES
13 13 Chain Lockers and Sump, Clean and Inspect GJ NACE III
NDT
D&D
| 14 | 14 | Voids (Non-Accessible), Preserve | GJ | D&D |
| 15 | 15 | Voids (Non-Accessible), Leak Test | GJ | D&D |
| 16 | 16 | Sideport Shell Door, Level 2, Inspect | KC | TK |
ELEC
BERNELL
| 17 | 17 | Mast, Preserve | GJ | NACE III | |
| NDT | KC - Bob - General overview recommend sub support | ||||
| 18 | 18 | Propulsion Shaft Alignment & Bearings (External) Clearances, Check | TA | DIEHL | |
| SPS | Is it the requirement of the contractor or the Coast Guard to …. Liquid loading… align. Note on PG 163 | ||||
| 19 | 19 | Propulsion Shaft Coverings (MIL-STD-2199B), Inspect and Repair | TA | NDT | |
| SPS | KC - Derek - General overview | Para 3.1.6 references a work item to remove shafts "Propulsion Shafts, Remove, Inspect, and Install." Does the Coast Guard intend to invoke a work spec that will require the shafts to be removed | |||
| 20 | 20 | Propulsion Shaft Seals (Mechanical), Overhaul | TA | SHAFT | |
| 21 | 21 | Controllable Pitch Propeller Hub Assembly, General Maintenance | TA | CPP |
D&D 22 22 Controllable Pitch Propeller System, Perform General Maintenance TA CPP D&D
| 23 | 23 | Doppler Speed Log Valve, Overhaul | KC | SPERRY | KC - Ask Noe about sub sperry options |
| 24 | 24 | Doppler Speed Log, General Maintenance | KC | SPERRY | |
| 25 | 25 | Fathometer Transducer (Deep Water), General Maintenance | TA | SHAFT | |
| 26 | 26 | Shallow Water Transducer, Renew | TA | SHAFT | |
| 27 | 27 | Sea Valves and Waster Pieces, Overhaul Or Renew | KC | TK | |
| 28 | 28 | Seawater Strainers (All Sizes), Overhaul and Inspect | KC | TK | |
| 29 | 29 | Rudder Stock Bearings, Check Clearances | TA | SHAFT | |
| 30 | 30 | Rudder Stock Seals, Overhaul | TA | SHAFT | |
| 31 | 31 | Bow Thruster Unit (General), Overhaul | TA | CPP |
D&D
LUBE OIL SAMPLE
BLADE POLISHING
NDT
32 32 Anchors Chains and Ground Tackles, Inspect and Preserve GJ PRES
NDT
33 33 Stern Ramp, Preserve 100% KC NACE III
NDT
34 34 Transom Doors, Inspect And Repair KC TRANSOM DOOR
HPU
SCAF
PRES
MACHINE SHOP
D&D
| 35 | 35 | Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew | TA | ICCP |
| 36 | 36 | Impressed Current Cathodic Protection System, Inspect and Maintain | TA | ICCP |
| 37 | 37 | Cathodic Protection (Zincs), Renew | TA | TK |
| 38 | 38 | Impressed Current Cathodic Protection System Anodes, Renew | TA | TK |
ICCP
39 39 Impressed Current Cathodic Protection System Reference Cells, Renew TA TK
ICCP
| 40 | 40 | Ship Service Diesel Generator (No. 3) Exhaust Piping, Modify | KC | TK |
| 41 | 41 | Transom Double Doors and Tow Outfits, Modify | KC | TK |
TRANSOM DOOR
HPU
NACE III
NDT
D&D 42 42 Stern Door Hydraulic and Control System, Modify KC TRANSOM DOOR
SPECIALTY FLUSH
SCAF
D&D
LAG
43 43 Stern Ramp Rails, Modify KC TK
NACE III
NDT
D&D
LAG
PRES
44 44 Cascade Orificial Resistive Device, Clean And Inspect KC TK D&D 45 45 Deck Covering (Slip-Resistant) Mast, Preserve GJ DECK
PRES
SCAF
NDT
ELEC
| 46 | 46 | Drydocking, Accomplish | MY | DIVE | ENG - Prep drydocking calculations |
| 47 | 47 | Vessel in Drydock Temporary Services, Provide | GJ | D&D |
WASA
48 48 Sea Trial Performance, Support, Provide KC
Questions
| WI | WORK ITEM DESCRIPTION | QUESTIONS | SES |
| 1 | Hull 3D, Laser Scan | Please provide a copy of the 3D model referenced in paragraph 3.2.1: …"Non-Uniform Rational Basis Spline (NURBS) surface developed and provided by U.S. Coast Guard SFLC…" | SES is contacting and coordinating with ESD to provide Non-Uniform Rational Basis Spline (NURBS). |
| 4 | Freeboard, Preserve (Full) | 1. Paragragh 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair, the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptible surface prepartion method; the Navy and other government agencies allow for this surface prepartion method. Water jetting without abrasive addition will provide the government with a better value. | WABs and DABs are requested and preferred respectively. |
WJs are still listed and approved under SFLC Std Spec 6310.
