Specification_REV1.pdf

PDF 2 MB Posted

Attached to
DOCKSIDE (DS): USCGC ALERT DS Federal contract opportunity
Solicitation number
70Z080-22-Q-MEC-ALERTDS
Issued by
Department of Homeland Security US Coast Guard

About this file

This is a solicitation for a dockside availability period for the USCGC ALERT from February 4th to March 31st, 2023. The solicitation is seeking contractors to perform maintenance, repairs, and inspections for the cutter at a Coast Guard facility. Services required include cleaning heat exchangers, exhaust piping, and other machinery. Load testing is also specified for electrical systems including 28V DC and 400Hz power supplies. The document provides detailed requirements, references, government property to be furnished, and notes. Contractors must meet preservation, safety, and environmental standards and obtain approvals for work plans, procedures, and repairs.

View the file

Other files for this federal contract opportunity

Other files attached to DOCKSIDE (DS): USCGC ALERT DS, newest first.
File Type Posted
A0005 Page 1.pdf PDF
A0005 Page 2.pdf PDF
Amendment 0004 Page 1.pdf PDF
A0004 Page 2.pdf PDF
A0003.pdf PDF
UPDATED Schedule of Services.xls XLS spreadsheet
Amendment 002_CGC ALERT_.pdf PDF
QUESTIONS_RESPONSES_2.pdf PDF
A0001 Questions_Answers.pdf PDF
Amendment 0001_CGC ALERT_.pdf PDF
Solicitation USCGC_ALERT_ 9.29.pdf PDF
ALERT_Schedule_of_Services.xls XLS spreadsheet
ALERT_Statement_of_work.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC ALERT (WMEC 630)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2023

Developed By: Colin D Gregory

(Rev-1, 20 October 2022)

USCGC ALERT (WMEC-210B) DOCKSIDE AVAILABILITY FY2023

ii (Rev-1)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: Seawater Heat Exchangers, Clean, Inspect And Hydro WORK ITEM 2: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean WORK ITEM 3: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean WORK ITEM 4: Boiler Exhaust Stack Uptakes, Commercial Clean WORK ITEM 5: Lube Oil Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 6: 28 Volt DC Helo Power Supply, Load Test WORK ITEM 7: 400 Hz Power Supply (FCX Systems Inc), Load Test WORK ITEM 8: Windspeed Transmitter, Anemometer, Renew WORK ITEM 9: Flow Meter (Aviation Fuel), Calibrate WORK ITEM 10: Chill Water System, Clean and Flush WORK ITEM 11: Potable Water Pneumatic Tanks, Clean and Inspect WORK ITEM 12: Hot Water Accumulator Tanks, Clean and Inspect WORK ITEM 13: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift ... 57 WORK ITEM 14: Steering Gear, General, Overhaul WORK ITEM 15: Steering System Relief Valve(s), Overhaul or Renew WORK ITEM 16: Single Point Davit, Renew WORK ITEM 17: Helo Talon Grids, Inspect and Test WORK ITEM 18: Sewage Discharge and Vacuum Pumps, Renew WORK ITEM 19: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 20: Sewage Holding Tanks, Clean and Inspect WORK ITEM 21: Sewage Piping, Clean and Flush WORK ITEM 22: Tanks, Grey Water Holding, Preserve, Partial WORK ITEM 23: Tanks (Sewage Holding), Preserve, Partial WORK ITEM 24: Decks, Helicopter Operating Areas, Preserve WORK ITEM 25: Piping Insulation, Renew WORK ITEM 26: Deck Drain Piping, Renew WORK ITEM 27: Deck Plating and Insulation, Renew WORK ITEM 28: Vent Ducts, All, Commercial Cleaning WORK ITEM 29: Oily Water Separator, Install iii (Rev-1)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

20 October 2022

1 25 Removed Work Item 25 of the Rev 0 specification (Main Reduction Gear Gasket, Renew) from the Rev 1 specification.

