QUESTIONS_RESPONSES_2.pdf
PDF 107 KB Posted
- Attached to
- DOCKSIDE (DS): USCGC ALERT DS Federal contract opportunity
- Solicitation number
- 70Z080-22-Q-MEC-ALERTDS
About this file
This document contains questions and responses related to a forthcoming contract for dockside services on the USCGC ALERT. Pier power, water, and sewage discharge will not be available to the contractor, who must provide their own generator, toilet, and shower trailer units. The contractor questions clarify space availability on the pier and flushing procedures for piping systems. The related federal contract opportunity is for dockside services on the USCGC ALERT from February 4th to March 31st, 2023. The solicitation was issued by the Department of Homeland Security's United States Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0005 Page 1.pdf | ||
| A0005 Page 2.pdf | ||
| Amendment 0004 Page 1.pdf | ||
| A0004 Page 2.pdf | ||
| A0003.pdf | ||
| Specification_REV1.pdf | ||
| UPDATED Schedule of Services.xls | XLS spreadsheet | |
| Amendment 002_CGC ALERT_.pdf | ||
| A0001 Questions_Answers.pdf | ||
| Amendment 0001_CGC ALERT_.pdf | ||
| ALERT_Schedule_of_Services.xls | XLS spreadsheet | |
| ALERT_Statement_of_work.pdf | ||
| Solicitation USCGC_ALERT_ 9.29.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION: QA: Is there ample room on the pier for Toilet/Shower Trailers?
QB; Is there power available on the pier to power the Toilet/Shower Trailers?
QC; Can the Toilet/Shower Trailers be hooked up to the Cutter’s Pier Side Discharge?
RESPONSE:
QA: There is ample room on the pier for Toilet/Shower Trailers.
QB: Unit POC recalls that in previous projects Toilet/ Shower Trailers were powered via contractor rented generator.
QC: Toilet/Shower Trailers cannot be hooked up to the cutter’s pier side discharge.
QUESTION: QA; Neither the Drawings or the Tech Pub identify the Type or Thickness of the new Gasket, can CG provide that information?
Following the submittal of contractor’s Question No. 15, this question is no longer applicable or required.
QUESTION: QA; Will Pier Power and Water be available to the Contractor?
Pier power and water will not be available to the contractor.
QUESTION: This paragraph directs Contractor to...."Flush all chill/hot water piping with a system manufacturer recommended flushing fluid..."
Please provide manufacturers or the USCG's recommended flushing fluid.
RESPONSE: “fresh water is the recommended flushing fluid”.