WJs are acceptable only when remaining surface profiles still meet standards and requirements.
Otherwise, any surface prep areas failed to meet standards and requirements must be corrected/implemented by SP-10 or SP-10 (WAB) or equivalent.
2. For estimating purposes, please provide surface areas for the regions shown in Table 1 as well as the "adjacent structural members" referenced in paragraph 3.4 & 4.1. Total Overall Preservations ~ 25,500 sqft Freeboard ~ 18,000 sqft Transom ~1,800 sqft Other miscellaneous surfaces 1,800 sqft Visual safety and identification markings ~ 300 sqft Touch Up ~ 1,800 sqft Please see "Tap WI4 Freeboard" for Tables and Details
| 5 | Superstructure, Preserve (Partial) | 1. Paragraph 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptable surface preparation method; the Navy and other government agencies allow for this surface preparation method. Water jetting without abrasive addition will provide the government with a better value. |
| WABs and DABs are requested and preferred respectively. |
WJs are still listed and approved under SFLC Std Spec 6310.
WJs are acceptable only when remaining surface profiles still meet standards and requirements.
Otherwise, any surface prep areas failed to meet standards and requirements must be corrected/implemented by SP-10 or SP-10 (WAB) or equivalent.
2. For estimating purposes, please provide surface areas for each location listed in Table 1, Table 2, and Table 3 as well as all the structures noted in paragraph 4.1 and 4.2. Total Overall Preservations ~ 14,762 sqft Partial : All Top Coat Layer ~ 11,012+ sqft, and Primer & Mid-Coat ~ < 30% Other miscellaneous surfaces 1,500 sqft Visual safety and identification markings ~ 150 sqft Touch Up ~ 2,100 sqft Please see "Tap WI5 Superstructure" for Tables and Details 6 U/W Body Hull, Preserve (Full) 1. Paragraph 3.1.7 notes that "The Contractor may have the option of using either “Wet Abrasive Blasting” or “Dry Abrasive Blasting” to achieve the required surface preparation…" The note in this paragraph states that "Water jetting without abrasive addition does not provide any additional anchor profile to the surface, beyond what was present after the previous surface preparation.". Contractor requests that the USCG consider revising the work specification to allow for Water jetting without abrasive addition. With new construction, abrasive blast media is needed to achieve the required anchor profile, but with repair the anchor profile already exists, and Water jetting without abrasive addition is generally an acceptable surface preparation method; the Navy and other government agencies allow for this surface preparation method. Water jetting without abrasive addition will provide the government with a better value.
WABs and DABs are requested and preferred respectively.
WJs are still listed and approved under SFLC Std Spec 6310.
WJs are acceptable only when remaining surface profiles still meet standards and requirements.
Otherwise, any surface prep areas failed to meet standards and requirements must be corrected/implemented by SP-10 or SP-10 (WAB) or equivalent.
2. For estimating purposes, please provide surface areas for each location listed in Table 1 and paragraph 4.1.1. Total Overall Preservations ~ 27,781 sqft U/W Body Hull ~ 22,300 sqft Sea Chest, Strainer, Grid Cooler, and Hull Recesses ~ 400 sqft Appendages - Fins, Strut Arms, and Rudders ~ 1,086 sqft Appendages - Others ~ 3,835 sqft Draft mark painting ~ 150 sqft Please see "Tap WI6 UW Body" for Tables and Details 10 Chain Lockers and Sump, Preserve 1. For estimating purposes, please provide surface areas for each location listed in Table 1. Total Overall Preservations ~ 5,250 sqft Chain Locker, Stbd ~ 1,800 sqft Chain Locker, Port ~ 1,800 sqft Chain Locker Sump ~ 900 sqft Touch Up ~ 750 sqft Please see "Tap WI10 Chain Lockers and Sump" for Tables and Details
| 16 | Propulsion Shaft Alignment & Bearings (External) Clearances, Check | 1. Paragraph 3.2.1.4 notes that "The Contractor and the Coast Guard Inspector must ensure that the aft tanks are 80% full (or at other condition Cutter dictates)." For estimating purposes, should the Contractor assume any level of effort to achieve the requested condition, or can it be assumed that the Government will be responsible for shifting liquids to achieve the desired condition? | |
| 2. Paragraph 3.4.1 notes "During sea trials the Cutter will be run at various speeds and conditions. The Contractor must be responsible for correcting any vibration, noise or excessive temperatures that may arise as a consequence of his work covered by this Specification." Can this sea trial procedure, as noted in paragraphs 3.4.1 and 3.4.2, be replicated prior to the start of any work associated with the contract to ensure that both the Government and the Contractor understand the existing conditions relative to vibration, noise or excessive temperatures. | 1. Government will be responsible for shifting liquid loads |
2. Sea trials should be able to be accomplished during transit from cutters homepier to to DD facility. Once formal awards are made, and the gov. is provided with the production schedule and required pre-work inspections, planning and scheduling of trials can be discussed and formalized.