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-1)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Bill of Materials 627 WMEC 011, Rev C, 3rd Dk, 2nd Dk, Main Dk, 02 Dk, 01 Dk & Bridge Dk Pltg & Supports

Coast Guard Bill of Materials 627 WMEC 097, Rev G, Arrangement Aviation Fuel System

Coast Guard Bill of Materials 627 WMEC 127, Rev C, Arrangement Hot & Cold Sys Inside Mach’y Space

Coast Guard Bill of Materials 627 WMEC 73, Rev C, Arrangement Hot & Cold Sys Outside Machinery Space

Coast Guard Bill of Materials 627 WMEC 88, Rev F, Arr. Of Plumbing Sys & Deck Drains

Coast Guard Drawing 618 WMEC 314-001, Rev J, Helo 400 Hz & 28.5 VDC Replacement Diagram

Coast Guard Drawing 618 WMEC 320-060, Rev -, OWS Booster Pump and Cooling Fan Install

Coast Guard Drawing 618 WMEC 430-050, Rev -, I.C. Distribution Panel

Coast Guard Drawing 627 561-053, Rev -, 4” Opposed Ram Power Unit with Adjustable Links for Tiller Connection

Coast Guard Drawing 627 WMEC 085-301, Rev D, Booklet of General Plans

Coast Guard Drawing 627 WMEC 136-001, Rev G, 01, 02 & Bridge Deck Plating & Supports.

Coast Guard Drawing 627 WMEC 186-002, Rev C, Talon Grid Fdn & Structural Mod 01 Level

Coast Guard Drawing 627 WMEC 201-001, Rev C, Arrangement of Machinery Plans, Sections & Elevations

Coast Guard Drawing 627 WMEC 241-005, Rev A, Lufkin HSQ2724 Marine Gear View Cross Section

Coast Guard Drawing 627 WMEC 241-007, Rev -, Lufkin HSQ2724 Marine Gear Plan Installation, Starboard Unit

Coast Guard Drawing 627 WMEC 252-001, Rev G, Control Air Piping Arrangement

Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping

Coast Guard Drawing 627 WMEC 437-002, Rev B, Wind speed & Direction Ind Sys Elem Wrg Diag IC Ckt “HD & HE”

Coast Guard Drawing 627 WMEC 437-003, Rev A, Wind Spd & Dir Ind Sys Ckt “HD & HE” Block and Elem Wrg Diag

Coast Guard Drawing 627 WMEC 512-006, Rev D, Ventilation Diagram Second Deck

Coast Guard Drawing 627 WMEC 512-007, Rev D, Ventilation Diagram Main Deck

Coast Guard Drawing 627 WMEC 512-008, Rev D, Ventilation Diagram 01 Dk & Abv v (Rev-1)

Coast Guard Drawing 627 WMEC 512-019, Rev A, Ventilation ModsIncid to DC Shop and Steering Gr Rm

Coast Guard Drawing 627 WMEC 512-020, Rev -, Arrgt Vent & Air Cond 02 & Bridge Dk

Coast Guard Drawing 627 WMEC 512-021, Rev -, Arrgt Vent & Air Cond 01 Deck

Coast Guard Drawing 627 WMEC 512-026, Rev -, Arrangement Ventilation & Air Conditioning Main Deck

Coast Guard Drawing 627 WMEC 512-029, Rev -, Arrangement Ventilation & Air Conditioning Second Deck

Coast Guard Drawing 627 WMEC 512-030, Rev -, Arrangement Ventilation & Air Conditioning Third Deck

Coast Guard Drawing 627 WMEC 514-001, Rev D, Diagram: Heating and Chilled Water System

Coast Guard Drawing 627 WMEC 514-002, Rev C, Arrangement of Chilled and Hot Water System Inside Machinery Space

Coast Guard Drawing 627 WMEC 514-003, Rev D, Arrangement of Chilled and Hot Water System Outside Machinery Space

Coast Guard Drawing 627 WMEC 514-004, Rev C, Heating, Ventilation & Air Cond Control, Block & Schematic Wrg Diagrams

Coast Guard Drawing 627 WMEC 528-001, Rev H, Arr. Of Plumbing Sys & Deck Drains

Coast Guard Drawing 627 WMEC 528-002, Rev E, Diagram Of Plumbing System & Deck Drains

Coast Guard Drawing 627 WMEC 529-012, Rev A, Piping Mods GEA Westfalia OWS Install

Coast Guard Drawing 627 WMEC 533-001, Rev K, Diagram Hot & Cold Potable Water System

Coast Guard Drawing 627 WMEC 536-001, Rev C, Diagram Sea Water Piping for Mn Engs, Aux & Emergency Gens. & A.C. Condensers

Coast Guard Drawing 627 WMEC 536-003, Rev D, Diagram – F.W. for Machinery Cooling

Coast Guard Drawing 627 WMEC 536-053, Rev A, Heat Exchanger

Coast Guard Drawing 627 WMEC 542-001, Rev E, Diagram Aviation Fuel System

Coast Guard Drawing 627 WMEC 542-002, Rev E, Arrangement of Aviation Fuel System

Coast Guard Drawing 627 WMEC 551-002, Rev D, Arrangement of Compressed Air in Machinery Space

Coast Guard Drawing 627 WMEC 561-004, Rev B, Hydraulic Steering System Piping Arrangement

Coast Guard Drawing 627 WMEC 561-059, Rev -, Steering Arrangement 210 FT USCG Cutter

Coast Guard Drawing 627 WMEC 583-007, Rev D, D5700CT SPD/RHI Arrangement and Details, Port Side

Coast Guard Drawing 627 WMEC 583-008, Rev C, Installation Arrangement of Allied SPD D5700 with Constant Tension Winch

Coast Guard Drawing 627 WMEC 593-001, Rev B, Diagram - MSD System

Coast Guard Drawing 627 WMEC 593-002, Rev D, Arrg’t MSD System

Coast Guard Drawing 627 WMEC 601-004, Rev D, General Arrangement – Main & 01 Deck

Coast Guard Drawing 627 WMEC 613-001, Rev B, Main Mast Rigging, Arrg’t & Dets.

Coast Guard Drawing 627 WMEC 635-002, Rev B, Sheathing & Insulation

Coast Guard Drawing 627 WMEC 635-002, Rev B, Sheathing And Insulation

Coast Guard Drawing 627 WMEC 637-001, Rev C, Ceiling Layout Main and 01 Deck

Coast Guard Drawing 627 WMEC 800-002, Rev A, Strg Sys Hyd Mchry & Ppg Installations

Coast Guard Drawing 627 WMEC 85-301, Rev D, Booklet of General Plans vi (Rev-1)

Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl

Coast Guard Drawing FL-8201-96, Rev B, Standard Lifting Rig for Allied D5700-CT Davit

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details

NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 2754, SWBS 583, August 2013, Hydraulic Power Unit (HPU)

Coast Guard Technical Publication (TP) 3234A, Dec 2012, Distribution Switchboard

Coast Guard Technical Publication (TP) 3239A, SWBS 542, Section E, Feb 2020, JP-5 Flow Meter

Coast Guard Technical Publication (TP) 3240B, SWBS 583, May 2010, Hydraulic Power Unit – Motor Controller

Coast Guard Technical Publication (TP) 3241A, SWBS 593, June 2011, Vacuum Sewage System

Coast Guard Technical Publication (TP) 3368, Jun 2020, Talon Helicopter Landing Grid - Type 18-22-01 Multiple Class Cutters

Coast Guard Technical Publication (TP) 3485C, SWBS 583, Sept 2013, Single Point Boat Model

D5700CT

Coast Guard Technical Publication (TP) 3965, Apr 2020, Air Conditioning System, R-134A – Model

90RMC025-D-6-D005/MS1

Coast Guard Technical Publication (TP) 4034, Aug 2018, SWBS 561, Electro-Hydraulic Steering System & Alarm System Upgrade

Coast Guard Technical Publication (TP) 4200, May 2015, SWBS 561, Manufacturer's Instruction Book, 210' WMEC Electro-Hydraulic Steering System

Coast Guard Technical Publication (TP) 4649, SWBS 233, Section A, Apr 2018, Main Propulsion Plant (210’ WMEC “B” Class Only)

Coast Guard Technical Publication (TP) 4931, Aug 2009, Section 321A, Precision Frequency Converters