17 Propulsion Shaft Coverings (MIL-STD-2199B), Inspect and Repair 1. A level of effort cannot be determined based on the information provided for paragraph 3.31 & 3.32. Paragraph 3.4 is only required if repairs are required. Please confirm that paragraphs 3.3.1, 3.3.2, and 3.4 are all subject to and pending the contract modification noted in paragraph 3.3. 1. For bidding purposes the contractor must estimate up to 10 sq/ft of repairs per shaft.
18 Propulsion Shaft Seals (Mechanical), Overhaul 1. Please confirm that the operational tests noted in paragraph 3.6.2 & 3.6.3 will be replicated prior to the start of the work associated with this Contract. It is important that the Government and the Contractor have a deep understanding of the conditions found prior to executing the overhauls/repairs associated with this work item. 1. Sea trials should be able to be accomplished during transit from cutters homepier to to DD facility. Once formal awards are made, and the gov. is provided with the production schedule and required pre-work inspections, planning and scheduling of trials can be discussed and formalized.
19 Controllable Pitch Propeller Hub Assembly, General Maintenance 1. Please confirm that the operational tests noted in paragraph 3.12 will be replicated prior to the start of the work associated with this Contract. It is important that the Government and the Contractor have a deep understanding of the conditions found prior to executing the overhauls/repairs associated with this work item. 1. Sea trials should be able to be accomplished during transit from cutters homepier to to DD facility. Once formal awards are made, and the gov. is provided with the production schedule and required pre-work inspections, planning and scheduling of trials can be discussed and formalized.
20 Controllable Pitch Propeller System, Perform General Maintenance 1. No flushing procedure or detailed procedure for refilling the oil into the system are provided with this work item. Please confirm that the flush per the requirements of Work Item 19, paragraph 3.7, is all that is required relative to the CPP System. 1. Flush and fill outlinbed in WI 19 3.7 meets requirements for this WI. 3.7 Fill and flush the propeller hub. The Contractor must fill and flush the propeller hub in accordance with Section 7 (Maintenance Instructions), Paragraph 2.7.1 of CG TP 7153A.
3.7.1 Process any new oil added to the hub or hydraulic system through a non-bypass filter assembly prior to its introduction into the CPP hydraulic system. Filter assembly must utilize new clean disposable filter elements with a minimum Beta 10 = 75 ratio rating. Do not exceed filter assembly and/or element flow ratings or pressure ratings (both maximum collapse as well as delta across) during filling.
3.7.2 The Contractor must refill the CPP System using new Contractor supplied oil in accordance with Section 7 (Maintenance Instructions), Paragraph 5 of CG Tech Pub 7153A. Ensure that all air is vented from the system, and that the hub, shaft, hydraulic power unit and CPP gravity head tank are all filled to their proper levels. See Table 1 for approximate oil capacities. The minimum level of oil cleanliness must be 16/13 per ISO 4406. Submit a CFR documenting oil filling records.
| 43 | Drydocking, Accomplish | 1. For estimating purposes, please provide the Contractor with "Estimated Drafts/Loading Conditions". |
| Estimated Drafts/Loading Conditions are provided/guided in Note "Ideal Loading Conditions for Drydocking are with Liquid Loads at 50% though a range between 30 and 70% is acceptable." |
It is applied in Pre-award Drydocking Calculations to check and evaluate the Contractors' abilities.
2. Please confirm whether it is the Government's or Contractor's responsibility to adjust loading conditions, relative to the "Estimated Drafts/Loading Conditions" to provide an acceptable docking condition for the Contractor's Drydock. Cutters ( Government's) will only adjust required Liquid Loads/Loading Conditions/Arrival Drafts to meet Safe Conditions for Drydocking. (e.g ~ 0 List, Min Trim, Adequate Stabilities) In the other hands, the Contractors must also provide Docking Calculations at Arrival Drafts/Loading Conditions, and accomplish Safe Docking at Arrival Conditions accordingly.
WI4 Freeboard
| Total Overall Preservations | ~ 25,500 | sqft |
| Freeboard | ~ 18,000 | sqft |
| Transom | ~ 1,800 | sqft |
| Other miscellaneous surfaces | ~ 1,800 | sqft |
| Visual safety and identification markings | ~ 300 | sqft |
| Touch Up | ~ 1,800 | sqft |
WI5 Superstructure
| Super Structure Surface Areas | |||||||||
| Items | Top | Bottom | Front | Back | Stbd | Port | Outfits | Total |
SUPERSTRUCTURE
Superstructure general (inclusive but excluding stack)
| Pilot House | |
| - Pilot House | 428.40 |
| - Wings, Stbd and Port | 428.40 |
| Mast House | ||
| - Mast House BHD, Fwd | 186.48 | |
| - Mast House BHD, Aft | 186.48 |
| Deckhouse Forward Bulkhead, BHD 28 | |
| - Unit 4110 | 469.20 |
| - Unit 4120 | 428.40 |
| - Pilot House (Up to Windows) | 156.00 |
| - Pilot House Wings, Front (Up to Windows) | 84.00 |
| 1,137.60 |
| Deckhouse Afterward Bulkhead, BHD 44 | |
| - Unit 4210 | 224.40 |
| - Unit 4220 | 428.40 |
| - Unit 4230 (Mast House Aft BHD) | 186.48 |
| 839.28 |
Stack
| Tops of Main Stack and Fan Rooms, Stbd and Port | ||||||
| - Top of Stack | 489.39 | |||||
| - Side Bands | 168.30 | 168.30 | 510.21 | 510.21 | ||
| 1,846.41 |
| Stack Longitudinal Bulkhead Stbd, LBD L-6 Stbd | |
| - Unit 4310 | 343.61 |
| - Unit 4320 | 229.08 |
| - Unit 4430 (without Black Band) | 489.39 |
| 1,062.08 |
| Stack Forward Bulkhead, BHD 45 | |
| - Unit 4320 | 168.30 |
| - Unit 4430 (without Black Band) | 168.30 |
| 336.60 |
| Stack Afterward Bulkhead, BHD 58.5 | |
| - Unit 4430 | 168.30 |
| - Overhang (without Black Band) | 99.00 |
| 267.30 |
| Stack Longitudinal Bulkhead Port, LBD L-6 Port | |
| - Unit 4310 | 445.61 |
| - Unit 4320 | 229.08 |
| - Unit 4430 (without Black Band) | 489.39 |
| 1,164.08 |
| Hangar Forward Bulkhead Stbd and Port, BHD 52 Stbd & Port | |
| - Unit 4420, 01-02 Deck | 285.60 |
| - Unit 4420, 01-02 Deck | 260.10 |
| - Unit 4420, Fan Castles | 128.52 |
| - Unit 4420, Supports | 288.00 |
| 962.22 |
| Hangar Afterward Bulkhead, BHD 67 | |
| - Unit 4420, BHD 67 | 830.28 |
| - Hangar Doors | -428.91 |
| 401.37 |
Machinery, Deck (Side Boat Supports, and FAS System)
| Boat Launch Support (NSC1&2) | |
| - Plates | 12.00 |
| - Beam W10 x 60 | 144.00 |
| - Beam W8 x 67 | 120.00 |
| - Pipe Dia 4", Sch 80 | 163.28 |
| - Profiles | 25.00 |
| 464.28 |
| FAS System | from List of Structural Elements | |
| - Plates 1" | 8.00 | |
| - Plates 3/4" | 2.00 | |
| - Plates 1/2" | 34.00 | |
| - Plates 1/4" | 14.00 | |
| - Round Bar 3/4" | 1.18 | |
| - W12 x 4 x 22# | 37.33 | |
| - T 4" x 4" x 5.0# | 10.67 | |
| - FB 4"x 3/8" | 16.88 | |
| 124.05 |
WI6 UW Body
| Total Overall Preservations | ~ 27,781 | sqft |
| U/W Body Hull | ~ 22,300 | sqft |
| Sea Chest, Strainer, Grid Cooler, and Hull Recesses | ~ 400 | sqft |
| Appendages - |
Fins, Strut Arms, and Rudders
| ~ 1,086 | sqft | |
| Appendages - |
Others
| ~ 3,835 | sqft | |||
| Draft mark painting | ~ 150 | sqft |
Please see "Tap WI4 Freboard" for Tables and Details
WI10 Chain Lockers and Sump
| Total Overall Preservations | ~ 5,250 | sqft |
| Chain Locker, Stbd | ~ 1,800 | sqft |
| Chain Locker, Port | ~ 1,800 | sqft |
| Chain Locker Sump | ~ 900 | sqft |
| Touch Up | ~ 750 | sqft |