Coast Guard Technical Publication (TP) 5461, SWBS 421, Nov 2012, Anemometer – Model 120 & 122

Coast Guard Technical Publication (TP) 7099, SWBS 314, Oct 2009, Rectifier Power Supply - 28 VDC, 300 A

Coast Guard Technical Publication (TP) 9142, Nov 2016, Meter – Model M-5-2 Direct Drive

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2020, General Requirements for Drawing Preparation

Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2020, Overhaul AC Electrical Motors

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2020, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2020, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation vii (Rev-1)

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems

Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2020, Temporary Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities

American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services

American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End

ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component Adhesives (AN)

ASTM International (ASTM) F1387, 2012, Standard Specification for Performance of Piping and Tubing Mechanically Attached Fittings

ASTM International (ASTM) F683, 2010, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery

Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment

Commercial Item Description (CID) A-A-59588, July 2018, Rubber Silicone

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation

MIL-G-21164, Jul 2019, Grease, Molybdenum Disulfide, for Low and High Temperatures, NATO Code Number G-353

MIL-PRF-16173, 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-PRF-17672E, Oct 2010, Hydraulic Fluid, Petroleum, Inhibited

MIL-PRF-24667C, March 2018, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application

MIL-STD-1399 Section 300, Part 1, 25 September 2018, Low Voltage Electric Power, Alternating Current viii (Rev-1)

MIL-STD-419 E, Aug 2017, Cleaning, Protecting, and Testing Piping, Tubing, and Fittings for Hydraulic Power Transmission Equipment

NAVAIR SI-ACS-AFB-1P, 01 July 2020, Air Capable Ship Aviation Facilities Bulletin No. 1P

Naval Air Warfare Center (NAVAIR) Drawing 626348, Rev C, Visual Landing Aids Installation WMEC- 210 Class Ships

NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP-1), 2015, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 3, (SSPC-SP-3), 2018, Power Tool Cleaning ix (Rev-1)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

1 N MDE JW Seal Kit NSN: 2930-01-602-8570 P/N:

10-1AEW SEAL

2 ea 1,250.00

5 N Gasket, Shell, Inner NSN: 5330-01-478-5220 2 ea 27.00 5 N O-ring, Shell, Outer

End NSN: 5331-01-478-5310 4 ea 19.00

5 N Gasket, Shell, Outer NSN: 5330-01-478-5215 4 ea 29.00 8 Y Anemometer NSN: 6600-00-709-9947 2 ea. 5,316.00 9 N **JP-5 Flow meter, Meter NSN: 6680-01-658-6663 1 ea. 3,800.00

9 N ** Counter Rotating, Register

NSN: 6680-01-439-2365 1 ea. 388.00

14 N Packing, ram, preformed

NSN: 5330-00-599-2657 10 ea. 332.56

14 N Valve, counterbalance, 1000-4000 psi, 30 gpm, 25 psi check

NSN: 4810-01-353-0586 4 ea. 67.33

14 N Valve, safety relief NSN: 4820-01-241-5464 PN:

CS06F50

2 ea. 466.33

14 N Valve, check, 25 psi, 32 gpm

NSN: 4820-01-627-7022 4 ea. 58.64

14 N **Float switch, liquid level

NSN: 6680-01-673-5099 2 ea. 425.00

14 N **Valve, safety relief NSN: 4820-01-571-9823 PN:

RAH101S30

2 ea. 41.70

14 N **Coupling half, shaft NSN: 3010-01-675-1842 PN:

RC2-0625-156

2 ea. 25.30

14 N **Coupling half, shaft NSN: 3010-01-674-9183 PN:

RC2-1375-312

2 ea. 25.30

14 N **Insert, flexible coupling, pump to motor

NSN: 3010-01-674-8153 2 ea. 11.70

14 N **Pump, rotary Honor series 2D, CW

NSN: 4320-01-673-6806 2 ea. 536.00

16 Y Single Point Davit Assembly, Allied

D5700CT

NSN: 2030-01-476-6301 1 ea. 104,887.55

16 Y **Davit control console

PN: 60576 NSN: 2030-01-

612-7381

1 ea. 44,000.00

17 N Screw, Cap, 5/8-11 UNC 2A x 3in.

NSN: 5305-01-393-1827 24 ea. 25.65

17 N Screw, Cap, M12-1.75 x 42 mm

NSN: 5305-01-584-6095 12 ea. 33.75 x (Rev-1)

17 N **Talon Grid Stanchion Bolt

Assembly, Including Locking Nut

NSN: 5340-01-481-3786 60 ea. 31.50

18 N Sewage Discharge Pump

NSN: 4320-01-273-9350 2 ea. $4,719.00

18 N Sewage Vacuum Transfer Pump

NSN: 4320-01-519-3163 2 ea. $4,719.00

29 N ***Booster Pump Control Panel

NSN: 6110-01-F20-6126

PN: BCP11-0.5-D-L1-E2-

POL-PRL-DSP

1 ea. 2,300.00

29 N ***Thermal Transfer System

NSN: 4420-01-F21-6424

PN: AOC-08-41-1PH

1ea. 500.00

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-1)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4 (Inspection report particulars)):

Work Item

Title

1 Seawater Heat Exchangers, Clean Inspect And Hydro

5 Lube Oil Heat Exchangers, Clean Inspect And Hydro

16 Single Point Davit, Renew

17 Helo Talon Grids, Inspect and Test xii (Rev-1)

PRINCIPAL CHARACTERISTICS

210' WMEC (B-CLASS)

PHYSICAL

Length overall 210' 6" Length between perpendiculars 200' 0" Beam molded 34' 0" Depth molded, main deck amidships 19' 6" Full load displacement 1,170 long tons Draft, full load to baseline amidships *Baseline is 9” below keel amidships

12' 0"

Design drag between perpendiculars 1' 6" Highest projection above baseline *VHF-FM ADF antenna

90' 0"

Shore tie voltage requirements 400A / 440V Frame spacing 1' 0"

MACHINERY

Main propulsion 2 ALCO Model 16-251-B Diesel Engines, 5,000 BHP total

Ship's service generators 2 Caterpillar Model 3406B Diesel-driven SR4, 250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle

Emergency generator Caterpillar Model 3306B Diesel-driven SR4, 180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle

Number of propellers 2 Propeller diameter 7' 6" Number of blades, each 4 Pitch Controllable Shaft RPM 300 Shaft diameter 8.25" at exit of hull Anchor & chain Two 2,800 lb Navy Stockless Anchors, 7 shots of chain each

TANK CAPACITIES

Diesel fuel total (95%) 48,427 gal.

Fresh water total (100%) 11,693 gal.

JP-5 fuel total (95%) 4,683 gal.

Lube oil total (95%) 2,390 gal.

1 (Rev-1)

00000_0522_FLT

REC_00000_FLT_Commercial Project @ CG Facility (0121)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures

OTHER REFERENCES

Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

3. REQUIREMENTS

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under

2 (Rev-1) the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.

3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.

3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.

Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:

ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.

ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.

3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.

For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).

3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;

for each additional 1000 square feet, perform an additional area measurement. A “measurements” for coating thickness is defined as follows:

SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.

SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5 inch diameter circle defining the spot.

3 (Rev-1)

3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B- Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY- 130.

3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.

3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B- Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 are considered the same as those for welding HY-130.

3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Conditionally Exempt Small Quantity Generator (CESQG).

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

4 (Rev-1)

Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.

3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;

ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor must be aware of the following:

3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).

5 (Rev-1)

3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2020 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 8636. Add missing paragraphs between 3.2 and 3.5 of Std Spec 8636 as follows:

“3.3 Access cut boundaries. The Contractor shall ensure that access cuts comply with the requirements and restrictions detailed in the following and in SFLC Std Spec 0740, and referenced codes.

3.3.1 Location of boundaries. Boundaries of access cuts and closure plates shall, in general, be located between principal ship framing, bulkheads, and other structural members and shall be at least three inches from any of these members or from the toes of other welds. A reduction in this three inch minimum may be approved by the KO on a case by case basis provided sufficient clearance is maintained for welding and inspection requirements. The boundaries of access cuts and closure plates should land on existing butts or seams, wherever practicable. The boundaries of prior access cuts should be utilized wherever possible. Boundaries may extend across one or more frames as required for the size of the opening.

3.3.2 Access hole dimensions and arrangements. Holes or access cuts shall be the minimum size necessary and shall be in accordance with the following:

Rectangular access cuts and closure plates welded into primary hull structure shall be at least 12 inches wide in the lesser dimension.

For circular access cuts, the minimum diameter shall be 4T, where T = thickness of the involved structural member, but not less than three inches.

Circular closure plates for access cuts less than two feet in diameter shall be dished 1/16 to 1/8 inch to allow for shrinkage when welded.

Corners of rectangular access cuts and closure plates shall have a minimum radius of 6 inches except when a boundary lands on an existing hull longitudinal seam or transverse butt weld.

Corners at an existing seam or butt shall intersect at a 90 degree angle.

Cuts that are to cross existing butts or seams shall do so at an angle of 90 degrees plus or minus 15 degrees.

In primary hull structure, existing welds forming the boundary of a cut shall be cut back 3 inches beyond the toe of the access cut, except that the cut back shall not intersect or cross an existing weld, frame, or structural member. In which case, the cut back may be reduced to a minimum of two inches in length.

Existing welds crossed by the cut shall not be cut back.

3.3.3 Primary hull structure. Primary Hull Structure includes the shell, main strength decks, principal longitudinal bulkheads, vertical keel, deep web girders and stiffeners designed to withstand the ship bending stress.

3.3.4 Mechanically fastened joints. Welding closer than six inches to a mechanically fastened joint should be avoided. When access cuts cross or come within six inches of a mechanically fastened joint, the fasteners shall be checked for tightness and if necessary, 6 (Rev-1) loose fasteners shall be seal welded or removed, and replaced for a distance of 6 inches beyond the edge of the cut. When a cut crosses a mechanically fastened seam the cut plates shall be repaired using single V welds backed with glass tape (MIL-C-20079) to prevent fusion between the mechanically fastened plates.

3.4 Ship integrity maintenance. The Contractor shall maintain safety and ship integrity by installing temporary guarding and coaming, in addition to weathertight and watertight closures. Remove these temporary fabrications after closing the hull access, and grind surfaces flush in way of removals. For shell plating cuts made at or below the waterline where temporary closures are impractical, the Contractor shall secure each vulnerable compartment and subdivision to minimize potential damage to the extent permitted by the scope and urgency of the work.

3.4.1 Guarding. Install temporary guards in accordance with 29 CFR 1915.73.

3.4.2 Coaming. Ensure that in areas where flammable liquids may be stored, a 4 inch high metal coaming shall be installed on the surface of the deck with tack welds and fully sealed with caulking compound. The coaming shall encircle the access cut in the deck.

3.4.3 Weathertight and contamination closures. Fabricate temporary closures, using fire retardant material, before cutting access openings and install closures whenever access is not in use. Closures shall be:

Constructed to protect the access from inclement weather and entry of contaminants (shall include a coaming or dam on the deck to redirect rain runoff away from the opening).

Fitted with fasteners that permit rapid installation and removal.

Able to support a minimum of 150 pounds per square foot for horizontal deck closures.

Where the access opening is in way of a removed hatch, scuttle or door, the closure shall be configured to allow normal passage of ship’s personnel and equipment.

3.4.4 Watertight closures. Ensure that access openings created four feet or less above the maximum anticipated waterline shall include temporary watertight closures when the vessel is waterborne.

NOTE

NAVSEA S0600-AA-PRO-160/CH16 provides requirements for design, fabrication, and installation of temporary watertight closures.”

3.7.2 SFLC Standard Specification 0000. Replace paragraph 3.3.4 Vessel access, as follows:

"3.3.4 Vessel access. During work at the Contractor’s facility, provide access and/or egress to and from the vessel in accordance with 29 CFR 1915.74, Subpart E. Provide a minimum of two gangways that have the following:

Adequate walking surface width and strength and be safely secured.

A railing, with a mid-rail, on each side of the gangway, and a turn table if necessary.

Substantial steps properly secured and equipped with at least one handrail, 7 (Rev-1) when the upper end of the gangway rests on or is flush with the top of the bulwark of the dock.

Nets or other suitable protection on both sides, when there is a danger of personnel falling between the ship and the dock. Nets and other suitable protection must extend beyond the projected area of the access and egress points so as to catch a personnel that may be falling outward: i.e., the nets must be wider than the gangway.

Proper trimming at all times.

Adequate illumination for their full length.

Separated by one-fourth the length of the vessel, at a minimum, as to mitigate the possibility that an incident could block both means of escape."

3.7.3 SFLC Standard Specification 8635. Replace and add paragraphs as follows, "3.3.10.4.1 Contractor-furnished supporting equipment. Provide all hoses and fittings needed to supply water to the system. Provide pressure gauges at the connection(s) to the ship and the furthest firehose station to allow personnel to clearly read the gage-face to demonstrate or record the required water pressure is available at all energized portions of the system."

"3.2.3 Shipboard access/egress and routing of temporary services. Maintain a primary and secondary means of access/egress for each vessel, where practicable.

Pre-plan for the installation of temporary services to minimize the total number of service leads penetrating the hull by maximizing the use of backbones and/or manifolds for industrial services. Pre-planning for the installation of temporary services shall include removal (first in, last out, when no longer required). Pay special attention to transitional spaces (cross passages, top and bottom of stairwells) where services could potentially fall and restrict emergency personnel egress and/or casualty responder access."

"3.2.3.2 Materials used for suspending temporary services. Temporary services shall be suspended at regular intervals, to prevent impeding personnel access/egress and emergency response, using a high temperature line that meets the noncombustibility test requirements contained in reference (e). When using steel wire rope, or other potentially abrasive material, an anti-chafing material shall be used to prevent damage of the temporary service line. When available, temporary service lines may be run through the ship’s structural elements (i.e., cable ways, light stanchions, etc.). When the routing of temporary services overhead is not practicable, temporary services, rigging of hoses, welding leads, and temporary lights shall be clear of the decks on temporary “trees” or brackets and be arranged to minimize tripping and other hazards."

"3.2.3.5 Quick Disconnect Fittings. QDFs shall be located within 10 feet of designated vertical and horizontal fire zone boundaries. When practicable, QDFs shall be installed within 10 feet of hull penetrations used for personnel access, to facilitate the deployment of smoke control curtains. QDFs must be capable of being disconnected safely on pressurized or energized systems unless approved for use as described in paragraph 3.2.3.7. Pressurized and disconnected QDFs must prevent wetting of energized equipment. For hull openings used for services

8 (Rev-1) only, QDFs are not required, provided the opening is fitted with an air and smoke control “sock” that remains in place around the services. Air and smoke control curtains are not intended to provide an air tight seal of the hull opening. Rather, the curtains or socks, are to ensure that emergency responders can control the flow of air and smoke through the opening to allow for de-smoking of compartments, and minimize “chimney” effects. Curtains shall be made of fire resistant fabric meeting the requirements of NFPA 701."

"3.2.3.7 Service lines crossing fire zone boundaries. When service lines transit a fire zone boundary which cannot be safely disconnected locally (e.g., high voltage cables), the COR shall approve, in advance, the method to safely secure and remove the service."

3.7.4 SFLC Standard Specification 6310.

3.7.4.1 On page 2, replace REFERENCE “MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application” with “MIL-PRF-24667D, FEB 2021, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application”

3.7.4.2 On page 9, replace the NOTE under paragraph 3.1.8.5 as follows:

NOTE

De-ionized water may be used in cases where available fresh water has excessive chloride/chlorine content. Submit a CFR prior to using de-ionized water.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

9 (Rev-1)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME

10 (Rev-1)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

VESSEL NAME HULL #

WORK ITEM

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

11 (Rev-1)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

VESSEL NAME HULL # WORK ITEM

LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS

PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS

DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /

TIME

12 (Rev-1)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

VESSEL NAME HULL # WORK ITEM

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA

RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO

SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):

Mean Reading (mils)

13 (Rev-1)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE…